The idea of a fixed link between San Francisco and Marin had gained increasing popularity during the late 19th century, but it was not until the early 20th century that such a link became feasible.Joseph Strauss served as chief engineer for the project, withLeon Moisseiff,Irving Morrow andCharles Ellis making significant contributions to its design. The bridge opened to the public on May 27, 1937,[8] and has undergone various retrofits and other improvement projects in the decades since.
The Golden Gate Bridge is described inFrommer's travel guide as "possibly the most beautiful, certainly the most photographed, bridge in the world."[9][10] At the time of its opening in 1937, it was both thelongest and thetallest suspension bridge in the world, titles it held until1964 and1998 respectively. Its main span is 4,200 feet (1,280 m) and its total height is 746 feet (227 m).[11]
Before the bridge was built, the only practical short route between San Francisco and what is now Marin County was by boat across a section of San Francisco Bay. A ferry service began as early as 1820, with a regularly scheduled service beginning in the 1840s for the purpose of transporting water to San Francisco.[12]
In 1867, the Sausalito Land and Ferry Company opened. In 1920, the service was taken over by theGolden Gate Ferry Company, which merged in 1929 with the ferry system of theSouthern Pacific Railroad, becoming the Southern Pacific-Golden Gate Ferries, Ltd., the largest ferry operation in the world.[12][13] Once for railroad passengers and customers only, Southern Pacific's automobile ferries became very profitable and important to the regional economy.[14] The ferry crossing between theHyde Street Pier in San Francisco andSausalito Ferry Terminal in Marin County took approximately 20 minutes and cost $1.00 per vehicle prior to 1937, when the price was reduced to compete with the new bridge.[15][16] The trip from theSan Francisco Ferry Building took 27 minutes.
Many wanted to build a bridge to connect San Francisco to Marin County. San Francisco was the largest American city still served primarily by ferry boats. Because it did not have a permanent link with communities around the bay, the city's growth rate was below the national average.[17] Many experts said that a bridge could not be built across the 6,700-foot (2,000-metre) strait, which had strong, swirling tides and currents, with water 372 ft (113 m) deep[18] at the center of the channel, and frequent strong winds. Experts said that ferocious winds and blinding fogs would prevent construction and operation.[17]
Although the idea of a bridge spanning the Golden Gate was not new, the proposal that eventually took hold was made in a 1916San Francisco Bulletin article by former engineering student James Wilkins.[19] San Francisco's City Engineer estimated the cost at $100 million (equivalent to $2.9 billion in 2024), and impractical for the time. He asked bridge engineers whether it could be built for less.[12] One who responded, Joseph Strauss, was an ambitious engineer and poet who had, for hisgraduate thesis, designed a 55-mile-long (89 km)railroad bridge across theBering Strait.[20] At the time, Strauss had completed some 400drawbridges—most of which were inland—and nothing on the scale of the new project.[3] Strauss's initial drawings[21] were for a massivecantilever on each side of the strait, connected by a central suspension segment, which Strauss promised could be built for $17 million (equivalent to $491 million in 2024).[12]
A suspension-bridge design was chosen, using recent advances in bridge design andmetallurgy.[12]
Strauss spent more than a decade drumming up support in Northern California.[22] The bridge faced opposition, including litigation, from many sources. TheDepartment of War was concerned that the bridge would interfere with ship traffic. TheUS Navy feared that a ship collision or sabotage to the bridge could block the entrance to one of its main harbors. Unions demanded guarantees that local workers would be favored for construction jobs.Southern Pacific Railroad, one of the most powerful business interests in California, opposed the bridge as competition to its ferry fleet and filed a lawsuit against the project, leading to a mass boycott of the ferry service.[12]
In May 1924, ColonelHerbert Deakyne held the second hearing on the Bridge on behalf of theSecretary of War in a request to use federal land for construction. Deakyne, on behalf of the Secretary of War, approved the transfer of land needed for the bridge structure and leading roads to the "Bridging the Golden Gate Association" and both San Francisco County and Marin County, pending further bridge plans by Strauss.[23] Another ally was the fledglingautomobile industry, which supported the development of roads and bridges to increase demand for automobiles.[15]
The bridge's name was first used when the project was initially discussed in 1917 byM.M. O'Shaughnessy, city engineer of San Francisco, and Strauss. The name became official with the passage of theGolden Gate Bridge and Highway District Act by thestate legislature in 1923, creating aspecial district to design, build and finance the bridge.[24] San Francisco and most of the counties along theNorth Coast of California joined the Golden Gate Bridge District, with the exception beingHumboldt County, whose residents opposed the bridge's construction and the traffic it would generate.[25]
Design
South tower seen from walkway, withArt Deco elements
Strauss was the chief engineer in charge of the overall design and construction of the bridge project.[17] However, because he had little understanding or experience with cable-suspension designs,[26] responsibility for much of the engineering and architecture fell on other experts. Strauss's initial design proposal (two double cantilever spans linked by a central suspension segment) was unacceptable from a visual standpoint.[21] The final suspension design was conceived and championed byLeon Moisseiff, the engineer of theManhattan Bridge in New York City.[27]
Irving Morrow, a relatively unknown residential architect, designed the overall shape of the bridge towers, the lighting scheme, and Art Deco elements, such as the tower decorations, streetlights, railing, and walkways. The famousInternational Orange color was Morrow's personal selection, winning out over other possibilities, including the US Navy's suggestion that it be painted with black and yellow stripes to ensure visibility by passing ships.[17][28]
Senior engineer Charles Alton Ellis, collaborating remotely with Moisseiff, was the principal engineer of the project.[29] Moisseiff produced the basic structural design, introducing his "deflection theory" by which a thin, flexible roadway would flex in the wind, greatly reducing stress by transmitting forces via suspension cables to the bridge towers.[29] Although the Golden Gate Bridge design has proved sound, a later Moisseiff design, theoriginal Tacoma Narrows Bridge, collapsed in a strong windstorm soon after it was completed, because of an unexpectedaeroelastic flutter.[30] Ellis was also tasked with designing a "bridge within a bridge" in the southern abutment, to avoid the need to demolish Fort Point, a pre–Civil War masonry fortification viewed, even then, as worthy of historic preservation. He penned a graceful steel arch spanning the fort and carrying the roadway to the bridge's southern anchorage.[31]
Below Golden Gate Bridge
Ellis was a Greek scholar and mathematician who at one time was a University of Illinois professor of engineering despite having no engineering degree. He eventually earned a degree in civil engineering from the University of Illinois prior to designing the Golden Gate Bridge and spent the last twelve years of his career as a professor at Purdue University. He became an expert in structural design, writing the standard textbook of the time.[32] Ellis did much of the technical and theoretical work that built the bridge, but he received none of the credit in his lifetime. In November 1931, Strauss fired Ellis and replaced him with a former subordinate, Clifford Paine, ostensibly for wasting too much money sending telegrams back and forth to Moisseiff.[32] Ellis, obsessed with the project and unable to find work elsewhere during the Depression, continued working 70 hours per week on an unpaid basis, eventually turning in ten volumes of hand calculations.[32]
With an eye toward self-promotion and posterity, Strauss downplayed the contributions of his collaborators who, despite receiving little recognition or compensation,[26] are largely responsible for the final form of the bridge. He succeeded in having himself credited as the person most responsible for the design and vision of the bridge.[32] Only much later were the contributions of the others on the design team properly appreciated.[32] In May 2007, the Golden Gate Bridge District issued a formal report on 70 years of stewardship of the famous bridge and decided to give Ellis major credit for the design of the bridge.
Panorama showing the height, depth, and length of the span from end to end, looking west
Panorama of the Golden Gate Bridge at sunset, as seen from just north ofAlcatraz Island
Finance
The Golden Gate Bridge and Highway District, authorized by an act of theCalifornia Legislature, was incorporated in 1928 as the official entity to design, construct, and finance the Golden Gate Bridge.[17] However, after theWall Street Crash of 1929, the District was unable to raise the construction funds, so it lobbied for a $30 millionbond measure (equivalent to $549 million today). The bonds were approved in November 1930,[20] by votes in the counties affected by the bridge.[33] The construction budget at the time of approval was $27 million ($508 million today). However, the District was unable to sell the bonds until 1932, whenAmadeo Giannini, the founder of San Francisco–basedBank of America, agreed on behalf of his bank to buy the entire issue in order to help the local economy.[12]
Construction
Construction began on January 5, 1933.[12] The project cost more than $35 million[34] ($630 million in 2024 dollars[35]), and was completed ahead of schedule and $1.3 million under budget (equivalent to $29.8 million in 2024).[36]The Golden Gate Bridge construction project was carried out by the McClintic-Marshall Construction Co., a subsidiary ofBethlehem Steel Corporation founded by Howard H. McClintic and Charles D. Marshall, both ofLehigh University.
An originalrivet replaced during the seismic retrofit after the1989 Loma Prieta earthquake. A total of 1.2 million steel rivets hold the bridge's two towers together.
Strauss remained head of the project, overseeing day-to-day construction and making some groundbreaking contributions. A graduate of theUniversity of Cincinnati, he placed a brick from his alma mater's demolished McMicken Hall in the south anchorage before the concrete was poured.
Strauss also innovated the use of movable safety netting beneath the men working, which saved many lives. Nineteen men saved by the nets over the course of the project formed theHalf Way to Hell Club. Nonetheless, eleven men were killed in falls, ten on February 17, 1937, when a scaffold (secured by undersized bolts) with twelve men on it fell into and broke through the safety net; two of the twelve survived the 200-foot (61 m) fall into the water.[37][38]
TheRound House Cafédiner was then included in the southeastern end of the Golden Gate Bridge, adjacent to the tourist plaza which was renovated in 2012.[39] The Round House Café, an Art Deco design byAlfred Finnila completed in 1938, has been popular throughout the years as a starting point for various commercial tours of the bridge and an unofficial gift shop.[40] The diner was renovated in 2012[39] and the gift shop was then removed as a new, official gift shop has been included in the adjacent plaza.[40]
During the bridge work, the Assistant Civil Engineer of CaliforniaAlfred Finnila had overseen the entire iron work of the bridge as well as half of the bridge's road work.[41]
Contributors
Plaque of the major contributors to the Golden Gate Bridge lists contractors, engineering-staff, directors and officers:[42]
Electrical work - Alta Electric and Mechanical Company Incorporated
Bridge deck - Pacific Bridge Company
Presidio Approach Roads and Viaducts - Easton & Smith
Toll Plaza - Barrett & Hilp
Engineering staff
Chief engineer - Joseph B. Strauss
Principal assistant engineer - Clifford E. Paine
Resident engineer - Russell Cone
Assistant engineer - Charles Clarahan Jr., Dwight N. Wetherell
Consulting engineer - O.H. Ammann, Charles Derleth Jr., Leon S. Moisseiff
Consulting traffic engineer - Sydney W. Taylor Jr.
Consulting architect - Irving F. Morrow
Consulting geologist - Andrew C. Lawson, Allan E. Sedgwick
Directors
San Francisco - William P. Filmer, Richard J. Welch, Warren Shannon, Hugo D. Newhouse, Arthur M. Brown Jr., John P. McLaughlin, William D. Hadeler, C.A. Henry, Francis V. Keesling, William P. Stanton, George T. Cameron
Del Norte County - Henry Westbrook Jr., Milton M. McVay
Officers
President - William P. Filmer
Vice President - Robert H. Trumbull
General manager - James Reed, Alan McDonald
Chief engineer - Joseph B. Strauss
Secretary - W. W. Felt Jr.
Auditor - Roy S. West, John R. Ruckstell
Attorney - George H. Harlan
Torsional bracing retrofit
On December 1, 1951, a windstorm revealed swaying and rolling instabilities of the bridge, resulting in its closure.[43] In 1953 and 1954, the bridge was retrofitted with lateral and diagonal bracing that connected the lower chords of the two side trusses. This bracing stiffened the bridge deck in torsion so that it would better resist the types of twisting that had destroyed theTacoma Narrows Bridge in 1940.[44]
Bridge deck replacement (1982–1986)
The original bridge used aconcretedeck.Salt carried by fog or mist reached therebar, causingcorrosion and concretespalling. From 1982 to 1986, the original bridge deck, in 747 sections, was systematically replaced with a 40% lighter, and stronger, steelorthotropic deck panels, over 401 nights without closing the roadway completely to traffic. The roadway was also widened by two feet, resulting in outside curb lane width of 11 feet, instead of 10 feet for the inside lanes. This deck replacement was the bridge's greatest engineering project since it was built and cost over $68 million.[45]
Opening festivities, and 50th and 75th anniversaries
A plaque on the south tower commemorating the 25th anniversary of the bridgeThe Golden Gate Bridge andFort Point
The bridge-opening celebration in 1937 began on May 27 at 6:00a.m. and lasted for one week.[46][47] The day before vehicle traffic was allowed, 200,000 people crossed either on foot or on roller skates.[12][48] Donald Bryan, a studentsprinter from theSan Francisco Junior College (now the City College of San Francisco), was the first to make it across the bridge from end to end.[47] On opening day, MayorAngelo Rossi and other officials rode the ferry to Marin, then crossed the bridge in a motorcade past three ceremonial "barriers", the last a blockade ofbeauty queens who required Joseph Strauss to present the bridge to the Highway District before allowing him to pass. An official song, "There's a Silver Moon on the Golden Gate," was chosen to commemorate the event. Strauss wrote a poem that is now on the Golden Gate Bridge entitled "The Mighty Task is Done." The next day,President Franklin D. Roosevelt pushed a button in Washington, D.C. signaling the official start of vehicle traffic over the Bridge at noon. Weeks of civil and cultural activities called "the Fiesta" followed. A statue of Strauss was moved in 1955 to a site near the bridge.[19]
As part of the fiftieth anniversary celebration in 1987, the Golden Gate Bridge district again closed the bridge to automobile traffic and allowed pedestrians to cross it on May 24. This Sunday morning celebration attracted 750,000 to 1,000,000 people, and ineffective crowd control meant the bridge became congested with roughly 300,000 people, causing the center span of the bridge to flatten out under the weight.[49][50][51] Although the bridge is designed to flex in that way under heavy loads, and was estimated not to have exceeded 40% of the yielding stress of the suspension cables,[52] bridge officials stated that uncontrolled pedestrian access was not being considered as part of the 75th anniversary on Sunday, May 27, 2012,[53][54][55] because of the additional law enforcement costs required "since9/11."[56] To commemorate the bridge's 75th anniversary, automated user-controlledsolar beacons were temporarily installed atop the towers.[57]
A pedestrian poses at the old railing on opening day, 1937.
Opening of the Golden Gate Bridge
Official invitation to the opening of the bridge. This copy was sent to the City ofSeattle.
Structural specifications
On the south side of the bridge a 36.5-inch-wide (93 cm) cross-section of the cable, containing 27,572 wires, is on display.
Until 1964, the Golden Gate Bridge had the longest suspension bridge main span in the world, at 4,200 feet (1,280 m). Since 1964 its main span length has beensurpassed by twenty bridges; it now has the second-longest main span in theAmericas, after theVerrazzano-Narrows Bridge in New York City. The total length of the Golden Gate Bridge fromabutment to abutment is 8,981 feet (2,737 m).[58]
The Golden Gate Bridge's clearance above high water averages 220 feet (67 m) while its towers, at 746 feet (227 m) above the water,[58] were the world's tallest on a suspension bridge until 1993 when it was surpassed by theMezcala Bridge, in Mexico.
The weight of the roadway is hung from 250 pairs of vertical suspender ropes, which are attached to two maincables. The main cables pass over the two main towers and are fixed in concrete at each end. Each cable is made of 27,572 strands of wire. The total length of galvanized steelwire used to fabricate both main cables is estimated to be 80,000 miles (130,000 km).[58] Each of the bridge's two towers has approximately 600,000rivets.[59]
In the 1960s, when theBay Area Rapid Transit system (BART) was being planned, the engineering community had conflicting opinions about the feasibility of running train tracks north to Marin County over the bridge.[60] In June 1961, consultants hired by BART completed a study that determined the bridge's suspension section was capable of supporting service on a new lower deck.[61] In July 1961, one of the bridge's consulting engineers, Clifford Paine, disagreed with their conclusion.[62] In January 1962, due to more conflicting reports on feasibility, the bridge's board of directors appointed an engineering review board to analyze all the reports. The review board's report, released in April 1962, concluded that running BART on the bridge was not advisable.[63]
Aesthetics
Aesthetics was the foremost reason that the first design of Joseph Strauss was rejected. Upon re-submission of his bridge construction plan, he added details, such as lighting, to outline the bridge's cables and towers.[64] In 1999, it was ranked fifth on theList of America's Favorite Architecture by theAmerican Institute of Architects.
The color of the bridge is officially an orangevermilion calledinternational orange.[65][66] The color was selected by consulting architect Irving Morrow[67] because it complements the natural surroundings and enhances the bridge's visibility in fog.[68]
The bridge was originally painted withred lead primer and a lead-based topcoat, which was touched up as required. In the mid-1960s, a program was started to improve corrosion protection by stripping the original paint and repainting the bridge withzinc silicate primer andvinyl topcoats.[69][65] Since 1990,acrylic topcoats have been used instead for air-quality reasons. The program was completed in 1995 and it is now maintained by 38 painters who touch up the paintwork where it becomes seriously corroded.[70]The ongoing maintenance task of painting the bridge is continuous.[71]
A view of the Golden Gate Bridge from the Marin Headlands on a foggy morning at sunrise
View of Marin from the south tower
Top of the south tower
Golden Gate Bridge seen from Fort Point
Traffic
Installation of the movable median barrier system in January 2015Testing the newly installed movable barrier
Themovable median barrier between the lanesis moved several times daily to conform to traffic patterns. On weekday mornings, traffic flows mostly southbound into the city, so four of the six lanes run southbound. Conversely, on weekday afternoons, four lanes run northbound. During off-peak periods and weekends, traffic is split with three lanes in each direction.[73]
From 1968 to 2015, opposing traffic was separated by small,plastic pylons; during that time, there were 16 fatalities resulting from 128 head-on collisions.[74] To improve safety, thespeed limit on the Golden Gate Bridge was reduced from 50 to 45 mph (80 to 72 km/h) on October 1, 1983.[75] Although there had been discussion concerning the installation of a movable barrier since the 1980s, only in March 2005 did the Bridge Board of Directors commit to finding funding to complete the $2 million study required prior to the installation of a movable median barrier.[74] Installation of the resulting barrier was completed on January 11, 2015, following a closure of 45.5 hours to private vehicle traffic, the longest in the bridge's history. The new barrier system, including the zipper trucks, cost approximately $30.3 million to purchase and install.[74][76]
The bridge carries about 112,000 vehicles per day according to the Golden Gate Bridge Highway and Transportation District.[77]
Looking north with traffic and current flow into the bay with sailboats
The bridge is popular with pedestrians and bicyclists, and was built with walkways on either side of the six vehicle traffic lanes. Initially, they were separated from the traffic lanes by only a metal curb, but railings between the walkways and the traffic lanes were added in 2003, primarily as a measure to prevent bicyclists from falling into the roadway.[78] The bridge was designated as part ofU.S. Bicycle Route 95 in 2021.[79]
The main walkway is on the eastern side, and is open for use by both pedestrians and bicycles in the morning to mid-afternoon during weekdays (5:00 a.m. to 3:30 p.m.), and to pedestrians only for the remaining daylight hours (until 6:00 p.m., or 9:00 p.m. duringDST). The eastern walkway is reserved for pedestrians on weekends (5:00 a.m. to 6:00 p.m., or 9:00 p.m. during DST), and is open exclusively to bicyclists in the evening and overnight, when it is closed to pedestrians. The western walkway is open only for bicyclists and only during the hours when they are not allowed on the eastern walkway.[80]
Bus service across the bridge is provided by one public transportation agency,Golden Gate Transit, which runs numerous bus lines throughout the week.[81] The southern end of the bridge, near the toll plaza and parking lot, is also accessible daily from 5:30 a.m. to midnight bySan Francisco Muni line 28.[82] Muni formerly offered Saturday and Sunday service across the bridge on the Marin Headlands Express bus line, but this was indefinitely suspended due to theCOVID-19 pandemic.[83][84] The Marin Airporter, a private company, also offers service across the bridge between Marin County andSan Francisco International Airport.[85]
Avisitor center and gift shop, originally called the "Bridge Pavilion" (since renamed the "Golden Gate Bridge Welcome Center"), is located on the San Francisco side of the bridge, adjacent to the southeast parking lot. It opened in 2012, in time for the bridge's 75th-anniversary celebration. A cafe, outdoor exhibits, and restroom facilities are located nearby.[86] On the Marin side of the bridge, only accessible from the northbound lanes, is the H. Dana Bower Rest Area and Vista Point,[87] named after the first landscape architect for the California Division of Highways.[88]
Lands and waters under and around the bridge are homes to varieties of wildlife such asbobcats, harbor seals, and sea lions.[89][90] Three species ofcetaceans (whales) that had been absent in the area for many years have shown recoveries and recolonizations in the vicinity of the bridge as of 2017[update]; researchers studying them have encouraged stronger protections and recommended that the public watch them from the bridge or from land, or use a localwhale watching operator.[91][92][93]
Tolls
Current toll rates
Tolls are only collected from southbound traffic after they cross from Marin County at the toll plaza on the San Francisco side of the bridge.All-electronic tolling has been in effect since 2013, and drivers may either pay using theFasTrak electronic toll collection device or using the license plate tolling program. It remains not truly anopen road tolling system until the remaining unused toll booths are removed, forcing drivers to slow substantially from freeway speeds while passing through. Effective July 1, 2025 – June 30, 2026 (2025-07-01 –2026-06-30), the toll rate for passenger cars with license plate accounts is $10.00, while FasTrak users pay a discounted toll of $9.75. During peak traffic hours on weekdays between 5:00 am and 9:00 am, and between 4:00 pm and 6:00 pm,carpool vehicles carrying three or more people, or motorcycles may pay a discounted toll of $7.75 if they have FasTrak and use the designated carpool lane. Drivers without Fastrak or a license plate account must open a "short term" account within 48 hours after crossing the bridge or they will be sent a toll invoice of $10.75 (the FasTrak toll plus an additional $1 fee). No additional toll violation penalty will be assessed if the invoice is paid within 21 days.[94][95][96]
Historical toll rates
Golden Gate Bridge at sunset
When the Golden Gate Bridge opened in 1937, the toll was 50cents per car (equivalent to $10.94 in 2024), collected in each direction. In 1950 it was reduced to 40cents each way ($5.23 in 2024), then lowered to 25cents in 1955 ($2.93 in 2024). In 1968, the bridge was converted to only collect tolls from southbound traffic, with the toll amount reset back to 50cents ($4.52 in 2024).[97]
From May 1937 until December 1970, pedestrians were charged a toll of 10 cents for bridge access viaturnstiles on the sidewalks.[98][99]
The last of the construction bonds were retired in 1971, with $35 million (equivalent to $272M in 2024) in principal and nearly $39 million ($303M in 2024) in interest raised entirely from bridge tolls.[75] Tolls continued to be collected and subsequently incrementally raised; in 1991, the toll was raised a dollar to $3.00 (equivalent to $6.93 in 2024).[97][100]
The bridge began accepting tolls via the FasTrak electronic toll collection system in 2002, with $4 tolls for FasTrak users and $5 for those paying cash (equivalent to $6.99 and $8.74 respectively in 2024).[97] In November 2006, the Golden Gate Bridge, Highway and Transportation District recommended acorporate sponsorship program for the bridge to address its operating deficit, projected at $80 million over five years. The District promised that the proposal, which it called a "partnership program", would not include changing the name of the bridge or placing advertising on the bridge itself. In October 2007, the Board unanimously voted to discontinue the proposal and seek additional revenue through other means, most likely a toll increase.[101][102] The District later increased the toll amounts in 2008 to $5 for FasTrak users and $6 to those paying cash (equivalent to $7.3 and $8.76 respectively in 2024).[97]
In an effort to save $19.2 million over the following 10 years, the Golden Gate District voted in January 2011 to eliminate all toll takers by 2012 and use onlyopen road tolling.[103] Subsequently, this was delayed and toll taker elimination occurred in March 2013. The cost savings have been revised to $19 million over an eight-year period. In addition to FasTrak, the Golden Gate Transportation District implemented the use oflicense plate tolling (branded as "Pay-by-Plate"), and also a one-time payment system for drivers to pay before or after their trip on the bridge. Twenty-eight positions were eliminated as part of this plan.[104]
On April 7, 2014, the toll for users of FasTrak was increased from $5 to $6 (equivalent to $7.97 in 2024), while the toll for drivers using either the license plate tolling or the one time payment system was raised from $6 to $7 (equivalent to $9.3 in 2024). Bicycle, pedestrian, and northbound motor vehicle traffic remain toll free. For vehicles with more than two axles, the toll rate was $7 per axle for those using license plate tolling or the one time payment system, and $6 per axle for FasTrak users. During peak traffic hours, carpool vehicles carrying two or more people and motorcycles paid a discounted toll of $4 (equivalent to $5.31 in 2024); drivers must have had Fastrak to take advantage of this carpool rate.[104] The Golden Gate Transportation District then increased the tolls by 25cents in July 2015, and then by another 25cents each of the next three years.[105]
In March 2019, the Golden Gate Transportation District approved a plan to implement 35-cent annual toll increases through 2023, except for the toll-by-plate program which will increase by 20cents per year.[106] The district then approved another plan in March 2024 to implement 50-cent annual toll increases through 2028.[107]
In March 2008, the Golden Gate Bridge District board approved a resolution to startcongestion pricing at the Golden Gate Bridge, charging higher tolls during the peak hours, but rising and falling depending on traffic levels. This decision allowed theBay Area to meet the federal requirement to receive $158 million in federal transportation funds fromUSDOTUrban Partnership grant.[111] As a condition of the grant, the congestion toll was to be in place by September 2009.[112][113]
In August 2008, transportation officials ended the congestion pricing program in favor of varying rates for metered parking along the route to the bridge including on Lombard Street andVan Ness Avenue.[114]
Navigational aid
Beacons
Time-exposed image of the Golden Gate Bridge illuminated on a clear night, complemented by its aerial and maritime beacons
The Golden Gate Bridge's firstaircraft warning lights used rotatingaerobeacons at the top of the towers that flashed red. In the 1980s, the present-day 750-watt red lamps were put into service, along with 16 red outline lanterns on the cables to enhance the structure's visibility at night.[115] For maritime movement, the bridge has white and greennavigation lights on both sides at the midspan and red safety lights marking the south tower's fender.[116][117]
Commonly, particularly during the summer months, fog on the strait becomes so dense that it can fully obscure the whole bridge,[118] creating an even greater hazard for mariners.[117] A system of fivefoghorns was thus set up on the bridge in 1937 and remains operational to this day. The fog signals areair-powered and are manually switched on and off.[119][120][121]Coast Guard regulates the pattern and pitch by which the horns must sound.[115]
Two foghorns are mounted at the base of the south tower 40 feet (12 m) above water level (at high tide).[120] They each point in the opposite direction, west and east, and have an identical profile: 48 inches (120 cm) long and a23+1⁄2-inch (60 cm) diameterbell. Both horns sound in tandem, producing a 2-second blast every 18 seconds[115] in a distinctively low tone.[122][123] On October 18, 2013, at around 2:00a.m., one foghorn sounded perpetually for nearly an hour due to a malfunctioning relay. It was disconnected by 3:00a.m. and repaired later that morning.[124]
The other three foghorns are mounted at the midspan of the bridge, just beneath the deck.[125] Two westward-facing horns are each 36 inches (91 cm) long with an 18-inch (46 cm) diameter bell and emit a higher tone than the horns on the south tower.[115] The third horn facing east is smaller, with a length of24+1⁄2 inches (62 cm) and a bell diameter of 11 inches (28 cm), thus emitting an even higher note.[122] Altogether, the three horns produce two 1-second blasts every 36 seconds with a dual-toned timbre;[115] they are synchronized to sound after every two blasts of the south tower horns.[126] Ships heading in either direction generally stay to the right of the midspan by following the sound of these horns. Dating back to 1985, the midspan foghorns replaced the original horns that had partly failed in the late 1970s, causing them to sound with only a single tone.[115]
The foghorns blared wildly asQueen Mary 2 passed under the bridge for her 2007 visit in San Francisco.[127][128]
Issues
Protests and stunts
Since the late 1970s, the Golden Gate Bridge has seen a share of protest rallies throughout its history. In some cases, participants staged public stunts to draw heightened attention to their political messages by haphazardly scaling the bridge.[129][130] On November 24, 1996, actorWoody Harrelson joined a group of local environmentalists who draped a large banner above the roadway deck protesting CEOCharles Hurwitz over his aggressivelogging advances. The incident snarled traffic and caused delays lasting the entire day.[131] As an effort to deter any more disruptive stunts, a legislation authored by State SenatorQuentin Kopp and signed into law by GovernorPete Wilson in 1997, stiffened penalties for trespassing on the bridge.[130] Nonetheless, demonstrations have continued to take place on the Golden Gate Bridge over the years, often resulting in the complete shutdown of the bridge.[b] Notably, on June 6, 2020, protestors occupied the bridge as part of anationwide denunciation topolice brutality in the wake of theGeorge Floyd's murder,[148][149][150] and in November 2021 twoCalifornia Highway Patrol officers and three bridge employees were injured in a vehicular chain-reaction crash during a protest againstgovernment-mandated COVID-19 vaccinations.[151][152] In February 2024 and again in April, pro-Palestinian protestors gathered on the deck to decry theGaza war and theturmoil afflicting Palestinians inGaza.[153][154]
As asuicide prevention initiative, signs on the Golden Gate Bridge promote special telephones that connect to crisis hotlines, as well as 24/7 crisis text lines.
The Golden Gate Bridge was the most usedsuicide site in the world prior to the installation of suicide prevention nets.[155] Jumpers would fall for four seconds,[156] then hit the water at around 75 mph (120 km/h; 30 m/s). Most would die from impacttrauma.[156] About 5% would survive the initial impact but generallydrown or die ofhypothermia in the cold water.[157][158] After years of debate and an estimated more 2,000 deaths, implementation of suicide prevention barriers began in April 2017.[159][156]
Suicide nets on the Pacific side of the Golden Gate Bridge in December 2022
Suicide nets
The so-called nets are taut, designed to be painful to land on. They extend 20 feet (6.1 m) out from the walkway and, because of their design, cause serious—but not fatal—injury to people who jump from the bridge.[156][160] They are made of "marine-grade stainless-steel wire rope, akin to a horizontal fence four millimeters thick," which does not give, and is located 20 feet (6.1 m) below the walkway.[161]
Construction was first estimated to take approximately four years at a cost of over $200 million; however, installation of the nets was not completed until January 2024, and exceeded the budget by $17 million.[162][163][156]
The nets have widely been considered successful, even convincing former skeptics. As of November 21, 2024, theGolden Gate Bridge Highway and Transportation District reported that the number of deaths by suicide year to date had been eight, down from an average 33.5. Through the end of October 2024, thwarted attempts were down from an annual average of 200 to 106.[164][156]
Wind
The Golden Gate Bridge was designed to safely withstand winds of up to 68 mph (109 km/h).[165][166] Until 2008, the bridge was closed because of weather conditions only three times: on December 1, 1951, because of gusts of 69 mph (111 km/h); on December 23, 1982, because of winds of 70 mph (113 km/h); and on December 3, 1983, because of wind gusts of 75 mph (121 km/h).[69] Ananemometer placed midway between the two towers on the west side of the bridge has been used to measure wind speeds and direction. Another anemometer was placed on one of the towers.[167]
Wind safety retrofit introduces wind "songs"
A recording of the noise produced by the Golden Gate Bridge taken in the Presidio of San Francisco on Sunday March 2, 2025
In June 2020 residents acrossSan Francisco andMarin Counties began to notice a humming noise. The noise has been described as "eerie", "a shrill screeching sound", and for some evokes a feeling that "something bad is about to happen."[168][169][170] TheGolden Gate Bridge Highway and Transportation District determined that the "unsettling" whistle is produced by new railing slats when a strongzephyr blows.[171]
The new slats were installed starting in 2019 on the west side of the bridge; they are more flexible than their predecessors and were selected to improve the bridge's aerodynamic tolerance of high wind to 100 mph (161 km/h). The sound had been predicted fromwind tunnel tests,[165] but not included in the environmental impact report.[172]
The Bridge District determined that, in fact, there are two sounds that the bridge produces. When the wind passing through the slats reaches 22 mph (35 km/h), "a low-pitched, low-frequency tone—between 280 and 700hertz" is produced.[170] When the wind passes through the slats at an angle and reaches 27 mph (43 km/h), the slats produce "higher pitch and frequency (1.1kHz)."[173]
On December 16, 2021, the Bridge District approved a fix for the noise; 12,000∪-shaped clips with rubber dampers are to be installed between the slats at a cost of $450,000.[174] Testing suggests that this fix will reduce the noise by 75%; however, even with the fix, the bridge is expected to emit the high frequency tone an average of 70 hours per year; the low frequency tone is expected 18 hours per year. The Bridge District expects installation to be "completed in 2025."[173]
An independent engineering analysis of a 2020 sound recording of the tones concludes that the singing noise comprises a variety ofAeolian tones (the sound produced by air flowing past a sharp edge), arising in this case from the ambient wind blowing across metal slats of the newly installed sidewalk railings.[175] The tones observed were frequencies of 354, 398, 439 and 481 Hz, corresponding to themusical notes F4, G4, A4, and B4; these notes form an F Lydian Tetrachord.
Seismic vulnerability and improvements
South approach sub-structure withseismic isolators (short black cylinders) added as part of the Seismic Retrofit Construction Project
Modern knowledge of the effect of earthquakes on structures led to a program toretrofit the Golden Gate to better resist seismic events. The proximity of the bridge to theSan Andreas Fault places it at risk for a significant earthquake. Once thought to have been able to withstand any magnitude of foreseeable earthquake, the bridge was actually vulnerable to complete structural failure (i.e., collapse) triggered by the failure of supports on the 320-foot (98 m) arch over Fort Point.[176] A $392 million program was initiated to improve the structure's ability to withstand such an event with only minimal (repairable) damage. A custom-built electro-hydraulic synchronous lift system for construction of temporary support towers and a series of intricate lifts, transferring the loads from the existing bridge onto the temporary supports, were completed with engineers fromBalfour Beatty andEnerpac, without disrupting day-to-day commuter traffic.[177][178] Although the retrofit was initially planned to be completed in 2012, as of May 2017[update] it was expected to take several more years.[178][179][180]
The former elevated approach to the Golden Gate Bridge through theSan Francisco Presidio, known as Doyle Drive, dated to 1933 and was named afterFrank Pierce Doyle, a director of theCalifornia State Automobile Association.[181] The highway carried about 91,000 vehicles each weekday between downtown San Francisco and theNorth Bay and points north.[182] The road was deemed "vulnerable to earthquake damage", had a problematic 4-lane design, and lacked shoulders; a San Francisco County Transportation Authority study recommended that it be replaced. Construction on the $1 billion replacement,[183] temporarily known as the Presidio Parkway, began in December 2009.[184]The elevated Doyle Drive was demolished on the weekend of April 27–30, 2012, and traffic used a part of the partially completed Presidio Parkway, until it was switched onto the finished Presidio Parkway on the weekend of July 9–12, 2015. As of May 2012[update], an official at Caltrans said there is no plan to permanently rename the portion known as Doyle Drive.[185]
Gallery
Panorama of San Francisco with two bridges (Western section of Bay Bridge in the left background),Coit Tower (in background to the left of north tower), andFort Mason (on the San Francisco waterfront in the background behind the north tower) from Marin
Panorama of the Golden Gate Bridge at night, with San Francisco in the background
^"Golden Gate Bridge Design".goldengatebridge.org. Golden Gate Bridge, Highway and Transportation District. Archived fromthe original on December 10, 2017. RetrievedNovember 27, 2017.
^Rodriguez, Joseph A. (2000). "Planning and Urban Rivalry in the San Francisco Bay Area in the 1930s".Journal of Planning Education and Research.20:66–76.doi:10.1177/073945600128992609.S2CID143841247.
Cassady, Stephen (1979).Spanning the Gate (Commemorative edition, 1987 ed.). Squarebooks.ISBN978-0-916290-36-8.
Dyble, Louise Nelson; the Golden Gate Bridge (2009).Paying the Toll: Local Power, Regional Politics. University of Pennsylvania Press.ISBN978-0-8122-2278-4.