Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Interstate 565

Route map:
From Wikipedia, the free encyclopedia
Interstate Highway in Alabama
This article is about the Interstate highway in Alabama. For the Interstate highway in Kentucky formerly proposed as Interstate 565, seeInterstate 165 (Kentucky).

icon
This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Interstate 565" – news ·newspapers ·books ·scholar ·JSTOR
(March 2025) (Learn how and when to remove this message)
Interstate 565 marker
Interstate 565
Map
I-565 highlighted in red
Route information
Auxiliary route ofI-65
Maintained byALDOT
Length21.688 mi[1] (34.903 km)
Existed1991–present
NHSEntire route
Major junctions
West end
I-65 /US 72 Alt. /SR 20 inDecatur
Major intersections
East end
US 72 /US 72 Alt. in Huntsville
Location
CountryUnited States
StateAlabama
CountiesLimestone,Madison
Highway system
  • Alabama State Highway System
I-459SR 605

Interstate 565 (I-565) is a 22-mile-long (35 km)Interstate spur that connectsI-65 inDecatur withU.S. Route 72 (US 72) inHuntsville in the US state ofAlabama.

I-565 serves the cities of Decatur,Madison, and downtown Huntsville. It also provides a route to theHuntsville International Airport. The Interstate forms a part ofAppalachian Development Highway SystemCorridor V.U.S. Route 72 Alternate (US 72 Alt.) travelsconcurrently with I-565 for its entire length, although it is unsigned.

Route description

[edit]

I-565's connection with the rest of theInterstate Highway System occurs at its western terminus, at aninterchange withI-65. The interchange was extant prior to I-565's construction; it servedState Route 20 (SR 20), which previously extended eastward into Huntsville. (The interchange was rebuilt and improved as part of the I-565 construction.) From the interchange, I-565 takes a brief northerly swing tobypass the town ofMooresville before joining and subsuming the former right-of-way of SR 20 through rural southeasternLimestone County. Progressing eastward, as the western edge of the city ofMadison it diverges slightly to the south of the former SR 20 route, traveling parallel to it a short distance away. (This portion of the old SR 20 route is now named Madison Boulevard.) InGreenbrier, the route junctions with Greenbrier Road at aparclo interchange and County Line Road,[2] which is among the most congested interchanges in the state. Immediately after the junction with County Line Road, the route entersMadison County and immediately junctions with the main thoroughfare forHuntsville International Airport.

Continuing east, I-565 goes through the southern part of Madison, rejoining the former SR 20 route near the Huntsville–Madison city line. Here, I-565 once again subsumes the old route's right-of-way as it travels along the south edge ofCummings Research Park and theUniversity of Alabama in Huntsville campus and the north edge ofRedstone Arsenal. AtGovernors Drive, I-565 takes a slight turn northward away from the old route and continues through an area generally referred to as "West Huntsville". It enters a two-mile-long (3.2 km)elevated highway stretch, mainly because of difficulties while planning through Wall Triana Boulevard. It has an interchange withMemorial Parkway just south ofUniversity Drive, and then, gradually curving toward the northeast, passes north of downtown Huntsville and through a former cotton mill district. At Oakwood Avenue, it subsumes what was once the easternmost 0.5 miles (0.80 km) of Andrew Jackson Way, traveling over Chapman Mountain to its eastern terminus where it joins US 72.

After the completion of I-565, the SR 20 designation was removed from all remaining portions of the former route east of I-65.

History

[edit]
icon
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed.
Find sources: "Interstate 565" – news ·newspapers ·books ·scholar ·JSTOR
(January 2019) (Learn how and when to remove this message)
I-565 passing through the city of Huntsville
I-565 passing by theU.S. Space & Rocket Center

When theInterstate Highway System was first laid out during the mid-1950s, I-65 was routed on a north–southbee line connectingNashville, Tennessee, withBirmingham, Alabama. This route passes just to the east of Decatur, which was a majorriver port on theTennessee River at the time. Huntsville, however, was still a small town about 20 miles (32 km) east of I-65.

During the late 1950s and through the 1960s, Huntsville underwent massive population growth due to the establishment of theUS Army Missile Command atRedstone Arsenal and the newNASAMarshall Space Flight Center. By 1960, Huntsville had grown to be more than twice the size of Decatur. It became clear that an Interstate Highwayspur route would be beneficial to connect Huntsville with I-65 and to the rest of the country.I-565 was chosen as theFederal Highway Administration (FHWA)'s number for this proposed spur expressway. It was decided that, rather than terminating at the western edge of Huntsville, I-565 would extend farther eastward, providing an east–west freeway for Huntsville. On the eastern edge of Huntsville, I-565 was designed to feed into US 72, which was being widened to a four-lane highway traveling from Huntsville toKimball, Tennessee, where it feeds intoI-24.

Construction of I-565 began in 1987, and the freeway was opened on October 26, 1991. By the time construction had begun, Huntsville had become one of the most populous cities in thecontiguous United States without a freeway connection to the Interstate system.[3] Construction was performed in phases.[citation needed]

Phase 1 opened in 1989 and extended from the east side of Mooresville to County Line Road (exit 7, which was originally constructed to serve as a terminus taking traffic between I-565 and SR 20). At the time, traffic from I-65 still had to drive through Mooresville to where the Interstate started while the Mooresville overpasses and bridges over creeks were constructed.[citation needed]

Phase 2 added a bypass through Madison.[citation needed] The Interstate still ended at County Line Road, requiring traffic to take SR 20 through Madison until about Slaughter Road where a temporary entrance/exit merged traffic back onto I-565.[citation needed] The route then traveled along the old Governors Drive path past the Space and Rocket Center until it terminated with two lanes exiting at what is now the Governors Drive exit. This bypass through Madison allowed construction of the bridges over Zeirdt Road and the earthwork to be done near what is now the golf driving range and for construction of the Wall Triana exit and airport exit. The eastern terminus at Governors Drive was to allow for construction of the elevated sections crossing Memorial Parkway and extending over Pratt and Oakwood to the terminus at US 72.[citation needed]

Phase 3 opened the Interstate from County Line Road to the Governors Drive exit. This gave access via the Airport exit and Wall Triana exit.[citation needed]

Phase 4 was completed in 1991–1992, with the completion of the bridges and overpasses near Mooresville and the Interstate was opened directly from I-65, bypassing the city of Mooresville.[citation needed]

Phase 5 opened the "elevated sections" from Governors Drive to the US 72 intersection. At the time, this intersection with US 72 was no longer Interstate and was controlled by a red-light. This also opened the interchange of I-565 and Memorial Parkway.[citation needed]

When I-565 was first opened, it was signed as a north–south highway. This created some confusion because the highway travels roughly east–west. It was resigned soon after opening.[4] In 1996, the entirety of I-565 was designated the "Admiral Alan B. Shepard Highway" in honor of astronautAlan Shepard.[citation needed]

Unlike many urban Interstate Highways, which have a uniform speed limit of 55 mph (89 km/h), I-565 has a speed limit of 70 mph (110 km/h), continuing well into the city. Just west of the interchange with Memorial Parkway, the speed limit decreases to 65 mph (105 km/h) and remains so for the entire portion east.[citation needed]

Huntsville bus accident

[edit]
Main article:2006 Huntsville bus crash

On November 20, 2006, a school bus carrying high school students collided with another vehicle or swerved to avoid a collision and drove off an elevated offramp, falling nose-first approximately 30 feet (9.1 m) to the ground.[5][6] Four teenage girls were killed in the accident.[7]

Recent development

[edit]

Phase 6 was completed in 2010. This slightly extended I-565 from the then red light at US 72 to the east end and converted the connection with US 72 from an at-grade intersection into a full interchange. This kept traffic going over Chapman Mountain from having to stop at the intersection which created morning and afternoon commuter backups. After this intersection, controlled access officially stops, but the highway is still a four-lane highway and does not require a stop until the red light at the bottom of Chapman Mountain at the Moores Mill intersection.[citation needed]

Work began on Phase 7 in December 2013 to upgrade the interchange of I-565 and County Line Road at exit 7, adding exits and onramps to for access to/from the east. The upgrade was budgeted to cost $30 million with the city of Madison funding $1.7 million of the project. The new interchange added ramps providing access for traffic exiting westbound and entering eastbound, so that the interchange now has a full set of ramps. The exit was reopened with new ramps in April 2015.[citation needed]

Construction of an interchange at Dunlap Boulevard is currently underway, with the exit being built along with areas around theToyota Field. The exit is located in between Madison Boulevard and Wall Triana Highway exits. The exit was delayed because of the corona virus spreading and construction was delayed by several months. The exit cost will total somewhere around $20 million–30 million when completed.[citation needed]

Future

[edit]

An extension of I-565 west, from the current terminus at I-65, along the route of SR 20 and US 72 Alt. to its intersection withUS 31 near Decatur, is also planned. In January 2007, politicians in Northwestern Alabama announced that they would launch a campaign to extend I-565 westward toFlorence.[8] I-565 is part of a proposed highway that would connectMemphis, Tennessee, withAtlanta, Georgia, viaRome, Georgia, andChattanooga, Tennessee, as part ofISTEA High Priority Corridor 7.[9]

The Huntsville "5 Year Plan" shows adding additional westbound lane from Maysville Road to Shields Road (cost $9 million in FY2014) and closing the median opening where I-565 terminates into US 72 on Chapman Mountain. This would also include a connector road between Epworth Drive and Maysville Road (cost $5 million FY2014). In addition, "Projects Being Considered" to include additional lanes on I-565 from Wall Triana to County Line Road interchange (cost $60 million) and additional lanes on I-565 from County Line Road interchange to I-65 (cost $60 million).[10] Three interstate message boards will also be added to the route in 2024 (it was originally expected to be put in 2023).[11][12]

Exit list

[edit]
CountyLocationmi[1]kmExit[13][14]DestinationsNotes
LimestoneDecatur0.000.00
SR 20 west (US 72 Alt. west) –Decatur
Western terminus; western end of US 72 Alt. concurrency; eastern terminus of SR 20
DecaturHuntsville
city line
1I-65 –Birmingham,NashvilleSigned as exits 1A (south) and 1B (north) eastbound; I-65 exit 340 northbound & 340A-B southbound
Huntsville1.262.032Mooresville Road
3.475.583Greenbrier RoadWill be reconfigured into apartial cloverleaf interchange[15]
LimestoneMadison
county line
6.38–
7.02
10.27–
11.30
7Madison Boulevard / County Line RoadFormerSR-20 east[13]
Madison7.9812.848Huntsville International Airport[13]
Madison9.1914.799Wall-Triana Highway / Madison Boulevard[13][14]
10.5616.9910Town Madison BoulevardFull interchange opened on March 21, 2025[16]
Huntsville13.0220.9513Madison BoulevardWestbound exit and eastbound entrance; formerSR 20 west; to be rebuilt into a full interchange for improved access to Redstone Arsenal via new Resolute Way roadway
14.3423.0814
SR 255 north (Research Park Boulevard) –Redstone Arsenal Gate 9
Signed as exits 14A (Gate 9) and 14B (SR 255) westbound
15.77–
16.03
25.38–
25.80
15Madison Pike,Sparkman Drive / Bob Wallace AvenueEntrance toU.S. Space and Rocket Center
16.9827.3317A

SR 53 north (Jordan Lane) toUS 72
Signed as exit 17 westbound
17.3327.8917B
SR 53 south (Governors Drive)
Eastbound exit and westbound entrance
19.0230.6119AUS 231 /US 431 (Memorial Parkway /SR 1)Eastbound exit and westbound entrance; signed as exits 19A (south) and 19B (north)
19BUS 231 /US 431 (Memorial Parkway /SR 1) / Pratt Avenue west / Washington Street northWestbound exit and eastbound entrance; eastern terminus of Pratt Avenue; southern terminus of Washington Street
19.38–
19.75
31.19–
31.78
19CWashington Street / Jefferson Street – DowntownSigned as exit 19A westbound
20.6333.2020Oakwood Avenue / Andrew Jackson Way
21.6134.7821
US 72 west (SR 2 west) / Maysville Road –Athens
22.1335.61
US 72 east (SR 2 east) –Scottsboro
Eastern terminus; eastbound exit and westbound entrance; eastern end of US 72 Alt. concurrency; eastern terminus of US 72 Alt.
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

[edit]
  1. ^ab"County Milepost Maps".Alabama Department of Transportation. Archived fromthe original on July 27, 2011. RetrievedJune 28, 2011.
  2. ^staff reports (June 16, 2020)."Exit Changes on I-565: New Greenbrier Ramp to Open; Detour for Eastbound Mooresville Exit".huntsvillebusinessjournal.com. Huntsville Business Journal. RetrievedMarch 24, 2022.
  3. ^"Ranking Tables for Metropolitan Areas: Population in 2000 and Population Change from 1990 to 2000 (PHC-T-3)".United States Census Bureau. RetrievedFebruary 14, 2014. Per Table 1, in 1990, theFresno, California Metropolitan Statistical Area (MSA )had greater population than the Huntsville MSA. Fresno did not have Interstate service in 1990 and still does not as of April 2017. The Huntsville MSA may have been the second-largest, but the complete table has not been analyzed.
  4. ^"Confusing signs to be changed".The Gadsden Times. December 18, 1991.Archived from the original on November 27, 2021. RetrievedDecember 30, 2011.
  5. ^Faulk, Ken (November 21, 2006)."Bus crash kills 3 students".The Birmingham News. Archived fromthe original on September 30, 2007. RetrievedNovember 26, 2006.
  6. ^McCarter, Patricia C. (November 21, 2006)."15 still hospitalized after horrific crash; parents beg for info".The Huntsville Times. Archived fromthe original on September 30, 2007. RetrievedNovember 26, 2006.
  7. ^"Fourth teen dies in Alabama school bus crash".CNN.com. November 21, 2006.Archived from the original on November 28, 2006. RetrievedNovember 26, 2006.
  8. ^Delinski, Bernie (January 21, 2007)."Officials discussing I-565 spur to Shoals".TimesDaily. Archived fromthe original on July 9, 2011. RetrievedJune 28, 2011.
  9. ^"U.S. 72 (Corridor 7)". AARoads. January 31, 2003. Archived fromthe original on May 24, 2015. RetrievedJanuary 1, 2010.[self-published source?]
  10. ^"Huntsville Corridor Improvement Plan – 5 Years"(PDF). Archived fromthe original(PDF) on March 3, 2016. RetrievedMay 4, 2015.
  11. ^Gattis, Paul (August 10, 2021)."I-565 in Huntsville to get major technological upgrade, including message boards".al. RetrievedDecember 29, 2023.
  12. ^Gattis, Paul (April 12, 2023)."Interstate message boards finally coming to I-565 in Huntsville".al. RetrievedDecember 29, 2023.
  13. ^abcdClines, Keith (April 27, 2012)."I-565 exit numbers changed for County Line Road, airport, Wall Triana Highway".The Huntsville Times.Archived from the original on April 30, 2012. RetrievedApril 27, 2012.
  14. ^abClines, Keith (September 18, 2011)."Speed limit sign mix-up on Chapman Mountain to be corrected".The Huntsville Times.Archived from the original on September 27, 2011. RetrievedSeptember 18, 2011.
  15. ^"ALDOT work to begin on improved I-565 interchange near auto plant".WHNT-TV. October 26, 2018.
  16. ^Moessner, Emily (February 21, 2023)."Construction starts on westbound I-565 flyover ramps at Town Madison".WHNT-TV. RetrievedMay 12, 2023.

External links

[edit]
Template:Attached KML/Interstate 565
KML is from Wikidata
  • 1Former
  • 2Unbuilt
  • 3Future
Retrieved from "https://en.wikipedia.org/w/index.php?title=Interstate_565&oldid=1320656410"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp