High-speed rail in Thailand

From Wikipedia, the free encyclopedia

This article has multiple issues. Please helpimprove it or discuss these issues on thetalk page.(Learn how and when to remove these messages)
icon
This article'slead sectionmay be too short to adequatelysummarize the key points. Please consider expanding the lead toprovide an accessible overview of all important aspects of the article.(July 2020)
icon
This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "High-speed rail in Thailand" – news ·newspapers ·books ·scholar ·JSTOR
(October 2021) (Learn how and when to remove this message)
This article needs to beupdated. Please help update this article to reflect recent events or newly available information.(October 2025)
(Learn how and when to remove this message)

Thailand high-speed rail
CRRCFuxing Series EMU proposed forNortheastern high-speed rail line passenger services.
Overview
StatusUnder construction
LocaleThailand
Service
TypeHigh-speed rail
Operator(s)State Railway of Thailand
Rolling stockCR300AF (Delivery is planned for late 2024)
Technical
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
Operating speed300 km/h (186 mph) (Design)
250 km/h (155 mph) (Operational)

AlthoughThailand has no operational high-speed rail lines, the country is planning a large high-speed rail network connecting its major cities. The first line of the network is under construction fromBangkok toNakhon Ratchasima, with a planned maximum operational speed of 250 km/h (155 mph).

History

[edit]

In February 1996, Thailand was proposals about highspeed rail but project was cancelled.[1][2]

In October 2010, the Thai Parliament approved initial proposals for ahigh-speed rail (HSR) network. Five lines capable of handling 250 km/h (155 mph) speeds would radiate from Bangkok.[3]

In March 2013, the transport minister revealed that only one company would be selected to run all high-speed train routes, scheduled to be operational between 2018 and 2019.[4] The first 86 km (53 mi) section from Krung Thep Aphiwat to Ayuthaya was planned to be tendered in late 2013. However, a seven-month political crisis involving the dissolution of parliament and an annulled February 2014 election culminated in amilitary coup in May 2014. In July 2014, the new military junta deferred all HSR plans until a civilian government is installed.

Following the military coup of May 2014 and his elevation to the office of prime minister, GenPrayut Chan-o-cha proposed connecting Bangkok to two popular resort cities,Pattaya andHua Hin, by high-speed rail. The Transport Ministry'sOffice of Transport and Traffic Policy and Planning had earlier conducted studies on both routes. They assumed that, for the Bangkok-Pattaya line, trains would run throughChachoengsao,Chonburi, and Pattaya, terminating inRayong, a distance of 194 km (121 mi). Construction costs were estimated at 152 billionbaht with an economicinternal rate of return (EIRR) of 13%. Construction would take about 54 months. The route to Hua Hin would be 209 km (130 mi) in length with an investment cost of about 98 billion baht and an EIRR of 8.1%. The office concluded that these routes would be of little interest to private investors due to the high investment required coupled with a low rate of return.[5] Four HSR lines were included in the 2017fiscal year plans.[6]

Proposed high-speed routes

[edit]
A map depicting the planned high speed rail lines of Thailand as of 2022.
No.High-Speed CorridorRouteOperation SpeedLengthFunding ModelCostProjected OperationStatus
1Northeastern HSR Phase 1Krung Thep AphiwatDon MueangAyutthayaSaraburiPak ChongNakhon Ratchasima160–250 km/h (99–155 mph)250.8 km (155.8 mi)[7]PPP Net Cost[8][9]179,412.21 million baht[7][10][11] (5,986 million USD)"could be in service by 2028"[12]Under construction; civil engineering works are 49.40% complete as of October 2025[13]
2Eastern HSR Phase 1Don MueangKrung Thep AphiwatMakkasanSuvarnabhumi AirportChachoengsaoChonburiSi RachaPattayaU-Tapao250 km/h (160 mph)220 km (140 mi)PPP Net Cost224,544 million baht (7,492 million USD)[14]TBAConstruction works could start in April 2025[15]
3Northeastern HSR Phase 2Nakhon RatchasimaBua YaiBan PhaiKhon KaenUdon ThaniNong Khai250 km/h (160 mph)356.01 km (221.21 mi)PPP Net Cost[8][9]341,351.42 million baht (10.000 million USD)TBAThe phase 2 project is now approved by the cabinet, and it is under construction as of February 2025[16]
4Eastern HSR Phase 2U-TapaoRayongKlaengChanthaburiTrat[17]250 km/h (160 mph)190 km (120 mi)PPP Net Cost159,111 million baht (5,309 million USD)TBA[18]Planning stage
5Northern HSR Phase 1Krung Thep AphiwatDon MueangAyutthayaLopburiNakhon SawanPhichitPhitsanulok300 km/h (190 mph)380 km (240 mi)Japan212,892 million baht (7,103 million USD)TBAPlanning stage
6Southern HSR Phase 1Krung Thep AphiwatNakhon PathomRatchaburiPhetchaburiHua Hin300 km/h (190 mph)211 km (131 mi)PPP Net Cost100,125 million baht (3,341 million USD)TBAPlanning stage
7Northern HSR Phase 2PhitsanulokSukhothaiSi SatchanalaiLampangLamphunChiang Mai300 km/h (190 mph)288 km (179 mi)Japan232,411 million baht (7,755 million USD)TBAPlanning stage
8Southern HSR Phase 2Hua HinPrachuap Khiri KhanChumphonSurat ThaniNakhon Si ThammaratPhatthalungHat YaiPadang Besar300 km/h (190 mph)759 km (472 mi)PPP Net Cost432,329 million baht (14,425 million USD)TBAPlanning stage

Northeastern HSR: Bangkok–Nakhon Ratchasima–Nong Khai (Sino-Thai railway project)

[edit]
Main article:Bangkok–Nong Khai high-speed railway
See also:Kunming–Singapore Railway

In November 2014, Thailand and China signed amemorandum of understanding agreeing to construct the Thai portion of the transnational railway running fromKunming, China to theGulf of Thailand. In November 2015, both parties agreed to a division of labour. Under the framework, a joint venture would be set up to run the project. China would conduct feasibility studies, design the system, construct tunnels and bridges, and lay track. The MoU stipulates that Thailand is responsible for 100% investment in the project and operates the construction itself, including conducting social and environmental impact studies, expropriating land for construction, handling general civil engineering and power supply, and supplying construction materials.[9]

Once built, China will operate and maintain the system for the first three years of operation. Between the third and the seventh years, both countries would share responsibility. Later, Thailand would take on responsibility with China acting as an adviser. China would train Thai personnel to operate and maintain the system.

Dual standard-gauge tracks would be laid throughout the project. In Thailand, two routes would diverge at a junction inKaeng Khoi District inSaraburi Province. One to connect Bangkok to Kaeng Khoi. The other route to connect Kaeng Khoi withMap Ta Phut ofRayong Province. FromKaeng Khoi tracks would lead north toNakhon Ratchasima and on toNong Khai Province. Construction would be divided into four sections: Bangkok–Kaeng Khoi, Map Ta Phut–Kaeng Khoi, Kaeng Khoi–Nakhon Ratchasima, and Nakhon Ratchasima–Nong Khai.

Construction of Thailand's 873-kilometre-long portion of the railway system started in December 2017[19][20] The railway will connect to the 417 kmBoten–Vientiane railway and a 520 km line from the Lao border to Kunming.[21] In July 2021, authorities said: "works which will have to be postponed are the [... tracks] between Nawa Nakhon andBan Pho, betweenPhra Kaeo and Saraburi"; furthermore another postponement, "presumably until [... 2022 is] the section betweenDon Muang and Nawa Nakhon".[22] As of Q4 2022, the "first phase between Bangkok and Nakhon Ratchasima is [...] behind schedule"; furthermore, it's "15% completed when it should have been 37%"; the Phase 1 line was[23][12] due to be completed in 2026 - however, media says that the main contract will have to be extended, according to a source at the Transport Ministry.

Eastern HSR: Bangkok–U-Tapao Airport

[edit]
Main article:Don Mueang–Suvarnabhumi–U-Tapao high-speed railway

A HSR line to the eastern seaboard was first proposed in 1996 but there was no progress for over a decade. In 2009, the government requested theOffice of Transport and Traffic Policy and Planning (OTP) to create a plan for a new HSR network in Thailand that included an eastern HSR line to Rayong. The route was finalised before the 2011 election with the promise to begin construction the next year if the government was re-elected, but they lost the election. After the 2011 election, the new government reviewed all HSR plans and the SRT stated that the line would be tendered in early 2014.[24] After the May 2014 coup there were further delays while the military government reviewed all HSR lines, initially deferring all projects. In early 2016, the government agreed to proceed with the eastern HSR route and suggested that it could be extended toDon Mueang International Airport beyond the terminus atKrung Thep Aphiwat Central Terminal thus providing a link with three airports.[25] Extending the line would provide a link between Don Mueang Airport, Suvarnabhumi Airport, andU-Tapao International Airport inBan Chang District.

During 2017, OTP and the Ministry of Transport in consultation with the SRT agreed that extending the line to terminate at Don Mueang would effectively include the long-delayed extension of theAirport Rail Link (Bangkok) fromMakkasan Station to Don Mueang Airport as part of the project. The Eastern Economic Corridor Office (EEC Office) in October 2017 finalised previous OTP plans to build the 10-station Eastern HSR line linking Don Mueang airport, Krung Thep Aphiwat, Makkasan, Suvarnabhumi Airport, Chonburi, Si Racha, Pattaya, U-Tapao Airport, and Rayong. In early 2018, the section to Rayong was excluded due to environmental and safety concerns and it was decided that the line would terminate at U-Tapao Airport.[26]

The SRT stated that the first tenders for the Eastern HSR line are expected to be tendered by May 2018 with a four-month auction period before the contract is awarded.[27] The cost of the project was estimated to be over 200 billion baht, of which the Thai Government would fund 123 billion baht and the private sector estimated to contribute 90 billion baht.[28][29]

Two rival consortia vied for the airport link contract.[30] TheCharoen Pokphand (CP) Group-led consortium consisting ofItalian-Thai Development,China Railway Construction Corporation Ltd, CH. Karnchang, andBangkok Expressway and Metro, won the project with a 224 billion baht bid in December 2018. Their winning bid is valid until 8 November 2019. Until 16 October 2019, the consortium had refused to sign the contract, citing land expropriation and eviction problems and the consortium's request that the government share the risk in the project.[31] Negotiations were further complicated by the resignation of the entire board of the State Railway.[32] On 16 October 2019, news reports announced that the CP consortium intends to sign the rail deal on 25 October.[33] Tanit Sorat, vice-chairman of the Employers' Confederation of Thai Trade and Industry, said that the contract signing delays are, "...unlikely to affect the project because the government will carry out the project smoothly."[31] The project was eventually approved in October 2019 as a public private partnership between the Thai government andCharoen Pokphand/China Railway Construction Corporation. The assets will revert to state ownership after 50 years.[34] It is scheduled to start construction in 2023 and open for service in 2029.[35]

Northern HSR: Bangkok–Phitsanulok–Chiang Mai (Japanese-Thai project)

[edit]

Japan would provideShinkansen technology for a high-speed rail link between Bangkok and the northern city of Chiang Mai. Phase 1 would connect Bangkok to Phitsanulok. It is estimated to cost 280 billion baht. Seven stations are planned for this segment: Krung Thep Aphiwat, Don Mueang, Ayutthaya, Lopburi, Nakhon Sawan, Phichit, and Phitsanulok. To reduce costs, Thai authorities have proposed reducing the number of stations, but theJapan International Cooperation Agency (JICA) has rejected this suggestion on the grounds that it defeats the original purpose of the project.[36] This portion of the route was scheduled to be submitted to the Thai cabinet for financial approval in August 2018.[36]

After an initial cooperation agreement was signed in 2015, the Thai government formally requested the technical and financial assistance of the Japanese government in late 2016 for the building of the Northern HSR line to Chiang Mai.[37] The Japanese completed a feasibility study which estimated that the project will cost 420 billion baht to build.[38]

A feasibility study by JICA in mid-2018 reported that the train as planned would run at a loss. JICA's study projects only 10,000 passengers per day on the route, as opposed to the 30,000 per day forecasted in the original planning proposals. To be profitable from ticket sales would require 50,000 fares per day.[36]

The Thai government announced in September 2019 that it may cancel Bangkok-Chiang Mai high-speed rail project after private investors declined to invest. The cost of the 670 kilometre line is estimated to be 400 billion baht. Japan has turned down the project as a bad investment due to low passenger projections.[39] HoweverMinistry of Transport denies that Japan cancelled the project.[40]

On 14 December 2022, the Department of Railways is discussing withMLIT-JICA to speed up the conclusion of economic and financial feasibility studies for the high-speed rail between Bangkok and Chiang Mai, to be completed in March 2023. Additionally, the Department has asked for a study of the economic return from the development of the area around the station.[41] On March 8, 2023, the economic and financial feasibility study for the high-speed rail project from Bangkok to Chiang Mai, Phase 1 from Bangkok to Phitsanulok, was completed. The study included an analysis of direct and indirect benefits and found that the project is worth the investment. The economic return (EIRR) is 17.3 percent, which is 12 percent higher than the threshold, and thenet present value (NPV) is positive over the period of operation.[42]

Southern HSR: Bangkok–Hua Hin

[edit]

This line would link Bangkok withHua Hin. It would be 211 km (131 mi), and estimated costs in 2016 were 152 billion baht.[43] The extension have also plans to link withMalaysia which was proposed on September 28, 2021.[44]

See also

[edit]

References

[edit]
  1. ^ทีมข่าวเศรษฐกิจพิเศษ (21 December 2017)."8ปี3รบ.!ย้อนอภิมหากาพย์'ไฮสปีดจีน' ก่อนคสช.ได้ฤกษ์ตอกเสาเข็ม-ขาดทุนเพื่อชาติ5.9หมื่นล".สำนักข่าวอิศรา (in Thai). Retrieved18 September 2025.
  2. ^"ส.ส. ตั้งกระทู้เรื่องรถไฟความเร็วสูง (เมื่อ 15 ปีก่อน) สุเทพ เทือกสุบรรณ รมว.คมนาคมตอบ".prachatai.com (in Thai). Archived fromthe original on 22 September 2022. Retrieved18 September 2025.
  3. ^"Thailand to negotiate with China on high-speed proposal".International Railway Journal. 30 October 2010. Archived fromthe original on 1 November 2010. Retrieved30 October 2010.
  4. ^"Transport Minister: One firm will run all high-speed train routes".Thai Financial Post. 21 March 2013. Archived fromthe original on 2 February 2014.
  5. ^"Difficulty in implementing high-speed train to resort provinces".Mass Communication Organization of Thailand (MCOT). 14 February 2015. Archived fromthe original on 15 February 2015. Retrieved15 February 2015.
  6. ^"4 high speed rail projects in FY 2017 investment plan".The Nation. 1 November 2016.Archived from the original on 24 March 2018.
  7. ^ab"Hi-speed rail work delayed over curbs".Bangkok Post. 27 July 2021. Retrieved27 July 2021.
  8. ^abรถไฟความเร็วสูง ไทย-จีน-ญี่ปุ่น (in Thai), retrieved13 March 2023
  9. ^abcเปิดความแตกต่างโครงการรถไฟความเร็วสูงไทย - จีน VS โครงการรถไฟลาว - จีน, retrieved13 March 2023
  10. ^Mokkhasen, Sasiwan (21 June 2017)."Did Thailand get railroaded by the Chinese? No way, govt says".Khaosod English. Thailand.Archived from the original on 20 November 2021. Retrieved20 November 2021.
  11. ^"Thailand's high-speed railway will carry first passengers in 2023".Phuket Gazette. 4 September 2019.Archived from the original on 3 July 2021. Retrieved7 September 2019.
  12. ^abMarukatat, Saritdet (17 September 2021)."Nong Khai plans for rail link with China".Bangkok Post. Retrieved17 September 2021.
  13. ^Bangkok Post (in Thai). 25 November 2025https://www.highspeedrail-thai-china.com/. Retrieved26 November 2025.{{cite news}}:Missing or empty|title= (help)
  14. ^Signing Ceremony Program of Public Private Partnership (PPP) Agreement. The High-Speed Rail Linking Three Airports Project, archived fromthe original on 20 July 2020, retrieved20 July 2020
  15. ^https://www.bangkokpost.com/thailand/general/2941981/three-airport-rail-link-work-could-start-in-april Retrieved 2025-03-04
  16. ^https://www.thaigov.go.th/infographic/contents/details/8559. Retrieved 2025-02-04
  17. ^The High-speed Rail Linking Three Airports Project, Phase 2 (Extension Line: Rayong - Chanthaburi - Trat Section)(PDF), retrieved8 July 2020
  18. ^HSR Market Sounding(PDF), 24 July 2020, archived fromthe original(PDF) on 24 July 2020, retrieved24 July 2020
  19. ^Wang, Brian (25 December 2017)."Thailand high speed rail construction starts".Next Big Future. Retrieved29 December 2017.
  20. ^"Construction of Thai-Chinese railway begins".Bangkok Post. 21 December 2017.Archived from the original on 13 October 2021. Retrieved29 December 2017.
  21. ^Jikkham, Patsara (17 November 2015)."Sino-Thai railway responsibilities set".Bangkok Post.Archived from the original on 13 October 2021. Retrieved18 November 2015.
  22. ^"Hi-speed rail work delayed over curbs".Bangkok Post. 27 July 2021.Archived from the original on 13 October 2021. Retrieved27 July 2021.
  23. ^https://www.bangkokpost.com/thailand/general/2432925/high-speed-rail-project-behind-schedule. Bangkok Post. Retrieved 2022-11-08
  24. ^Marukatat, Saritdet (13 May 2013)."Rayong added to high-speed rail link".Bangkok Post.Archived from the original on 13 October 2021.
  25. ^Mahitthirook, Amornrat (25 January 2016)."Military government set to link 3 airports".Bangkok Post.Archived from the original on 13 October 2021. Retrieved12 October 2021.
  26. ^Theparat, Chatrudee; Chantanusornsiri, Wichit (14 February 2018)."EEC high-speed railway to steer clear of Rayong on safety fears".Bangkok Post.Archived from the original on 13 October 2021.
  27. ^Jotikasthira, Om (28 February 2018)."Auction for train contracts in April".Bangkok Post.Archived from the original on 13 October 2021.
  28. ^Theparat, Chatrudee; Jotikasthira, Om (9 March 2018)."New govt 'won't halt airport fast rail plan'".Bangkok Post.Archived from the original on 13 October 2021.
  29. ^Apisitniran, Lamonphet (20 March 2018)."Pitch set for airport rail link".Bangkok Post. Retrieved21 March 2018.
  30. ^"CP, BTS groups set to bid for airport link high-speed railway".The Nation. 11 November 2018.Archived from the original on 12 November 2018. Retrieved12 November 2018.
  31. ^abApisitiran, Lamonphet; Theparat, Chatrudee (14 October 2019)."Holding up the train".Bangkok Post.Archived from the original on 13 October 2021. Retrieved16 October 2019.
  32. ^"SRT board members in mass resignation".The Nation. 30 September 2019.Archived from the original on 25 September 2020. Retrieved16 October 2019.
  33. ^Leesa-Nguansuk, Suchit; Hongtong, Thodsapol (16 October 2019)."CP set to ink airport link deal".Bangkok Post.Archived from the original on 13 October 2021. Retrieved16 October 2019.
  34. ^"Thailand gives green light for US$7.4 billion high-speed rail link between Bangkok and Pattaya".South China Morning Post.Reuters. 24 October 2019.Archived from the original on 13 October 2021. Retrieved25 October 2019.
  35. ^รถไฟความเร็วสูงเชื่อม 3 สนามบินสร้างหรือยัง (in Thai), 3 March 2023
  36. ^abcHongtong, Thodsapol (25 July 2018)."Losses predicted for high-speed railway".Bangkok Post.Archived from the original on 13 October 2021. Retrieved25 July 2018.
  37. ^Mahitthirook, Amornrat (5 December 2016)."Government to ask Japan for rail project support".Bangkok Post.Archived from the original on 13 October 2021.
  38. ^Hongtong, Thodsapol (16 December 2017)."Bullet train project set to cost B420bn".Bangkok Post.Archived from the original on 13 October 2021.
  39. ^Hongtong, Thodsapol (27 September 2019)."Govt mulls end of fast train plan".Bangkok Post.Archived from the original on 13 October 2021. Retrieved27 September 2019.
  40. ^"ก.คมนาคม ยันญี่ปุ่นไม่ยกเลิกลงทุนรถไฟความเร็วสูง".thaipbs.or.th (in Thai). 27 October 2018.
  41. ^""กรมราง" ถก "ญี่ปุ่น" เร่งศึกษาลงทุนรถไฟความเร็วสูง "กรุงเทพฯ-เชียงใหม่" จบใน มี.ค. 66". 14 December 2022.
  42. ^เปิดเส้นทาง 'ไฮสปีดเทรน' ภาคเหนือ ลุ้นรัฐบาลใหม่เคาะตอกเสาเข็ม (in Thai), 11 March 2023
  43. ^"Hua Hin High-speed Rail Put on Fast Track".Hua Hin Today. 31 August 2016.Archived from the original on 8 August 2020. Retrieved6 September 2019.
  44. ^"Muhyiddin floats idea of KL-Bangkok high-speed rail in Parliament". Coconuts KL. 30 September 2021.

External links

[edit]

Official sites

[edit]
Technologies
Proposed
High-speed trains
by service speed
or planned service speed
400 km/h
(249 mph)
or more
350–399 km/h
(217–248 mph)
300–349 km/h
(186–217 mph)
250–299 km/h
(155–186 mph)
200–249 km/h
(124–155 mph)
High-speed railway line
By countries and territories

planned networks in italics
Africa
Americas
Asia
Europe
Oceania
Railways
Inter-city rail and
High-speed rail
Open
Under construction
Planned
Commuter rail
Rapid transit
Monorail
People mover
Light railandTram
Main stations
Seal of Bangkok Metropolitan
Roads
Expressways
Motorways
Open
  • ()
  • ()
Under construction
  • (2025)
  • (2025)
  • (2025)
Planned
National highways
  • ()
  • ()
  • ()
  • ()
Buses
Operators and Routes
Terminals
Water transport
River
Canals
Thailand Urbanpublic transport networks and systems inThailand
High-speed rail
Commuter rail
Rapid transit
Monorail
AGT,Light rail &Tram
Bus rapid transit
Major operators
Lines
Lists
Notable trains
Rolling Stock
Annual
Riderships
by cities
1 billion or more
500 million – 999 million
100 million – 499 million
50 million – 99 million
10 million – 49 million
5 million – 9.9 million
1 million – 4.9 million
Note: Under construction & planned lines are inItalics
Retrieved from "https://en.wikipedia.org/w/index.php?title=High-speed_rail_in_Thailand&oldid=1324194526"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp