Isle of Wight gasification facility

Coordinates:50°42′18″N1°20′06″W / 50.705°N 1.335°W /50.705; -1.335
From Wikipedia, the free encyclopedia

50°42′18″N1°20′06″W / 50.705°N 1.335°W /50.705; -1.335TheIsle of Wight gasification facility is amunicipal waste treatment plant inNewport,Isle of Wight.[1] It entered the commissioning phase in autumn 2008,[2] and was replaced by a moving grate incinerator in 2019.[3]

The facility has been funded as part ofDefra'sNew Technologies Demonstrator Programme and is one of the first and only facilities in theUnited Kingdom to be classed as a gasification system employed for the combustion ofrefuse derived fuel originating from municipal waste. The plant is operated by Waste Gas Technology UK Ltd, part of theENER·G group, and utilises the Energos technology; Energos is also part of the ENER·G group. The Energos system wasretrofitted into a small conventional incinerator plant[4] and combust an estimated 30,000 tonnes of refuse-derived fuel per year. Originally estimated at £8 million,[5] the retrofit cost £10 million to commission, £2.7 million of which was funded byDEFRA.

Temporary suspension of operation, 2010

[edit]

Due to increased dioxin emission levels detected in March 2010 exceeding 8 times the legal limit,[6] operation was temporarily suspended spring 2010. Theflue gas cleaning system of the old incinerator was reused in the retrofit, and ENER·G reported this system to be the cause of the problem.[7] Following modifications and several startup attempts, it has been operating again since October 2010.[8]

In June 2011, the Isle of Wight council decided to make radical efforts to lessen its dependence on the gasification facility with reference to its history of limited reliability.[9]

Permanent closure 2017

[edit]

The facility was permanently closed in 2017 after repeated breakdowns and breached emissions levels, and replaced by a conventional grate-fired waste-to-energy facility.[10][3]

Energos technology

[edit]

The Energos system includes a close coupled combustion stage which, as configured, uses all thesyngas in the combustion stage. It is thus not able to produce syngas for external use and therefore sometimes categorized as two-stage combustion. The process enables improved control of the combustion to minimise the formation of combustion related emissions such asoxides of nitrogen (NOx), Carbon Monoxide (CO) and Total Organic Carbons (TOC). Operating plants achieve average annual NOx emissions of 25 – 30% of the EU limit using just process control and without the need for eitherSelective Non Catalytic Reduction (SNCR) orSelective Catalytic Reduction (SCR), whilst at the same time achieving very low CO and TOC emissions.[citation needed]

The energy in the combustion is converted into steam. Energos plants produce steam at lower temperature and pressure than modernwaste incinerators, and thus achieve low energy-efficiencies compared to incinerators. As aCHP or heat delivery plant, the cycle efficiency is approaching 85%. One such example is the recently constructed Sarpsborg 2 plant, which provides process steam to the Borregaard Chemical Plant, directly displacing heavy fuel oil.[citation needed]

The Isle of Wight plant was intended to debut a new furnace design for the Energos process aimed at increasedcombustion efficiency, dust removal and enabling less interruptions and downtime than the earlier design.[11]

See also

[edit]

References

[edit]
  1. ^"Construction start for Isle of Wight incineration plant".www.letsrecycle.com. 18 September 2007. Archived fromthe original on 13 February 2010.
  2. ^"Island Gasification Plant Powers Up".Island Pulse. 12 November 2008. Archived fromthe original on 15 December 2009.
  3. ^ab"Isle of Wight drops gasification for moving bed facility".Letsrecycle. 31 May 2017.
  4. ^"Green Lane Eco Park Community Meeting 25 January 2010"(PDF). Archived fromthe original(PDF) on 11 July 2011. Retrieved22 June 2010.
  5. ^"Island to open gasification plant".BBC News. 16 May 2007. Retrieved14 October 2009.
  6. ^"Energos Isle of Wight Plant Fails Dioxin and Furan Emissions Tests". Archived fromthe original on 26 July 2011.
  7. ^"Energy Plant Suspends Waste Processing".Island Pulse. 31 May 2010. Archived fromthe original on 9 June 2010.
  8. ^Sloley, Chris (1 April 2011)."Isle of Wight gasification plant achieves compliance".letsrecycle.com.
  9. ^Sloley, Chris (22 June 2011)."Isle of Wight seeks to reduce use of 'unreliable' gasifier".letsrecycle.com.
  10. ^"End of the line for gasification plant".Isle of Wight County Press. 17 June 2017.
  11. ^Gibson, Lisa (August 2009)."MSW Spells Self-Sufficiency for Isle of Wight Residents".Biomass Magazine.
Power stations
Biomass
Active
Closed
Coal
Closed
Gas
Active
Closed
Geothermal
Active
Incinerators/Waste
Active
Nuclear
Closed
Refused/cancelled
Oil
Closed
Solar
Active
Wind
Active
Refused/cancelled
Hydro
Active
Organisations
Incineration in the United Kingdom
Operational
Under construction
  • Cornwall Energy Recovery Centre
  • Devonport Dockyard Incinerator
  • Milton Keynes Waste Recovery Park
Decommissioned
  • Bellozanne Incinerator
  • Byker Incinerator
  • Gateshead Incinerator
  • Polmadie Incinerator
  • Portrack Incinerator
  • South Shields Incinerator
  • Sunderland Incinerator
  • Tynemouth Incinerator
Retrieved from "https://en.wikipedia.org/w/index.php?title=Isle_of_Wight_gasification_facility&oldid=1311454022"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp