Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

European Train Control System

From Wikipedia, the free encyclopedia
Railway signaling system
"ETCS" redirects here. For a mathematical theory, seeElementary Theory of the Category of Sets.
"ETCS" redirects here and is not to be confused withETC (disambiguation) orECTS (disambiguation).
This article needs to beupdated. Please help update this article to reflect recent events or newly available information.(June 2022)

ETCS—"Eurobalise" transceiver, installed between rails, provides information to ETCS trains.
Automated track-bound traffic
Automatic train operation
Lists of automated train systems
Related topics

TheEuropean Train Control System (ETCS) is atrain protection system designed to replace the many incompatible systems used by European railways, and railways outside of Europe. ETCS is thesignalling and control component of theEuropean Rail Traffic Management System (ERTMS).

ETCS consists of 2 major parts:

  1. trackside equipment
  2. on-board (on train) equipment

ETCS can allow all trackside information to be passed to the driver cab, removing the need for trackside signals. This is the foundation for futureautomatic train operation (ATO). Trackside equipment aims to exchange information with the vehicle for safely supervising train circulation.[1] The information exchanged between track and trains can be either continuous or intermittent according to theERTMS/ETCS level of application and to the nature of the information itself.[1]

The need for a system like ETCS stems from more and longer running trains resulting from economic integration of theEuropean Union (EU) and the liberalisation of national railway markets. At the beginning of the 1990s there were some national high speed train projects supported by the EU which lacked interoperability of trains. This catalysed theDirective 1996/48 about the interoperability of high-speed trains, followed byDirective 2001/16 extending the concept of interoperability to the conventional rail system. ETCS specifications have become part of, or are referred to, theTechnical Specifications for Interoperability (TSI) for (railway) control-command systems, pieces of European legislation managed by theEuropean Union Agency for Railways (ERA). It is a legal requirement that all new, upgraded or renewed tracks and rolling stock in the European railway system should adopt ETCS, possibly keeping legacy systems for backward compatibility. Many networks outside the EU have also adopted ETCS, generally for high-speed rail projects. The main goal of achievinginteroperability had mixed success in the beginning.

History

[edit]

The European railway network grew from separate national networks with little more in common thanstandard gauge. Notable differences includevoltages,loading gauge,couplings, signalling and control systems. By the end of the 1980s there were 14 national standard train control systems in use across the EU, and the advent of high-speed trains showed that signalling based on lineside signals is insufficient.[citation needed]

Both factors led to efforts to reduce the time and cost of cross-border traffic. On 4 and 5 December 1989, a working group including Transport Ministers resolved a master plan for atrans-European high-speed rail network, the first time that ETCS was suggested. The commission communicated the decision to the European Council, which approved the plan in its resolution of 17 December 1990. This led to a resolution on 91/440/EEC as of 29 July 1991, which mandated the creation of a requirements list for interoperability in high-speed rail transport.[2] The rail manufacturing industry and rail network operators had agreed on creation of interoperability standards in June 1991.[3] Until 1993, the organizational framework was created to start technical specifications that would be published asTechnical Specifications for Interoperability (TSI). The mandate for TSI was resolved by 93/38/EEC.[2] In 1995, a development plan first mentioned the creation of theEuropean Rail Traffic Management System (ERTMS).[3]

Because ETCS is in many parts implemented in software, some wording from software technology is used. Versions are calledsystem requirements specifications (SRS). This is a bundle of documents, which may have different versioning for each document. A main version is calledbaseline (BL).

Baseline 1

[edit]

The specification was written in 1996 in response toEU Council Directive 96/48/EC99[2] of 23 July 1996 on interoperability of the trans-European high-speed rail system. First the European Railway Research Institute was instructed to formulate the specification and about the same time theERTMS User Group was formed from six railway operators that took over the lead role in the specification. The standardisation went on for the next two years and it was felt to be slow for some industry partners – 1998 saw the formation ofUnion of Signalling Industry (UNISIG), includingAlstom,Ansaldo,Bombardier,Invensys,Siemens andThales that were to take over the finalisation of the standard.[3]

In July 1998,SRS 5a documents were published that formed the first baseline for technical specifications. UNISIG provided for corrections and enhancements of the baseline specification leading to theClass P specification in April 1999.[citation needed] This baseline specification has been tested by six railways since 1999 as part of the ERTMS.[4]

Baseline 2

[edit]

The railway companies defined some extended requirements that were included to ETCS (e.g. RBC-Handover and track profile information), leading to theClass 1SRS 2.0.0 specification of ETCS (published in April 2000). Further specification continued through a number of drafts until UNISIG published the SUBSET-026 defining the current implementation of ETCS signalling equipment – thisClass 1SRS 2.2.2 was accepted by theEuropean Commission in decision 2002/731/EEC as mandatory for high-speed rail and in decision 2004/50/EEC as mandatory for conventional rail. The SUBSET-026 is defined from eight chapters where chapter seven defines the ETCS language and chapter eight describes thebalise telegram structure ofETCS Level 1.[3] Later UNISIG published the corrections as SUBSET-108 (known asClass 1SRS 2.2.2 "+"), that was accepted in decision 2006/679/EEC.[5]

The earlier ETCS specification contained a lot of optional elements that limited interoperability. TheClass 1 specifications were revised in the following year leading toSRS 2.3.0 document series that was made mandatory by theEuropean Commission in decision 2007/153/EEC on 9 March 2007. Annex A describes the technical specifications on interoperability for high-speed (HS) and conventional rail (CR) transport. UsingSRS 2.3.0 a number of railway operators started to deploy ETCS on a large scale, for example the ItalianSistema Controllo Marcia Treno (SCMT) is based on Level 1 balises. Further development concentrated on compatibility specification with the earlierClass B systems leading to specifications likeEuroZUB that continued to use the national rail management on top of Eurobalises for a transitional period. Following the experience in railway operation theEuropean Union Agency for Railways (ERA) published a revised specificationClass 1SRS 2.3.0d ("debugged") that was accepted by the European Commission in April 2008.[citation needed]

This compilation SRS 2.3.0d was declared final (later called Baseline 2) in this series. There were a list of unresolved functional requests and a need for stability in practical rollouts. So in parallel started the development of baseline 3 series to incorporate open requests, strip off unneeded stuff and combine it with solutions found for baseline 2. The structure of functional levels was continued.

Baseline 3

[edit]
This article needs to beupdated. Please help update this article to reflect recent events or newly available information.(October 2016)

While some countries switched to ETCS with some benefit, German and French railway operators had already introduced modern types oftrain protection systems so they would gain no benefit. Instead, ideas were introduced on new modes like "Limited Supervision" (known at least since 2004[6]) that would allow for

  • a low-cost variant,
  • a new and superior model for braking curves,
  • a cold movement optimisation and
  • additional track description options.

These ideas were compiled into a "baseline 3" series by the ERA and published as aClass 1 SRS 3.0.0 proposal on 23 December 2008. The first consolidationSRS 3.1.0 of the proposal was published by ERA on 26 February 2010[7] and the second consolidationSRS 3.2.0 on 11 January 2011.[8] The specificationGSM-R Baseline 0 was published as Annex A to thebaseline 3 proposal on 17 April 2012.[9] At the same time a change to Annex A ofSRS 2.3.0d was proposed to theEuropean Commission that includesGSM-R baseline 0 allowing ETCSSRS 3.3.0 trains to run onSRS 2.3.0d tracks.[10][11] Thebaseline 3 proposal was accepted by theEuropean Commission with decision 2012/88/EU on 25. January 2012.[12] The update forSRS 3.3.0 and the extension forSRS 2.3.0d were accepted by theEuropean Commission with decision 2012/696/EU on 6. November 2012.[13]

The ERA work programme concentrated on the refinement of the test specificationSRS 3.3.0 that was to be published in July 2013.[14] In parallel the GSM-R specification was to be extended into aGSM-R baseline 1 until the end of 2013.[14] The GermanDeutsche Bahn since announced equipping at least theTEN Corridors running on older tracks to be using eitherLevel 1 Limited Supervision orLevel 2 on high-speed sections. Work continued onLevel 3 definition with low-cost specifications (compareERTMS Regional) and the integration ofGPRS into the radio protocol to increase the signalling bandwidth as required in shunting stations. The specifications forETCS baseline 3 andGSM-R baseline 0 (Baseline 3 Maintenance Release 1) were published as recommendationsSRS 3.4.0 by the ERA in May 2014 for submission to theRailway Interoperability and Safety Committee (RISC) in a meeting in June 2014.[15][16] The SRS 3.4.0 was accepted by theEuropean Commission with the amending decision 2015/14/EU on 5. January 2015.[17]

Stakeholders such as Deutsche Bahn have opted for a streamlined development model for ETCS – DB will assemble a database ofchange requests (CRs) to be assembled by priority and effect in a CR-list for the next milestone report (MRs) that shall be published on fixed dates through ERA. TheSRS 3.4.0 from Q2 2014 matches with the MR1 from this process. The further steps were planned for the MR2 to be published in Q4 2015 (that became theSRS 3.5.0) and the MR3 to be published in Q3 2017 (whereasSRS 3.6.0 was settled earlier in June 2016). Each specification will be commented on and handed over to the RISC for subsequent legalization in the European Union.[18] Deutsche Bahn has expressed a commitment to keep the Baseline 3 specification backward compatible starting at least with SRS 3.5.0 that is due in 2015 according to the streamlined MR2 process, with the MR1 adding requirements from its tests in preparation for the switch to ETCS (for example better frequency filters for the GSM-R radio equipment).[18] The intention is based on plans to start replacing itsPZB train protection system at the time.

In December 2015, the ERA published theBaseline 3 Release 2 (B3R2) series includingGSM-R Baseline 1. The B3R2 is publicly named to be not an update to the previousBaseline 3 Maintenance Release 1 (B3MR1).[19] The notable change is the inclusion ofEGPRS (GPRS with mandatory EDGE support) in the GSM-R specification, corresponding to the newEirene FRS 8 / SRS 16 specifications. Additionally B3R2 includes the ETCSDriver Machine Interface and the SRS 3.5.0.[20] This Baseline 3 series was accepted byEuropean Commission with decisions 2016/919/EC in late May 2016.[21] The decision references ETCSSRS 3.6.0 that was subsequently published by the ERA in aSet 3 in June 2016.[22][23] The publications of theEuropean Commission and ERA forSRS 3.6.0 were synchronized to the same day, 15 June.[21] TheSet 3 of B3R2 is marked as the stable basis for subsequent ERTMS deployments in the EU.[24]

The name of Set 3 follows the style of publications of the decisions of the European Commission where updates to the Baseline 2 and Baseline 3 specifications were accepted at the same time – for example decision 2015/14/EU of January 2015 has two tables "Set of specifications # 1 (ETCS baseline 2 and GSM-R baseline 0)" and "Set of specifications # 2 (ETCS baseline 3 and GSM-R baseline 0)".[25] In the decision of May 2016 there are three tables: "Set of specifications # 1 (ETCS Baseline 2 and GSM-R Baseline 1)", "Set of specifications # 2 (ETCS Baseline 3 Maintenance Release 1 and GSM-R Baseline 1)", and "Set of specifications # 3(ETCS Baseline 3 Release 2 and GSM-R Baseline 1)".[21] In that decision the SRS (System Requirement Specification) and DMI (ETCS Driver Machine Interface) are kept at 3.4.0 for Set 2 while updating Set 3 to SRS and DMI 3.6.0. All three of the tables (Set 1, Set 2 and Set 3) are updated to include the latest EIRENE FRS 8.0.0 including the same GSM-R SRS 16.0.0 to ensure interoperability.[21] In that decision the SRS is kept at 2.3.0 for Set 1 – and the decision of 2012/88/EU was repealed that was first introducing the interoperability of Set 1 and Set 2 (with SRS 3.3.0 at the time) based on GSM-R Baseline 0.[21]

Introduction of Baseline 3 on railways requires installation of it on board, which requires re-certification of trains. This will cost less than first ETCS certification, but still at least €100k per vehicle. This makes Baseline 3 essentially a new incompatible ETCS which requires replacement of electronic equipment and software onboard and along the track when installing. Trains with ETCS Baseline 3 are allowed to go on railways with Baseline 2 if certified for it, so railways with ETCS do not need to change system urgently.

The first live tests of Baseline 3 took place in Denmark July 2016.[26] Denmark wants to install ERTMS on all its railways, and then use Baseline 3.

British freight and passenger operators have signed contracts to install Baseline 3 in their trains, the first around 2020.[27][28]

Baseline 4

[edit]

ETCS Baseline 4 was published on 8 September 2023 by the European Union,[29][30] together with theATO Baseline 1, RMR: GSM-R B1 MR1 andFRMCS Baseline 0.[31]

TheEuropean Union Agency for Railways will prepare a report to the commission by 1 January 2025 on the availability of ETCS on-board products compliant with ETCS Baseline 4 and ATO Baseline 1, and on the availability of FRMCS on-board prototypes.[29]

Deployment planning

[edit]

The development of ETCS has matured to a point that cross-border traffic is possible and some countries have announced a date for the end of older systems. The first contract to run the full length of a cross-border railway was signed by Germany and France in 2004 on the high-speed line fromParis toFrankfurt, includingLGV Est. The connection opened in 2007 usingICE3MF, to be operational with ETCS trains by 2016.[32] TheNetherlands, Germany,Switzerland andItaly have a commitment to openCorridor A from Rotterdam to Genoa for freight by the start of 2015. Non-European countries also are starting todeploy ERTMS/ETCS, includingAlgeria,China,India,Israel,Kazakhstan,Korea,Mexico,New Zealand, andSaudi Arabia.[33] Australia would switch to ETCS on some dedicated lines starting in 2013.[34]

TheEuropean Commission has mandated that European railways to publish their deployment planning up to 5 July 2017. This will be used to create a geographical and technical database (TENtec) that can show the ETCS deployment status on theTrans-European Network. From the comparative overview the commission wants to identify the needs for additional coordination measures to support the implementation.[35] Synchronous with the publication ofETCS SRS 3.6.0 on 15 June 2017 the Regulation 2016/796/EC was published. It mandates the replacement of theEuropean Railways Agency by theEuropean Union Agency for Railways. The agency was tasked with the creation of a regulatory framework for aSingle European Railway Area (SERA) in the4th Railway Package to be resolved in late June 2016.[36][37] A week later the new EUAgency for Railways emphasized the stability of B3R2 and the usage as the foundation for oncoming ETCS implementations in the EU.[24] Based on projections in theRhine-Alps-Corridor, a break-even of the cross-border ETCS implementation is expected in the early 2030s.[38] A new memorandum of understanding was signed onInnoTrans in September 2016 for a completion of the first ETCS Deployment Plan targets by 2022.[38][39] The new planning was accepted by theEuropean Commission in January 2017 with a goal to have 50% of the Core Network Corridors equipped by 2023 and the remainder in a second phase up to 2030.[40]

The costs for the switch to ETCS are well documented in the Swiss reports from their railway operator SBB to the railway authority BAV. In December 2016 it was shown that they could start switching parts of the system to ETCS Level 2 whenever a section needs improvement. This would not only result in a network where sections of ETCS and the older ZUB would switch back and forth along lines, but the full transition to ETCS would last until 2060 and its cost were estimated at 9.5 billion Swiss Franc (US$ 10.4 billion). The expected advantages of ETCS for more security and up to 30% more throughput would also be at stake. Thus legislation favours the second option where the internal equipment of interlocking stations would be replaced by new electronic ETCS desks before switching the network to ETCS Level 2. However the current railway equipment manufacturers did not provide enough technology options at the time of the report to start it off. So the plan would be to run feasibility studies until 2019 with a projected start of changeover set to 2025. A rough estimate indicates that the switch to ETCS Level 2 could be completed within 13 years from that point and it would cost about 6.1 billion Swiss Franc (US$ 6.7 billion). For comparison, SBB indicated that the maintenance of lineside signals would also cost about 6.5 billion Swiss Franc (US$ 7.14 billion) which however can be razed once Level 2 is effective.[41]

The Swiss findings influenced the German project "Digitale Schiene" (digital rail). It is estimated that 80% of the rail network can be operated by GSM-R without lineside signals. This will bring about 20% more trains that can be operated in the country. The project was unveiled in January 2018 and it will start off with a feasibility study on electronic interlocking stations that should show a transition plan by mid 2018. It is expected that 80% of the network will have been rebuilt to the radio-controlled system by 2030.[42] This is more extensive than earlier plans which focused more on ETCS Level 1 with Limited Supervision instead of Level 2.

Alternative implementations

[edit]

The ETCS standard has listed a number of olderAutomatic Train Controls (ATC) asClass B systems. While they are set toobsolescence, the older line side signal information can be read by usingSpecific Transmission Modules (STM) hardware and fed theClass B signal information to a new ETCS onboard safety control system forpartial supervision. In practice, an alternative transition scheme is sometimes used where an older ATC is rebased to use Eurobalises. This leverages the fact that a Eurobalise can transmit multiple information packets and the reserved national datagram (packet number 44) can encode the signal values from the old system in parallel with ETCS datagram packets. The older train-born ATC system is equipped with an additional Eurobalise reader that converts the datagram signals. This allows for a longer transitional period where the old ATC and Eurobalises are attached on the sleepers until all trains have a Eurobalise reader. The newer ETCS-compliant trains can be switched to an ETCS operation scheme by a software update of the onboard train computer.[43]

In Switzerland, a replacement of the olderIntegra-Signum magnets andZUB 121 magnets to Eurobalises in the Euro-Signum plus EuroZUB operation scheme is under way. All trains had been equipped with Eurobalise readers and signal converters until 2005 (generally called "Rucksack" "backpack"). The general operation scheme will be switched to ETCS by 2017 with an allowance for older trains to run on specific lines with EuroZUB until 2025.[44]

Croco + TBL + ETCS balises at the same signal in Belgium

InBelgium, theTBL 1crocodiles were complemented with Eurobalises in theTBL 1+ operation scheme. The TBL 1+ definition allowed for an additional speed restriction to be transmitted to the train computer already. Likewise inLuxembourg theMemor II (using crocodiles) was extended into aMemor II+ operation scheme.

InBerlin, the old mechanical train stops on the localS-Bahn rapid transit system are replaced by Eurobalises in the newerZBS train control system. Unlike the other systems it is not meant to be transitional for a later ETCS operation scheme. The signalling centres and the train computer use ETCS components with a specific software version, manufacturers like Siemens point out that their ETCS systems can be switched for operating on ETCS, TBL, or ZBS lines.[43]

TheWuppertal Suspension Railway called for bids on a modernization of its train protection and management system. Alstom won the tender with a plan largely composed of ETCS components. Instead of GSM-R the system usesTETRA which had been in use already for voice communication. The TETRA system will be expanded to allow movement authority being signaled by digital radio. Because train integrity will not be checked, the solution was called as ETCS Level 2+ by the manufacturer.[45] Train integrity is the level of belief in the train being complete and not having left coaches or wagons behind.[1] The usage of moving blocks was dropped however while the system was implemented with just 256 balises checking the odometry of the trains that signal their position by radio to the ETCS control center. It is expected that headways will drop from 3,5 minutes to 2 minutes when the system is activated. The system was inaugurated on 1 September 2019.

Levels of ETCS

[edit]
ETCS is specified at four numbered levels.
LevelDescription
0ETCS-compliantlocomotives orrolling stock do not interact with lineside equipment, e.g. because of missing ETCS compliance.
NTC (former STM)ETCS-compliant driving cars are equipped with additionalSpecific Transmission Modules (STM) for interaction with legacy signalling systems. Inside the cabs are standardised ETCS driver interfaces. WithBaseline 3 definitions it is calledNationalTrainControl.
1ETCS is installed at lineside (possibly superimposed with legacy systems) and on board; spot transmission of data from track to train (and versa) viaEurobalises orEuroloops.
2As Level 1, but Eurobalises are only used for the exact train position detection. The continuous data transmission viaGSM-R with theRadio Block Center (RBC) give the required signalling information to the driver's display. There is further lineside equipment needed, i.e. for train integrity detection.
3As Level 2, but train location and train integrity supervision no longer rely on trackside equipment such astrack circuits oraxle counters. Note that Levels 2 and 3 have been merged as an extended Level 2 in CCS TSI 2023.[46]

Level 0

[edit]

Level 0 applies when an ETCS-fitted vehicle is used on a non-ETCS route. The trainborne equipment monitors the maximum speed of that type of train. The train driver observes the trackside signals. Since signals can have different meanings on different railways, this level places additional requirements on drivers' training. If the train has left a higher-level ETCS, it might be limited in speed globally by the lastbalises encountered.

Level 1

[edit]
ETCS Level 1 schematic

Level 1 is acab signalling system that can be superimposed on the existing signalling system, leaving the fixed signalling system (national signalling and track-release system) in place. Eurobalise radio beacons pick up signal aspects from the trackside signals via signal adapters and telegram coders (Lineside Electronics Unit – LEU) and transmit them to the vehicle as amovement authority together with route data at fixed points. The on-board computer continuously monitors and calculates the maximum speed and thebraking curve from this data. Because of the spot transmission of data, the train must travel over the Eurobalise beacon to obtain the nextmovement authority. In order for a stopped train to be able to move (when the train is not stopped exactly over a balise), there are optical signals that show permission to proceed. With the installation of additional Eurobalises ("infill balises") or aEuroLoop between the distant signal and main signal, the new proceed aspect is transmitted continuously. The EuroLoop is an extension of the Eurobalise over a particular distance that basically allows data to be transmitted continuously to the vehicle over cables emitting electromagnetic waves. A radio version of the EuroLoop is also possible.

For example, inNorway andSweden the meanings of single green and double green are contradictory. Drivers have to know the difference (already with traditional systems) to drive beyond the national borders safely. In Sweden, theETCS Level 1 list of signal aspects are not fully included in the traditional list, so there is a special marking saying that such signals have slightly different meanings.[a]

Limited Supervision

[edit]
This section needs to beupdated. Please help update this article to reflect recent events or newly available information.(November 2016)
The ETCS Corridor A will mostly be using Level 1 Limited Supervision. (Outdated for Germany, the Level will be mostly Level 2, only some bordertracks will be Level 1 LS.)[47]

Whereas ETCS L1 Full Supervision requires supervision to be provided at every signal, ETCS L1 Limited Supervision allows for only a part of the signals to be included, thus allowing to tailor the installation of equipment, only to points of the network where the increase in functionality justifies the cost.[48] Formally, this is possible for all ETCS levels, but it is currently only applied with Level 1. As supervision is not provided at every signal, this implies that cab signalling is not available and the driver must still look out for trackside signals. For this reason, the level of safety is not as high, as not all signals are included and there is still reliance on the driver seeing and respecting the trackside signalling.[48] Studies have shown thatETCS L1 LS has the same capacity as plain Level 1 FS for half the cost.[citation needed] Cost advantages come from reduced efforts necessary for calibrating, configuring and designing the track equipment and ETCS telegrams. Another advantage is, thatLimited Supervision has little requirements for the underlying interlocking, hence it can be applied even on lines with mechanical interlockings as long as LEUs can read respective signal aspects. In contrast Level 2 requires to replace older interlockings with electronic or digital interlockings. That has led to railway operators pushing for the inclusion ofLimited Supervision into theETCS Baseline 3. Although interoperable according to TSI, implementations ofLimited Supervision are much more diverse than other ETCS modes, e.g. functionality of L1LS in Germany is strongly based onPZB principles of operation and common signal distances.

Limited Supervision mode was proposed byRFF/SNCF (France) based on a proposal bySBB (Switzerland). Several years later a steering group was announced in spring 2004. After theUIC workshop on 30 June 2004 it was agreed that UIC should produce aFRS document as the first step. The resulting proposal was distributed to the eight administrations that were identified: ÖBB (Austria),SNCB/NMBS (Belgium),BDK (Denmark),DB Netze (Germany),RFI (Italy),CFR (Romania),Network Rail (UK) and SBB (Switzerland). After 2004 German Deutsche Bahn took over the responsibility for the change request.[49]

In Switzerland theFederal Office of Transport (BAV) announced in August 2011 that beginning with 2018 the Eurobalise-based EuroZUB/EuroSignum signalling will be switched to Level 1 Limited Supervision.[50] High-speed lines are already using ETCS Level 2. The north–south corridor should be switched to ETCS by 2015 according to international contracts regarding the TEN-T Corridor-A from Rotterdam to Genova (European backbone).[51] But it is delayed and will be used with December 2017 timetable change.

Level 2

[edit]
ETCS Level 2 schematic
Radio Block Centre (RBC)

Level 2 is a digital radio-based system.Movement authority and other signal aspects are displayed in the cab for the driver. Apart from a few indicator panels, it is therefore possible to dispense with trackside signalling. However, the train detection and the train integrity supervision still remain in place at the trackside. Train movements are monitored continually by theradio block centre using this trackside-derived information. Themovement authority is transmitted to the vehicle continuously via GSM-R or GPRS together with speed information and route data. The Eurobalises are used at this level as passive positioning beacons or "electronic milestones". Between two positioning beacons, the train determines its position via sensors (axle transducers, accelerometer andradar). The positioning beacons are used in this case as reference points for correcting distance measurement errors. The on-board computer continuously monitors the transferred data and the maximum permissible speed.

Level 3

[edit]
ETCS Level 3 schematic

With Level 3, ETCS goes beyond pure train protection functionality with the implementation of full radio-basedtrain spacing. Fixed train detection devices (GFM) are no longer required. As with Level 2, trains find their position themselves by means of positioning beacons and via sensors (axle transducers, accelerometer andradar) and must also be capable of determining train integrity on board to the very highest degree of reliability. By transmitting the positioning signal to the radio block centre, it is always possible to determine that point on the route the train has safely cleared. The following train can already be granted anothermovement authority up to this point. The route is thus no longer cleared in fixed track sections. In this respect, Level 3 departs from classic operation with fixed intervals: given sufficiently short positioning intervals, continuous line-clear authorisation is achieved and train headways come close to the principle of operation with absolutebraking distance spacing ("moving block"). Level 3 uses radio to pass movement authorities to the train. Level 3 uses train reported position and integrity to determine if it is safe to issue the movement authority.[1] Level 3 is currently[as of?] under development. Solutions for reliable train integrity supervision are highly complex and are hardly suitable for transfer to older models of freight rolling stock. The Confirmed Safe Rear End (CSRE) is the point in rear of the train at the furthest extent of the safety margin. If the Safety margin is zero, the CSRE aligns with the Confirmed Rear End. Some kind ofend-of-train device is needed or special lines for rolling stock with included integrity checks like commuter multiple units or high speed passenger trains. A ghost train is a vehicle in the Level 3 Area that are not known to the Level 3 Track-side.

(The Level 3 will be integrated into Level 2 and Level 3 will be no more available in the future as an own Level.)[46]

ERTMS Regional

[edit]

A variant of Level 3 isERTMS Regional, which has the option to be used with virtual fixed blocks or with true moving block signalling. It was early defined and implemented in a cost sensitive environment in Sweden. In 2016 withSRS 3.5+ it was adopted by core standards and is now officially part of Baseline 3 Level 3.

It is possible to use train integrity supervision, or by accepting limited speed and traffic volume to lessen the effect and probability of colliding with detached rail vehicles.ERTMS Regional has lower commissioning and maintenance costs, since trackside train detection devices are not routinely used, and is suitable for lines with low traffic volume.[52][53] These low-density lines usually have noautomatic train protection system today, and thus will benefit from the added safety.

This system was put into operation in 2012 on one railway in Sweden, however without passenger traffic. It is still in operation there (as of 2022), but has not been put into operation on any other railway, since more development and higher requirement on installation is needed to fulfil the high ETCS safety standards, causing much higher cost than originally anticipated. So the targeted railways in general keep their manual signalling.

ETCS Hybrid Train Detection (formerly known as ETCS Hybrid Level 3)

[edit]

ETCS Hybrid Train Detection is under development.[54]The last published reference[55] byEEIG introduced "Joining two trains" as additional feature. This additional functionality will pave the way to live shunting in Virtual Coupling which will enhance Train Convoys (platooning) principles. The basic setup is like Level 2 with fixed blocks supervised by trackside train detection systems. But for approved trains, there can be much shorter virtual blocks, "Virtual Sub-Sections", which allow such trains to go more dense, without having so many expensive and fault prone trackside detection systems. These trains, mainly passenger trains, must have their own train integrity supervision and other requirements like known train length, and software for Hybrid Train Detection. Only one non-approved train allowed per Level 2 block at each time, which make traditional freight trains possible, but consuming more capacity. For metros,CBTC is a system in operation using similar ideas. ETCS Hybrid was deployed in real traffic for the first time on theDelhi–Meerut railway in India in October 2023.[56]

GNSS

[edit]

Instead of using fixedbalises to detect train location there may be "virtual balises" based onsatellite navigation andGNSS augmentation. Several studies about the usage of GNSS in railway signalling solutions have been researched by the UIC (GADEROS/GEORAIL) and ESA (RUNE/INTEGRAIL).[57] Experiences in theLOCOPROL project show that real balises are still required in railway stations, junctions, and other areas where greater positional accuracy is required. The successful usage of satellite navigation in theGLONASS-based RussianABTC-M block control has triggered the creation of theITARUS-ATC system that integrates Level 2 RBC elements – the manufacturersAnsaldo STS andVNIIAS[58] aim for certification of the ETCS compatibility of this system.[59]

The first real implementation of the virtual balise concept has been done during theESA project3InSat on 50 km of track of theCagliari–Golfo Aranci Marittima railway onSardinia[60] in which aSIL-4 train localisation at signalling system level has been developed usingdifferential GPS.

There is a pilot project "ERSAT EAV" running since 2015 with the objective to verify the suitability ofEGNSS as the enabler of cost-efficient and economically sustainable ERTMS signalling solutions for safety railway applications.[61]

Ansaldo STS has come to lead the UNISIG working group on GNSS integration into ERTMS withinNext Generation Train Control (NGTC) WP7,[62] whose main scope is to specify ETCS virtual balise functionality, taking into account the interoperability requirement. Following the NGTC specifications the future interoperable GNSS positioning systems, supplied by different manufacturers, will reach the defined positioning performance in the locations of the virtual balises.[63]

Level 4

[edit]

Level 4 is an idea that has been mooted that envisages Train Convoys or Virtual Coupling as ways to increase track capacity, it is merely for discussion at the moment.[64]

Train-borne equipment

[edit]
A driver's cab with an ETCS Driver-Machine Interface amongst other instruments and displays

Operation under ETCS requires that each train be fitted with a number of interlinked on-board systems that monitor the position and the status of the train, and that allow the driver to receive Movement Authorities and interact with the ETCS system. The equipment must be certified by the appropriateNotified Bodies.

Driver Machine Interface

[edit]

TheDriver-Machine Interface [de] (DMI), formerly "Man-Machine Interface" (MMI), is the standardised interface for the driver. It consists of a set of colour displays that show the train's speed, the ETCS Movement Authority (where relevant), and other information about the status of the ETCS equipment. It is also used to display train control information sourced from pre-ETCS signalling and train protection systems when the train is not under ETCS control. To allow access to setup and configuration menus, the DMI is provided with either atouchscreen or an array ofsoft keys.

Balise Transmission Module

[edit]
A Balise Transmission Module mounted on the underside of a railway vehicle

TheBalise Transmission Module (BTM) is a wirelesstransceiver that facilitates the traffic of data telegrams between the train and the Eurobalises mounted on the track.

Odometric sensors

[edit]
ADoppler radar odometry system mounted on the underside of a railway vehicle
Further information (in German):Odometry (ETCS) [de]

Theodometric sensors allow the train to determine the distance it has travelled along the track since it last passed a Eurobalise or other known fixed position, which is necessary for the train's ETCS controller to ensure that the train does not proceed past the end of its Movement Authority. A number of different technologies are applied for this purpose, including rotation counters mounted on one or more of the train's axles,accelerometers, andDoppler radar.

European Vital Computer

[edit]
A rack-mounted European Vital Computer system

TheEuropean Vital Computer [de] (EVC), sometimes referred to as Eurocab, is the heart of train's on-board ETCS equipment. It receives and processes the information received from the train's sensors and communications equipment, sends the display image to the DMI, monitors the train's compliance with Movement Authorities and other operational constraints, and intervenes if necessary to ensure safety by making an emergency brake application or otherwise overriding the driver's controls. Because there is an upper limit to length of the cables that connect the EVC to the other ETCS components, longer multiple-unit trains can sometimes require a separate EVC for each driver's cab.

Euroradio

[edit]

TheEuroradio communication unit is for both voice and data communication. Because in ETCS Level 2 all signalling information is exchanged via GSM-R, the radio equipment is capable of maintaining two simultaneous connections to the ETCS Radio Block Centre.

Juridical Recording Unit

[edit]
An ETCS Juridical Recording Unit

TheJuridical Recording Unit (JRU) is anevent recorder, usually integrated with the EVC, that logs the actions of the driver and the state of both the signalling and the ETCS equipment itself. It can be considered equivalent to an aircraft'sflight recorder.

Train Interface Unit

[edit]

The Train Interface Unit (TIU) is the interface between the EVC and the train/locomotive, for submitting commands or receiving information.

Specific Transmission Modules

[edit]
A DMI operating in STM mode for PZB, a German Class B system

ASpecific Transmission Module (STM) is a special interface for the EVC that enables operation with one or more Class BATP systems, such asPZB, MEMOR, orATB. It consists of the hardware needed to link the specific sensors and receivers that pick up on-track and lineside signals from the legacy installation with the EVC, and the software that allows the EVC to emulate the processing functions that would be performed by the legacy system controller on a non-ETCS train. The information provided by the legacy system is then shown to the driver via the DMI. It is possible to fit an EVC with STMs for multiple legacy systems, as required.

Lineside equipment

[edit]

Lineside equipment is the fixed installed part of ETCS installation. According to ETCS Levels the rail related part of installation is decreasing. While in Level 1 sequences with two or more of eurobalises are needed for signal exchange, in Level 2 balises are used for milestone application only. It is replaced in Level 2 by mobile communication and more sophisticated software. In Level 3 even less fixed installation is used. In 2017 first positive tests for satellite positioning were done.

Eurobalise

[edit]

TheEurobalise is a passive or active antenna device mounted on rail sleepers. Mostly it transmits information to the driving vehicle. It can be arranged in groups to transfer information. There are Fixed andTransparent Data Balises.Transparent Data Balises are sending changing information from LEU to the trains, e.g. signal indications.Fixed Balises are programmed for a special information like gradients and speed restrictions.

Euroloop

[edit]

TheEuroloop [de] is an extension for Eurobalises in ETCS Level 1. It is a specialleaky feeder for transmitting information telegrams to the car.

Lineside Electronic Unit

[edit]

TheLineside Electronic Unit (LEU) is the connecting unit between theTransparent Data Balises with signals orSignalling control in ETCS Level 1.

Radio Block Centre

[edit]

ARadio Block Centre [de] is a specialised computing device with specificationsafety integrity level 4 (SIL) for generatingMovement Authorities (MA) and transmitting it to trains. It gets information fromsignalling control and from the trains in its section. It hosts the specific geographic data of the railway section and receives cryptographic keys from trains passing in. According to conditions the RBC will attend the trains with MA until leaving the section. RBC have defined interfaces to trains, but have no regulated interfaces to Signalling Control and only have national regulation.

Operation modes in ETCS

[edit]
Modes during a cab change under ETCS Level 2
Screenshot of the Driver Machine Interface of ETCS, highlighting the areas of the display
Abbreviation and
DMI [de] symbol
Full nameUsed
in level
Description
FS
Full Supervision1, 2, 3The locomotive pulls the train, ETCS has all required information
LS
Limited Supervision1, 2, 3This mode is new to SRS 3.0.0
OS
On Sight1, 2, 3On-sight ride
SR
Staff Responsible1, 2, 3The driver was granted permission to pass faulty signals
SH
Shunting0, 1, 2, 3
PS
(no symbol)
Passive Shunting0, NTC, 1, 2, 3This mode is new to SRS 3.0.0
UN
Unfitted0The line is not fitted with ETCS: the system will only observe master speed limit and train protection is left to older systems
SL
(no symbol)
Sleeping0, NTC, 1, 2, 3Second locomotive controlled from the leading one
SB
Stand By0, NTC, 1, 2, 3
TR
TripNTC, 1, 2, 3
PT
Post Trip1, 2, 3The train overpassed the order to stop, full braking will be executed
SF
System Failure0, NTC, 1, 2, 3Trainborne ETCS equipment detected its failure
IS
(no symbol)
Isolation0, NTC, 1, 2, 3Driver disconnected ETCS
NP
(no symbol)
No Power0, NTC, 1, 2, 3
NL
Non Leading0, NTC, 1, 2, 3Second locomotive with its own driver
SE
(no symbol)
STM EuropeanNTCThis mode has not been implemented by any vendor and was removed by SRS 3.1.0
SN
National SystemNTC
RV
Reversing1, 2, 3

ETCS test laboratories

[edit]

To be a reference laboratory ERA isrequesting the laboratories to be accredited ISO17025.

Many ETCS test laboratories work together to bring support to the industry, most are members of the ERTMS Accredited Labs (EAL) association which is recognized as a Representative Body:[65]

Future

[edit]
Main article:GSM-R

GSM is no longer being developed outside of GSM-R.[citation needed] However, as of 2021, ERA expected GSM-R equipment suppliers to support the technology until at least 2030, however this may be extended further depending upon the availability and validation of a suitable replacement system. ERA is considering what action is needed to smoothly transition to a successor system,[66] withUIC'sFuture Railway Mobile Communication System (FRMCS) program considering5G NR.[67] The Baseline 3 of ETCS contains functionality for this.

Deployment

[edit]

In July 2009, theEuropean Commission announced that ETCS is mandatory for all EU-funded projects that include new or upgraded signalling, and GSM-R is required when radio communications are upgraded.[68] Some short stretches in Spain,[69] Switzerland, Italy, the Netherlands, Germany, France, Sweden, and Belgium are equipped with Level 2 and in operation.[70]

ETCS corridors

[edit]
This article needs to beupdated. Please help update this article to reflect recent events or newly available information.(October 2016)

Based on the proposal for 30TEN-T Priority Axes and Projects during 2003, a cost/benefit analysis was performed by the UIC, presented in December 2003.[71] This identified ten rail corridors covering about 20% of the TEN network that should be given priority in changing to ETCS, and these were included in decision 884/2004/EC by theEuropean Commission.[72]

In 2005 the UIC combined the axes into the following ETCS Corridors, subject to international development contracts:[73][74]

  • Corridor A: Rotterdam – Duisburg – Basel – Genoa
  • Corridor B: Naples – Bologna – Innsbruck – Munich – Hamburg (branch from Berlin) – Stockholm
  • Corridor C: Antwerp – Strasbourg – Basel/Antwerp – Dijon – Lyon
  • Corridor D: Valencia – Barcelona – Lyon – Turin – Milan – Trieste – Ljubljana – Budapest
  • Corridor E: Dresden – Prague – Vienna – Budapest – Constanta
  • Corridor F: Aachen – Duisburg – Hanover – Magdeburg – Berlin – Poznań – Warsaw – Belarus

The Trans-European Transport Network Executive Agency (TEN-T EA) publishes ETCS funding announcements showing the progress of trackside equipment and onboard equipment installation.[75]

  • Corridor A gets trackside equipment January 2007 – December 2012 (2007-DE-60320-P German section Betuweroute – Basel), June 2008 – December 2013 (2007-IT-60360-P Italian section). The Betuweroute in the Netherlands is already using Level 2 and Switzerland will switch to ETCS in 2017.
  • Corridor B, January 2007 – December 2012 (2007-AT-60450-P Austrian part), January 2009 – December 2013 (2009-IT-60149-P Italian section Brenner – Verona).
  • Corridor C, May 2006 – December 2009 (2006-FR-401c-S LGV-Est).
  • Corridor D, January 2009 – December 2013 (2009-EU-60122-P Valencia – Montpellier, Turin – Ljubljana/Murska).
  • Corridor E, June 2008 – December 2012 (2007-CZ-60010-P Czech section), May 2009 – December 2013 (2009-AT-60148-P Austrian section via Vienna).
  • Corridor F, January 2007 – December 2012 (2007-DE-60080-P Aachen – Duisburg/Oberhausen).

Corridor A has two routes in Germany – the double track east of the Rhine (rechte Rheinstrecke) would be ready with ETCS in 2018 (Emmerich, Oberhausen, Duisburg, Düsseldorf, Köln-Kalk, Neuwied, Oberlahnstein, Wiesbaden, Darmstadt, Mannheim, Schwetzingen, Karlsruhe, Offenburg, Basel),[76] while the upgrade of the double track west of the Rhine (linke Rheinstrecke) would be postponed.

Corridor F would be developed in accordance with Poland as far as it offers ETCS transport: Frankfurt – Berlin – Magdeburg will be ready in 2012, Hanover to Magdeburg – Wittenberg – Görlitz in 2015. At the other end Aachen to Oberhausen will be ready in 2012, the missing section from Oberhausen to Hanover in 2020. The other two corridors are postponed and Germany chooses to support the equipment of locomotives with STMs to fulfill the requirement of ETCS transport on the corridors.[77]

Australia

[edit]
  • Implementation inAdelaide,South Australia is planned for mid/late 2014.[78]
  • Implementation of ETCS Level 2 inSouth East Queensland is planned to be operational from 2021.[79]
  • Planning to trial in the Central Queensland with electric coal trains west ofRockhampton from 2019.
  • ETCS L2 will be used for the implementation ofRio Tinto Iron Ore's AutoHaul system,[80] and implemented throughout the majority of their heavy-haul network.
  • Implementation of ETCS L1/LS onSydney Trains andNSW TrainLink's electrified heavy rail suburban lines is being progressively rolled out across the rail network with the northern and southern lines operational 2020. Portions of the electrified network are planned to be equipped with ETCS L2 and ATO; the implementation project is called 'Digital Systems'.
  • ETCS is to be implemented on theCross River Rail project for theGreater Brisbane region. Works continue into 2024.[81]

Austria

[edit]

Implementation in Austria started in 2001 with a level 1 test section on theEastern Railway between Vienna and Nickelsdorf. By the end of 2005 the whole line between Vienna and Budapest had been equipped with ETCS L1.

The newly built stretches of theWestern Railway between Vienna and St. Pölten and theNew Lower Inn Valley Railway are equipped with ETCS L2, as is theNorth railway from Vienna to Bernhardstal.

As of 2019 a total of 484 km (301 mi) of track uses ETCS.

On the 22 of April 2024 theAustrian Federal Railways (ÖBB) have published their "ETCS expansion plan". As of the publishing date, 616 km have been equipped with ETCS, 461 km of which are L2. The plan foresees 3,300 km of the Austrian railway network being equipped with ETCS by the end of 2038; the implementation devises 20 geo-redundant RBCs for centralised control. The upgrades for theTEN-T Core Network corridors are being prioritised, with their completion being forecasted for the end of 2030. By 2040 the entire network will be operated using ETCS L2 only. An additional challenge being faced by ÖBB is the end-of-life forGSM-R, ÖBB is intending to employFRMCS in production, starting 2027, while continuously phasing out the olderGSM-R; although, there will be a period where both systems are in operation simultaneously. The delay in the standardisation ofFRMCS V3 has tightened the time-frame for rollout, all the whileGSM-R has kept its date for deprecation, that being 2035.[82]

Furthermore, the entire project is being advertised under the name “TRACK FWD” (spoken: Track Forward). The advertisement claims that the benefits for customers are safety, punctuality, climate action, better service on the countryside and “smarter” maintenance planning, meaning less and shorter times that the tracks are out of order for upkeep.[83]

Belgium

[edit]

In Belgium the state railway companySNCB (inFrench, inDutch NMBS, inGerman NGBE) led all activities for introduction of ETCS since the end of the 1990s. The interest resulted from newHigh Speed Lines (HSL) under construction, the development of the ports at theAtlantic and technically rotting national signalling systems.

in 1999 the council of SNCB decided the opening of HSL 2 with proprietary systemTBL 2, but all following lines should use ETCS. To rise the level of security on conventional lines, it was thought to use ETCS L1 for compatibility. But because of high costs for full implementation on rolling stock, it was chosen to select standard components from ETCS for interfacing locos (receiver) and rails (balises) to easy support existing infrastructure. The balises were sending information with reserved national packet type 44, compatible with common signalling.[84] The system was named TBL1+. Later it can be complemented with standardised ETCS information. This is the same migration path as chosen inItaly (SCMT) or Switzerland (Euro-Signum andEuro-ZUB).

In 2003 the SNCB selected a consortium to supply ETCS for the next high-speed lines with Level 2 and fallback with Level 1.[85]

It was chosen to supply ETCS L1LS first and later migrate to L1FS. So it was started tendering the renewing of 4000 signals with TBL1+ and L1 including support for 20 years in 2001. In 2006 Siemens was selected for delivery.[86]

Following the privatisation of SNCB in 2006 a split-off companyInfrabel stepped in to be responsible for the whole state railway infrastructure. It continued the introduction of ETCS railway infrastructure, whereas SNCB was responsible for rolling material. Following some serious accidents (i.e.Halle train collision) caused by missing or malfunctioning protection systems, there was the obvious target to raise the security level in the whole network.[87]

The first line in ETCS operation wasHSL 3 in 2007, which is 56 km (35 mi) long. Because of lack of trains equipped with ETCS, the commercial start of operations was in 2009 withICE 3 andThalys trains. The operations started with ETCS SRS 2.2.2 and were later upgraded to 2.3.0.[88]

TheHSL 4 high-speed line was constructed at the same time asHSL 3 and so got the same ETCS equipment. Testing began in 2006 and commercial traffic started about 2008 with locomotive-hauled trains under Level 1. In 2009 commercial high-speed traffic started under ETCS L2 with supported Thalys- and ICE-trains like onHSL 3. A special feature is the first full-speed gaplessborder crossing under ETCS L2 supervision withHSL Zuid.[89]

In 2009 all railway lines in Belgium were covered by GSM-R, a foundation of ETCS L2 installation and also useful in L1 operation.[90]

In 2011 was released a first nationalETCS–Masterplan, which was renewed in 2016.[90] It names following four phases of ETCS introduction:

  • Phase 1: TBL1+ programme completed (until end of 2015, succeeded);
  • Phase 2: Network fully equipped with ETCS and TBL+ (20162022, in progress);
  • Phase 3: Making ETCS the only technical standard and removing of TBL+ (until 2025);
  • Phase 4: Convergence towards a homogeneous version of ETCS L2 (about 20302035).

The first conventional railway line, which was equipped with ETCS L1, wasBrussels–Liège. It started public service in March 2012.[91]

Next was in December 2014 theLiefkenshoek rail link with ETCS L2 inAntwerp, connecting the north and south banks ofScheldt by tunnel for cargo traffic.[92]

Infrabel has budgeted about €332 million for signalling including ETCS in 2015. After tendering it was given in summer 2015 a long time order to the consortium ofSiemens Mobility and Cofely-Fabricom about the installation of ETCS Level 2 on more than 2,200 km (1,400 mi) of track. The order includes the delivery ofcomputer based interlockings for the full network until 2025.

The complete Belgian part of theEuropean north-south Corridor C (port of Antwerp–Mediterranean Sea) with a length of about 430 km (270 mi) is crossable with ETCS Level 1 since the end of 2015. According to Infrabel this was the longest conventional railway supported with ETCS in Europe.[93]

Summarizing at end of 2015, there were 1,225 km (761 mi) mainlines (about a fifth of the network) usable with ETCS L1 or L2.[94]

In 2016, NMBS/SNCB was given an order for 1362M7double-deck coaches. They are to be delivered between 2018 and 2021 and have a complete ETCS equipment for replacement of older types.

As of mMay 2025, 83% of the Infrabel network was equipped with a form of ETCS.[95]

Canada

[edit]

Alstom will be implementing ERTMS, including ETCS, inthe upgrade of the commuter rail network of Toronto area regional operatorGO Transit, under contract to the Ontario provincial agencyMetrolinx.[96] The first line to receive ETCS signalling will be theRichmond Hill line.[97]

China (People's Republic)

[edit]
Main article:Chinese Train Control System

Croatia

[edit]

In Croatia,Croatian Railways deployed Level 1 on theVinkovciTovarnik line in 2012.[99]

Czech Republic

[edit]

The CzechLS train protection system is not as advanced as the systems used in Germany, Austria, Switzerland and other Western European countries. Moreover, the LS system is present only on the main lines that useautomatic block signalling. Lines that usetelephonic block ortokenless block do not have any train protection system at all, such as the Prague-Radotín–Beroun (–Plzeň) main line. Because of this, the ETCS was highly anticipated by Czech railway experts since the beginning. The first trials of the ETCS Level 2 started on a section of thePragueOstrava main line betweenPoříčany andKolín in 2008. The first full-scale implementation project was installed on theKolínČeská TřebováBrnoBřeclav rail line (excluding the Brno rail junction) in 2014. In 2017, the plan to install ETCS Level 2 on the TEN-T lines was revealed.[100] In 2021, the Czech government decided to implement the ETCS on the entire rail network.[101] The TEN-T corridors are prioritized and most of them have been already equipped with ETCS Level 2, excluding the sections that await complete refurbishment, such as Prague–Beroun or Brno–Přerov. The first line operated exclusively under ETCS Level 2 supervision is theOlomoucUničov branch line with 160 km/h top speed.[102] The exclusive ETCS Level 2 operation on this line started in January 2023, the automatic block signalling is not equipped with trackside light signals and relies solely on the ETCS. The TEN-T corridors that are equipped with ETCS Level 2 will be operated solely under ETCS since 1 January 2025. Vehicles not equipped with operational ETCS on-board units will not be allowed to use these lines. Light signals will be kept in operation to cope with shunting, ETCS failures, signalling disruptions during construction works etc.

Branch lines are to be equipped with Level 1 Limited Supervision or with a simplified version called ETCS STOP. Up to this day (2024), many of them do not have any conventional signalling system, as the train movements are dispatched only by telephone or radio (the so-called D3 operation). Thus the installation of ETCS has to be preceded by a new signalling system on these lines. The deployment of the ETCS on the entire network is expected to be finished by 2040.

Denmark

[edit]

As of May 2025, full implementation is expected in Jutland by 2027 and everywhere else by 2033.[103]

In December 2008: In Denmark, plans were announced in for the conversion of its entire national network to Level 2. This was necessitated by the near obsolete nature of parts of its network. The total cost of the project is estimated at €3.3 billion, with conversion beginning in 2009 and projected for completion in 2021.[104] Denmark has decided to drop its older ATC, which will reach its end of life between 2015 and 2020, switching the network of 2100 km to ETCS. TheS-train network inCopenhagen will use the SiemensTrainGuard system. Two suppliers will equip the rest of the country to Level 2 with an option for Level 3 (ERTMS Regional) in rural parts. Implementation will be between 2014 and 2018.[105] Denmark will be the first to introduce GPRS support on its network by 2017.[106][107] Hence Banedanemark is driving this development with other ETCS users in Europe[107] that has led to the inclusion in B3R2 in late 2015.[20] Due to complexity the completion date was moved by two years to 2023, especially for testing in the S-train network, while the equipment of the first three main lines will be done in 2018.[108]

In November 2017: Further delays of the complete roll-out from 2023 to 2030 were announced. The following dilemma has appeared: ETCS must be introduced before electrification. Electrification must be introduced before new trains are obtained. New trains must be purchased before ETCS is introduced. Because the old signalling system was not built compatible with electrification, and many components (which often have to be developed anew and be certified) must be replaced to make them compatible, expensive and time-consuming and fairly meaningless if it shall soon be replaced by ETCS. Diesel trains must mainly be custom-made and are expensive (likeIC4) because of little demand in Europe, andDSB wants to have electric trains for the future. But most lines are not electrified yet. The plan was to fit the existing old diesel trains such asIC3 with ETCS, but that has proven difficult, since they are not well documented because various ad hoc spare parts have been fitted in various ways and other problems. Furthermore, the newCopenhagen–Ringsted high-speed line was planned for opening in 2018 with ETCS only, creating a deadline, but there is a decision to introduce old signalling there, and delay ETCS roll-out for several years (still the dilemma must be solved by fitting ETCS into the trains).[108][109]

In September 2022: The roll-out proceeds according to the delayed plan; some lines in the Jutland peninsula have been successfully converted and the goal of complete roll-out in 2030 is confirmed.[110]

France

[edit]

Germany

[edit]
Lines equipped with ETCS L1 (light blue) and ETCS L2 (dark blue) in Germany (as of December 2024)

Germany intends to use Level 1 only as Limited Supervision – neither Full Supervision nor Euroloops will be installed.[112]

The first project that was intended to implement ETCS was theKöln–Frankfurt high-speed rail line that had been under construction since 1995. Due to the delays in the ETCS specification a new variant of LZB (CIR ELKE-II) was implemented instead.

The next planned and first actual implementation was on the Leipzig-Ludwigsfelde main line to Berlin. There, SRS 2.2.2 was tested together with a PZB and LZB mixed installation in conditions of fast and mixed traffic. The section was co-financed by the EU and DB to gain more experience with the ETCS Level 2 mode. Since April 2002 the ETCS section was in daily usage and in March 2003 it was announced that it had reached the same degree of reliability as before using ETCS. Since 6. December 2005 an ETCS train ran at 200 km/h (125 mph) as a part of the normal operation plan on the line north of Leipzig to obtain long-term recordings.[113] As of 2009, the line had been decommissioned for ETCS and is henceforth in use with LZB and PZB. In May 2022 construction started for a new SRS 3.4.0 installation between Berlin and Leipzig.[114]

In 2011, the installation of ETCS L2 (SRS 2.3.0d) was ordered for 14 Mio EUR following the reconstruction and enhancement of the railway line Berlin-Rostock.[115] A first part of 35 km was finished at the end of 2013 betweenLalendorf andKavelstorf,[116] but never went into service.

The newly built Ebensfeld–Erfurt segment ofNuremberg–Erfurt high-speed railway as well as theErfurt–Leipzig/Halle high-speed railway and the upgraded Erfurt–Eisenach segment of theHalle–Bebra railway are equipped with ETCS L2. The north-eastern part (Erfurt–Leipzig/Halle) is in commercial use since December 2015 exclusively with ETCS L2 SRS 2.3.0d. The southern part (Ebensfeld–Erfurt) started test running and driver training in the end of August 2017[117] and regular operation with ETCS L2 in December 2017. Starting in December 2017 there are about 20 high-speed trains per day from Munich to Berlin.[118] ETCS on the western part (Erfurt–Eisenach) was also scheduled for commencing operation in December 2017 but commission was delayed until August 2018.

Germany started replacing some of itsPZB andLZB systems in 2015.[77] During 2014 it was planned to use a dual equipment for the four main freight corridors to comply with the EC 913/2010 regulation. Further testing showed that a full ETCS system can increase capacity by 5-10% leading into a new concept "Zukunft Bahn" to accelerate the deployment, presented in December 2015.[119] The overall cost reduction of about half a billion euro may be reinvested to complete the switch to ETCS that may take about 15 years.[119] The Deutsche Bahn expected to get further federal funding after the2017 German federal election.[120][121] In a first step, another 1750 km of existing railway lines are planned to be equipped with ETCS until 2023, focusing on the Rhine-Alpine corridor, the Paris–Southwest Germany corridor and border-crossing lines.[122]

With Germany pressing for Baseline 3, neighbouring countries like Austria intend to update their rolling stock, especially by modernizing the GSM-R radio on their trains.[123] One of the last additions to B3R2 was the usage of EDGE in GSM-R. This is already widely deployed in the German rail network (including better frequency filters for the GSM-R radio equipment).[18]

In January 2018 the project "Digitale Schiene" (digital rail) was unveiled that intended to bring about a transition plan by mid 2018. Deutsche Bahn intends to equip 80% of the rail network with GSM-R by 2030 razing any lineside signals in the process. This will bring about 20% more trains that can be operated in the country.[42] In the process 160,000 signals and 400,000 km (250,000 mi) of interlocking cables will be disposed of.[124] The Digital Rail project came about shortly after theNuremberg–Erfurt high-speed railway was operational in December 2017 being the first high-speed line to have no lineside signals anymore. After some teething problems with radio reception it settled within the expected range of usability.

Priority is on the 1,450 km (900 mi) Rhine Corridor that is about to be equipped with ETCS Level 2.[42] Bringing ETCS to the corridor has been agreed on at the EU level in 2016 as part of the TEN Core network that has expectations set to 2023.[38] The Digital Rail project of 2018 has set the completion date to 2022 for using ETCS Level 2[42] while Switzerland intends to switch to ETCS Level 2 no later than 2025.[41] Switzerland is expecting an increase in capacity of 30% that will probably come out the sameon congested sections along theRhine.

Greece

[edit]

ETCS Level 1 will be deployed on theAthens-Thessaloniki railway, the first in Greece. The system is expected to be ready by late 2023. ETCS Level 1 is expected to be installed as part of electrification and modernisation works on the Palaifarsalos toKalambaka line which began in 2022. Works to install ETCS Level 1 was also begun in 2022 on theThessaloniki-Idomeni railway.[125]

Hungary

[edit]

In Hungary, theZalacsébHodoš line was equipped with Level 1 as a pilot project in 2006.TheBudapestHegyeshalom Level 1 was launched in 2008, and it was extended toRajka (GYSEV) in 2015.TheBékéscsaba-Lőkösháza line was equipped with Level 1 as an extension of the Level 2 network until further refurbishments will take place.

In Hungary Level 2 is under construction on the Kelenföld-Székesfehérvár line as a part of a full reconstruction, and was planned to be ready before 2015, but due to problems with the installation ofGSM-R, all of them are delayed.The Level 2 system is under construction in several phases, currently: Boba-Hodoš, Székesfehérvár station, Székesfehérvár-Ferencváros, Ferencváros-Monor, Monor-Szajol, Szajol-Gyoma and Gyoma-Békéscsaba sections.GYSEV is currently installing Level 2 to the Sopron-Szombathely-Szentgotthárd line.

Work on the expansion of theBelgrade-Budapest railway line has stopped because the Chinese contractors are not equipped to build ETCS.[126]

India

[edit]

National Capital Region Transport Corporation has decided to equip European Train Control System (ETCS) on itsSarai Kale Khan hub in India's First Rapid Rail corridorDelhi-MeerutRRTS Route.[127] However, the national train protection systemKavach, which unifies the key features of the ETCS and the Indian Anti-Collision Device, seems to become more widespread.ETCS Hybrid was deployed as the first line in the world on the Delhi–Meerut line in October 2023.[56]

Indonesia

[edit]

Palembang LRT is equipped with ETCS Level 1[128] and PT. LEN Industri (Persero) provides the trackside fixed-block signalling.[129]

Italy

[edit]
  • December 2005:Rome–Naples high-speed railway opens with ETCS Level 2.
  • February 2006: ETCS Level 2 is extended to theTurin–Milan high-speed line on the section between Turin andNovara.
  • December 2008: Opening ofMilanoBologna line.
  • Autumn/Winter 2009: Opening of High Speed lines Novara–Milano andBologna–Florence, thus completing the whole HS line Turin-Naples.[130]
  • December 2016: Opening of high-speed line Treviglio-Brescia, part of Milan-Verona line.
  • December 2016: Italy has 704 km (437 mi) of high-speed lines which use Level 2. These lines do not overlap with national signaling systems and do not have side light signals. They are connectingTorino toNaples in5+12 hours andMilan toRome in 2 hours 50 minutes.[131]

As of June 2022 the plan is to equip 3400 km of lines by 2026 and the entire State-owned network (16,800 km) by 2036.[132]

Israel

[edit]

InIsrael ETCS Level 2 will begin replacingPZB in 2020. Three separate tenders were issued in 2016 for this purpose (one contract each was let for track-side infrastructure, rolling-stock integration, and the erection of a GSM-R network).[133] Initial test runs of the system began on 31-March-2020.[134] Concurrent with the implementation ofERTMS arerailway electrification works, and an upgrade of thesignaling system in the northern portion ofIsrael Railways' network from relay-based to electronicinterlocking. (The southern portion of the network already employs electronic signaling.)

Libya

[edit]

In Libya, Ansaldo STS was awarded a contract in July 2009 to install Level 2.[135] This has stalled because ofcivil war.

Luxembourg

[edit]

Procurement for ETCS started in 1999 and the tender was won byAlcatel SEL in July 2002. By 1. March 2005 a small network had been established that was run under ETCS Level 1. The track-side installations were completed in 2014 after spending about €33 million.

The equipment of the rolling stock did take a bit longer. In early 2016 it became known that the new Class 2200 could not run on Belgium lines.[136] In February 2017 the changeover of Class 3000 was not even started, and Class 4000 had just one prototype installation. However the problems were resolved later with the complete rolling stock having ETCS installations by December 2017.[137]

The government had pushed for the changeover following the rail accident of Bettembourg on 14. February 2017. With the rolling stock being ready as well, the end date of the usage of the old Memor-II+-systems was set to 31. December 2019. With the decision of 29. January 2018 all trains have to use ETCS by default and it should be continued to use on tracks in Belgium and France as far as possible.

Mexico

[edit]

Morocco

[edit]

ETCS equips and will equip the high-speed lines that linkTangier to Kénitra (in service from 2018) and Kénitra to Casablancavia Rabat (under construction, planned to open in 2020). Other high-speed lines planned to link Casablanca to Agadir and Rabat to Oujda from 2030 will likely be equipped as well.

Netherlands

[edit]
  • 2001: ETCS Pilot Projects. Bombardier Transportation Rail Control Solutions and Alstom Transportation each equipped a section of line and two test trains with ETCS Level 1 and Level 2. The Bombardier Transportation project was installed betweenSteenwijk andHeerenveen. The Alstom project was installed betweenMaastricht and Heerlen. The trains used were former "Motorpost" self-propelled postal vans. One of these - 3024 - is still operational with Bombardier equipment in 2018. The pilot line equipment was dismantled in 2005.
  • June 2007: TheBetuweroute, a new cargo line with ETCS Level 2 between the port ofRotterdam and the German border opens for commercial traffic.
  • September 2009:HSL-Zuid/HSL 4 opened to commercial traffic. It is a new 125 km (78 mi) longhigh-speed line between the Netherlands and Belgium that uses ETCS Level 2 with a fallback option to ETCS Level 1 (although restricted to 160 km/h (100 mph) in the Netherlands).
  • December 2011: Entry to operation of the rebuilt and 4-tracked Holendrecht - Utrecht line with dual-signalling Class B ATB-EG/vV and ETCS Level 2
  • December 2012: The newly constructed Hanzelijn between Lelystad and Zwolle entered service with dual-signalling Class B ATB-EG/vV and ETCS Level 2

New Zealand

[edit]
  • April 2014: ETCS Level 1 was commissioned in the Auckland Metro network forKiwiRail by Siemens Rail Automation, in conjunction with the introduction of the ETCS-compliantAM class electric multiple units.[139]
  • 2023: Kiwirail is implementing ETCS level 2 as part of a project to rebuild Wellington Junction.[140][141]

Norway

[edit]

In August 2015 theeastern branch of the Østfold Line becomes first the line with ETCS functionality inNorway.

Philippines

[edit]

In 2022, Level 1 was installed by Alstom on theManila LRT Line 1 in preparation for the Cavite extension of the line.[142][143] Level 1 shall also be installed for theSouth Main Line as part of thePNR South Long Haul project, and as a minimum requirement on theMindanao Railway.[144][145]

Level 2 will also be installed on theNorth–South Commuter Railway with a maximum speed of 160 km/h (100 mph).[146]Hitachi Rail STS (formerly Ansaldo STS) is the sole bidder for the supply of such equipment.[147]

Poland

[edit]

In Poland, Level 1 was installed in 2011 on theCMK high-speed line betweenWarsaw andKatowice-Kraków, to allow speeds to be raised from 160 km/h (100 mph) to 200 km/h (125 mph), and eventually to 250 km/h (155 mph).[148] The CMK line, which was built in the 1970s, was designed for a top speed of 250 km/h (155 mph), but was not operated above 160 km/h (100 mph) due to lack ofcab signalling. The ETCS signalling on the CMK was certified on 21 November 2013,[149] allowing trains on the CMK to operate at 200 km/h (125 mph).[150]

In Poland, Level 2 has been installed as part of a major upgrade of the 346 km (215 mi) Warsaw-Gdańsk-Gdynia line that reduced Warsaw – Gdańsk travel times from five to two hours and 39 minutes in December 2015.[151] Level 2 has been installed on line E30 between Legnica – Węgliniec – Bielawa Dolna on the German border[152] and is being installed on the Warsaw-Łódź line.[153] As of 2024 the CMK high-speed line is being upgraded to allow a maximum speed of 250 km/h (155 mph) by upgrading the existing L1 ETCS signalling to L2, until the works are completed by the end of 2025 the maximum speed has been reduced to 160 kilometres per hour (100 mph).[154]

According to a Tender[155] put out by the infrastructure manager -PKP PLK, a part of the E30 railway between two major population centers - Katowice and Kraków - will be equipped with ETCS L2 signalling by 2027. This will not result in a higher speed limit, as the line is only built for a maximum speed of 160 km/h (100 mph)[156]

Slovakia

[edit]

In Slovakia, Level 1 has been deployed as part of theBratislavaKošice mainline modernisation program, currently between Bratislava (Výh. Svätý Jur) andŽilina (AH Príkrik), with the rest of the line to follow on Level 2. The current implementation is limited to 160 km/h (100 mph) due to limited braking distances between the control segments.[citation needed] In addition, Level 2 has been istalled on the route Žilina - Čadca.

Spain

[edit]
  • December 2004:ZaragozaHuesca high-speed line inSpain opens with ETCS Level 1.[157]
  • December 2007:Córdoba-Málaga High speed line in Spain opens with ETCS Level 1, in addition with LZB and the Spanish ATP systemASFA. Also, the line has been equipped with ETCS Level 2.
  • December 2007:Madrid-Segovia-Valladolid high-speed line opens with ETCS Level 1, with plans to upgrade to Level 2 in the future.
  • December 2009:Madrid-Zaragoza-Barcelona High speed line fully opens with ETCS level 2. First line in the world to run ETCS Level 2.
  • December 2010:Madrid-Cuenca-Valencia and Madrid-Cuenca-Albacete High speed line opens withETCS Level 1, but has also been equipped to upgrade to Level 2 in the future.
  • October 2011: ETCS Level 2 was commissioned on theMadrid-Barcelona high speed line, allowing the speed to be raised to 310 km/h (195 mph) with Madrid-Barcelona travel times reduced to 2 hours 30 minutes.[158]
  • December 2011:Orense-Santiago high speed line opens withETCS level 1, but has also been equipped to upgrade to level 2 in the future.
  • January 2013:Barcelona-Girona-Figueres high speed line opens with ETCS level 1. This line connects France to Spain.

Sweden

[edit]
  • August 2010: In Sweden, theBothnia Line was inaugurated using ETCS Level 2.[159]
  • November 2010: OnWest Dalarna Line in mid Sweden a demonstration run was made using ETCS Level 3 (ERTMS Regional).
  • February 2012: Full commissioning of West Dalarna Line (Repbäcken-Malung) under ETCS Level 3 without lineside signals or track detection devices.[160][161]
  • May 2012: The Transport Administration in Sweden decided to delay the introduction of ERTMS into more Swedish railways a few years, because of the trouble onBotniabanan andÅdalsbanan railways, and unclear financing of rebuilding the rolling stock.[162]
  • December 2013: TheHaparanda Line (Boden-Bredviken) reopened fitted with Level 2 ETCS.[163] This project also included a new-built section of railway between Bredviken and Haparanda, replacing the old line which had a more inland route. The new line was built to 200 km/h high-speed standards.
  • September 2024: ERTMS was deployed on parts of theIron Ore Line and is planned on all of it in 2029, after years of delays.[164][165] This was the first railway in Sweden and Norway to get ERTMS having high amount of traffic before deployment, and therefore trouble at introduction must be avoided.
  • The introduction of ERTMS on theSouthern Main Line Stockholm–Denmark, as part of an EU demand to fit allTEN-T routes with it, was planned for 2018. This has been delayed in multiple steps, and as of 2022 the plan is for cost reasons to deploy it wheresignalling control systems needs to be replaced anyway, starting around 2030 on the Southern Main Line, with planned finished replacement of all ATC installations in Sweden around 2050.[166]

Switzerland

[edit]
two high-speed lines have been using Level 2 in Switzerland by 2007 (shown red)
  • December 2004: ETCS Level 2 is to be installed on theMattstetten-Rothrist new line, a high-speed line opened in 2004 betweenBern andZürich for train speeds of 200 km/h (125 mph). This ETCS Level 2 installation was the pioneering ETCS installation in Switzerland. Technical problems with the new ETCS technology caused ETCS operation to be put off past the planned starting date.
  • February 2006: ETCS Level 2 is finally installed on the Mattstetten–Rothrist line. ETCS Level 2 operation was fully implemented in March 2007.[167]
  • June 2007: TheLötschberg Base Tunnel, part of the SwissNRLA project, opens with ETCS Level 2 and went in commercial use in December.[168]
  • Switzerland has announced in 2011 that it will switch from its national ZUB/Signum to ETCS Level 1 for conventional rail by enabling L1 LS packets on its transitional Euro-ZUB balises during 2017.[169]
  • As of September 2022, ETCS has been installed on the entire state-owned network, Level 2 is used on ten lines (section between Berne and Olten, base lines through the Lötschberg, Gotthard and Ceneri tunnels, sections between Lausanne and Sierre). The upgrade of the entire network to Level 2 is considered a long-term goal for which no explicit deadline has been set; conversion of lines will be continuously evaluated on a case-by-case basis.[170]

Thailand

[edit]

State Railway of Thailand uses ETCS Level 1 for the signalling onBangkok'selectrified suburban commuter rail system.[171] ETCS Level 1 will also be installed in mainlines extended fromBangkok toChumphon (Southern Line),Nakhon Sawan (Northern Line),Khon Kaen (Northeastern Line),Si Racha (Eastern Coast Line) and in shortcut line fromChachoengsao toKaeng Khoi (Shortcut from Eastern Line to North/Northeastern Line) along with Double Tracking Phase I projects and ATP system upgrade of existing double track lines, both scheduled to be completed in 2022.[172]

Turkey

[edit]

In Turkey, Level 2 is installed on the Ankara–Konya high-speed line designed for 250 km/h (155 mph).[173] The new 306 kilometres (190 mi) high-speed line has reduced Ankara-Konya travel times from10+12 hours to 75 minutes.[174]

United Kingdom

[edit]
Main article: European Rail Traffic Management System in Great Britain
  • October 2006:Network Rail announced that ETCS would be operational on theCambrian line in December 2008 and would cost £59million.
  • 2008: On the Cambrian line Network Rail will install in-cab ETCS Level 2, specification 2.3.0d. This level does not require conventional fixed signals – existing signals and RETB boards will be removed. Additionally, the lineside speed signs will be redundant – drivers are given the appropriate maximum speed on the cab display. The main supplier wasAnsaldo STS.Interfleet Technology ofDerby was commissioned to carry out the design for the passenger rolling stock and subsequently managed the installation on-site atLNWR, Crewe under contract to Ansaldo STS. Eldin Rail was contracted by Ansaldo STS as its infrastructure partner managing and installing all aspects of lineside infrastructure including the purpose-built Control Centre. During the design phase the key project stakeholders; Network Rail,Arriva Trains Wales andAngel Trains were all consulted to ensure the design was robust due to the criticality of the project, as the first installation of its kind in the UK. Twenty-fourClass 158s were fitted as well as threeClass 97/3 locomotives (formerlyClass 37s) to be used for piloting services.[175] The Class 97/3 design and installation was provided by Transys Projects ofBirmingham for Ansaldo STS.
  • 2010: Beginning of the national roll-out of ETCS in the United Kingdom.[176]
  • February 2010: The Cambrian ETCS –Pwllheli toHarlech Rehearsal commenced on 13 February 2010 and successfully finished on 18 February 2010. The driver familiarisation and practical handling stage of the Rehearsal has provided an excellent opportunity to monitor the use of GSM-R voice in operation on this route. The first train departed Pwllheli at 0853hrs in ERTMS Level 2 Operation with GSM-R voice being used as the only means of communication between the driver and the signaller.
  • October 2010: The commercial deployment of ETCS Level 2 by passenger trains started on the Cambrian Line between Pwllheli and Harlech inWales without lineside signals.[177]
  • March 2011: Full commissioning of Cambrian Line (Sutton Bridge Junction-Aberystwyth or Pwllheli) in Wales under ETCS level 2.[178]
  • In 2013, a Network Rail class 97/3 locomotive with Hitachi's Level 2 onboard equipment successfully completed demonstration tests.[179]
  • July 2015: As part of theThameslink Programme, ETCS is used for the first time in the Core using newBritish Rail Class 700 rolling stock. This upgrade is in order to raise capacity in the core to up to 24tph.
  • 2020: TheHeathrow branch of theElizabeth line started using ETCS.
  • November 2023: As part of the East Coast Digital Programme, theBritish Rail Class 717 operated in ETCS Level 2 in passenger service on theNorthern City Line for the first time. The first train to transition was 717018 with train running number 2B11 on 27 November.[180]
  • 2025: ETCS is to be rolled out across the country in coming years; some trains will run in digital-only mode from the end of 2025. ETCS was fitted to the 2017A1 60163 Tornado, the first steam locomotive built in the UK in 50 years. This is the first time that a steam locomotive has been so fitted, and it is hoped that it will continue to make it legally possible to run heritagesteam trains on the national network as the technology becomes a requirement.[181]

See also

[edit]

Notes

[edit]
  1. ^TheCity Tunnel (Malmö) has ETCS Level 1 signals as a preparation for ETCS Level 1 installation

References

[edit]
  1. ^abcdSubset-023. "ERTMS/ETCS-Glossary of Terms and Abbreviations". ERTMS USERS GROUP. 2014. Archived fromthe original on 21 December 2018. Retrieved21 December 2018.
  2. ^abcDirective 96/48/EC of 23 July 1996 of the European Parliament and of the Council amending Council Directive 96/48/EC on the interoperability of the trans-European high-speed rail system and Directive 2001/16/EC of the European Parliament and of the Council on the interoperability of the trans-European conventional rail system
  3. ^abcdWarren Kaiser, Stein Nielson (14 March 2008)."The Core of ATP – Data Engineering". IRSE Technical Meeting "All About ATP" Sydney. Archived fromthe original on 29 April 2013. Retrieved15 November 2013.|
  4. ^"ERTMS in 10 questions"(PDF).European Railway Agency. Archived fromthe original(PDF) on 15 February 2010.
  5. ^"I. 284".COMMISSION DECISION concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system (notified under document number C(2006) 964) (Text with EEA relevance) (2006/679/EC)(PDF). European Union. 16 October 2006. pp. 1–176. Retrieved17 October 2016.
  6. ^"Stand der Entwicklung und Einführung von ERTMS"(PDF).
  7. ^"Baseline 3 First Consolidation".European Railway Agency.
  8. ^"Baseline 3 Second Consolidation".European Railway Agency.
  9. ^"New Annex A for ETCS Baseline 3 and GSM-R Baseline 0".European Railway Agency.
  10. ^"Recommendation on updating the Annex A of the TSI Control Command and Signalling".
  11. ^"Recommendation on ERTMS delivered to European Commission".European Railway Agency.
  12. ^"commission decision on the technical specification for interoperability relating to the control-command and signalling subsystems of the trans-European rail system". 25 January 2012. 2012/88/EU.
  13. ^"commission decision amending Decision 2012/88/EU on the technical specifications for interoperability relating to the control-command and signalling subsystems of the trans-European rail system". 6 November 2012. 2012/696/EU.
  14. ^ab"ERA Work Programme 2013". European Railway Agency. 19 December 2012. Section 6. ERTMS System Authority. Retrieved4 January 2012.
  15. ^"System Requirements Specification (SUBSET-026)". European Railway Agency. 12 May 2014.
  16. ^"ETCS Driver Machine Interface (ERA/ERTMS/015560)". European Railway Agency. 12 May 2014.
  17. ^"COMMISSION DECISION (EU) 2015/14 amending Decision 2012/88/EU on the technical specification for interoperability relating to the control-command and signalling subsystems of the trans-European rail system". European Commission. 5 January 2015.
  18. ^abc"European Train Control System (ETCS) bei der DB Netz AG"(PDF) (in German). April 2014. p. 15. Archived fromthe original(PDF) on 15 September 2014. Retrieved12 September 2014.
  19. ^"ERTMS Recommendations". ERA. Archived fromthe original on 5 February 2016. Retrieved8 January 2016.The ETCS Baseline 3 release 2 specifications (B3R2), which will coexist in parallel with the current Baseline 2 and Baseline 3 / The formal maintenance of ETCS Baseline 3 Maintenance release 1 (B3 MR1), on the basis of two Technical Opinions of the Agency already approved
  20. ^ab"ERTMS Recommendations". ERA. Archived fromthe original on 5 February 2016. Retrieved8 January 2016.
  21. ^abcde"COMMISSION REGULATION (EU) 2016/919 on the technical specification for interoperability relating to the 'control-command and signalling' subsystems of the rail system in the European Union". European Commission. 27 May 2016.
  22. ^"Set of specifications # 3 (ETCS baseline 3 and GSM-R baseline 1)". ERA. 15 June 2016.
  23. ^"ERA_ERTMS_015560 – ETCS Driver Machine Interface". 15 June 2016.
  24. ^ab"ERTMS B3R2 Launch – The Time Has Come for a Truly European Train Control System". EU Agency for Railways. 22 May 2016.
  25. ^"EUR-Lex - 32015D0014". Eur-lex.europa.eu. 7 January 2015. Retrieved29 October 2018.
  26. ^"First test for ETCS Baseline 3".Railway Gazette International.
  27. ^"Network Rail awards ETCS freight fitment contract".Railway Gazette International.
  28. ^"Electrostar ETCS contract awarded".Railway Gazette International.
  29. ^ab"EUR-Lex - L:2023:222:TOC - EN - EUR-Lex".eur-lex.europa.eu. Retrieved10 June 2024.
  30. ^CLEARSY (19 September 2023)."Version 4 of the ETCS specification has just been published".CLEARSY. Retrieved10 June 2024.
  31. ^"Control Command and Signalling TSI | European Union Agency for Railways".www.era.europa.eu. 25 November 2022. Retrieved10 June 2024.
  32. ^"ERTMS Pilot Project: Paris-Frankfurt corridor & ICE3 and POS trainsets". Deutsche Bahn. 3 December 2003. Presentation of the DB/RFF/SCNF projekt to working group ERTMS. Archived fromthe original(powerpoint) on 2 April 2012.
  33. ^"Deployment world map". Archived fromthe original on 8 October 2010.
  34. ^"Australia embraces ERTMS".ertms.com. Retrieved21 April 2023.
  35. ^"2016/919/EC – technical specification for interoperability relating to the 'control-command and signalling' subsystems of the rail system in the European Union". European Commission. 27 May 2016.
  36. ^"Technical Pillar of the 4th Railway Package approved by European Parliament". European Railways Agency. 28 April 2016.
  37. ^"European Union Agency for Railways Policy"(PDF). European Union Agency for Railways. 15 June 2016.
  38. ^abc"ERTMS business case confirmed".Railway Gazette. 22 June 2016. Archived fromthe original on 23 June 2016. Retrieved22 June 2016.
  39. ^"European Rail Sector commits to the 4th ERTMS MoU at InnoTrans 2016". UNIFE ERTMS. Retrieved6 October 2016.
  40. ^"Revised ERTMS Deployment Plan adopted".Railway Gazette. 5 January 2017. Archived fromthe original on 6 January 2017. Retrieved5 January 2017.
  41. ^ab"Verzögerungen und Milliardenkosten bei ETCS-Zugsicherung befürchtet".Blick. 26 May 2017.
  42. ^abcd"Digitale Schiene Deutschland" bringt mehr Leistung und Qualität auf die Gleise". Deutsche Bahn. 25 January 2018.
  43. ^ab"Trainguard" [Train Guard](PDF).Mobility.Siemens.com (in German).Siemens. 2014. Archived fromthe original(PDF) on 26 February 2015. Retrieved26 February 2015.
  44. ^"European Train Control System ETCS".www.bav.admin.ch. Archived fromthe original on 6 May 2016.
  45. ^"Alstom signs a signalling system contract worth €17 million with WSW mobil GmbH". Alstom. 6 June 2012.
  46. ^ab"TSI Revision Package 2023 - Key Changes (Part I - Rolling stock and CCS)"(PDF).ERA.
  47. ^"ETCS Migrationsstrategie".www.dbinfrago.com (in German). Retrieved27 September 2024.
  48. ^abEndersby, Tom (June 2015)."Viability of ETCS limited supervision for GB application".RSSB Research Project Catalogue.
  49. ^"UIC Project – ETCS Annual Report 2004"(PDF). UIC. 31 March 2005. section 2.3.9.4 New ETCS Mode "Limited Supervision". I/92/E/051. Archived fromthe original(PDF) on 2 April 2012.
  50. ^"Siemens Awarded Swiss ETCS Level 1 Roll-Out Contract".Railway Gazette International.DVV Media Group. 9 September 2011. Archived fromthe original on 26 November 2020. Retrieved25 December 2014.
  51. ^"Information zur Weiterentwicklung der ETCS-Strategie" (in German). Bundesamt für Verkehr. Archived fromthe original on 24 November 2011. Retrieved22 September 2011.
  52. ^"Overall presentation of ERTMS ERTMS European Rail Transport Management System Regional".International Union of Railways. Archived fromthe original on 16 August 2011.
  53. ^"Yet more ERTMS challenges ahead".International Railway Journal. Archived fromthe original on 2 May 2010.
  54. ^"ERTMS Level 3: the Game-Changer"(PDF). Archived fromthe original(PDF) on 9 February 2022. Retrieved6 June 2022.
  55. ^Principles of ETCS Hybrid Train Detection (EEIG ERTMS Users Group) (PDF)
  56. ^ab"India's first semi high-speed regional train by Alstom – NaMo Bharat gets inaugurated, sets a new world standard in advanced signalling technology". Alstom. 20 October 2023. Retrieved8 June 2025.
  57. ^"Galileo".galileo.uic.asso.fr. Archived fromthe original on 26 November 2006. Retrieved6 June 2022.
  58. ^"ОАО "НИИАС"". Archived fromthe original on 25 July 2017. Retrieved19 July 2017.
  59. ^"Комплексная российско-итальянская система управления и обеспечения безопасности движения поездов".
  60. ^"3INSAT - Train Integrated Safety Satellite System". Artes-apps.esa.int. Retrieved29 October 2018.
  61. ^"Enabling Application Validation". Gsa.europa.eu. 11 October 2018. Retrieved29 October 2018.
  62. ^"NGTC | Structure". Ngtc.eu. Archived fromthe original on 29 December 2020. Retrieved29 October 2018.
  63. ^"Commissione europea : CORDIS : Servizio Progetti e risultati : Periodic Report Summary 1 - NGTC (Next Generation Train Control)". Archived fromthe original on 18 October 2016. Retrieved8 June 2016.
  64. ^"ERTMS Level 4, Train Convoys or Virtual Coupling (2016)".webinfo.uk.
  65. ^"ANNEX to the COMMISSION DECISION amending Decision C(2020)2140 final defining the list of representative bodies from the railway sector acting at Union level"(PDF). EUROPEAN COMMISSION.
  66. ^"Radio Communication".European Union Agency for Railways. 26 October 2018. Retrieved15 April 2021.
  67. ^Kessell, Clive (30 January 2019)."GSM-R: a migration strategy to its successor?".Rail Engineer. Archived fromthe original on 22 February 2019.
  68. ^"EC Sets Out ERTMS Deployment Deadlines".Railway Gazette International.DVV Media Group. 31 July 2009. Archived fromthe original on 14 June 2015. Retrieved25 December 2014.
  69. ^trenyrail (17 July 2019)."Atlas, la tecnología de Alstom para ERTMS Nivel 2 entra en servicio en España".Tren y Rail (in Spanish). Retrieved14 February 2023.
  70. ^"UIC ERTMS Implementation Maps". Archived fromthe original on 19 November 2008.
  71. ^de Cicco, Paolo."Implementing the European Train Control System – Opportunities for European rail"(PDF). International Union of Railways. Archived fromthe original(PDF) on 21 April 2014. Retrieved21 April 2014.
  72. ^"UIC Project – ETCS Annual Report 2004"(PDF). UIC. 31 March 2005. section 2.1 ETC migration strategy for European Rail corridors. I/92/E/051. Archived fromthe original(PDF) on 2 April 2012.
  73. ^"Migration und Sicherung der Interoperabilität von ETC"(PDF). DLR. 7 December 2009. Archived fromthe original(PDF) on 2 April 2012. Retrieved22 September 2011.
  74. ^"ERTMS Corridor route comparison"(PDF). European Commission. 2008. Archived fromthe original(PDF) on 19 May 2016.
  75. ^"ERTMS (European Rail Traffic Management System)". Archived fromthe original on 5 July 2011.
  76. ^"Korridor A data"(PDF).dbnetze.com. Retrieved21 April 2023.
  77. ^ab"Nationaler Umsetzungsplan für die TSI Zugsteuerung, Zugsicherung und Signalgebung des konventionellen transeuropäischen Eisenbahnsystems im Rahmen der Richtlinie 2001/16/EG in der Bundesrepublik Deutschland"(PDF). European Commission. 4 August 2009.
  78. ^"South Australia to install ERTMS in Adelaide".International Railway Journal.Simmons-Boardman Publishing Corporation. 13 February 2013. Retrieved6 February 2018.
  79. ^"European Train Control System (ETCS)".www.queenslandrail.com.au. Archived fromthe original on 5 September 2018. Retrieved5 September 2018.
  80. ^"Rio Tinto launches the autonomous heavy freight rail operation".Ansaldo STS Corporate website. 13 July 2018. Archived fromthe original on 18 December 2018. Retrieved17 December 2018.
  81. ^"Rail Network Improvements".Cross River Rail. Retrieved28 March 2024.
  82. ^ÖBB-Infrastruktur AG (22 April 2024)."ETCS"(PDF).ÖBB-Infrastruktur Aktiengesellschaft Website (in German). Retrieved18 October 2024.
  83. ^ÖBB-Infrastruktur AG."TRACK FWD - digitale Zukunft auf Schiene".ÖBB-Infrastruktur Aktiengesellschaft Website. Retrieved18 October 2024.
  84. ^Van den Abeele, An; Verschaeve, Johan (2007). "Zugbeeinflussung und Zugsicherung in Belgien – heute und morgen".Signal + Draht (in German).99 (7):14–18.{{cite journal}}: CS1 maint: multiple names: authors list (link)
  85. ^Gehrenbeck, Jean-Jacques (2007). "Cross-border operation at 300 km/h".Signal + Draht.99 (3):32–35.
  86. ^"Siemens gewinnt Großauftrag über ETCS-Komponenten".Signal + Draht (in German).98 (7+8): 50. 2006.
  87. ^Walenberg, Frank; Pas, Rob te; Zigterman, Lieuwe (2012). "Making progresses towards standardised train control".Railway Gazette International.168 (3):35–38.{{cite journal}}: CS1 maint: multiple names: authors list (link)
  88. ^Aouati, Amar (2007). "ERTMS/ETCS/GSM-R on the Belgian high-speed lines L3 and L4".Signal + Draht.99 (6):31–34.
  89. ^Gehrenbeck, Jean-Jacques (2007). "Cross-border operation at 300 km/h".Signal + Draht.99 (3):32–35.
  90. ^abGilson, Benoît (9 March 2016)."ETCS Master Plan for rail safety in Belgium"(PDF; 1,6 MB). Infrabel, Public Limited Company, Place Marcel Broodthaers 2, BE-1060 Brussels. Retrieved20 December 2017.
  91. ^"First Belgian conventional line equipped with ETCS".International Railway Journal. 5 March 2012. Archived fromthe original on 31 March 2012. Retrieved20 December 2017.
  92. ^"Antwerpen tunnel opened".Railway Gazette International.171 (1): 9. 2015.
  93. ^"ETCS in service from Athus to Antwerpen".Railway Gazette International.172 (2): 43. 2016.
  94. ^"Längste ETCS-Strecke in Belgien".Eisenbahn-Revue International (in German) (4): 192. 2016.
  95. ^"ETCS Infrabel".infrabel.be (in Dutch). 2024.
  96. ^"Alstom and consortium partners selected for GO Expansion to transform collective mobility in Toronto, Canada".Alstom. Retrieved19 April 2022.
  97. ^Capital Projects Group (GO & UP) Quarterly Report(PDF) (Report). 12 September 2024. Retrieved25 September 2024.
  98. ^"Bombardier secures €66m Chinese ERTMS contract".International Railway Journal. September 2007. p. 7.
  99. ^"Croatia begins operating first ERTMS equipped rail line".railway-technology.com. 18 January 2012. Retrieved8 February 2016.
  100. ^"Národní implementační plán ERTMS" (in Czech). Retrieved27 March 2024.
  101. ^"Vláda schválila plán zavádění ETCS na českou železnici" (in Czech). 14 September 2021. Retrieved27 March 2024.
  102. ^"Mezi Olomoucí a Uničovem výhradně pod dohledem ETCS" (in Czech). Retrieved27 March 2024.
  103. ^"Ny udrulningsplan på plads for det digitale signalsystem i Østdanmark". Banedanmark. 14 May 2024. Archived fromthe original on 21 March 2025.
  104. ^"ETCS Level 2 for Entire Danish Network".Railway Gazette International.DVV Media Group. 19 December 2008. Archived fromthe original on 26 April 2015. Retrieved25 December 2014.
  105. ^"Biting the Bullet – the Danish ERTMS Rollout". TheRailEngineer. 6 November 2013. Archived fromthe original on 11 November 2013.
  106. ^Briginshaw, David (14 October 2013)."A GSM-R evolution strategy starts to emerge". Railway Journal.Alstom plans to start conducting live demonstrations for some of its customers next year and will begin to roll-out the first full-scale GPRS deployment in Denmark as part of the national ERTMS programme in 2017.
  107. ^ab"The Danish Signalling Programme – The Projects". BaneDanmark (Danish Railways). Archived fromthe original on 7 March 2016. Retrieved27 February 2016.
  108. ^ab"Danish ERTMS programme facing two-year delay".International Railway Journal. 12 October 2016.
  109. ^"Danish ERTMS programme facing seven-year delay".railjournal.com. 17 November 2017. Retrieved9 December 2017.
  110. ^"Banedanmark completes two more ETCS installations in Jutland".RailTech. ProMedia Group. 17 August 2022. Retrieved10 October 2022.
  111. ^"Paris-Lyon: The pilot project for a high-performance high-speed line | Topic | English | SNCF RÉSEAU".
  112. ^"European Train Control System (ETCS) bei der DB Netz AG"(PDF). DB Netz. April 2014. Archived fromthe original(PDF) on 14 June 2015. Retrieved31 January 2017.
  113. ^"DB AG nimmt ETCS-Betrieb auf".Eisenbahn-Revue International (Heft 1/2006): S. 30.ISSN 1421-2811.
  114. ^"Login - Eurailpress".
  115. ^"Ansaldo STS wins the Berlin-Rostock ERTMS/ETCS 2 signalling systems contract".Ansaldo STS, A Hitachi Group Company. 7 May 2012. Archived fromthe original on 20 December 2015. Retrieved3 September 2017.
  116. ^"Operationelles Programm Verkehr, EFRE BUND 2007–2013, Abschließender Durchführungsbericht"(PDF; 8,1 MB).Federal Ministry of Transport and Digital Infrastructure (in German). 20 March 2017. pp. 78–79. Retrieved3 September 2017.
  117. ^"Was fährt denn da? Neubaustrecke Ebensfeld-Erfurt vor der Inbetriebnahme".DB Netze. 14 July 2017. Archived fromthe original on 4 September 2017. Retrieved3 September 2017.
  118. ^"Das größte Bahnbauprojekt Deutschlands, Aus- und Neubaustrecke Nürnberg–Berlin"(PDF).DB Netze (in German). 30 August 2017. Archived fromthe original(PDF; 4,2 MB) on 4 September 2017. Retrieved3 September 2017.
  119. ^abRother, Richard (18 December 2015)."Bahn entdeckt Pünktlichkeit".Die Tageszeitung: Taz.
  120. ^"Zukunft Bahn: Weitere Etappe im Ankündigungs-Marathon der DB".Eisenbahn-Revue International Deutschland-Ausgabe (2).Eisenbahn-Revue International: 94 f. 2016.ISSN 1421-2811.
  121. ^"DB-Aufsichtsrat nimmt Zukunftskonzept zur Kenntnis – ETCS-Vollausstattung des Netzes geplant".eurailpress.de.Eurailpress. 18 December 2015. Archived fromthe original on 20 February 2016. Retrieved20 February 2016.
  122. ^"Nationaler Umsetzungsplan ETCS"(PDF; 1 MB).Federal Railway Authority (in German). 11 December 2017.
  123. ^Connecting Europe FacilityUpgrade of Austrian vehicles to ERTMS Baseline 3
  124. ^Fockenbrock, Dieter (23 January 2018)."ICE fahren mit Rekordauslastung".Handelsblatt.
  125. ^"Ποια είναι τα 10 μεγαλύτερα υπό κατασκευή σιδηροδρομικά έργα στην Ελλάδα". 28 September 2022.
  126. ^red, ORF at/Agenturen (22 September 2023)."China stoppt Bahnprojekt Budapest – Belgrad".news.ORF.at (in German). Retrieved22 September 2023.
  127. ^Pioneer, The."Sarai Kale Khan hub to get European Train Control System".The Pioneer.
  128. ^Simorangkir, Eduardo."Awal 2018, Masyarakat Palembang Bisa Jajal LRT".detikfinance. Retrieved26 May 2018.
  129. ^Simorangkir, Eduardo."Waskita Karya Gandeng PT Len Industri Garap Fasilitas Operasi LRT Palembang".detikfinance. Retrieved26 May 2018.
  130. ^"[1]". Archived fromthe original on 29 May 2008.
  131. ^"ERTMS, per l'interoperabilità tra le reti europee". Rfi.it. 24 October 2018. Retrieved29 October 2018.[dead link]
  132. ^"RFI Aggiudicata la gara da 2,7 miliardi per la tecnologia ERTMS in tutta Italia".Rete Ferroviaria Italiana (in Italian). Roma: Gruppo Ferrovie dello Stato Italiane. 1 June 2022. Retrieved10 October 2022.
  133. ^Dori, Oren (1 May 2016).מכרז האיתות של רכבת ישראל יוצא לדרך [Israel Railways Commences Signalling System Contract].TheMarker (in Hebrew). Retrieved1 May 2016.
  134. ^"רכבת ישראל: נסיעת ניסוי מוצלחת עם מערכת האיתות החדשה". Archived fromthe original on 27 November 2020.
  135. ^"Ansaldo STS Wins Huge Libyan Signalling Contract".Railway Gazette International.DVV Media Group. 22 July 2009. Archived fromthe original on 24 September 2015. Retrieved26 December 2014.
  136. ^"Wenn Vereinfachung Dinge kompliziert macht ... ETCS-SYSTEM".tageblatt.lu (in German). Tageblatt Letzeburg; 44, rue du Canal, L-4050 Esch-sur-Alzette. 31 March 2016. Archived fromthe original on 8 March 2017. Retrieved7 March 2017.
  137. ^"RAPPORT D'ETAPE - Collision ferroviaire du 14 février 2017 à Dudelange"(PDF) (in French). Luxemburg - Ministerium für nachhaltige Entwicklung und Infrastrukturen. 19 February 2018. pp. 32–34. Archived fromthe original(PDF; 1,4 MB) on 21 February 2018. Retrieved20 February 2018.
  138. ^"CAF - Construcciones y Auxiliar de Ferrocarriles, creamos soluciones ferroviarias".www.caf.net. Retrieved21 April 2023.
  139. ^"Auckland launches electric suburban services".Railway Gazette. 28 April 2014. Archived fromthe original on 26 March 2016. Retrieved8 February 2016.
  140. ^"Senior Engineer Wellington Metro Resignalling (Wellington ETCS Project)"(PDF). Retrieved28 February 2024.
  141. ^"GETS | KiwiRail Group - KiwiRail Addendum No2 to Advance Notice of Procurement - Wellington ETCS Lineside Contractor".www.gets.govt.nz. Retrieved28 February 2024.
  142. ^"Alstom to supply an integrated metro solution to Manila".Alstom. 12 February 2016. Retrieved5 June 2019.
  143. ^officialLRT1 (1 February 2022)."LRMC completes upgrade of LRT-1 signalling system".Light Rail Manila Corporation. Retrieved2 February 2022.{{cite web}}: CS1 maint: numeric names: authors list (link)
  144. ^"Bidding Document for the PNR South Long Haul Project"(PDF).Department of Transportation (Philippines). 31 August 2018. Retrieved2 August 2020.
  145. ^"PROCUREMENT OF PROJECT MANAGEMENT CONSULTANCY SERVICES OF THE MINDANAO RAILWAY PROJECT: (TAGUM-DAVAO-DIGOS SEGMENT)-REBID".Department of Transportation (Philippines). Archived fromthe original on 18 April 2021. Retrieved15 April 2021.
  146. ^LIVE: North-South Commuter Railway Extension Project (NSCR-Ex) Contract Package (CP) NS-01 E&M System and Track Works (Facebook Watch).Department of Transportation (Philippines). 16 April 2021. Retrieved19 April 2021.The outline of Signaling System is as follows: a) Signaling system to be based on ETCS Level 2 with a maximum speed of 160 km/h. (at 1:08:37)
  147. ^"NORTH-SOUTH COMMUTER RAILWAY PROJECT (MALOLOS-TUTUBAN) N1CP04: ELECTRICAL AND MECHANICAL SYSTEMS AND TRACKWORKS".Department of Transportation (Philippines). 25 August 2021. Archived fromthe original on 5 November 2021. Retrieved5 November 2021.
  148. ^"Cab Signalling to Bring 200 km/h to Poland".Railway Gazette International.DVV Media Group. 10 September 2009. Archived fromthe original on 24 February 2018. Retrieved25 December 2014.
  149. ^"First ETCS Certified in Poland".Railway Gazette International.DVV Media Group. 23 December 2013. Archived fromthe original on 14 March 2016. Retrieved25 December 2014.
  150. ^"Polish Pendolino Launches 200 km/h Operation".Railway Gazette International.DVV Media Group. 15 December 2014. Archived fromthe original on 16 December 2014. Retrieved25 December 2014.
  151. ^Dziennik Baltycki, 'Pociagi Gdynia-Warszawa 160 km/h?'http://www.dziennikbaltycki.pl/artykul/724293,pociagi-gdyniawarszawa-160-kmh-rusza-ostatni-etap-modernizacji-szyciej-pojedziemy-w-2015,id,t.html
  152. ^Kolejowy, Rynek (15 April 2014)."EP09 z Europejskim System Sterowania" [EP09 with the European Control System].Rynek-Kolejowy.pl (in Polish). ZDG. Retrieved18 February 2015.
  153. ^"Warszawa–Lódż ERTMS Contract Awarded".Railway Gazette International.DVV Media Group. 12 March 2014. Archived fromthe original on 26 July 2014. Retrieved26 December 2014.
  154. ^Portal, Kolejowy (17 July 2023)."Pod koniec 2025 r. na CMK pojedziemy z prędkością do 250 km/h".Kolejowy Portal (in Polish). Retrieved29 January 2024.
  155. ^"Nowoczesny system zarządzania zwiększy bezpieczeństwo pociągów na linii Kraków - Katowice".PKP Polskie Linie Kolejowe S.A. 29 January 2024. Retrieved29 January 2024.
  156. ^"Regulamin sieci 2023/2024".PKP Polskie Linie Kolejowe S.A. Retrieved29 January 2024.
  157. ^"ERTMS Level 1: Trackside on the Zaragoza-Huesca project".Alstom.com. September 2004. Archived fromthe original on 16 July 2008. Retrieved4 July 2008.
  158. ^"Madrid–Barcelona at 310 km/h with ETCS Level 2".Railway Gazette International.DVV Media Group. 18 October 2011. Archived fromthe original on 31 March 2015. Retrieved25 December 2014.
  159. ^"Massive three-day celebration inaugurates the Bothnia Line".Botniabanan. 9 September 2010.[permanent dead link]
  160. ^"ERTMS Regional for a safe and cost-effective railway"(PDF).Swedish Rail Administration. July 2009. Retrieved27 April 2012.
  161. ^"Västerdalsbanan, ERTMS Regional -" (in Swedish).Swedish Transport Administration. 15 February 2012. Retrieved27 April 2012.
  162. ^TT (23 May 2012)."Prestigeprojekt för tågen skjuts upp".SvD.se (in Swedish).
  163. ^"ETCS goes live to Haparanda".Railway Gazette International. Sutton: DVV Media International. 17 January 2014. Retrieved21 April 2023.
  164. ^"Malmbanan, nya signalsystemet ERTMS". Retrieved18 September 2024.
  165. ^"Nya datum för inkoppling av ERTMS på Malmbanan efter återställningsarbetena". Retrieved18 September 2024.
  166. ^"Utbyggnad och tidplaner för ERTMS".Trafikverket. Archived fromthe original on 21 April 2023. Retrieved21 April 2023.
  167. ^"Alstom Awarded ERTMS Service Contract".Railway Gazette International.DVV Media Group. 29 January 2009. Archived fromthe original on 16 July 2014. Retrieved25 December 2014.
  168. ^Jackson, Chris (15 November 2007)."ERTMS: the view from the cab".Railway Gazette International. Archived fromthe original on 18 January 2016. Retrieved4 June 2017.
  169. ^SBB, Walter von Andrian:ETCS L1 LS und Geschwindigkeitsüberwachung bei den SBB. In:Eisenbahn-Revue International, Heft 11/2011,ISSN 1421-2811, S. 543
  170. ^"Information for professionals: ETCS".Federal Office of Transport. Ittigen: Swiss Confederation. Retrieved10 October 2022.
  171. ^"Thales to supply ETCS to Bangkok's suburban train network".Railway Technology. railway-technology.com. 24 May 2018. Retrieved9 November 2019.
  172. ^"Thales consortium to install ETCS Level 1 ATP system in Thailand".Railway Technology. railway-technology.com. 19 September 2019. Retrieved9 November 2019.
  173. ^"First ETCS Level 2 Contract Awarded in Turkey".Railway Gazette International.DVV Media Group. 27 January 2011. Archived fromthe original on 26 April 2015. Retrieved26 December 2014.
  174. ^"Opening of Ankara–Konya Fast Line Completes Strategic Link".Railway Gazette International.DVV Media Group. 24 August 2011. Archived fromthe original on 13 August 2020. Retrieved26 December 2014.
  175. ^"PIONEERING RAIL TECHNOLOGY GETS TESTED IN WALES". Network Rail. 12 February 2010. Archived fromthe original on 29 September 2011.
  176. ^"2017 start date for Great Western ERTMS upgrade". National Union of Rail, Maritime & Transport Workers. 9 October 2007. Archived fromthe original on 26 December 2007.
  177. ^"UK's First ETCS Level 2 Signalling Goes Live".Railway Gazette International.DVV Media Group. 16 November 2010. Archived fromthe original on 24 September 2015. Retrieved26 December 2014.
  178. ^"CAMBRIAN LINE ERTMS GETS GO-AHEAD".Rail. 20 February 2011. Archived fromthe original on 15 July 2011. Retrieved4 June 2017.
  179. ^"Hitachi ETCS Level 2 tested in Wales".International Railway Journal. 11 June 2013. Retrieved31 January 2017.
  180. ^"Commuters look forward to more reliable services as first passenger trains run to City of London using digital signalling".Mynewsdesk. 27 November 2023. Retrieved27 November 2023.
  181. ^Puddicombe, Daniel (19 April 2025)."'Nobody has done this before': Britain's beloved steam trains trial pioneering technology".The Guardian.

External links

[edit]
Wikimedia Commons has media related toEuropean Train Control System.
Block systems
Signalling control
Signals
Train detection
Train protection
Crossing signals
Manufacturers
Organisations
By country
Authority control databases: NationalEdit this at Wikidata
Retrieved from "https://en.wikipedia.org/w/index.php?title=European_Train_Control_System&oldid=1299148494"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp