Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Don Antonio station

Coordinates:14°40′37″N121°04′57″E / 14.67699°N 121.08263°E /14.67699; 121.08263
From Wikipedia, the free encyclopedia
Train station in Quezon City, Philippines
S05
Don Antonio
Don Antonio station construction progress as of November 2025
General information
LocationCommonwealth Avenue
Holy Spirit,Quezon City
Philippines
Coordinates14°40′37″N121°04′57″E / 14.67699°N 121.08263°E /14.67699; 121.08263
Owned bySMC-Mass Rail Transit 7 Incorporated
Line     MRT Line 7
Platforms2 side platforms
Tracks2
ConnectionsBus interchange 6  7  49  Ever Gotesco
Construction
Structure typeElevated
Platform levels2; one concourse and one platform
Accessibleyes
Other information
StatusUnder construction
Station code S05 
History
OpeningTBA
Services
Preceding stationManila MRTFollowing station
Tandang Sora
towardsNorth EDSA
MRT Line 7Batasan
Location
Map

Don Antonio station is an under-constructionMetro Rail Transit (MRT) station located on theMRT Line 7 (MRT-7) system alongCommonwealth Avenue in Holy Spirit,Quezon City. Its working title wasStation 5.

As of 31 January 2023[update], the project is 66.07% complete.[1] The station's construction is to be finished by 2025.[2][3]

Station details

[edit]

Don Antonio station is located in Holy Spirit,Quezon City, alongCommonwealth Avenue. Once completed, the station will serve two nearby shopping malls, Shopwise Commonwealth and Ever Gotesco. It will be connected tovarious local bus routes via the Ever Gotesco bus stop, as well as the Quezon City Bus Service Route 2 via St. Peter Parish.[4]

References

[edit]
  1. ^"HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS".House of Representatives of the Philippines. Press and Public Affairs Bureau. February 16, 2023. RetrievedFebruary 21, 2023.
  2. ^Balinbin, Arjay L. (January 25, 2023)."Full MRT-7 operations seen by 2nd quarter 2025".BusinessWorld. Philippines:The Philippine STAR. RetrievedJanuary 25, 2023.
  3. ^"12 MRT-7 stations will be up and running by late 2025, says DOTr". GMA Integrated News. August 28, 2024. RetrievedApril 1, 2025.
  4. ^Santos, Kara (April 29, 2025)."MRT-7 guide: Stations, landmarks, and planned connections".Top Gear Philippines. RetrievedFebruary 9, 2026.

External links

[edit]
Italicized stations are either under construction, not yet operational, or have been closed.
Line 1
South extension
Line 2
West extension
East extension
Line 6
Line 3
Line 4
Line 7
Line 8
MMS
NAIA spur
Metro Commuter Line
Metro North
Metro South
North–South Commuter Railway
Stub icon

This Philippine railroad station-related article is astub. You can help Wikipedia byadding missing information.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Don_Antonio_station&oldid=1337406386"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp