Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Guangtong–Dali railway

From Wikipedia, the free encyclopedia
(Redirected fromGuangtong–Dali Railway)
Railway line in Yunnan, China
Guangtong–Dali railway
The Guangtong–Dali railway in the city ofChuxiong
Overview
Native name廣大鐵路
Statusopen
LocaleYunnan Province, China
Termini
Stations21
Service
TypeHeavy rail
SystemChina Railway
Operator(s)CR Kunming Group & Dianxi Railway Co., Ltd
History
OpenedMay 1999
Technical
Line length206 km (128 mi)
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
Minimum radius
  • 350 m (1,150 ft)
  • 5,500 m (18,000 ft) (difficult)
ElectrificationNo
Operating speed60 km/h (37 mph)
SignallingSemi-automatic block
Maximum incline1.2%
Route map

km
toChengdu–Kunming railway toKunming
0
Guangtong [zh]
toChengdu–Kunming railway toYuanmou West [zh]
16
Chimuling
Up arrowGuangtong–Chuxiong–Dali railway towardsGuangtong North [zh]
30
Chuxiong South [zh]
37
Chuxiong West [zh]
48
Qianliangqiao
56
Lvhe
66
Nanhua North
71
Dagudui
81
Shaqiao
93
Dazhu
100
Yao'an
112
Changchong
123
Xinshaozhan
134
Mupang
153
Tianma
167
Xiangyun West
179
Zaiyangqing
187
Midu
197
Dajiangxi
Guangtong–Chuxiong–Dali railway to the right
205
Dali East
toDali–Lijiang railway towardsLijiang
213
Dali
Right arrowDali–Lincang railway toLincang [zh]
Down arrowDali–Ruili railway to Ruili
km
This diagram:

TheGuangtong–Dali orGuangda railway (simplified Chinese:广大铁路;traditional Chinese:廣大鐵路;pinyin:guǎngdà tiělù), is asingle-trackelectrifiedrailroad inYunnan Province ofSouthwest China. The line branches off from the Guangtong station, nearKunming on theChengdu–Kunming railway and runs west toDali City. The line is 213 km (132 mi) in length and was built from May 1992 to June 1998.[1] Major cities and towns along the route includeChuxiong City,Nanhua,Xiangyun County,Midu County and Dali.

Construction of a new, 175-km dual-track electrified line, theGuangtong–Chuxiong–Dali railway, paralleling the line began in September 2010. Difficulties in construction included 110,000 cubic meters of water inundation of the tunnels. The new electrified line opened for traffic in July 2018, upping speeds from 60 to 200 km/h and doubling the track.[2][3] After the opening of the Guangtong–Chuxiong–Dali railway, the Guangtong–Dali railway discontinued its passenger services.[4][5]

Rail connections

[edit]

See also

[edit]

References

[edit]
  1. ^"广大铁路扩能改造工程项目前期工作顺利推进" (in Chinese). 24 May 2010. Archived fromthe original on 1 August 2012. Retrieved27 November 2011.
  2. ^"中缅国际通道广大铁路祥和隧道贯通 7月开行动车-中新网" (in Chinese).
  3. ^"这条铁路今天开通!从金马碧鸡到苍山洱海,只要两小时!".People's Railway (in Chinese).China Railway. 1 July 2018. Retrieved12 August 2024.
  4. ^China Railway Kunming Group (2020-07-22)."一专多能!铁路人修剪危树也是一把好手".微信公众平台 (in Chinese). Retrieved2025-04-25.
  5. ^云南年鉴社, ed. (2019). "广大铁路扩能改造工程竣工".云南年鉴·2019 [Yunnan Yearbook 2019] (in Chinese). Kunming: 云南年鉴社. p. 231.ISSN 1007-4988.
Kunming–Bangkok
Eastern route
Central route
Western route
Bangkok–Singapore
  • Ho Chi Minh City–Phnom Penh: section planned, not operational or disused
  • §: standard-gauge railway
Stub icon

This Chinese rail-related article is astub. You can help Wikipedia byadding missing information.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Guangtong–Dali_railway&oldid=1287296067"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp