Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Expressway S12 (Poland)

From Wikipedia, the free encyclopedia
Expressway in Poland connecting Piotrków Trybunalski, Radom, Lublin and Chełm with Ukraine
Expressway S12 shield}}
Expressway S12
Droga ekspresowa S12
Route information
Part ofE373
Length89.3 km (55.5 mi)
plus 8.6 km single carriageway, 315 km (196 mi) planned
Major junctions
West endA 1 nearPiotrków Trybunalski
Major intersections
East endUkrainian border at Dorohusk
Location
CountryPoland
RegionsŁódź Voivodeship,Masovian Voivodeship,Lublin Voivodeship
Major citiesRadom,Lublin
Highway system
S 11S 14

Expressway S12 orexpress road S12 (in Polishdroga ekspresowa S12) is aPolish highway planned to run from a junction with theA1 highway nearPiotrków Trybunalski to a border crossing withUkraine atDorohusk, passing byRadom,Lublin andChełm. The completed road should be about 328 km (204 mi) long.

As of 2024 the section open to traffic runs fromPuławy throughLublin toPiaski. The expressway from Piaski to the border withUkraine is under construction, set to be opened in 2026 and 2027.

Existing sections

[edit]
  • Puławy-Lublin-Piaski section, part of it co-signed with expresswayS17, includes the road bypass around Lublin
    • first stage ofPuławy bypass (12.7 km (7.9 mi)) with theJohn Paul II bridge (51°26′13″N21°56′35″E / 51.437°N 21.943°E /51.437; 21.943). Opened in 2008.
    • second stage of Puławy bypass to Kurów West, 11.8 km long,[1] opened to traffic on August 22, 2018.[2]
    • Kurów West - Lublin Felin - 55 km long, opened in stages May 2013, September 2014 and October 2014. This section is co-signed withS17.
    • Lublin Felin –Piaski West - 13.8 km built by upgrading existing dual carriageway road, opened as expressway in July 2013. Co-signed withS17.
    • Piaski West - Piaski East (bypass of Piaski) - 4.2 km bypass built in 2004. Co-signed withS17.

Future

[edit]

A document outlining the future development of transport infrastructure issued by the Polish government in December 2022 projects that the road would be fully completed in 2030, however the majority of the section from Lublin toUkrainian border will be opened in years 2025 – 2027.[3][4]

See also

[edit]

References

[edit]
  1. ^"Wielu chętnych do budowy II etapu obwodnicy Puław". Archived fromthe original on 2013-12-30. Retrieved2013-12-29.
  2. ^"Otwarcie drugiego etapu obwodnicy Puław". Archived fromthe original on 2019-07-08. Retrieved2018-08-23.
  3. ^"Rządowy Program Budowy Dróg Krajowych do 2030 r. (Z perspektywą do 2033 r.) - Ministerstwo Infrastruktury - Portal Gov.pl".
  4. ^"Portal Gov.pl".
Motorways
Expressways
National roads
Former
Retrieved from "https://en.wikipedia.org/w/index.php?title=Expressway_S12_(Poland)&oldid=1270299886"
Category:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp