Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Doyang Hydro Electric Project

From Wikipedia, the free encyclopedia
(Redirected fromDoyang HEP)
Abandoned Hydro Power Project in Nagaland, India
This articlemay rely excessively on sourcestoo closely associated with the subject, potentially preventing the article from beingverifiable andneutral. Please helpimprove it by replacing them with more appropriatecitations toreliable, independent sources.(July 2020) (Learn how and when to remove this message)

TheDoyang Hydro Electric Project is aNTPCNEEPCO owned hydro power project situated on theRiver Doyang (a tributary of theRiver Brahmaputra) located in theWokha District ofNagaland. It was commissioned in the year 2000 and the total installed capacity of the project is 75 (3 X 25)MW.[1] In the decades since its commissioning, the project has fallen into disrepair. The hydro power project has maintained a housing colony for the employees since its inception. As the state steadily withdraws from public sector enterprises, the maintenance and repairs of the project and the housing colony have suffered. The project remains in a state of steady disintegration, and with the level of malfunctioning of infrastructure, infrastructure asserts its visibility and has become central to the sight. The Doyang Hydro Electric Project is the only major river dam in Nagaland.

References

[edit]
  1. ^"DOYANG HYDRO ELECTRIC PLANT | North Eastern Electric Power Corporation Limited".neepco.co.in. Retrieved29 July 2020.
NTPC power stations
Thermal
Coal (own)
Coal (JVs)
Gas (own)
Gas (JVs)
Hydel
Own
JVs


Stub icon

This article about ahydroelectric power plant is astub. You can help Wikipedia byexpanding it.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Doyang_Hydro_Electric_Project&oldid=1209156730"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp