G650 | |
---|---|
![]() | |
Gulfstream Aerospace G650 with landing gear and flaps down on an approach | |
Role | Business jet Type of aircraft |
National origin | United States |
Manufacturer | Gulfstream Aerospace |
First flight | November 25, 2009 |
Status | In production |
Produced | G650[ER]: 2008–2025 G700: 2019–present G800: 2021–present[citation needed] |
Number built | G650[ER]: 598[1] G700: 53 as of Apr. 2024[2] G800: 3 as of Dec. 2024[3] |
TheGulfstream G650 is a largebusiness jet produced by the American companyGulfstream Aerospace.[4] The model is designatedGulfstream GVI in itstype certificate.[5] The aircraft can be configured to carry from 11 to 18 passengers over a range of 7,000nautical miles [nmi] (13,000 km; 8,100 mi) at a top speed ofMach 0.925 (530.6 kn; 982.7 km/h; 610.6 mph). The aircraft is powered by twoRolls-Royce BR725 turbofans, mounted on the rear fuselage. Gulfstream began the G650 program in 2005 and revealed it to the public in 2008. TheG650ER is an extended-range version of the G650, adding about 500 nmi (930 km; 580 mi) by modifying the fuel system, an upgrade offered for existing G650 aircraft.[6]
At its introduction, the G650 was the company's largest and fastest business jet, until being surpassed by theG700. Introduced in October 2019, the G700 stretched the airframe by 10 feet (3.0 m) and increased its top speed to Mach 0.935 (536.3 kn; 993.3 km/h; 617.2 mph) using a new wing and improvedRolls-Royce Pearl 700 engines. A fourth variant, theG800 was announced in October 2021. The new aircraft is the same size as the G650 but uses the improved wing and Pearl 700 engines from the G700.
The aircraft project was named the 2014 winner of theCollier Trophy, for having "strengthened business aviation through significant technological advancements in aircraft performance, cabin comfort, and safety."[7] The 300th was delivered in April 2018, just over five years since introduction in December 2012.[8] The 400th was delivered in December 2019, seven years after the type's introduction.[9] The 500th was delivered by Gulfstream'sAppleton completions facility in September 2022.[10] In February 2025, the final G650 was completed; it is being replaced by the G800.
The Gulfstream G650 was formally launched as an internal company project in May 2005, and publicly unveiled on March 13, 2008. At the public announcement occasion, company executives stated the new model would become Gulfstream's largest, fastest and most expensive business jet on entry to the market.[11]
The wing design was completed in 2006. A total of 1,400 hours ofwind tunnel testing was completed by 2008. A pressure-test fuselage was built and tested, including an ultimate-pressure test of 18.37 psi (127 kPa).[12]
The G650 taxied under its own power for the first time on September 26, 2009.[13] A public rollout ceremony was held on September 29, 2009.[14] The G650 had itsmaiden flight on November 25, 2009.[15]
Flight testing for the maximum operating speed of Mach 0.925 was announced as completed on May 4, 2010.[16] Gulfstream reported on August 26, 2010, that the G650 hit a maximum speed of Mach 0.995 during a dive as part of its 1,800-hour flight test program.[17] In April 2011, a G650 crashed shortly after liftoff. The cause was determined to be related to the speeds carried out for the single engine takeoff run. The G650 test aircraft were grounded until May 28, 2011, when the remaining test aircraft were allowed to return to flight testing.[18]
On September 7, 2012, the G650 received itstype certificate from the USFederal Aviation Administration (FAA).[19][20] Its first delivery was to an American customer,Preston Henn,[21] on December 27, 2012.[22]
The G650 had a nominal list price of $64.5 million in 2013,[23] but there was a three-year waiting list. Some aircraft produced for delivery in 2013 sold for more than $70 million to buyers that wanted to take immediate delivery.[24]
After rising to $71-73 million in 2014, initial enthusiasm dissipated and the value of pre-owned G650s stabilized at $50 million after the competingBombardier Global 7500 was certified in 2018.[25]
Also in May 2014, Gulfstream confirmed that the G650 would be offered to theUnited States Air Force for its program to replace theE-8C JSTARS air-to-ground surveillance and targeting aircraft. The still emerging requirements call for an aircraft with a 10-13 man crew and a belly-mounted radar 3.9–6 m (13–20 ft) long.[26] However, during the fiscal 2019 budget rollout briefing it was announced that the Air Force will not move forward with an E-8C replacement aircraft. Funding for the JSTARS recapitalization program will instead be diverted to pay for development of an advanced battle management system.[27][28]
In September 2018, Gulfstream was conducting testing atLondon City Airport to certify the aircraft to performsteep approaches.[29] In 2023, its equipped price was $68.5M for the G650, and $70.5M for the G650ER.[30]
On May 18, 2014, Gulfstream announced at the annualEuropean Business Aviation Association exhibition, that it had developed an extended range version called theG650ER. The G650ER is capable of flying 7,500 nautical miles (13,900 km; 8,600 mi) at Mach 0.85, due to its 4,000 pounds (1,814 kg) increase in fuel capacity. Gulfstream stated that in March a G650ER development aircraft had flown non-stop from Hong Kong to Teterboro, New Jersey in the United States, a distance of 7,494 nautical miles (13,879 km; 8,624 mi); it had also flown non-stop from Los Angeles to Melbourne in Australia. The extra fuel is housed in existing space inside the G650's wings and aircraft already built may be quickly upgraded to the ER version. The G650ER received its certification in October 2014 and began deliveries in late 2014.[31] The G650ER attempted two world records from New York to Beijing to Savannah in February 2015.[32] The same year, a G650ER set a new record for the longest non-stop flight by a purpose-built business jet, flying 8,010 nautical miles (14,835 km; 9,218 mi) from Singapore to Las Vegas with four passengers and crew. The record was surpassed by a Bombardier Global 7500 in March 2019,[33] before the G650ER retook the record in April 2019 by flying 8,379 nmi (15,518 km) from Singapore to Tucson.[34] Production on the G650 ended in February 2025, with it being replaced by the G800.[35]
On the eve of the October 2019NBAA Convention & Exhibition in Las Vegas, Gulfstream announced its new flagship, the G700, showing a video of the aircraft taxiing under its own power in Savannah.It should fly 7,500 nmi/13,890 km at Mach 0.85 or 6,400 nmi/11,853 km at Mach 0.90.Its longer cabin can accommodate up to five areas and has 20 windows.It is powered byRolls-Royce Pearl 700 engines and has new winglets.Customer deliveries were originally planned to start in 2022.[36] In July 2023, FAA approval was expected to be received in the autumn.[37]
The $75 million jet is a 10 ft (3.0 m) stretch of the G650. The aircraft completed its first flight on February 14, 2020.[38] The G700 should share itsfly-by-wire cockpit with theG500/G600: active control sidesticks andHoneywell Primus Epic flight deck with synthetic andenhanced vision systems for a commontype rating.The jet is 110 ft (33.5 m) long, about 9.8 ft (3 m) longer than the G650ER and about 0.98 ft (0.3 m) shorter than the competingBombardier Global 7500. Its main cabin is 57 ft (17.4 m) long, 6.2 ft (1.9 m) high and 8.2 ft (2.5 m) wide; 2.6 ft (0.8 m) longer, 0.33 ft (0.1 m) wider and a fraction taller than the 7500's cabin.It should carry 19 seated passengers or sleep 10.It will have aMTOW of 107,600 lb (48,800 kg) and the 18,250 lbf (81.2 kN) turbofans should burn 2–3% less fuel than the G650's R-RBR725s.The aircraft should need a 6,250 ft (1,905 m) runway at MTOW in ISA conditions at sea level and land in 2,500 ft (762 m) at a typical landing weight.[39]
It has the same 1,283 sq ft (119.2 m2) wing with its 33° wingsweep but the more outboard canted winglets are 3.4 ft (1.0 m) wider.Thebasic operating weight increases from 54,500 to 56,000 lb (24,700 to 25,400 kg) and thewet wing fuel capacity increases slightly by 1,200 lb (540 kg).The Pearl 700 turbofan is an improved version of the BR725, with one more low-pressure turbine stage, anoverall pressure ratio over 50:1, and abypass ratio higher than 6.5:1 for a 3–5% betterthrust specific fuel consumption.After flight tests, G700 bested its competitor's 7,700 nmi (14,300 km) range and reached up to 7,800–8,000 nmi (14,400–14,800 km).[40] The maximum operating speed of the G700 has increased from Mach 0.925 to Mach 0.935, ranking it as the fastest in the Gulfstream product line.[41]
In 2023, its equipped price was $79.9M.[30] The FAA issued its certificate on 29 March 2024, and the first two deliveries, to U.S.-based customers, took place on 23 April 2024.[42][43]
On April 23, 2024, Gulfstream began customer deliveries of its new G700 aircraft, less than a month after obtainingFederal Aviation Administration (FAA) certification. The first two G700s have begun service.[44]
On October 4, 2021, Gulfstream unveiled in Savannah the 8,000 nmi (14,800 km) range Gulfstream G800, with the G700 wing and Pearl 700 engines, offering four living areas and 16 windows, with deliveries planned to begin in 2023.[45]
Priced at $72.5 million,[30] the G800 has a G650-size cabin, 10 ft (3.0 m) shorter than the G700's with two fewer windows per side.[46] The G800 first flew on June 28, 2022[47] and FAA certification is expected in the first half of 2025.[48]
The G650 has acruise speed ofMach 0.85 to 0.90, with maximum speed of Mach 0.925 and a range of up to 7,000nautical miles [nmi] (13,000 km; 8,100 mi). It can be equipped with a full kitchen and bar as well as a variety of entertainment features includingsatellite telephones and wirelessInternet. The jet uses twoRolls-Royce BR725 engines, each producing a maximumthrust of 17,000pounds-force (75.6 kN).[49] Gulfstream has stated that with a weight of less than 100,000pounds (45,400 kg), the G650 is able to land at small general aviationairports allowing passengers to avoid larger more busy airports.
To better use the main cabin space, Gulfstream designers rejected the usual circularfuselage cross-section in favor of an oval which uses a flatter lower portion.[50] The cabin is 8 feet 6 inches (2.59 m) wide and 6 feet 3 inches (1.91 m) high,[51] allowing the craft to be configured to carry between 11 and 18 passengers. The fuselage and wing are constructed mostly of metal whilecomposite materials are used for theempennage, winglets, rear pressure bulkhead, enginecowlings, cabin floor structure and many fairings.[52] Theelliptical cabin windows,[53] eight on each side of the fuselage, are 28 inches (71 cm) wide. Panels are bonded rather than riveted, reducing parts count compared to the G550.[citation needed]
The G650 wing has a sweep of 36 degrees which is greater than wings on previous Gulfstream aircraft like the G550 with a sweep of 27 degrees. It does not use leading-edgehigh-lift devices, and tracks for rear-mounted flaps are completely enclosed within the airfoil contour. The wing's leading edge is a continuously changing curve, and theairfoil varies continuously from root to tip. The aircraft also incorporateswinglets.[54]
The aircraft controls are completelyfly-by-wire, with no mechanical control between pilot and flight surfaces. The surfaces are moved by dual hydraulic systems. The G650 shares itsyokes and column with theG550 in an effort to receive a commontype rating.[55] While most newer airliners now employ fly-by-wire technology, the G650 was only the second fly-by-wire business jet, after theDassault Falcon 7X and before theEmbraer Legacy 500.[56]
At FL 470 and ISA-7°C, it cruises at Mach 0.85 or 480 kn (890 km/h) TAS and burns 2,400 lb (1,100 kg) per hour at a weight of 67,500 lb (30,600 kg), raising to 3,000 lb (1,400 kg) per h at Mach 0.90 or 506 kn (937 km/h)TAS.[57]
The G700's flight deck is upgraded to the Symmetry flight deck from the G500/G600.[58]
According to flight tracking service SiliconJets using data fromADS-B,[62] current executives flying G650 models on a regular basis include:Bill Gates,Jeff Bezos,Elon Musk,Mark Zuckerberg,Mark Benioff, andLarry Ellison.[63][64]
On April 2, 2011, the second G650 test aircraft crashed during takeoff from theRoswell International Air Center, New Mexico, killing the four Gulfstream employees on board (two pilots and two test engineers). The aircraft was conducting a takeoff-performance test during which an engine failure was simulated by reducing the right engine's thrust to idle.[65] The G650 became airborne briefly at a highangle of attack before its right wingtip hit the runway; then it slid on the ground, struck a concrete berm, and caught fire.[66]
TheNational Transportation Safety Board (NTSB) determined the probable cause of the crash was anaerodynamic stall of the aircraft, due to a failure to properly develop and validate takeoff speeds involving persistent and increasingly aggressive attempts to achieve aV2 speed that was too low. It found that Gulfstream's investigation of the two previous uncommanded roll events was inadequate. Following the crash, Gulfstream raised the V2 speed of the G650 from 135 knots (250 km/h) to 150 knots (280 km/h).[65] The NTSB accused Gulfstream of withholding information, which the company denied. The NTSB also objected to Gulfstream's use of legal counsel during the investigation.[67][needs update]
Model | G650[51][68] | G650ER[51][68] | G700[69][68][70] | G800[71] |
---|---|---|---|---|
Cockpit crew | 2 | |||
Capacity | 19 | |||
Length | 99 ft 9 in (30.40 m) | 109 ft 10 in (33.48 m) | 99 ft 9 in (30.40 m) | |
Wingspan | 99 ft 7 in (30.35 m) | 103 ft (31 m) | ||
Height | 25 ft 8 in (7.82 m) | 25 ft 5 in (7.75 m) | 25 ft 6 in (7.77 m) | |
Cabin length | 46 ft 10 in (14.27 m) | 56 ft 11 in (17.35 m) | 46 ft 10 in (14.27 m) | |
Cabin cross section | Height: 6 ft 3 in (1.91 m), width: 8 ft 2 in (2.49 m) | |||
Cabin volume | 2,138 cu ft (60.5 m3) | 2,603 cu ft (73.7 m3) | 2,138 cu ft (60.5 m3) | |
Baggage volume | 195 cu ft (5.5 m3) | |||
Maximum takeoff weight (MTOW) | 99,600 lb (45,200 kg) | 103,600 lb (47,000 kg) | 107,600 lb (48,800 kg) | 105,600 lb (47,900 kg) |
Basic operating weight (BOW)[a] | 54,000 lb (24,000 kg) | 56,365 lb (25,567 kg) | 54,300 lb (24,600 kg) | |
Maximum payload | 6,500 lb (2,900 kg) | 6,385 lb (2,896 kg) | 6,200 lb (2,800 kg) | |
Fuel capacity | 44,200 lb (20,000 kg) | 48,200 lb (21,900 kg) | 49,400 lb (22,400 kg) | |
Fuel consumption per hour | 500 US gal (1,900 L) | 503 US gal (1,900 L) | 509 US gal (1,930 L) | |
Turbofans (x2) | Rolls-Royce BR725 | Rolls-Royce Pearl 700 | ||
Takeoff thrust (x2) | 16,900 lbf (75.2 kN) | 18,250 lbf (81.2 kN) | ||
Range[b][72] | 7,000 nmi (13,000 km; 8,100 mi) | 7,500 nmi (13,900 km; 8,600 mi) | 7,750 nmi (14,350 km; 8,920 mi) | 8,000 nmi (15,000 km; 9,200 mi) |
Cruise speed | Mach 0.85 – Mach 0.90 (488–516 kn; 903–956 km/h; 561–594 mph) | |||
Max. operating speed,MMO | Mach 0.925 (531 kn; 983 km/h; 611 mph) | Mach 0.935 (536 kn; 993 km/h; 617 mph) | Mach 0.925 (531 kn; 983 km/h; 611 mph) | |
Takeoff distance (SL, ISA, MTOW) | 5,858 ft (1,786 m) | 6,299 ft (1,920 m) | 6,250 ft (1,905 m) | 6,000 ft (1,829 m) |
Ceiling | 51,000 ft (15,545 m) |
Related development
Aircraft of comparable role, configuration, and era