Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

G4222 He County–Xiangyang Expressway

From Wikipedia, the free encyclopedia
Road in China
alt=He County–Xiangyang Expressway shield
He County–Xiangyang Expressway
和县-襄阳高速公路
Hexiang Expressway
和襄高速公路
Route information
Auxiliary route ofG42
Major junctions
West endZaoyang,Xiangyang,Hubei
East endG4231 / Anhui S22 inHe County,Ma'anshan,Anhui
Location
CountryChina
Highway system
G4221G4223

TheG4222 He County–Xiangyang Expressway (Chinese:和县—襄阳高速公路), also referred to as theHexiang Expressway (Chinese:和襄高速公路), is anexpressway inChina that connectsHe County,Anhui toXiangyang,Hubei.[1]

Route

[edit]

Anhui

[edit]

The Ninghe Expressway has a design speed on 120 km/h (75 mph) with a total length of 41.2 km (25.6 mi). It is expected to start construction at the end of August 2024 and be completed at the end of August 2027.[2]

The section inHefei has a length of 34.21 km (21.26 mi) and a design speed of 120 km/h (75 mph).

The section from Tongyang to Fengle has a total length of 42.5 km (26.4 mi), of which approximately 16.1 km (10.0 mi) will pass through theChaohu Tunnel. Construction started in 2024 and is slated for completion in 2029.

On 15 December 2022, the construction of the section fromShucheng toJinzhai started, with a length of 170.59 km (106.00 mi).[3] The section from Feixi,Feixi County to Shucheng has a length of 10.11 km (6.28 mi) with a design speed of 120 km/h (75 mph).[4]

Henan

[edit]

On 28 June 2021, construction began of the sections fromMount Jigong toShangcheng (boundary of Hubei and Anhui provinces) and fromMinggang toMount Jigong. The total length of the section fromJigong Mountain to Shangcheng is 123.32 km (76.63 mi) and has a design speed of 100 km/h (62 mph).[5]

Hubei

[edit]

The section inSuizhou has a length of 75.42 km (46.86 mi) and has a design speed of 120 km/h (75 mph).

TheXiangyang section is approximately 74.09 km (46.04 mi), which includes 56.05 km (34.83 mi) inZaoyang and 18.04 km (11.21 mi) inXiangzhou. Construction of this section started in 2024.

References

[edit]
  1. ^"国家公路网规划"(PDF).National Development and Reform Commission. Archived fromthe original(PDF) on 2022-07-12. Retrieved2024-07-31.
  2. ^"《G4222和县至襄阳高速公路和县至含山段环境影响报告书》全文公示". 2024-01-25. Retrieved2024-07-31.[permanent dead link]
  3. ^"G4222和襄高速公路六安段开工".ah.people.com.cn. Archived fromthe original on 2022-12-22. Retrieved2024-07-31.
  4. ^"G4222和县至襄阳高速公路舒城(千人桥)至金寨(皖豫界)段工程环境影响报告书----审批前公示". 2022-11-25. Retrieved2024-07-31.
  5. ^"河南省交通运输厅 关于沿大别山高速鸡公山至商城(豫皖省界)段项目主体工程施工图设计的批复". 2022-03-25. Archived fromthe original on 2022-12-20. Retrieved2024-07-31.
Blank NTHS marker  Expressways of theNational Trunk Highway System of China
Primary
Auxiliary
Spur
Parallel
Metropolitan
Area Ring
City ring
Italic indicates the routes that were available in 2013 network plan, but removed in 2022 network plan.


Stub icon

This People's Republic of China road-related article is astub. You can help Wikipedia byexpanding it.

Retrieved from "https://en.wikipedia.org/w/index.php?title=G4222_He_County–Xiangyang_Expressway&oldid=1300989263"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp