Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Crossrail Glasgow

From Wikipedia, the free encyclopedia
Proposed railway development in central Scotland

icon
This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Crossrail Glasgow" – news ·newspapers ·books ·scholar ·JSTOR
(September 2014) (Learn how and when to remove this message)
Crossrail Glasgow
Proposed route
Bellgrove
Up arrow
City Union Line andArgyle Line
to north and east
High Street Curve
High Street (relocated)
Glasgow Cross (new)
Glasgow Cross (Argyle)
Queen Street (Low Level)
Gorbals (new)
Central Station (High Level)
Charing Cross
Glasgow Subway
anticlockwise
Up arrow
West Street (Subway)
West Street (new)
turnback facility
Down arrow
Glasgow Subway
clockwise
Finnieston Junction
Shields Junction

Crossrail Glasgow (formerly known asGlasgow Crossrail) is a proposedrailway development inCentralScotland to connect the stationsGlasgow Central andQueen Street.[1][2] It has been estimated at a cost of £200 million.[2][3]

Since the 1960s, it has been widely recognised that one of the main weaknesses of the railway network inGreaterGlasgow is that rail services from the south (which would normally terminate atCentral main line station) cannot bypass Glasgow city centre and join the northern railway network which terminates atGlasgow Queen Street station, and vice versa for trains coming from the north. At present, rail users who wish to travel across Glasgow have to disembark at either Central or Queen Street and traverse the city centre by foot, or by road.

Proposal

[edit]
Rail bridge over the river Clyde
City Union Bridge on theCity Union Line

The proposedCrossrail initiative involves electrifying and reopening theCity Union Line for regular passenger use in conjunction with new filler sections of track, which are planned to connect theNorth Clyde,Ayrshire, andKilmarnock and East Kilbride suburban routes, therefore allowing running of services through the centre of Glasgow in a North-South axis. TheGlasgow Airport Rail Link that was to have directly connectedGlasgow Airport to the rest of the Scottish rail network (including theAirdrie to Bathgate Link to Edinburgh) was cancelled in 2009.

The development would also include a number of new (or redeveloped) stations:[citation needed]

  • High Street Station would be demolished and relocated to the east to provide an interchange with the North Clyde Line and the newly electrified City Union Line.[4]
  • A new station built atGlasgow Cross, behind the Mercat Building, potentially providing an interchange with theArgyle Line services that run under the street below (this was previously the site ofGallowgate railway station prior to the union line's closure to passengers).
  • The reopening ofCumberland Street proposed in theGorbals, opening the area up to the passenger railway network for the first time since the 1960s.
  • West Street subway station would be expanded and remodelled so as to provide a major interchange between the railway network and theGlasgow Subway, similar to thePartick station upgrades and renovations completed in 2013.

In conjunction with the core proposals, other possible developments of Crossrail may include:[citation needed]

  • The construction of a chord over the former Gushetfaulds railfreight terminal to link Crossrail with theWest Coast Main Line (WCML), thereby creating a new path for WCML express services to access the north of Scotland network.
  • Reinstatement of the link to Strathbungo across the former Gushetfaulds railfreight terminal. An overbridge was provided as part of theM74 Extension to allow this in the future.[5]
  • The reopening ofGlasgow Cross Low Level station to provide interchange to theArgyle Line.
  • A turnback facility in the Yorkhill/Kelvinhaugh area for trains on theNorth Clyde line from the east, before reaching the already overloaded Finnieston Junction and congested tracks to the west.

Developments

[edit]

The project has been in limbo for decades.[6] The scheme has been heavily pushed byStrathclyde Partnership for Transport (SPT) for many years and a £500,000 study was commissioned by theScottish Executive in 2003 to investigate the feasibility and costs of the link.[7] The outcome of this was published in 2005, with funding and Government approval pending. However, the scheme was once again omitted from a review published by Network Rail andTransport Scotland in 2006, suggesting that any chances of the scheme becoming a reality remain largely uncertain. The Route Utilisation Strategy for Scotland, published in March 2007, again omitted the Glasgow Crossrail scheme from its recommendations.[citation needed]

The Scottish Government's Strategic Transport Projects Review (STPR), published in December 2008, included a Glasgow Crossrail-type solution as part of its wider West of Scotland Strategic Rail Enhancement project, one in a list of 29 projects to be taken forward as a priority in the following 20 years; however,Transport Scotland has never given a formal commitment to the project, which has not been included in their list of future investments.[1] In December 2017, Edinburgh-based think tankReform Scotland voiced support of regional projects like Crossrail Glasgow in a published report to improve journey times around Scotland.[8][9]

The then-Scottish Labour leader,Jim Murphy, supported the project in the2016 Scottish Parliament election, stating that Scottish Labour would build it if they were to win the election.[2][3] TheScottish Green Party have been consistently in favour of the project,[6] and in 2017 GreenMSPMark Ruskell voiced support for the re-opening of the line as a means of reducing congestion in the city area.[10] In 2018, Glasgow Labour MPPaul Sweeney called for the protection of the proposed route of the Glasgow Crossrail project east of theHigh Street from encroachment by residential developers.[11][12][13]

References

[edit]
  1. ^abGillian Loney (10 March 2017)."Campaigners call for Crossrail to make travel between north and south of Glasgow easier". Glasgow Live.Archived from the original on 6 September 2017. Retrieved6 September 2017.
  2. ^abcChris McCall (13 October 2015)."Glasgow Crossrail: Will the 'missing link' be built?".The Scotsman.Archived from the original on 6 September 2017. Retrieved6 September 2017.
  3. ^ab"Scottish Labour commits to funding of Glasgow Crossrail scheme".BBC. 9 February 2015.Archived from the original on 2 December 2017. Retrieved6 September 2017.
  4. ^"Crossrail Glasgow".crossrail.fs-server.com. Archived fromthe original on 17 January 2008. Retrieved12 January 2022.
  5. ^"Strathbungo Rail Link Underbridge/Cathcart Cut, November 2010". 8 November 2010.Archived from the original on 13 December 2020. Retrieved4 July 2019.
  6. ^abPatrick Harvie (23 February 2015)."Patrick Harvie: Glasgow needs Crossrail and should welcome any genuine support to make it a reality".Daily Record.Archived from the original on 20 September 2017. Retrieved20 September 2017.
  7. ^""THE CITY TRACKS", Glasgow Magazine, February 2004"(PDF). Retrieved28 November 2007.[permanent dead link]
  8. ^Stewart Paterson (27 December 2017)."Put local rail services ahead of high speed links to London says think tank". Evening Times.Archived from the original on 21 January 2018. Retrieved20 January 2018.
  9. ^Phillip Gates (27 December 2017)."ScotRail nationalisation 'a meaningless distraction'". insider.co.uk.Archived from the original on 21 January 2018. Retrieved20 January 2018.
  10. ^Mark Ruskell (15 September 2017)."Mark Ruskell: Greener, fairer travel? We still have a mountain to climb".The National.Archived from the original on 20 September 2017. Retrieved20 September 2017.
  11. ^"New rented homes plan near High Street has 'killed off Crossrail link for Glasgow'". Evening Times. 12 December 2018. Retrieved2 January 2021.
  12. ^"Crossrail Glasgow Hits Buffers As 700 Luxury Flats Approved On Vital Railway Site". A Thousand Flowers. 10 December 2018. Retrieved2 January 2021.
  13. ^"Glasgow Crossrail". Rail. 11 April 2018. Retrieved2 January 2021.
Bus
Present
Past
Bus stations


National RailRail
Present
Operations
Stations
Commuter
lines
Main lines
Past
Operations
Stations
Lines
Future
Operations
Stations
motorway symbolRoads
Motorways
A roads
Streets /
junctions
Tram interchangeTram
Past
Other
Airport interchange Air
ferry/water interchange Water
Cycling
Cross-border lines and services
ScotRail intercity lines
Glasgow commuter lines
Edinburgh commuter lines
Rural lines and Great Scenic Railways
Current projects
Completed projects
Heritage railways
Rail infrastructure projects in the United Kingdom
Current projects
Projects
Electrification
Stations
Proposed projects
Projects
Stations
Heritage railways
Cancelled projects
Projects
Stations
Retrieved from "https://en.wikipedia.org/w/index.php?title=Crossrail_Glasgow&oldid=1286190930"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp