Human Space Flight Centre

From Wikipedia, the free encyclopedia
Indian human spaceflight agency

Human Space Flight Centre
Map
Agency overview
Formed30 January 2019; 7 years ago (2019-01-30)
JurisdictionDepartment of Space
HeadquartersBengaluru,Karnataka,India
Annual budgetSee thebudget of ISRO
Agency executive
Parent agencyISRO
WebsiteHSFC Website

TheHuman Space Flight Centre (HSFC) is a body underISRO to coordinate theIndian Human Spaceflight Programme. The agency will be responsible for implementation of theGaganyaan project.[1] The first crewed flight is planned for 2024 on a home-grownLVM3 rocket.[2][3][4]

BeforeGaganyaan mission announcement in August 2018, human spaceflight was not the priority for ISRO, though most of the required capability for it had been realised.[5] ISRO has already developed most of the technologies for crewed flight and it performed aCrew Module Atmospheric Re-entry Experiment and aPad Abort Test for the mission.[6] The project will cost less than Rs. 10,000 crore.[7][8] In December 2018, the government approved further 100 billion (US$1.5 billion) for a 7-days crewed flight of 3 astronauts to take place in December 2021,[2][9] later delayed to 2023.[10]

If completed on schedule, India will become world's fourthnation to conduct independent human spaceflight after theSoviet Union/Russia,United States andPeople's Republic of China. As part of an integrated lunar exploration and outer space strategy, the agency plans to continue working on theBharatiya Antariksh Station programme, future crewed lunar landings, and moonbase habitat after completing crewed spaceflights.[11][12]

The Human Space Flight Center's founder isS. Unnikrishnan Nair.[13] The director of Human Space Flight Centre isDinesh Kumar Singh, Distinguished Scientist.

History

[edit]
Prototype flight suit for crewed mission

The trials for crewed space missions began in 2007 with the 600 kgSpace Capsule Recovery Experiment (SRE), launched using thePolar Satellite Launch Vehicle (PSLV) rocket, and safely returned to earth 12 days later.

TheDefence Food Research Laboratory (DFRL) has worked on thespace food for crewed spaceflight and has been conducting trials onG-suit for astronauts as well.[14][15] A prototype 'Advanced Crew Escape Suit' weighing 13 kg was built by Sure Safety (India) Limited based on ISRO's requirements has been tested and performance verified.[16][17][18][19]

On 28 December 2018, the Indian Union cabinet approved the funding for Indian Space Research Organisation's (ISRO's) human spaceflight programme, under which a three-member crew will be sent to space for seven days and is expected to cost Rs 9,023 crore. The testing phase is expected to begin from 2022[20] and the mission will be undertaken by 2023.[21][10]

Spacecraft development

[edit]
Main article:Gaganyaan
Development schedule of Gaganyaan[20][22][10]
Flight typeProposed month & yearCrew
Test Flight 1June 2022None
Test Flight 22023None
Crewed20233
Michael Clark talks about India's Human Spaceflight Programme and the rockets that will enable them.

The first phase of this programme is to develop and fly the 3.7-ton spaceship calledGaganyaan that will carry a 3-member crew to low Earth orbit and safely return to Earth after a mission duration of a few orbits to two days. The first uncrewed launch is planned for 2022.[20] The extendable version of the spaceship will allow flights up to seven days, rendezvous and docking capability.

Enhancements in spacecraft will lead to development of a space habitat allowing spaceflight duration of 30–40 days at once in next phase. Further advances from experience will subsequently lead to development of aspace station.[23]

On 7 October 2016, Vikram Sarabhai Space Centre Director K. Sivan stated that ISRO was gearing up to conduct a critical 'crew bailout test' calledISRO Pad Abort Test to see how fast and effectively the crew module could be released safely in the event of an emergency. The tests were conducted successfully on 5 July 2018 at Satish Dhawan Space Centre, Sriharikota. This was the first test in a series of tests to qualify a crew escape system technology.[24][6]

India will not use any animals for life support systems testing but robots resembling humans will be used.[25][26] ISRO is targeting more than 99.8% reliability for its crew escape system.[27]

As of August 2018, ISRO plans to launch its crewed orbiterGaganyaan atop aLVM3 rocket.[2][3][7][8] About 16 minutes after lift-off, the rocket will inject the orbital vehicle into an orbit 300 to 400 km above Earth. The capsule would return for asplashdown in theArabian Sea near theGujarat coastline.[28] As of May 2019, design of crew module has been completed.[29] The spacecraft will be flown twice uncrewed for validation before conducting actual human spaceflight.[22]

Infrastructure development

[edit]

Human-Rating of LVM3

[edit]

Human-rating rates the system is capable of safely transporting humans. ISRO will be building and launching 2 missions to validate the human rating ofLVM3.[30] Existing launch facilities will be upgraded to enable them to carry out launches under Indian Human Spaceflight campaign.[31][32]

Escape System

[edit]

The escape system will boast of a recently included geometry. Work on parachute enlargement and new architecture are also going on.[30][33]

Astronaut training

[edit]

Training for Gaganyaan programme

[edit]

ISRO Chairman, K. Sivan, announced in January 2019 the creation of India's Human Space Flight Centre in Bangalore for training astronauts, also called vyomanauts (vyoma means 'Space' or 'Sky' in Sanskrit).[34] The1,000 crore (US$118.3 million) centre will train the selected astronauts in rescue and recovery operations, operate in zero gravity environment, and monitoring of the radiation environment.

In spring 2009 a full-scale mock-up of the crew capsule was built and delivered to Satish Dhawan Space Centre for training of astronauts. India will be short listing 200Indian Air Force pilots for this purpose. The selection process would begin by the candidates having to complete an ISRO questionnaire, after which they would be subjected to physical and psychological analyses. Only 4 of the 200 applicants will be selected for the first space mission training. While two will fly, two shall act as reserve.[35][36]

ISRO signed amemorandum of understanding in 2009 with theIndian Air Force's Institute of Aerospace Medicine (IAM) to conduct preliminary research on psychological and physiological needs of crew and development of training facilities.[37][38] ISRO is also discussing an agreement with Russia regarding some aspects of astronaut training.[39][40]

As of January 2020, 4 crews have been selected for the mission with astronaut training scheduled to begin in third week of January.

NASA administratorBill Nelson visited India in November 2023 and said he was ready to back the country's goal of constructing a commercial space station by 2040, provided that India asked for NASA's assistance. By combining the knowledge and experience of the two nations, this possible collaboration might promote innovation and increase human presence in space between the two parties ofArtemis Accords.[41][42] He stated that during a prior state visit, there was discussion about the Indian proposal to send an astronaut to theInternational Space Station (ISS).[43][44]

Astronaut Training Facility

[edit]

An astronaut training facility will be established on proposed site of 140 acres (0.57 km2) nearbyKempegowda International Airport inDevanahalli, Karnataka.[45] ISRO has operationalized the baseline astronaut training facility for the Gaganyaan program as of 24 May 2022. It will accommodate theory classes and house three different kinds of simulators. The first is avirtual reality simulator, and the second will replicate different machine interfaces. The crew module simulator will be the last one, featuring internal settings,environmental control and life support (ECLS) systems, and other features. Located close to the Institute of Aerospace Medicine and theISRO Satellite Integration and Testing Establishment, this facility will be constructed in phases and is situated on a property owned by theU R Rao Satellite Centre.[46]

New equipment along with additional simulators, including static mock-up simulator, dynamic training simulator, and virtual training simulator, were added to the facility as of September 2024. Feedback is being utilized to improve the simulators, which are connected to consoles. Crew modules are available at the training facility for instruction on a variety of subsystems, including bio-toilets, navigation systems, and spaceship operational familiarization. Facilities for yoga and other physical, psychological, and aeromedical training.

For procedural instruction for different activities, a separate training simulator includes control buttons, display systems, and warnings that are comparable to those in the crew module. Virtual training simulations introduce astronauts to the crew module's interior, electronic components, and placements of various components using avirtual reality headset, software, and a handheld controller. Astronauts can examine real-time data that is shown in this simulator and realistically operate the switches and control panels in the crew module. The static mock-up simulator combines multiple elements found in the crew module, including avionics, environment control, and life support. The purpose is to give feel of the crew module by introducing the distance and approach estimates of various controls. The simulator's crew activity spaces will match the real crew module. The dynamic training simulator allows to experience the movements and feelings astronauts will encounter during actual mission. They will receive training to handle jerks, vibrations, acceleration, and shocks duringstage separation, parachute deployment, landing, or activation of crew escape system.

Additional facilities for microgravity familiarization and survival training will be available at the Astronaut Training Facility, where astronauts can receive training on how to withstand the harsh conditions of space.[47][48]

Another advanced facility is proposed to be constructed inChallakere under a2,700 crore (equivalent to32 billion or US$380 million in 2023) plan. It will be a facility spanning 400 acres (1.6 km2) and will be the primary facility for astronaut training and other related activities. As of January 2020, it is planned to be completed in 3 years. Once completed, all activities related to theIndian Human Spaceflight Programme will be undertaken there.[49][50][51]

Other planned facilities within India

[edit]

In order to provide appropriate interplanetary conditions for astronaut training, Human Space Flight Centre worked with AAKA Space Studio,University of Ladakh,Ladakh Autonomous Hill Development Council, Leh andIIT Bombay onLadakh Human Analogue Mission (LHAM). This is to understand the challenges that future astronauts might have when venturing beyond of Earth. Hab-1 is a small, inflatable habitat that is part of the mission. In addition to testing life support systems, the expedition will gatherbiometric data, recreate an extraterrestrial environment, examinecircadian lighting, and evaluate human health and endurance in isolation.[52][53]

Experiments and objectives

[edit]

On 7 November 2018, ISRO released an Announcement of Opportunity seeking proposals from the Indian science community for microgravity experiments that could be carried out during the first two robotic flights ofGaganyaan.[54][55] The scope of the experiments is not restricted, and other relevant ideas will be entertained. The proposed orbit for microgravity platform is expected to be in an Earth-bound orbit at approximately 400 km altitude. All the proposed internal and external experimental payloads will undergo thermal, vacuum and radiation tests under required temperature and pressure conditions. To carry outmicrogravity experiments for long duration, a satellite may be placed in orbit.

International collaboration

[edit]

On 1 July 2019, Human Space Flight Center andGlavkosmos inked a contract for the medical evaluation,astronaut training, and selection assistance of Indian astronauts for theGaganyaan mission. TheRussian Academy of Sciences'Institute of Biomedical Problems, theYuri Gagarin Cosmonaut Training Center, and the Federal State Budget Organization will all contribute in the executed contract.[56][57] An ISRO Technical Liaison Unit (ITLU) will be set up inMoscow to facilitate the development of some key technologies and establishment of special facilities which are essential to support life in space.[58]

Human Space Flight Centre inked a deal with Glavkosmos in October 2019 forEnergia to equip the Gaganyaan crew with life support system and supply thermal control system for the spacecraft. In addition to supplying food, water, and oxygen and assisting in regulating body temperature, the life support system will also handle waste products of crew members. Throughout the mission, the thermal control system will maintain the spacecraft's component within permissible temperature limits.[59]

A comprehensive framework for cooperation activities in human space exploration was signed by ISRO andEuropean Space Agency (ESA) on 21 December 2024.[60] It focuses on research projects and astronaut training programs, including access to ESA's facilities on theISS. Beginning with theAxiom Mission 4, the agreement will be put into effect. Indian astronauts will take part in ESA's technology demonstration projects and human physiological investigations.[61]

See also

[edit]

References

[edit]
  1. ^"Inauguration of Human Space Flight Centre (HSFC) - ISRO".Indian Space Research Organisation. Archived fromthe original on 29 March 2019. Retrieved2 June 2019.
  2. ^abc"Gaganyaan mission to take Indian astronaut to space by 2022: PM Modi".The Hindu. 15 August 2018.ISSN 0971-751X. Retrieved2 January 2024.
  3. ^ab"Gaganyaan mission to take Indian astronaut to space by 2022: PM Modi".The Hindu. 15 August 2018.ISSN 0971-751X. Retrieved2 January 2024.
  4. ^"Independence Day 2018 Live Updates: 'We will put an Indian on space before 2022,' says Narendra Modi at Red Fort".Firstpost.com. 15 August 2018. Retrieved15 August 2018.
  5. ^"Satellites Are Our Priority Now, Not Human Space Flight".Outlook. Retrieved21 July 2017.
  6. ^ab"ISRO's first 'pad abort' test, critical for future human space mission, successful".The Hindu. 5 July 2018.ISSN 0971-751X. Retrieved2 January 2024.
  7. ^ab"Indian Astronaut Will Be In Space For 7 Days, Confirms ISRO Chairman".NDTV. 15 August 2018. Retrieved2 January 2024.
  8. ^abSuresh, Haripriya (15 August 2018)."JFK in 1961, Modi in 2018: PM announces 'Indian in space by 2022,' but is ISRO ready?".The News Minute.
  9. ^Indians To Spend 7 Days In Space In Rs. 10,000 Crore Gaganyaan Plan: 10 Points, NDTV, 28 Dec 2018.
  10. ^abcSingh, Surendra (11 November 2021)."Covid stalled Gaganyaan project, manned mission will finally be launched in 2023: Isro chief".The Times of India.ISSN 0971-8257. Retrieved2 January 2024.
  11. ^Sharma, Dinesh C (16 January 2019)."ISRO Looks Beyond Manned Mission; Gaganyaan Aims to Include Women".The Quint. Retrieved2 January 2024.
  12. ^Laxman, Srinivas (29 December 2023)."Nuclear sector set to power Indian space missions: Isro chief".The Times of India.ISSN 0971-8257. Retrieved29 December 2023.
  13. ^"Who is Dr S Unnikrishnan Nair, one of the heroes behind Chandrayaan-3?".The Statesman. 24 August 2023. Retrieved3 March 2024.
  14. ^"Def lab works on food for spaceflight crew".The New Indian Express. 3 December 2016. Retrieved2 January 2024.
  15. ^Kerur, Bhargavi (19 March 2019)."Dosa or dum aloo. What will India's first astronauts eat?".DNA India. Retrieved2 January 2024.
  16. ^"AHMEDABAD DNA G & G [PG 16] : Vadodara-based company develops space suit for ISRO".epaper.dnaindia.com. Archived fromthe original on 19 August 2018. Retrieved18 August 2018.
  17. ^"Gujarat's firms helping ISRO shape up 'manned space mission'".The Indian Express. 3 November 2015. Retrieved18 August 2018.
  18. ^IndiaTV (12 February 2016),Gujarat's Firm Develops India's First Space Suit for ISRO | Make in India, retrieved18 August 2018
  19. ^"Government of India, Department of Space, Unstarred Question number 213 LokSabha"(PDF). 16 November 2016. Archived fromthe original(PDF) on 18 August 2018. Retrieved19 August 2018.
  20. ^abc"First human-rated test flight for India's Gaganyaan not likely in 2021".The Tribune. 1 July 2021. Archived fromthe original on 29 October 2021. Retrieved1 July 2021.
  21. ^"First human-rated test flight for India's Gaganyaan not likely in 2021".The Tribune. 1 July 2021. Archived fromthe original on 29 October 2021. Retrieved2 January 2024.
  22. ^abDepartment of Space (10 February 2021)."Training of Astronauts and Progress of Gaganyaan Mission".Press Information Bureau. Delhi. Retrieved11 February 2021.
  23. ^"We're talking of habitation on moon, Mars…we have to know how to adapt: ISRO chief K Sivan".The Indian Express. 19 January 2019. Retrieved2 January 2024.
  24. ^"SUCCESSFUL FLIGHT TESTING OF CREW ESCAPE SYSTEM - TECHNOLOGY DEMONSTRATOR - ISRO".Indian Space Research Organisation. Archived fromthe original on 5 July 2018. Retrieved5 July 2018.
  25. ^"ISRO Not To Fly Living Being Before Actual Manned Space Mission: Official".NDTV.com. Retrieved16 September 2018.
  26. ^"ISRO to use a humanoid, not animal, for Gaganyaan tests".
  27. ^"Before humans, 'humanoids' to do experiments in space".The Times of India. 18 January 2019.ISSN 0971-8257. Retrieved2 January 2024.
  28. ^Peri, Dinakar (28 August 2018)."Manned space mission before 75th I-Day: ISRO chief".The Hindu.ISSN 0971-751X. Retrieved29 August 2018.
  29. ^"India's first solar mission in 2020: Isro chairman".The Times of India. 4 May 2019.ISSN 0971-8257. Retrieved2 January 2024.
  30. ^ab"Isro to build 3 sets of rockets, crew modules for Gaganyaan".The Times of India. 30 December 2018.ISSN 0971-8257. Retrieved2 January 2024.
  31. ^"India's human space programme gets a fillip". Retrieved11 January 2019.Initially, the plan was the construct a new launch pad for the human space flight, but Sivan told the Express that due to paucity of time one of the two existing launch pads is being modified to meet the requirement.
  32. ^"Question number 1733 in Rajya Sabha"(PDF). Archived fromthe original(PDF) on 16 April 2023. Retrieved11 January 2019.It is proposed to utilise the existing launch pad with augmentation for carrying out the initial flights under the Gaganyaan manned space flight programme.
  33. ^Ray, Kalyan (4 January 2019)."Agra lab parachutes to bring back India astronauts". Deccan Herald. DHNS. Retrieved2 January 2024.
  34. ^Gopal, Vikram (11 January 2019)."ISRO set for April launch of Chandrayaan-2 after missed deadline".Hindustan Times. Retrieved2 January 2024.
  35. ^Model of space crew module ready,The Hindu, 2 May 2009
  36. ^"IAF developing parameters for India's manned space mission".The Economic Times. 28 December 2012.ISSN 0013-0389. Retrieved2 January 2024.
  37. ^Singh, Gurbir (31 March 2014)."Prospects for the Indian human spaceflight program".The Space Review. Retrieved18 August 2018.
  38. ^Raghu, K. (23 March 2010)."Isro unit to start building space capsule for manned mission".mint. Retrieved2 January 2024.
  39. ^Bhaumik, Anirban (30 September 2018)."Russia may train Indian astronauts at ISS".Deccan Herald. DHNS. Retrieved2 January 2024.
  40. ^"Russia To Help India In 2022 Space Mission: Russian Envoy".NDTV.com. Retrieved2 January 2024.
  41. ^"Nasa working to send Indian astronaut selected by Isro to Space Station".India Today. Retrieved28 November 2023.
  42. ^"NASA to collaborate with ISRO on space station development, says Bill Nelson".HT Tech. 28 November 2023. Retrieved28 November 2023.
  43. ^PTI."NASA open to working with ISRO to help India build space station".Deccan Herald. Retrieved28 November 2023.
  44. ^Pinto, Nolan (1 January 2020)."4 astronauts identified for Gaganyaan mission: Isro chief K Sivan".IndiaToday. Retrieved3 January 2020.
  45. ^Kumar, Chethan (12 January 2019)."Beyond space: Isro plans to place Indians on the Moon".The Times of India.ISSN 0971-8257. Retrieved2 January 2024.
  46. ^Kumar, Chethan (24 May 2022)."Gaganyaan: Astronaut training facility in B'luru operational".The Times of India.ISSN 0971-8257. Retrieved11 July 2025.
  47. ^"Training for space at ISRO's Bengaluru centre: Simulators, yoga and engineering classes".The Indian Express. 6 March 2024. Retrieved11 July 2025.
  48. ^"Newer systems being added to astronaut training facility in Bengaluru: VSSC director".The Economic Times. 5 September 2024.ISSN 0013-0389. Retrieved11 July 2025.
  49. ^D.s, Madhumathi (6 January 2020)."Challakere to be ISRO's astronaut training hub".The Hindu.ISSN 0971-751X. Retrieved6 January 2020.
  50. ^"Application For Prior Environmental Clearance: Residential Township For Human Space Flight Centre".environmentclearance.nic.in.Archived from the original on 10 January 2020. Retrieved10 January 2020.
  51. ^"Environmental clearance form: Human Space Flight Centre along with residential township, ISRO, Department of Space"(PDF).Archived(PDF) from the original on 30 December 2019. Retrieved10 January 2020.
  52. ^Choudhary, Puran (1 November 2024)."ISRO's analogue space mission kicks off at Ladakh's Leh".The Economic Times.ISSN 0013-0389. Retrieved3 November 2024.
  53. ^"Isro launches analogue mission in Ladakh to simulate life outside Earth".India Today. 1 November 2024.
  54. ^"Announcement of Opportunity (AO) for Low Earth Orbit based Microgravity Experiments - ISRO"(PDF). Archived fromthe original on 21 November 2018. Retrieved2 June 2019.
  55. ^"Human Mission: Isro looking at pool of 10 experiments in space".The Times of India. 12 November 2018.ISSN 0971-8257. Retrieved2 January 2024.
  56. ^"Glavkosmos signed a contract for space training of Indian astronauts".Glavkosmos. 1 July 2019. Retrieved7 August 2024.
  57. ^Kumar, Chethan (1 July 2019)."Gaganyaan: India chooses Russia to pick & train astronauts".The Times of India.ISSN 0971-8257. Retrieved7 August 2024.
  58. ^"Isro will set up unit in Moscow to develop technology needed for Gaganyaan mission".The Times of India. 31 July 2019.ISSN 0971-8257. Retrieved2 January 2024.
  59. ^Singh, Surendra (3 November 2019)."Russia to help provide life support system to Gaganyaan astronauts".The Times of India.ISSN 0971-8257. Retrieved7 August 2024.
  60. ^"ISRO & ESA agree to cooperate on astronaut training, mission implementation".The Indian Express. 21 December 2024. Retrieved23 December 2024.
  61. ^Kumar, Chethan (21 December 2024)."Isro, ESA ink pact for astronaut training & more".The Times of India.ISSN 0971-8257. Retrieved23 December 2024.

External links

[edit]
Portals:
Organisations
Programmes
Satellites
Space observatories
Lunar and
planetary spacecraft
Human spaceflight
Launch vehicles
Active
In development
Retired
Engines
Active
In development
Spaceports
Research facilities
Communications
Legislation and policy
Private companies
Related
Satellites
Communication
Earth observation
Experimental
Navigation
Student satellites
Aryabhata Satellite
Space probes
Scientific
Astronomical
Lunar programme
Interplanetary
Human
spaceflight
  • Future spacecraft initalics.
Research and
construction facilities
Tracking and
control facilities
Launch centres
Associated
organisations
Institutions
Government organisations