Guindy is an elevated metro station on the North-South Corridor of theBlue Line ofChennai Metro inChennai, India, which opened on 21 September 2016. This station will serve the neighbourhoods ofGuindy andVelachery.
The 105-metre-long steel girder rail overbridge, which is the only such structure in the entire Chennai Metro system, lies near the station.[1]
The station is also the only one in the entire system that will have two skywalks providing access to the station—one near the Guindy Industrial Estate and the other near Race Course Road.[2]
Guindy track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 1 Southbound | Towards →Chennai International Airport Next Station:Arignar Anna AlandurChange at the next station forGreen Line (to be further extended toKilambakkam in the future) | |
| Platform 2 Northbound | Towards ←Wimco Nagar Depot Next Station:Little Mount | |
| Side platform | Doors will open on the left | ||
| L2 | ||