Expressway S17 (Poland)

From Wikipedia, the free encyclopedia
Road in Poland
Expressway S17 shield}}
Expressway S17
Droga ekspresowa S17
Route information
Part ofE372
Length195 km (121 mi)
322 km (200 mi) planned
Major junctions
North endS 8 northeast ofWarsaw (planned)
Major intersections
South endUkrainian border at Hrebenne
Location
CountryPoland
RegionsMazowieckie,Lubelskie
Major citiesWarsaw,Lublin
Highway system
S 16S 19

Expressway S17 orexpress road S17 (pl.Droga ekspresowa S17) is aPolish highway which, when completed, will run fromWarsaw throughLublin to the border crossing withUkraine atHrebenne/Rava-Ruska.

As of 2024, 163 km (101 mi) out of planned 310 km (190 mi) are opened to traffic: the main section running fromWarsaw throughLublin to Piaski, as well as bypasses ofTomaszów Lubelski andHrebenne. The section from Piaski to the border withUkraine is planned to get completed by 2028.

History

[edit]

The joint section ofS12 and S17, including the bypass ofLublin, was constructed in years 2011 – 2014. The section between Warsaw and Lublin was to be finished by 2015, but with subsequent reductions in government spending on infrastructure, the investment was delayed. The section was constructed in thedesign-build system starting late 2015 and early 2016, and the road was opened to traffic in 2019 and 2020.[1][2]

The road southeast of Lublin has smaller traffic density and received a lower priority, except for the bypass of Tomaszów Lubelski which was opened in 2021 (first carriageway only).[3] Opening of the expressway between Piaski andUkraine's border is expected from 2026 until 2028 depending on the section.[4] In January 2024 contractors were selected to build two sections of the segment betweenPiaski andZamość (16,6 km Piaski - Łopiennik ; 18,8 km Krasnystaw - Izbica ) with completion planned for 2027.[5] Three sections between Zamość and Hrebenne are currently in the design stage of the design-build projects (Zamość Wschód - Zamość Południe, Zamość Południe - Tomaszów Lubelski, Tomaszów Lubelski - Hrebenne), with completion planned for 2026.[5]


Sections of the expressway

[edit]
Current signageExpressway sectionLengthOpenedNote
Warsaw eastern bypass:Drewnica – Zakręt14 km (8.7 mi)unknownIn planning, timetable unknown due to the environmental permit having been challenged in the courts.[6]
S17Warsaw eastern bypass:Zakręt – Lubelska2.5 km (1.6 mi)2022
Warsaw Lubelska – Kołbiel24 km (15 mi)2020Opened to traffic in July 2020, construction fully completed in March 2021
Kołbiel – Garwolin13 km (8.1 mi)2019
Garwolin bypass12.8 km (8.0 mi)2007
Garwolin – Kurów58.6 km (36.4 mi)2019
S12S17Kurów –Jastków24.7 km (15.3 mi)2013
Jastków – Lublin7.7 km (4.8 mi)2014
S12S17S19Lublin bypass10.2 km (6.3 mi)2014
S12S1712.8 km (8.0 mi)
Lublin – Piaski13.8 km (8.6 mi)2012Signed as expressway in 2013
Piaski bypass4.2 km (2.6 mi)2004
S17Piaski - Tomaszów Lubelski100 km (62 mi)2026 – 2028Partially under design-build contracts, partially in planning.
S17Tomaszów Lubelski bypass9.6 km (6.0 mi)2021 / 2023Opened as single-carriageway in 2021 and as dual-carriageway in 2023.
S17Tomaszów Lubelski – Hrebenne20 km (12 mi)2026Design-build contract ongoing.
S17Hrebenne bypass2.0 km (1.2 mi)2004Single carriageway, not signed as expressway. Second carriageway in planning.

Lublin bypass

[edit]

In December 2009, the bidding process was started for the contracts to build the 66 km (41 mi) section of the road around Lublin, fromKurów to Piaski, which includes the city's east–west bypass road.[7] The construction of this section started in 2010, with the first 13 km section to be opened to traffic in late 2012[8] and the rest in 2014.[9][10] On this section, S17 overlaps withS12.

Planned route of S17 in Warsaw

Warsaw eastern bypass

[edit]

In Warsaw, the S17 expressway will serve as theeastern bypass of the city. Apart from the southernmost section from Lubelska to Zakręt, which was opened in 2022, the construction timetable is not yet set due to the environmental permit having been challenged in the courts.[11]

See also

[edit]

References

[edit]
  1. ^Szukamy wykonawców kolejnych odcinków S17
  2. ^"Załącznik nr 5"(PDF). Archived fromthe original(PDF) on 2013-12-20. Retrieved2013-04-02.
  3. ^"Budowa drogi ekspresowej S17 Warszawa – Hrebenne" (in Polish). Retrieved2020-06-05.
  4. ^"Mapa Stanu Budowy Dróg - Generalna Dyrekcja Dróg Krajowych i Autostrad - Portal Gov.pl".
  5. ^ab"Trasa S17. Wiemy, kto zbuduje dwa duże fragmenty ekspresówki do Zamościa. Inwestycje za 1,6 mld zł". Gazeta Wyborcza. January 11, 2024. RetrievedFebruary 8, 2024.
  6. ^"Wyroki NSA w sprawie S17 Wschodniej Obwodnicy Warszawy - Generalna Dyrekcja Dróg Krajowych i Autostrad- Oddział Warszawa - Portal Gov.pl".
  7. ^AnnouncementsArchived 2010-09-21 at theWayback Machine posted on GDDKiA site, retrieved Dec. 17 2009
  8. ^Dziennik budowy S17: Prezent na 11 listopada
  9. ^Kurier Lubelski article from 10 August 2010
  10. ^"Aecom joint venture wins Polish road contract".Bloomberg Businessweek. 23 September 2010. Archived fromthe original on October 6, 2010. Retrieved27 September 2010.
  11. ^"Wyroki NSA w sprawie S17 Wschodniej Obwodnicy Warszawy - Generalna Dyrekcja Dróg Krajowych i Autostrad- Oddział Warszawa - Portal Gov.pl".
Motorways
Expressways
National roads
Former
Retrieved from "https://en.wikipedia.org/w/index.php?title=Expressway_S17_(Poland)&oldid=1243721638"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp