Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Eglisau–Neuhausen line

From Wikipedia, the free encyclopedia
(Redirected fromEglisau–Neuhausen railway line)
Swiss railway line that crosses part of Germany

Eglisau–Neuhausen
Service
SystemSwiss Federal Railways
History
Opened1897
Technical
Line length17.88 kilometres (11.11 mi)
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
ElectrificationOverhead line
  • 15 kV 16.7 Hz AC
Maximum incline1.3  %
Route map

elev (M)
or length (m)
inmetres
22.25
Eglisau
390.1 M
23.60
Hüntwangen-Wil
368.2 M
27.04
Rafz
368.2 M
29.3
448.2 M
30.16
Lottstetten
437.9 M
34.33
Jestetten
S65
428.0 M
36.42
Altenburg-Rheinau
428.0 M
37.5
Fischerhölzli
112 m
Schweizerhof II
84 m
Schweizerhof I
82 m
39.0
Neuhausen Rheinfall
402 M
Neuhausen
144 m
40.13
Neuhausen
397.2 M

TheEglisau–Neuhausen line is a cross-border railway in Germany and Switzerland. It linksEglisau in the Swisscanton of Zurich with thecity of Schaffhausen in the Swisscanton of Schaffhausen, crossing some 8 kilometres (5 mi) of the German state ofBaden-Württemberg in between. It thus crosses theGermany–Switzerland border twice. The line is 17.88 kilometres (11.11 mi) long,standard gauge and electrified at15 kV  16.7 Hz AC supplied byoverhead line. It is formed of a mixture of single and double track sections.[1]

History

[edit]

Schaffhausen was first connected to the Swiss railway system in 1857 with the opening of theRheinfall Railway. Whilst this line was entirely on Swiss soil, and provided a direct link to thecity of Winterthur, it only provided a rather indirect route to the rest of Switzerland and theGotthard Railway. TheSwiss Northeastern Railway therefore constructed the Eglisau to Neuhausen line, which opened in 1897. The construction of the line involved the building of several civil engineering structures, including the 439 metres (1,440 ft)Eglisau railway bridge across theRhine at the southern end of the line. At the northern end of the line, two tunnels were necessary, with lengths of 112 metres (367 ft) and 144 metres (472 ft).

Route

[edit]
The Eglisau railway bridge carries the Eglisau–Neuhausen line across the Rhine

The line commences at a junction with theWinterthur to Koblenz line immediately to the west ofEglisau station. From the junction the single-track line turns north and crosses theRhine on theEglisau railway bridge before reachingHüntwangen-Wil station. Although now north of the Rhine, the line at this stage is still in Switzerland and the canton of Zürich. Between Hüntwangen-Wil and the followingRafz station the line is double track, and also connects to freight only spurs serving quarries to the west of the line. After Rafz the line returns to single track before crossing the border into Germany.[1][2]

Peak hour train between Jestetten and Neuhausen

Lottstetten station is the first station in Germany, followed byJestetten station. Roughly half-way between the two stations, the line again becomes double-track again. After leaving Jetstetten the line passes through the site of the formerAltenburg-Rheinau station, which was closed in 2010 because of low passenger numbers and despite protests from the German authorities.[1][3][4][5][6]

The Eglisau–Neuhausen line in background and the Rheinfall line with a train

Shortly after the site of Altenburg-Rheinau station, the line passes back into Switzerland, although this time in the canton of Schaffhausen, and reverts to single track again. After passing through the Fischerhölzli tunnel, the line emerges high on the hillside above the Rhine and the famousRhine Falls. On this stretch of line lies theNeuhausen Rheinfall station, which was opened in 2015 and is linked to the area around the falls by a combination of bridges and lifts.[1][7][8]

Neuhausen Rheinfall station, showing lift to the falls

After Neuhausen Rheinfall station, the line passes through the Neuhausen tunnel, running under the former railway rolling stock factory ofSchweizerische Industrie Gesellschaft (SIG). It then joins theRheinfall line, which links Winterthur with Schaffhausen, immediately beforeNeuhausen's main station.[1][7]

Train services

[edit]

The line carries an hourly service of long-distance passenger trains betweenZürich and Schaffhausen, with some trains operating as far asFrankfurt andBern. Trains on theZurich S-Bahn lineS9 operate half-hourly from Zurich as far asRafz (just before the German border), with alternate trains continuing to Schaffhausen. Schaffhausen S-Bahn line provides a local service fromJestetten to Schaffhausen. Freight trains also use the line between Germany and the Gotthard route.[9][10]

Cross-border operation

[edit]

The whole line, including the section in Germany, now belongs to theSwiss Federal Railways, and is subject to Swiss rail regulations and Swiss domestic rail fares. The section of the line running through German territory has no rail connection to the German railway network other than by passing through the sections of the line that are in Switzerland.[1] Jestetten and Lottstetten are border stations and as such are in local transport tariff zones in both Germany and Switzerland.[citation needed]

Trains which pass through German territory without stopping at a German station, are not subject to any customs inspection or restrictions of either country, despite the train and its passengers technically leaving theSwiss customs area, entering theEuropean Union customs area and reentering Swiss territory again. An agreement in this respect was entered into by the two countries and became law in 1936. From 1840 until 1935, Lottstetten, Altenburg, Jestetten and what was thenDettighofen, was part of the region which formed a customs exclusion zone and was not part of the German customs area.[11]

Accidents and incidents

[edit]

On 20 February 2015, at approximately 6.43 am,a collision occurred between anInterregio train and anS-Bahn train atRafz. The collision occurred as the Interregio train, which was running late, was passing throughRafz without stopping. The S-Bahn train was departing forJestetten and was involved in a sideswipe collision, with the Interregio train coming from behind the S-Bahn train. The express was partially derailed, but the couplings held and no carriages overturned. The S-Bahn train was operated byClass 514electric multiple unit 514 046-2. The InterRegio train was hauled byClass 460electric locomotive No. 460 087-0.[12]

Future

[edit]

In 2021, the Swiss Federal Railways announced plans to double the track between Jestetten andRafz, thus introducing a second track and platform in Lottstetten station. This will facilitate the planned introduction of a day-long half-hourly S-Bahn service between Zürich and Schaffhausen by 2029. The augmented capacity would also make it possible for an increased number of goods trains to utilise the route.[13]

References

[edit]
  1. ^abcdefEisenbahnatlas Deutschland. Verlag Schweers + Wall GmbH. 2009. pp. 110–111.ISBN 978-3-89494-139-0.
  2. ^"Map of route from Eglisau to Rafz" (Map).map.geo.admin.ch. Swiss Confederation. Retrieved30 July 2021.
  3. ^"Map of route from Rafz to Altenburg-Rheinau" (Map).map.geo.admin.ch. Swiss Confederation. Retrieved30 July 2021.
  4. ^"Bahnhalt in Altenburg muss bestehen bleiben" [The train stop in Altenburg must remain].SPD-Wehr (in German). 14 May 2009.Archived from the original on 6 June 2021. Retrieved21 February 2021.
  5. ^"Ab Sonntag brausen die Züge hier vorbei" [The trains will rush past here from Sunday].Tages-Anzeiger (in German). 13 December 2010. Archived fromthe original on 15 December 2010. Retrieved21 February 2021.
  6. ^"Altenburg nach 113 Jahren ohne Bahnhof" [Altenburg after 113 years without a train station].Südkurier (in German). 9 December 2010.Archived from the original on 30 July 2021. Retrieved21 February 2021.
  7. ^ab"Map of route from Altenburg-Rheinau to Neuhausen" (Map).map.geo.admin.ch. Swiss Confederation. Retrieved30 July 2021.
  8. ^"New train station Rhine Falls". Interessensgemeinschaft Rheinfall.Archived from the original on 26 February 2016. Retrieved26 February 2016.
  9. ^"S-Bahn trains, buses and boats"(PDF). ZVV.Archived(PDF) from the original on 18 September 2018. Retrieved18 September 2018.
  10. ^"Schaffhausen–Bülach–Zürich"(PDF). Bundesamt für Verkehr.Archived(PDF) from the original on 18 September 2018. Retrieved18 September 2018.
  11. ^"Schweizerisch-deutsches Abkommen" [Swiss-German agreement](PDF).fedlex.data.admin.ch (in German).Archived(PDF) from the original on 30 July 2021. Retrieved21 February 2021.
  12. ^"Switzerland Zurich: Injuries as trains collide in Rafz".BBC News Online. 20 February 2015. Retrieved22 February 2021.
  13. ^"Die Schweizer Bahn plant ein zweites Gleis bei Lottstetten" [The Swiss railway is planning a second track near Lottstetten].Südkurier (in German). 4 March 2021.Archived from the original on 31 July 2021. Retrieved31 July 2021.


Retrieved from "https://en.wikipedia.org/w/index.php?title=Eglisau–Neuhausen_line&oldid=1279038547"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp