Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Guangzhou–Shenzhen railway

From Wikipedia, the free encyclopedia
Railway line in Guangdong province, China
This article is about the Chinese Section of the Kowloon–Canton railway. For the British Section of the Kowloon–Canton railway, seeEast Rail line. For the company that operates the railway, seeGuangshen Railway (company).
Not to be confused withGuangzhou–Shenzhen intercity railway.

Guangzhou–Shenzhen railway
CRH6A at Guangzhou-Shenzhen Railway in Guangzhou in March 2018
Overview
Other namesGuangshen railway
Kowloon–Canton railway (Chinese section)
Native name广深铁路
广深线
StatusOperational
OwnerChina Railway Guangzhou Group
Line number4
Locale
Termini
Stations22
Service
TypeHigher-speed rail
Heavy rail
System
Operator(s)China Railway Guangzhou Group
Guangshen Railway Company
Rolling stockCRH1A EMU,CRH6A EMU (Regular service),

CR200J (Occasionally for "Demand-relief" between Guangzhou and Shenzhen station or Shenzhen East station)

CRH1A-A EMU (e.g. Guangzhou East to Xiamen EMU service),CRH1E-250 EMU (e.g. Guangzhou East to Hangzhou East EMU train service),

CRH2A EMU (e.g. Nanchang West to Guangzhou East EMU train service via Shenzhen city and Dongguan),

CRH380A EMU (e.g. Guangzhou East to Longyan EMU train service via Guangzhou Xintang)
History
Opened8 October 1911 (114 years ago) (1911-10-08)
Technical
Line length147 km (91 mi)
Number of tracks
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
Electrification25 kV 50 Hz AC (Overhead line)
Operating speed200 km/h (120 mph) (tracks 1 and 2)
160 km/h (99 mph) (tracks 3 and 4)
SignallingCentralizedCTCS Automatic closing block system (UM-70, ZPW-2000)
Route map

Guangzhou
0 km
Yunlu
4 km
Guangzhou East
8 km
Shipai
12 km
Jishan
20 km
Xiayuan
27 km
Nangang
32 km
Guangzhou Xintang
39 km
Shapu
45 km
Xiancun
51 km
Shitan
60 km
Honghai
64 km
Shilong
69 km
Dongguan
72 km
Chashan
75 km
Nanshe
78 km
Hengli
84 km
Changping
90 km
Zhangmutou
103 km
Ganzhou–Shenzhen high-speed railway
Tangtouxia
114 km
Shigu
119 km
Pinghu
127 km
Pinghu South
Shenzhen East
139 km
Sungang
144 km
Shenzhen
147 km
Lo Wu Bridge, the border betweenHKSAR &Shenzhen
Guangshen Railway
Simplified Chinese广深铁路
Traditional Chinese廣深鐵路
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngshēn Tiělù
IPA[kwàŋ.ʂə́n tʰjè.lû]
Yue: Cantonese
Jyutpinggwong2sam1 tit3lou6
IPA[kʷɔŋ˧˥.sɐm˥ tʰit̚˧.lɔw˨]
Kowloon–Canton railway, Chinese section
Simplified Chinese广九铁路华段
Traditional Chinese廣九鐵路華段
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngjiǔ Tiělù Huáduàn
IPA[kwàŋ.tɕjòʊ tʰjè.lû xwǎ.twân]
Yue: Cantonese
Jyutpinggwong2gau2 tit3lou6 waa4dyun6
IPA[kʷɔŋ˧˥.kɐw˧˥ tʰit̚˧.lɔw˨ wa˩.tyn˨]

Guangshen railway orGuangzhou–Shenzhen railway (Chinese:广深铁路 or 广深线), historically known as theChinese section of the Kowloon–Canton railway (Chinese:广九铁路华段) in 1911–1949, is a railway inGuangdong province in thePeople's Republic of China, betweenGuangzhou andShenzhen. It is operated byGuangshen Railway Co., Ltd., a publicly traded company.

With a length of 147 kilometres (91 mi), it was the first railway in the People's Republic of China to reach the speed of 220 km/h (137 mph) in some sections, though it is limited to about 180 km/h (112 mph) during commercial operation. Now it has four tracks betweenGuangzhou East andShenzhen railway station. Line 1 and 2 areup-direction anddown-direction 200 km/h (124 mph) (currently restricted to 180 km/h (112 mph) in operation) passenger lines forCRHEMU respectively, and Lines 3 and 4 are up-direction and down-direction 160 km/h (99 mph) (currently restricted to 140 km/h (87 mph) in operation) mixed passenger and freight line respectively. In order to reduce the interference topassenger trains in the daytime from lower-speedfreight trains, most freight trains will be scheduled to run at night.

Guangshen railway connects with several other important railways to different directions. It linksJingguang railway andGuangmao railway in Guangzhou,Jingjiu railway in Dongguan (with which shares two regular speed track), and theEast Rail line to Hong Kong at the southern end of the railway. Besides, there are some branch lines along Guangshen Railway, such asPingyan railway toYantian Port,Pingnan railway toShenzhen West railway station and also the line toHuangbu Port.

Before the manifestation of COVID-19 pandemic in January 2020, traditional "Z-class" border-crossing services via the whole or part of the Guangshen Railway, serving Hong Kong and mainland destinations includingChangping, Guangzhou East,Foshan andZhaoqing, as well as toBeijing West and Shanghai, were available. However, the above-mentioned cross-border services were suspended since the on set of COVID-19 pandemic.[1]

Starting 15 January 2023, train services between Hong Kong West Kowloon Railway Station and Guangzhou East Railway Station are available,[2] at which Guangzhou-Shenzhen Railway is part of the route.

History

[edit]
See also:East Rail line andKowloon–Canton Railway

The idea of constructing a railway linkingCanton (nowGuangzhou) andKowloon inHong Kong, a Britishcrown colony germinated in the lateQing dynasty. In 1899,Britain and the Qing government agreed to construct theKCR British Section, but Britain postponed the construction as Britain was busy at theSecond Boer War in Africa. In 1907, Qing government andBritain formally signed an agreement in Peking on issuing a £100-millionbond as part of loan for the construction of the Chinese section of the Kowloon–Canton railway. In July 1907, construction of the British Section of the KCR began. The construction of Chinese section was delayed and only started in 1909. Under the loan contract, China needed to employ the British engineers for the construction of Chinese section, but China still employed famous Chinese railway engineer,Zhan Tianyou, as a consultant. On 8 October 1911, the Chinese section of KCR with total length of 142.77 km (88.71 mi) was opened[3] together with the commencement ofthrough train service between Kowloon and Guangzhou which was started to operate at the same time. The northern end of railway at that time was located in Dashatou (大沙頭), Guangzhou, which was demolished in 1951[citation needed].

After the establishment of People's Republic of China in October 1949, the 'Chinese section of the Canton–Kowloon railway' was renamed 'Guangshen railway', and repairs were made to sections of the railroad damaged during the war. In 1967, railway department carried out a comprehensive maintenance on Guangshen railway to improve the transport capacity. Beginning in the 1980s economic reform policies of China, the establishment of ShenzhenSpecial Economic Zone and rapid economic development in thePearl River Delta region has brought large volume of imported goods and increased passenger demand to the railway. Therefore, the second line of Guangshen Railway was constructed during 1984 to 1987 in order to meet the huge demand. Simultaneously Guangshen Railway Company (the predecessor ofGuangshen Railway Company), which was directly subordinated to the Guangzhou Railway Bureau (nowGuangzhou Railway Group), was established. This company was in charge of the construction projects and operational management of Guangshen Railway. In 1987, Guangshen railway became the first double-track railway inGuangdong province.

X2000 running on Guangshen railway

Guangshen railway is the first place in China to carry out successfully speed-up on the existing railroad. At the beginning of the 1990s, Guangzhou Railway Bureau and theMinistry of Railways carried out the pre-feasibility research about raising the maximum speed of passenger trains to 160 km/h (99 mph). At 28 December 1991, the construction of the third line of Guangshen railway, and the speed-up improvement works of original double tracks started. In October 1994, the maximum speed of a train reached 174 km/h (108 mph) during the test. The first sub-high speed (160 km/h (99 mph))[4] passenger train in China started commercial operation at 22 December 1994, operating between Guangzhou and Shenzhen.

Fourth track of Guangshen railway under construction

In 1998[4] theelectrification of two sub-high speed lines of Guangshen railway was finished. After the improvement the 200 km/h (124 mph) high speed trains are allowed to run on the existing sub-high speed railroad. A Swedish-builtX 2000tilting train called 'Xinshisu' began to serve intercity train service between Guangzhou and Shenzhen, as well as thethrough train to Hong Kong. The train are 165m long, consisting of apower car, five passenger cars, and a trailing car. The non-power cars can have a pitch of up to 8 degrees. They are noted for being very quiet (less than 65dBA) even at 200 km/h (124 mph). Such Swedish X 2000 trains allowed the line to reach 200 km/h (124 mph) and 220 km/h (137 mph)[4] in some sections[4] of the Guangshen line.

Starting 21 October 2001, the "As-frequent-as-buses" Train Project was fully roll out[5]: p.5  using 8 sets of domestic made"Blue Arrow" trains,[5]: p.2  which were high-speed (capable to reach a speed of 210 km/h)[5]: p.2  electrical trains for express service between Guangzhou and Shenzhen.

Construction of the fourth track was commenced at 31 December 2005, and was finished at 18 April 2007 in time for theSixth Speed-Up Campaign. Since then Guangshen railway has been the first four-track railway inmainland China and it allows passenger trains and freight trains to run on separate lines.

CRH1A running on Guangshen railway

8-carCRH1A highspeedEMUs have been introduced since year 2007 for the intercity train service between Guangzhou and Shenzhen. There were 100 pairs of trains operated daily. The fastest journey time was 52 minutes betweenGuangzhou East andShenzhen with no stop in-between. Train numbers D7002 and D7008 had been used for such direct service.

Tickets of intercity trains as of 2008

Implementation of "stop-at-all-stations" operating model started since 1 May 2009[6]: p.12  at which intermediate stations includesDongguan (located inChangping at that time),Shilong andZhangmutou.[7]: p.38 

Non-stop trains serving between Guangzhou East and Shenzhen re-emerges since the early 2020s[8] at which "C8" prefix train numbers[8] are introduced for such service.

Guangzhou-Shenzhen intercity service

[edit]
This section is about intercity service that serves the station(s) in Shenzhen city that are located along the Guangshen railway. For cross-line traffic serving between Guangzhou-Shenzhen North orFutian railway station in Shenzhen via Guangzhou-Shenzhen Railway, see§ Service heading to Shenzhen North Railway Station direction. For trains serving betweenFutianShenzhen NorthGuangzhou South stations, seeGuangzhou–Shenzhen–Hong Kong Express Rail Link.

Regularly operating "C-prefix" trains

[edit]
A departure using CRH6A EMU is waiting atShenzhen railway station and heading for Guangzhou direction
At the front: Information plates that one at platform ofShenzhen railway station and another at the body of the train

Regularly operating service between Guangzhou and Shenzhen uses 8-carCRH1AEMU orCRH6AEMU. Currently train numbers with prefix "C" are in use.

According toOfficial customer portal of China Railway[Note 1] as at October 2024[10][11] showing all train trips between Guangzhou city and Shenzhen city, train numbers (C800x-C801x) are assigned for non-stop express trips running betweenGuangzhou East railway station andShenzhen railway station.

For "C" prefix trains numbered by 4 numerical digits (7xxx or 80xx) servingShenzhen railway station and Guangzhou city, a majority of trains serveGuangzhou East railway station at Guangzhou side, and within the Guangshen line a few number of trains serveGuangzhou railway station, mostly in a manner as an intermediate stopping before terminating atGuangzhou Baiyun railway station[12] which is located at short distance beyond the Guangshen line.

"Demand-relief" trips

[edit]
Train destinated forGuangzhou railway station in year 2024 as shown was a temporary additional "arrangement" operating duringchunyun of that year, at which train number starts with "C9" was in use

Temporally added trips for the Guangzhou-Dongguan-Shenzhen service may be numbered with prefix "Z",[Note 2][13][14][15] "C" or "D", usingShenzhen East railway station[14][16][17][18][19]orShenzhen railway station as the terminal station.

In addition to CRH EMUs running temporally added intercity trips typically numbered C9xxx, it is possible thatCR200J "Fuxing" trains are deployed to the temporally added trips (with prefix "D" or "C") since the allocation of 4 sets[20]: p.14  of such type of "Fuxing" train to Guangshen Railway Company Limited (GSRC) at the time of year 2019[20]: p.14  and thereafter.

The emergence of "D-class" trip using CR200J trains inShenzhen railway station begins in December 2019 serving regular long-distance D727, D728 trains[21] forBeijing West[20]: p.14  while this service actually runs mainly along the Beijing-Kowloon railway[Note 3] which starts its multiplexes with Guangshen line in Dongguan City, meaning that the initial manifestation of CR200J trains along Guangshen line was just confined within a limited distance.

For the use of CR200J trains travelling longer distance of GuangShen line for demand-relief purpose, one noteworthy example is, to start with, an internet media reported that a temporally added service was available on 29 and 30 September and 2, 3, 5, and 6 October 2023,[22] mentioning a pair of train service numbered D7495, D7496[22] although that was a cross-line traffic betweenChangsha railway station andShenzhen East railway station for demand relief.

Additional train D7496[22] of year 2023 as appeared in ticket-selling machine (an intermediate stop of D7496 was shown)

Shorter "intercity" service betweenShenzhen East railway station andGuangzhou East railway station may occur in a rare, temporally[Note 4] manner while not on a regular basis. For the example in relation to the above-mentioned D7496[22] service in year 2023, to start with, Guangzhou Railway Group maintains several Sina Weibo accounts officially where latest information about status of available tickets up-to-date, in particular for the days within peak demand period, may be posted. Previous posts in the Guangzhou Railway Group's official Weibo channels[Note 5] show that service betweenShenzhen East railway station andGuangzhou East railway station was provided[16][17] with available ticket on-sale among at least some, if not all, of the days that the above-mentioned D7495, D7496 trips were in service in year 2023.

Temporal "Shenzhen East - Guangzhou East service"[16][17] as shown at the information Display in the passenger waiting area ofShenzhen East railway station
The "Shenzhen East - Guangzhou East service"[16][17] (at platform ofShenzhen East railway station)
The arrival of "Shenzhen East - Guangzhou East service"[17] at platform ofGuangzhou East railway station

Examples of temporally added "D-class" service between Guangzhou city and Shenzhen city during peak-demand holidays, at which written notice has been announced via the Chinese language page[9] ofOfficial customer portal of China Railway beforehand, include the added service during "Spring Festival Travel Rush" (or named as "chunyun") in year 2024 numbered D9785-D9786[18] serving betweenShenzhen East railway station andGuangzhou East railway station, and D9791-D9796[23] serving betweenGuangzhou East railway station andShenzhen railway station.

Information Display at platform of Guangzhou East railway station, showing the final destination "Shenzhen railway station" of D9795[23] service as at Spring 2024

During the holiday week of October 2024, there exists a pair of trains serving betweenGuangzhou East railway station andShenzhen railway station, using train set composed by both second class seat coaches and sleeper berth configuration coaches,[24][25] with train numbers C99[24] for southbound and C100[25] for northbound services of peak demand days of October 2024 according to the timetable as shown at the China Railway's official 12306 website.[10][11]

Rolling stock

[edit]
TimeRolling stocks using by Guangshen intercity trains
Before 1966SL6 steam locomotive hauling21 Series /22 Series railway carriages
1966–mid-1970sSL6 steam locomotive /Dongfanghong1 /DF diesel locomotive (from 1972) hauling21 Series /22 Series railway carriage
Dongfanghong1 /DF diesel locomotive(from 1972) hauling24 Series railway carriages with air-conditioning (91/92 Express)
1970s–late 1994Locomotives:DF3 /ND2 /DF4B (from 1985) /DF9diesel locomotive(from 1990s)
Passenger coaches:24 Series with air-conditioning /25 Series /22 Series / 22 Series railway carriages with air-conditioning
Late 1994–1998Locomotives:DF4B /DF9 /DF11diesel locomotive
Passenger coaches:22 Series /Double-deck 25B Series with air-conditioning /25Z Series
1998–2004DF4B diesel locomotive hauling22 Series /Double-deck 25B Series with air-conditioning /
SS8 electric locomotive /DF11 diesel locomotive hauling25Z Series /25C Series railway carriage
DDJ1 EMU(1999–2000)
Xianfenghao EMU(2001)
X2000 tilting train
DJJ1 EMU (Blue Arrow)(from 2001)
2004–2006DF4B diesel locomotive haulingDouble-deck 25B Series with air-conditioning /
SS8 electric locomotive /DF11 diesel locomotive hauling25Z Series /25C Series railway carriage
X2000 tilting train /DJJ1 EMU (Blue Arrow)
2007–DF11 diesel locomotive hauling25Z Series railway carriage (Until 25 April 2007)
DF4B diesel locomotive haulingDouble-deck 25B Series with air-conditioning (Until 30 June 2007)
DJJ1 EMU (Blue Arrow) (Until 25 April 2007)
CRH1A EMU (from 1 February 2007)
CRH6A EMU (from year 2018)

CR200J

CR200J train allocated for Guangshen Railway Company Limited[20]: p.14  serving temporally added intercity trip fromGuangzhou East railway station... (Final destination in Chinese would be shown in a separate photo as below)
...toShenzhen railway station
(Photographs taken in year 2023)

Stations

[edit]

Stations with services

[edit]

Most of the existing stations on the line are abandoned for passenger service, while reopening of a previously abandoned station after reconstruction or refurbishment can occur. Examples includePinghu in year 2016[26] andXintang (later renamed to Guangzhou Xintang) in year 2023[Note 6].

As at year 2024, major stations on the line offering passengers service are, in order:

Station
No.
Station NameChineseDistance
km
PRD MIR (CR C-train)
transfers/connections
Metro
transfers/connections
Location
GZQGuangzhou广州00Guangzhou Metro 2  5 

 11  14  22 

YuexiuGuangzhou
GGQGuangzhou East
Guangzhoudong
广州东88 SS *Guangzhou Metro 1  3 

 11  18 

Tianhe
XWQGuangzhou Xintang广州新塘3139Guangzhou Metro 13 Zengcheng
RTQDongguan东莞3372Dongguan Rail Transit 2 ShilongDongguan
DAQChangping常平1890Changping
ZOQZhangmutou樟木头13103Zhangmutou
PHQPinghu平湖24127Shenzhen Metro10LonggangShenzhen
BJQShenzhen East
Shenzhendong
深圳东12139Shenzhen Metro3514
SZQShenzhen深圳8147Luohu

All existing stations

[edit]
Existing stations
China Railway High-speedChina RailwayStation Name
English
Station Name
Chinese
Total
Distance
TransferLocationGradeNotes
Guangzhou广州0Urban rail transit in ChinaGuangzhou Metro 2  5 

 11  14  22 
Mainline rail interchangeChina RailwayChina Railway High-speed

Yuexiu,GuangzhouT
[Note 7]
Stop station for a few number Guangzhou – Shenzhen trains (CRH)
Yunlu云麓44Not for passenger service. Decommissioned in 2009.
Guangzhou East广州东8Urban rail transit in ChinaGuangzhou Metro 1  3 

 11  18 
Mainline rail interchangeChina RailwayChina Railway High-speed

Tianhe,Guangzhou1The major stop and departure station for Guangzhou–Shenzhen trains (CRH)
Shipai石牌144Not for passenger service.
Huangpu黄埔182Not for passenger service.
Jiuyunhui九运会Decommissioned in 2002.
Jishan吉山203Not for passenger service.
Xiayuan下元27Huangpu,Guangzhou3Not for passenger service.
Nangang南岗324Decommissioned in 2009.
Guangzhou Xintang广州新塘39Urban rail transit in ChinaGuangzhou Metro 13 
Mainline rail interchangeChina RailwayChina Railway High-speed
Zengcheng,Guangzhou4Reopened in 2023[28] with Guanhzhou-Shenzhen passenger service commences since year 2024.[29]

Stopping station for some Guangzhou–Shenzhen intercity trains (CRH)

Shapu沙浦455Decommissioned in 2007.
Tangmei塘美4Decommissioned in 2007.
Xiancun仙村514Not for passenger service.
Shitan石滩604Decommissioned in 2009.
Honghai红海644Not for passenger service. Decommissioned in 2006.
Shilong石龙69Shilong,Dongguan3Decommissioned in 2014.
Dongguan东莞72Urban rail transit in ChinaDongguan Rail Transit 2 
Mainline rail interchangeChina RailwayChina Railway High-speed
2Stopping station for Guangzhou–Shenzhen trains (CRH)
Chashan茶山75Chashan,Dongguan4Not for passenger service.
Nanshe南社784Decommissioned in 2007.
Hengli横沥84Hengli,Dongguan4Decommissioned in 2009.
Changping常平90Changping,Dongguan2Stopping station for Guangzhou–Shenzhen trains (CRH)
Tutang土塘945Decommissioned
Zhangmutou樟木头103Zhangmutou,Dongguan3Stopping station for Guangzhou–Shenzhen trains (CRH)
Lincun林村Tangxia,Dongguan4Decommissioned in 2010.
Tangtouxia塘头厦1144Not for passenger service.
Shigu石鼓1194Decommissioned in 2007.
Tiantangwei天堂围122Fenggang,Dongguan4Decommissioned in 2007.
Pinghu平湖127Urban rail transit in ChinaShenzhen Metro10
Mainline rail interchangeChina RailwayChina Railway High-speed
Longgang,Shenzhen4Stopping station for some Guangzhou–Shenzhen intercity trains (CRH)
Pinghu South平湖南131Not for passenger service.
Lilang李朗4Decommissioned in 2007.
Shenzhen East深圳东139Urban rail transit in ChinaShenzhen Metro35
Mainline rail interchangeChina Railway
3Departure station for some non-high-speed trains. Regular CRH trains normally DO NOT stop here. In very limited occasions,[18] or for demand-relief purpose, mostly at those "ultimately most busiest" dates during peak demand periods[Note 8] some intercity trains[16][17] (160 km/hour speed maximum) may, although rarely, depart or terminate here.
Sungang笋岗144Luohu,Shenzhen1Not for passenger service.
Shenzhen深圳147Urban rail transit in ChinaShenzhen Metro19
Mainline rail interchangeChina RailwayChina Railway High-speed
1The departure station for regular service trains (CRH)
Through-service to/fromHung Hom (Kowloon) viaEast Rail line

Cross-Line Traffic

[edit]

Service heading toGuangzhou Baiyun Railway Station

[edit]
A regular departure stopping at Guangzhou Station, heading forGuangzhou Baiyun Railway Station

As mentioned in the Stations list in the "Stations" section in above, a few number of departures, using CRH trains, provide service toGuangzhou railway station. Starting year 2024,[12] the coverage of above-mentioned service is further extended toGuangzhou Baiyun Railway Station as the terminal station, located some 5 kilometres distance[30] beyond the Guang-shen line.

Service heading to Shenzhen North Railway Station direction

[edit]

Starting 20 June 2022,[31] service between Guangzhou East station andShenzhen North station is available.

Service extension to coverGuangzhou Baiyun railway station andFutian railway station in Shenzhen starts from 15 June 2024,[32] in addition to the existing trains serving betweenGuangzhou East andFutian stations that already exist during June 2024.[32]

These services use Guangzhou–Shenzhen railway as part of the route.

Service heading toHong Kong West Kowloon Railway Station

[edit]
Train at Guangzhou East Station, heading for Hong Kong West Kowloon railway station
Main article:Guangzhou–Hong Kong high-speed train

This service uses Guangzhou–Shenzhen railway and Ganzhou-Shenzhen High-speed railway toShenzhen North direction and provides service betweenGuangzhou East railway station andHong Kong West Kowloon Railway Station.

Service heading to other mainland cities

[edit]

For traffic heading to other cities, there are services of EMUs using Guangzhou–Shenzhen railway as part of the route.

Cross-line traffic stopping atChangping (in Chinese:常平) Station after the CTCS upgrade[33]

The completion of upgrading work in year 2020 makes the whole Guangshen line to be compatible withCTCS-2,[33] as a result more EMUs from nationwide railway network can enter Guangshen line, and useShenzhen railway station,[33][34]Guangzhou East railway station orGuangzhou railway station as terminal station.[33] Thus, more cross-line traffic and also more variety of types of EMUs becomes available along the Guangzhou–Shenzhen railway.

On the otherhand, the construction of the Guangzhou-Zhanjiang High-speed Railway[35] results in a disruption of some of the cross-line traffic, at which starting from 11 October 2023[35] trains of China Railway running at or running for Foshan city will not enter to nor leave from theGuangzhou Railway Station.

Service heading towardsChaoshan orFujian direction

[edit]

Cross-line traffic servingChaoshan railway station is available daily, at bothGuangzhou East railway station, orShenzhen railway station near the Luohu border with Hong Kong.[36] Some of those trains serveShantou also.

Service betweenShenzhen andChaoshan direction
[edit]

Starting 11 October 2023, train service betweenShenzhen railway station andChaoshan railway station is introduced.[36][37]

Since December 2023, service running by G-prefix train trips betweenShenzhen railway station andShantou South railway station become available.[38]

Starting 15 June 2024,[39] service betweenShantou railway station andShenzhen railway station, near the Luohu border with Hong Kong, become available; and these C-prefix train number trips[39] or D-prefix train number trips[40] are operating daily in a regular basis.

Service between Guangzhou andChaoshan orFujian direction
[edit]
Guangzhou East to Shantou service

Daily trains are offered betweenGuangzhou East Railway Station andChaoshan Railway Station, a few of them will continue toShantou Railway Station; in addition, starting from 1 July 2018, one departure serving the Guangzhou East to Chaoshan service will continue to Xiamen.

Since not later than 26 June 2021, more EMU trains are available for service between Xiamen (or Xiamen North Station) and Guangzhou city, at which two of them (using Xiamen North Station at the time of writing in June 2023) will continue to Nanning East Station.[41][42] CRH2A EMU trains are in use for service between Xiamen North and Nanning.[42] However, with effective from 11 October 2023 the above-mentioned trains, in particular those formerly serving between Fujian and Guangxi province via Guangzhou, are shorten to serve only between Fujian province and Guangzhou city.

In year 2023, D3653/D3652 train served by CRH2A EMU made a stop at Dongguan station, after departing from Nanpingshi (some 35km from Wuyishan) via Fuzhou, Xiamen North, and Shenzhen North stations, and after Dongguan station the train will continue to Guangzhou via Guang-Shen line, and the final destination for D3653/D3652 is Nanning East station as at 30 June 2023.
Train serving Xiamen (North) - Guangzhou - Nanning (East) service in year 2023.[42] It's CRH2A EMU serving train number D3655/D3658 from Nanning (East) station...
...to Xiamenbei Station (see the final destination as shown on the display board of the train)

Starting January 2024, service using CRH380A EMU running betweenGuangzhou East railway station andLongyan railway station becomes available.[43]

Service heading towardsZhejiang orJiangsu Province direction

[edit]

Starting 11 October 2022, a pair of EMU train service betweenGuangzhou East railway station andHangzhou East railway station numbered D3121/4 and D3122/3 with a stop atShenzhen North railway station[44] becomes available that CRH1E trains are in use.[45][46]

Service heading towards Ganzhou direction

[edit]

Train departures are available between Guangzhou East station andGanzhou West railway station.

Between 15 January 2022[47] to 9 January 2024,[48] a pair of departures is available using CRH380A[47] EMU trains, at which train G2775/G2778 departs from Guangzhou East station exists, and train G2777/G2776 departs from Ganzhou West station, as at June 2023 this service servesDongguan railway station as well; in addition, another pair for the Guangzhou East to Ganzhou West service was added since 11 October 2022, with train number D1695/D1698 and D1697/D1696,[49] at which CRH1E-250 train is in use as at June 2023.

CRH380A EMU serving train G2775[47]
G2775[47] stopping and providing passenger service at Dongguan station as of June 2023

Starting from 10 January 2024, the above-mentioned service was suspended,[50] and the newly added service for cross-line traffic between Guangzhou East station andGanzhou West railway station heading toJiangXi Province direction takesGuangzhou–Shanwei HSR toGanzhou–Shenzhen HSR[51] instead thus the new service no longer servesDongguan railway station.

Service heading west from Guangzhou

[edit]

A disruption of this cross-line traffic, starting 11 October 2023, occurs because of the route adjustment of Guangzhou-Sanshui section of theGuangzhou-Maoming railway to facilitate the construction of the Guangzhou-Zhanjiang High-speed Railway.[35]

Starting 10 July 2019[52] to 10 October 2023, there was a daily service between Shenzhen Railway Station andHuaiji Railway Station onGuiyang-Guangzhou HSR, which is the first[52] utilizing the whole Guangzhou-Shenzhen line in full as part of the route; starting 1 July 2020[53][54] to 10 October 2023, daily service between Shenzhen Railway Station and Foshan West Railway Station was available; however, according to the new railway timetable effective from 11 October 2023, these direct train services no longer exist.

In year 2023, and before 11 October 2023,[55] China Railway Nanning Group's[56] CRH2A EMU train served Shenzhen Station (by running the train number D3666 from Shenzhen to Liuzhou[56] at that moment)

China Railway Nanning Group's[56] EMU trains running on the whole Guangzhou-Shenzhen line used to be exist that, since not later than year 2023[56] such EMU train service was previously available betweenShenzhen railway station (the one in Luohu district near the Hong Kong border) and Liuzhou[56] via Guangzhou, at which this pair of service was numbered D3665 (southbound) and D3666 (northbound); however, with effective from 11 October 2023, train number D3665/D3666 no longer serves Shenzhen and Dongguan, and this pair of train serves Zhuhai[55] and Zhongshan[57] instead.

Image gallery

[edit]
  • Bond agreement signed in 1907
    Bond agreement signed in 1907
  • Foundation ceremony of the Chinese Section of KCR in 1909. Group photo of both Chinese and British officials.
    Foundation ceremony of the Chinese Section of KCR in 1909. Group photo of both Chinese and British officials.

See also

[edit]
Wikimedia Commons has media related toGuangzhou-Shenzhen Railway.

Note

[edit]
  1. ^Chinese language version of official timetable[9] has also been referred.
  2. ^It was reported that "Z-class" train services between Shenzhen East and Guangzhou East, numbered Z8351-Z8356, existed temporarily in December 2019.[13][14]
  3. ^Chinese-language wiki article ofD727/728 trains refers.
  4. ^The author(s) or editor of a media report website,[14] in Chinese, use the Chinese words「臨時」(at which the meaning equals to "temporal" in English) when reporting the Z8351-Z8354 service in December 2019.[14] For situation in year 2024, the service period of D9785-D9786 as reported by the China Railway's official website[18] only confined withinChunyun period.
  5. ^Other than the mentioned temporary added trips in October 2023, another example occurred that information was released to the internet in a similar way (in Chinese language), is on 6 April 2024[19]
  6. ^Guangzhou-Shanwei High-speed Railway started operation since 26 September 2023[27] at which trains running via III、IV line of Guangshen railway to serve between Xintang and Guangzhou East Station become available;[28] for intercity service with Shenzhen via Dongguan,[29] service become available since year 2024
  7. ^Top class;Chinese:特等站
  8. ^There exist examples[16][17][19] to support the description.

References

[edit]
  1. ^"'End of an era' for Hong Kong MTR's cross-border through-train services with Guangzhou, Beijing, Shanghai". South China Morning Post. 29 April 2022.Archived from the original on 9 October 2024. Retrieved9 October 2024.
  2. ^"高鐵推出廣州東新綫.途經東莞". 港鐵. 15 January 2023. Retrieved15 January 2023.
  3. ^"Canton-Kowloon Chinese Railway 5% Loan – 1938". Archived fromthe original on 1 December 2008. Retrieved23 June 2009.
  4. ^abcdMichael Molitch-Hou (14 June 2019)."How China's High-Speed Rail Zooms Past Other Countries". Retrieved15 August 2024.
  5. ^abcGuangshen Railway Company Limited,Annual Report 2001.
  6. ^Guangshen Railway Company Limited (2009),Interim Report 2009(PDF), retrieved26 September 2024
  7. ^Guangshen Railway Company Limited,Annual Report 2009.
  8. ^abNancy (9 April 2021). Monica Liu; Jerry (eds.)."Non-stop trains from Guangzhou to Shenzhen from April 10th".Newsgd.com.Archived from the original on 26 September 2024. Retrieved26 September 2024.
  9. ^ab中國鐵路12306網站 (in Chinese), China Railway, retrieved8 October 2024
  10. ^ab"广州 --> 深圳 (10月1日 周二) 共计440个车次".kyfw.12306.cn (in Chinese). Archived fromthe original on 30 September 2024. Retrieved30 September 2024.
  11. ^ab"深圳 --> 广州 (10月1日 周二) 共计458个车次".kyfw.12306.cn (in Chinese). Archived fromthe original on 30 September 2024. Retrieved30 September 2024.
  12. ^ab"廣鐵將啟用新的列車運行圖 廣州白雲站運力大幅增加".portal.sina.com.hk (in Chinese). 31 December 2023.Archived from the original on 4 September 2024. Retrieved5 September 2024.
  13. ^ab"深圳東至廣州東增3趟直達列車".深圳市交通運輸局 (in Chinese). 深圳市交通運輸局(深圳市港務管理局). 4 December 2019. Archived fromthe original on 27 September 2020. Retrieved15 August 2024.
  14. ^abcde潘少婷; 冯欢 (5 December 2019). 符德明 (ed.)."买票请注意啦!12月起东莞站加开三对列车".www.timedg.com (in Chinese).Archived from the original on 4 September 2024. Retrieved4 September 2024.
  15. ^纪晓欣, ed. (3 December 2019)."深圳东站增开至广州东直达特快列车(附列车详情)".深圳之窗传媒有限公司 (in Chinese).Archived from the original on 5 September 2024. Retrieved5 September 2024.
  16. ^abcdef广州铁路."#广铁资讯# 10月3日广铁集团管内主要车站余票信息".m.weibo.cn (in Chinese).Archived from the original on 4 September 2024. Retrieved4 September 2024.
  17. ^abcdefg广铁集团深圳火车站."【10月5日深圳地区车站往这些方向仍有余票】".m.weibo.cn (in Chinese).Archived from the original on 4 September 2024. Retrieved4 September 2024.
  18. ^abcd"中国铁路广州局集团有限公司关于2024年2月1日至2月29日期间增开部分旅客列车的公告" (in Chinese). 中国铁路12306. Archived fromthe original on 6 February 2024. Retrieved6 February 2024.
  19. ^abc"4月6日深圳地区火车站往这些方向仍有余票" (in Chinese). 广铁集团深圳火车站. 6 April 2024.Archived from the original on 4 September 2024. Retrieved4 September 2024.
  20. ^abcd廣深鐵路股份有限公司董事會 (30 March 2020)."廣深鐵路股份有限公司2019年度社會責任報告"(PDF) (in Chinese). Retrieved3 April 2024.
  21. ^"绿色"复兴号"首跑深圳-北京西!全程运行21小时37分钟".m.dutenews.com (in Chinese).Archived from the original on 27 September 2024. Retrieved27 September 2024.
  22. ^abcd"复兴号"绿巨人"助力株洲假期出行".红网时刻新闻 (in Chinese). 28 September 2023.Archived from the original on 4 September 2024. Retrieved4 September 2024 – via 腾讯新闻.
  23. ^ab"中国铁路广州局集团有限公司关于2024年2月17日增开D9791次等旅客列车的公告" (in Chinese). 中国铁路12306. Archived fromthe original on 17 February 2024. Retrieved22 February 2024.
  24. ^ab"广州东 --> 深圳 (10月4日 周五)",kyfw.12306.cn (in Chinese), archived fromthe original on 4 October 2024, retrieved4 October 2024
  25. ^ab"深圳 --> 广州东 (10月2日 周三)".kyfw.12306.cn (in Chinese). Archived fromthe original on 2 October 2024. Retrieved2 October 2024.
  26. ^"Train stations in Shenzhen".www.szpsq.gov.cn.Archived from the original on 27 September 2024. Retrieved27 September 2024.
  27. ^"Guangzhou-Shanwei High-speed Railway starts operation".GDToday. 27 September 2023.Archived from the original on 5 September 2024. Retrieved5 September 2024 – via Guangzhou International (the official website of Guangzhou Municipality).
  28. ^ab"广汕高铁9月26日开通运营".广州日报 (in Chinese). 26 September 2023.Archived from the original on 27 September 2024. Retrieved27 September 2024 – via 广州市人民政府办公厅官方网站.
  29. ^ab"九市速遞:廣深線下周起可抵增城 停新塘站 全線車程長3分鐘" (in Chinese). 明報.Archived from the original on 27 September 2024. Retrieved27 September 2024.
  30. ^"亚洲最大火车站——广州白云站、汕汕高铁开通!附搭乘攻略",星岛环球网 (in Chinese), 26 December 2023,archived from the original on 26 September 2024, retrieved26 September 2024
  31. ^"6月20日起,广州东站新增深圳北方向动车组".广州日报·新花城 (in Chinese). 18 June 2022.Archived from the original on 27 September 2024. Retrieved27 September 2024 – via huacheng.gz-cmc.com.
  32. ^ab"本周六列车运行图上新!广州白云站重要变化".白云融媒 (in Chinese). 13 June 2024.Archived from the original on 27 September 2024. Retrieved27 September 2024 – via 腾讯新闻.
  33. ^abcd"广深铁路信号系统改造完成, 未来多条高铁可直达深圳站" (in Chinese). 深圳商报. 15 September 2020.Archived from the original on 27 September 2024. Retrieved27 September 2024.
  34. ^"在罗湖也能坐高铁!多趟高铁动车将直达深圳站!".m.thepaper.cn (in Chinese).Archived from the original on 27 September 2024. Retrieved27 September 2024.
  35. ^abc"Attention! Guangzhou-Foshan-Zhaoqing Intercity Railway to start skip-stop train service".GDToday. 12 October 2023.Archived from the original on 5 September 2024. Retrieved5 September 2024 – via Guangzhou International (the official website of Guangzhou Municipality).
  36. ^ab"Luohu station operates hi-speed trains to east GD".Shenzhen Daily. 12 October 2023.Archived from the original on 28 September 2024. Retrieved28 September 2024 – via Guangming Government Online.
  37. ^"加开、新开!从深圳出发,将有更多选择".大湾区之声 (in Chinese). 10 October 2023.Archived from the original on 28 September 2024. Retrieved28 September 2024 – via 光明网(责任编辑:季爽).
  38. ^"开通!深圳⇋汕头只需109分钟!这些高铁预计通车时间也定了!".深圳本地寶 (in Chinese). 28 December 2023.Archived from the original on 28 September 2024. Retrieved28 September 2024 – via 网易新闻.
  39. ^ab李嘉莹, ed. (6 June 2024)."6月15日起铁路调图!汕头出行有变".网易新闻 (in Chinese).Archived from the original on 28 September 2024. Retrieved28 September 2024.
  40. ^"汕头火车站9月14日起实行新的列车运行图".汕头市委宣传部 (in Chinese). 13 September 2024.Archived from the original on 28 September 2024. Retrieved28 September 2024 – via 网易新闻.
  41. ^"实现高铁直连!南宁至厦门、福州高铁动车开跑!".www.gxnews.com.cn (in Chinese). 27 June 2021.Archived from the original on 4 September 2024. Retrieved5 September 2024.
  42. ^abc"6月25日起全國鐵路實施新列車運行圖 新增南寧至廈門直通動車".gx.people.com.cn (in Chinese).Archived from the original on 5 September 2024. Retrieved5 September 2024.
  43. ^"龙岩始发至广州高速动车组首发开行" (in Chinese). 福建日报报业集团. 12 January 2024.Archived from the original on 27 September 2024. Retrieved27 September 2024.
  44. ^"深圳铁路部门10月11日起实施新的列车运行图" (in Chinese). GUANGSHEN RAILWAY CO., LTD. 12 October 2022. Retrieved4 March 2024.
  45. ^"车迷好图 第510期".m.sohu.com (in Chinese). 搜狐. 4 March 2023. Retrieved27 September 2024.
  46. ^"CRH1E执行D3121次".www.trainnets.com (in Chinese). TrainNet@126.com. 23 July 2023.Archived from the original on 27 September 2024. Retrieved15 August 2024.
  47. ^abcd"高铁首次开进广州市中心车站 正式步入高铁时代".m.lwgcw.com (in Chinese).Archived from the original on 27 September 2024. Retrieved27 September 2024.
  48. ^"1月10日起调整铁路运行图!广州车站有什么变化".www.gz.gov.cn (in Chinese).Archived from the original on 27 September 2024. Retrieved27 September 2024.
  49. ^"廣鐵集團實施新的列車運行圖".hn.people.com.cn (in Chinese).Archived from the original on 27 September 2024. Retrieved27 September 2024.
  50. ^"明日首发!2小时17分!赣州到广州!" (in Chinese). 赣州商会联合总会.Archived from the original on 27 September 2024. Retrieved27 September 2024.
  51. ^"2小时17分!赣州至广州!" (in Chinese). 上海东方报业有限公司.Archived from the original on 27 September 2024. Retrieved27 September 2024.
  52. ^ab深圳市交通運輸局 (19 June 2019)."深圳站7月将開行第一對跨線動車組列車" (in Chinese). 深圳市交通運輸局(深圳市港務管理局). Retrieved15 August 2024.[dead link]
  53. ^深圳市交通運輸局 (30 June 2020)."7月1日起鐵路部門實施新的運行圖 3對廣深動車延至佛山西站" (in Chinese). 深圳市交通運輸局(深圳市港務管理局). Retrieved15 August 2024.[dead link]
  54. ^尹辅华; 孙景锋, eds. (30 June 2020)."7月起全国铁路用新图!佛山西站、火车站车次有变化".南方日报 (in Chinese).Archived from the original on 5 September 2024. Retrieved5 September 2024.
  55. ^ab"动车"公交化"!途经"海上高铁"!柳州人跨城逛街更方便了".南宁日报 (in Chinese). 11 October 2023.Archived from the original on 20 September 2024. Retrieved20 September 2024 – via 澎湃新闻.
  56. ^abcde"中国铁路南宁局集团有限公司加开列车公告 2023.04.01" (in Chinese). 中国铁路12306.Archived from the original on 4 September 2024. Retrieved4 September 2024.
  57. ^"Zhongshan Station to implement new train schedule". 9 October 2023.Archived from the original on 4 September 2024. Retrieved4 September 2024.

External links

[edit]
Wikimedia Commons has media related toGuangzhou-Shenzhen Railway.
China RailwayCR S-train
Beijing
Tianjin
Yangquan
Lianyungang
Ningbo
Shaoxing
Haikou
CRH C-train
CR Shenyang
CR Beijing
CR Zhengzhou
CR Shanghai
CR Wuhan
CR Chengdu
CR Jinan
CR Guangzhou
CR Lanzhou
China Railways Logo
#: stations that don't provide CRH trains' services
High-speed demonstrativemaglev
Coastal
Hangshen
parallel
other branches
Beijing–Shanghai
West route
East route
branches
Beijing–Hong Kong (Taipei)§
ToHong Kong
ToTaipei
Harbin–Hong Kong (Macau)§
Hohhot–Nanning
Beijing–Kunming
Branch lines
Baotou (Yinchuan)–Hainan
Lanzhou (Xining)–Guangzhou
Suifenhe–Manzhouli
Beijing–Lanzhou
Qingdao–Yinchuan
Eurasia Continental
Yangtze River
Old line
Shanghai–Kunming
Xiamen–Chongqing
Guangzhou–Kunming
Intercity and
long-distance
North China
Northeast China
East China
Central and South China
Northwest China
Southwest China
Intercity railway
networks
Upgraded lines with
operating speeds
≥ 200 km (120 mi)
  • Italics: under construction or currently not operational
  • (-), Place A-: section under construction or currently not operational
  • §: in/related to Hong Kong, Macau, Taiwan
  • (Place A–Place B): share tracks with other lines
Government
agencies
Road
Rail
Water
Ports
Canals
Industry
Aviation
Major airlines
Airports
Industry
Space
Other topics
Public transport in Guangdong, Hong Kong and Macau
Public transport in Guangdong, Hong Kong and Macau
Portals:
Retrieved from "https://en.wikipedia.org/w/index.php?title=Guangzhou–Shenzhen_railway&oldid=1319326090"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp