Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

HBR Layout metro station

Coordinates:13°01′58″N77°37′47″E / 13.032787°N 77.629732°E /13.032787; 77.629732
From Wikipedia, the free encyclopedia
Upcoming Namma Metro station under Blue Line

‹ ThetemplateInfobox station is beingconsidered for merging. ›
HBR Layout
Under Construction of this metro station under Phase 2B of Namma Metro'sBlue Line as of February 2024
General information
Location4th Main Rd, 5th Block, 1st Stage, EXTENSION, HBR Layout, Bengaluru, Karnataka 560043
Coordinates13°01′58″N77°37′47″E / 13.032787°N 77.629732°E /13.032787; 77.629732
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineBlue Line
PlatformsSide platform(TBC)
Platform-1Krishnarajapura /Central Silk Board
Platform-2KIAL Terminals
Platform numbers (TBC)
Tracks2(TBC)
Construction
Structure typeElevated,Double track
Platform levels2(TBC)
Parking(TBC)
Accessible(TBC)
ArchitectNagarjuna Construction Company (NCC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningDecember 2026; 12 months' time (December 2026)(TBC)
Electrified(TBC)
Services
Preceding stationNamma MetroFollowing station
Kalyan NagarBlue Line
(Under Construction)
Nagawara
Route map
Central Silk Board
HSR Layout
Agara
Ibbaluru
Bellandur
Embassy TechVillage Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Indian Railways TowardsUpperLeft arrowHosur and
LowerRight arrowBanaswadi orBaiyyappanahalli
Doddanekundi
Bagmane Developers - DRDO Sports Complex
Sarasvathi Nagara
KrishnarajapuraKrishnarajapuram railway station
Indian Railways TowardsLeft arrowKrishnarajapuram and
Down arrowYelahanka Jn orBengaluru Cantt.Right arrow
Mainline rail interchangeBaiyappanahalli Depot(U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura
HebbalaHebbal railway station
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation(no scope)
Indian Railways Towards
Left arrowKSR Bengaluru andYelahanka JnRight arrow
Yelahanka
Bagalur Cross
Bettahalasuru(no scope)
Chikkajala(future)
Doddajala
Indian Railways Towards
Left arrowKolar andYelahanka JnRight arrow
Mainline rail interchangeDoddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals
Location
Map

HBR Layout is an upcoming elevated metro station on the north–south corridor of theBlue Line[1] ofNamma Metro inBangalore, India. Around this metro station holds the Hennur area, Residential areas of HBR Layout. This metro station is stated to become operational around December 2026.[2][3][4][5]

History

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the HBR Layout metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 kmBlue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd.(NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates.[6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.[7]

Station Layout

Blue LineStation Layout - To Be Confirmed

HBR Layout track layout(TBC)
P# toKalyan Nagar **
Station with two tracks and two side platforms
**Under Construction
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2Side platform | Doors will open on the leftDisabled access
Platform #
Eastbound
Towards →Krishnarajapura /Central Silk Board
Next Station:Kalyan Nagar
Platform #
Westbound
Towards ←Hebbala /KIAL Terminals
Next Station:Nagawara
Change at the next station forPink Line
Side platform | Doors will open on the leftDisabled access
L2

References

  1. ^"Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty".timesproperty.com. Retrieved14 December 2023.
  2. ^"L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today".Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved14 December 2023.
  3. ^"Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar".The Indian Express. 6 June 2023. Retrieved14 December 2023.
  4. ^"Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026".TimesNow. 7 June 2023. Retrieved14 December 2023.
  5. ^"Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL".The New Indian Express. 16 September 2023. Retrieved14 December 2023.
  6. ^"NCC Wins Bangalore Metro Airport Line's Construction Work".The Metro Rail Guy. 14 September 2021. Retrieved24 October 2024.
  7. ^Service, Express News (16 September 2021)."Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line".The New Indian Express. Retrieved24 October 2024.
Phase-2A
Phase-2B
Not in Scope
Depot(s)
  • Baiyappanahalli & Doddajala
See also
*Stations initalics are Under Construction


Retrieved from "https://en.wikipedia.org/w/index.php?title=HBR_Layout_metro_station&oldid=1321930475"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp