Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

First Avenue station (BMT Canarsie Line)

Coordinates:40°43′53″N73°58′57″W / 40.731324°N 73.982577°W /40.731324; -73.982577
From Wikipedia, the free encyclopedia
New York City Subway station in Manhattan

New York City Subway station in Manhattan, New York
 1 Avenue
 "L" train
Northbound platform
Station statistics
AddressFirst Avenue & East 14th Street
New York, New York
BoroughManhattan
LocaleEast Village,Stuyvesant Park,Stuyvesant Town
Coordinates40°43′53″N73°58′57″W / 40.731324°N 73.982577°W /40.731324; -73.982577
DivisionB (BMT)[1]
LineBMT Canarsie Line
Services  L all times (all times)
TransitBus transportNYCT Bus:M14A/M14D Select Bus Service,M15 (northbound),M15 Select Bus Service (northbound)
StructureUnderground
Platforms2side platforms
Tracks2
Other information
OpenedJune 30, 1924; 101 years ago (1924-06-30)
RebuiltJuly 1, 2019; 6 years ago (2019-07-01) to December 31, 2020; 4 years ago (2020-12-31)
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990ADA-accessible
Traffic
20246,266,103[2]Increase 9.1%
Rank35 out of 423[2]
Services
Preceding stationNew York City SubwayNew York City SubwayFollowing station
Third AvenueBedford Avenue
Location
First Avenue station (BMT Canarsie Line) is located in New York City Subway
First Avenue station (BMT Canarsie Line)
Show map of New York City Subway
First Avenue station (BMT Canarsie Line) is located in New York City
First Avenue station (BMT Canarsie Line)
Show map of New York City
First Avenue station (BMT Canarsie Line) is located in New York
First Avenue station (BMT Canarsie Line)
Show map of New York
Track layout

Street map

Map

Station service legend
SymbolDescription
Stops all timesStops all times

TheFirst Avenue station is astation on theBMT Canarsie Line of theNew York City Subway. Located at the intersection of First Avenue and East 14th Street at the border ofStuyvesant Park,Stuyvesant Town, and theEast Village inManhattan,[3] it is served by theL train at all times.

History

[edit]

Contract 4 of theDual Contracts, adopted on March 4, 1913, between New York City and theBrooklyn Rapid Transit Company, included a subway route under 14th Street, to run toCanarsie in Brooklyn; this became the BMT'sCanarsie Line.[4]: 203–219 [5]

Booth and Flinn was awarded the first contract for the line, namely a tunnel under theEast River, in January 1916.[6] At the time, the Public Service Commission was completing plans for the rest of the line;[7] the commission began accepting bids for two parts of the line within Manhattan, sections 1 and 2. in April 1916.[8] The next month, Booth and Flinn won the contract for section 1, which was to cost $2.528 million (equivalent to $73.049 million in 2024).[9] By early 1919, the section of the line under 14th Street was about 20 percent completed.[10]

In 1922, the Charles H. Brown & Son Corporation was contracted to build out the Canarsie Line's stations in Manhattan, including the First Avenue station.[11] Track-laying in the tunnels between Sixth andMontrose Avenues started in the last week of October 1922.[12][13] The First Avenue station at Union Square opened on June 30, 1924, as part of the 14th Street–Eastern Line, which ran fromSixth Avenue under theEast River and throughWilliamsburg to Montrose and Bushwick Avenues.[14][15]

In September 1983, this station was the site of the arrest ofMichael Stewart, a notable case in the history ofpolice brutality.[16]

The station originally had entrances only at its western end, on First Avenue. Its eastern entrances at Avenue A were built as part of the wide scope in the2019–2020 rebuilding of the Canarsie Tubes that were damaged duringHurricane Sandy, and to improve service for people living inStuyvesant Town–Peter Cooper Village, theEast Village, andAlphabet City. Work on the entrances began in July 2017,[17][18] necessitating the relocation of bus stops at that intersection.[19] The entrances to the Brooklyn-bound platform were opened on November 4, 2019. The entrance to the Eighth Avenue-bound platform was expected to be opened by the end of 2019,[20][21] but the opening date was postponed to February 10, 2020. This was followed by the temporary closure of the entrances at First Avenue.[22] Newelevators were built at the new eastern entrances[23][24] and were opened on August 6, 2020.[25] Substantial completion of the entrances occurred in November 2020.[26][27]

In June 2024,[28] the MTA installed low platform-edge fences at the First Avenue station and several others on the Canarsie Line to reduce the likelihood of passengers falling onto the tracks.[29] The barriers, spaced along the length of the platform, do not have slidingplatform screen doors between them.[30]

Station layout

[edit]
Old entrance structure (since remodeled)
GroundStreet levelExit/entrance
Disabled access
Elevators located:
  • Northwest corner of Avenue A and 14th Street
  • Southwest corner of Avenue A and 14th Street
MezzanineMezzanineFare control, station agent,MetroCard machines
Disabled access
Elevators located:
  • Northwest corner of Avenue A and 14th Street
  • Southwest corner of Avenue A and 14th Street
Platform levelSide platformDisabled access
Westbound"L" train towardEighth Avenue(Third Avenue)
Eastbound"L" train towardCanarsie–Rockaway Parkway(Bedford Avenue)
Side platformDisabled access

This underground station has twoside platforms and two tracks.[31] Fixed platform barriers, which are intended to prevent commuters falling to the tracks, are positioned near the platform edges.[32][33] It is the easternmost Canarsie Line station in Manhattan. East of here, the line travels under the East River toWilliamsburg, Brooklyn. The platforms are columnless and have the standard BMT style trim-line and name tablets. The former contains "1" tablets in standard intervals, while the latter consists of "FIRST AVE" in white seriffed lettering.

Exits

[edit]

The station's western entrances are at the (railroad north) end of the station; from each platform, a single staircase goes up to a smallmezzanine that contains aturnstile bank, token booth. Two street stairs to the Eighth Avenue-bound platform lead to the northeastern corner of First Avenue and 14th Street, while the ones to the Brooklyn-bound platform lead to the southeastern corner. The mezzanine on the Brooklyn-bound side had a florist shop outsidefare control; the shop closed in 2019. There is no free transfer between directions at this station.[34]

The station's eastern entrances are at the railroad south end of the station; there are platform-level turnstile banks from each platform. Two street stairs to the Eighth Avenue-bound platform lead to the northwestern corner ofAvenue A and 14th Street, while two more to the Brooklyn-bound platform lead to the southwestern corner. Each eastern entrance has an elevator between the platform and the street.

Art

[edit]

The station contains two sets of mosaic artwork byKatherine Bradford.[35][36] The eastern entrances include three large works collectively titledQueens of the Night, which depict figures in dancelike poses against a sapphire blue background. In addition, the First Avenue mezzanines contain two smaller works of flying superheroes, titledSuperhero Responds.[36][37] The mosaics cover 400 square feet (37 m2) in total. When the artworks were commissioned, Bradford used the L train on her daily commute, passing through the First Avenue station.[35]

Image gallery

[edit]
  • Name Tablet
    Name Tablet
  • Trim-line Tablet
    Trim-line Tablet
  • Station wall
    Station wall

Nearby points of interest

[edit]

References

[edit]
  1. ^"Glossary".Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS)(PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived fromthe original(PDF) on February 26, 2021. RetrievedJanuary 1, 2021.
  2. ^ab"Annual Subway Ridership (2018–2023)".Metropolitan Transportation Authority. 2023. RetrievedApril 20, 2024.
  3. ^"East Village, Manhattan Senior Pedestrian Crashes 2001-2006"(PDF).NYC.gov. Archived fromthe original(PDF) on December 1, 2018.
  4. ^Walker, James Blaine (1918).Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. RetrievedNovember 6, 2016.
  5. ^"Subway Contracts Solemnly Signed; Cheers at the Ceremonial Function When McCall Gets Willcox to Attest"(PDF).The New York Times. March 20, 1913.ISSN 0362-4331.Archived(PDF) from the original on May 4, 2022. RetrievedJanuary 11, 2018.
  6. ^"East River Tunnel Contract Awarded; Booth & Flinn, Who Will Do the Work for $6,639,023, to Use the Shield Method".The New York Times. January 14, 1916.ISSN 0362-4331.Archived from the original on July 27, 2018. RetrievedJuly 16, 2023.
  7. ^"Public Service Commission Promises to Complete Contract Awards This Year".The Brooklyn Daily Eagle. January 16, 1916. p. 40.Archived from the original on July 16, 2023. RetrievedJuly 16, 2023.
  8. ^"E. D. Tube Trains Will Run in 1918".Times Union. April 8, 1916. p. 15.Archived from the original on July 16, 2023. RetrievedJuly 16, 2023.
  9. ^"Award Subway Contracts".Times Union. May 26, 1916. p. 6.Archived from the original on July 16, 2023. RetrievedJuly 16, 2023.
  10. ^"When Will Dual Subway Be Finished?: Completed Work Cost 188,332,000--unfinished Contracts Amount to 20,000,000 Two Bodies Responsible for Construction Lack Mutual Confidence and Team-work".New-York Tribune. January 5, 1919. p. D10.ISSN 1941-0646.ProQuest 575999620.
  11. ^"Long Delayed E. D. Transit Relief Move Announced".The Standard Union. October 29, 1922. pp. 9,11.Archived from the original on June 11, 2021. RetrievedJune 11, 2021.
  12. ^"Laying of Tracks Starts New Action for Thru Tubes".The Chat. November 4, 1922. p. 18.Archived from the original on June 11, 2021. RetrievedJune 11, 2021.
  13. ^"Long Delayed E. D. Transit Relief Move Announced".The Standard Union. October 29, 1922. pp. 9,[1].Archived from the original on July 17, 2023. RetrievedJuly 16, 2023.
  14. ^"Celebrate Opening of Subway Link"(PDF).The New York Times. July 1, 1924. p. 23. RetrievedFebruary 13, 2010.
  15. ^"Pushing Throng Christens Spur Of B. M. T. Tube: Hylan Runs the First Train From Brooklyn to 14th Street, Then Assails "Interests'" at Luncheon Yearns to Boss System Transit Commission Heads Remind Mayor Epithets Won't Solve Problems".The New York Herald, New York Tribune. July 1, 1924. p. 12.ISSN 1941-0646.ProQuest 1112998377.
  16. ^Wilkerson, Isabel (November 25, 1985)."Jury Acquits All Transit Officers in 1983 Death of Michael Stewart".The New York Times.ISSN 0362-4331. RetrievedMarch 28, 2020.
  17. ^Hobbs, Allegra (July 11, 2017)."MTA Begins Work on New L Train Entrance at Avenue A as Bus Stops Relocate".DNAinfo New York. Archived fromthe original on September 1, 2017. RetrievedAugust 31, 2017.
  18. ^"Project Description, Budget and Scope".Metropolitan Transportation Authority. March 31, 2018. RetrievedJune 5, 2018.
  19. ^Mollot, Sabina (July 7, 2017)."Bus stop shelters on East 14th Street removed, will be relocated".Town & Village. Archived fromthe original on September 1, 2017. RetrievedAugust 31, 2017.
  20. ^"Press Release - NYC Transit - MTA Opens New Entrance at 1 Av L Station, Announces Early Completion of Street Restoration on 14th Street".MTA. November 4, 2019. Archived fromthe original on February 8, 2023. RetrievedFebruary 11, 2020.
  21. ^"Fast Forward - Q4 2019 Customer Commitments".MTA. Archived fromthe original on September 5, 2023. RetrievedFebruary 11, 2020.
  22. ^Hallum, Mark (February 10, 2020)."Avenue A subway entrance for L train users now open with elevators to follow in June".amNewYork. RetrievedFebruary 11, 2020.
  23. ^"MTA - Press Release - NYC Transit - MTA Seeks Federal Funds to Increase Capacity on Canarsie L Line".mta.info. Archived fromthe original on November 28, 2022. RetrievedSeptember 19, 2015.
  24. ^"mta.info | Superstorm Sandy: One Year Later".web.mta.info. Archived fromthe original on June 5, 2016. RetrievedJune 5, 2016.
  25. ^MTA Press Conference - 08/06/2020.YouTube.Archived from the original on December 11, 2021.
  26. ^"Governor Cuomo Announces Completion of Nation-leading L Project Tunnel Rehabilitation With No Shutdown" (Press release). Albany, NY: New York State - Governor Andrew M. Cuomo. April 26, 2020.Archived from the original on April 27, 2020. RetrievedApril 27, 2020.
  27. ^"Capital Program Oversight Committee Meeting November 2018"(PDF).Metropolitan Transportation Authority. November 13, 2018. p. 92. RetrievedNovember 10, 2018.
  28. ^Platform Edge Safety Barrier Installation at 1st Ave L Train Station #shorts. RetrievedAugust 19, 2024 – via www.youtube.com.
  29. ^Nessen, Stephen (August 29, 2024)."MTA installs platform barriers at 10 subway stations to prevent fatal slips and shoves".Gothamist. RetrievedAugust 30, 2024.
  30. ^Roberts-Grmela, Julian; Seiwell, Emma (January 21, 2024)."MTA testing subway platform barriers in Manhattan, Brooklyn aimed at preventing track falls".New York Daily News. RetrievedJanuary 21, 2024.
  31. ^Dougherty, Peter (2006) [2002].Tracks of the New York City Subway 2006 (3rd ed.). Dougherty.OCLC 49777633 – viaGoogle Books.
  32. ^Wassef, Mira (July 18, 2025)."Platform barriers installed at 56 subway stations in NYC".PIX11. RetrievedJuly 21, 2025.
  33. ^Russo-Lennon, Barbara (July 20, 2025)."These are the NYC subway stations that now have protective platform barriers".amNewYork. RetrievedJuly 21, 2025.
  34. ^abcdeMTA neighborhood map
  35. ^abSchulz, Dana (September 24, 2021)."MTA unveils colorful new subway mosaics at Bedford and 1st Avenue L train stations".6sqft. RetrievedMarch 22, 2022.
  36. ^abDi Liscia, Valentina (September 23, 2021)."Katherine Bradford Mosaic Murals Make a Manhattan Subway Station Shine".Hyperallergic. RetrievedMarch 22, 2022.
  37. ^Hoeffner, Melissa Kravitz (September 23, 2021)."These gorgeous new mosaics are coming to L train stations".Time Out New York. RetrievedMarch 22, 2022.

External links

[edit]
Wikimedia Commons has media related to1st Avenue (BMT Canarsie Line).
Buildings
14th–23rd Sts
23rd–34th Sts
Former and unbuilt
Culture
Shops, restaurants, nightlife
Theaters, galleries, art venues
Hotels
Clubs
Former
Green spaces
Education
Primary and secondary education
Higher education
Religion
Health
Transportation
Subway stations
Other transport
Streets
Related topics
Green spaces
Education
Religion
Culture
Restaurants/
nightlife
Theater
Stores
Museums and galleries
Other
Former
Other buildings
Transportation
Subway stations
Streets
Regions
"l" train14th Street–
 Canarsie Local
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Note: Service variations, station closures, and reroutes are not reflected here.
    Stations with asterisks have no regular peak, reverse peak, or midday service on that route. See linked articles for more information.
Canarsie Line
"L" train
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Stations and line segments initalics are closed, demolished, or planned (temporary closures are marked with asterisks). Track connections to other lines' terminals are displayed in brackets.Struck through passenger track connections are closed or unused in regular service.
Retrieved from "https://en.wikipedia.org/w/index.php?title=First_Avenue_station_(BMT_Canarsie_Line)&oldid=1322551712"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp