You can helpexpand this article with text translated fromthe corresponding article in Chinese. (January 2021)Click [show] for important translation instructions.
|
| Honghe Modern Tramway | |
|---|---|
Honghe Tram at Passenger Transport Station | |
| Operation | |
| Open | October 1, 2020; 5 years ago (2020-10-01) |
| Status | Operation suspended |
| Infrastructure | |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Statistics | |
| Route length | 13.3 km (8 mi) |
| Stops | 15 |
TheHonghe Modern Tramway (Chinese:红河有轨电车) is atram operating inMengzi City,Honghe Prefecture,Yunnan Province,China. The rolling stock was provided byCRRC Nanjing Puzhen.[1]
Construction began on 6 August 2015.[2]
The project was delayed. Testing began on 21 September 2020.[3] The first line officially opened to the public on 1 October.[4]
On 25 July 2024, Honghe Tram company announced to suspend tram line operation for maintenance.[5]
News reports speculated about the tram system shutting down, as it reports one of the lowest passenger numbers of all trams in China. In June 2024 the daily average passenger number amounted to 300, down from 2,000 when the tram first started operation. In 2022 the tram operations recorded an 80 million yuan loss.[6][7]
The line runs south fromMengzi North railway station.
This Chinese rail-related article is astub. You can help Wikipedia byadding missing information. |