Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Citi Bike

This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
Bike sharing system in the New York City area
Not to be confused withCiti Bike Miami.

Citi Bike
Citi Bikes in Sunset Park, Brooklyn. The gray bicycles are e-bikes.
Citi Bikes inSunset Park, Brooklyn. The gray bicycles are e-bikes.
Overview
OwnerLyft
LocaleNew York City (Manhattan, the westernBronx, northernBrooklyn, and westernQueens);Jersey City, New Jersey;Hoboken, New Jersey
Transit typeBicycle-sharing system
Number of stations2,799 (March 2025)[1]
Daily ridership104,557 (daily average, March 2025)
Websitecitibikenyc.com
Operation
Began operationMay 27, 2013; 12 years ago (2013-05-27)
Operator(s)Motivate
Number of vehicles33,000 (September 2023)[2]: 3 

Citi Bike is a privately owned publicbicycle sharing system inNew York serving theNew York City boroughs ofthe Bronx,Brooklyn,Manhattan, andQueens, as well asJersey City andHoboken, New Jersey. Named after lead sponsorCitigroup, it was operated byMotivate (formerlyAlta Bicycle Share), with formerMetropolitan Transportation Authority CEOJay Walder as chief executive until September 30, 2018, when the company was acquired byLyft. The system's bikes and stations use technology from Lyft.

First proposed in 2008 by theNew York City Department of Transportation, Citi Bike's scheduled 2011 opening was delayed byHurricane Sandy and technological problems. It officially opened in May 2013 with 332 stations and 6,000 bikes. By October 2017 annual expansions brought the totals to 706 stations and 12,000 bikes, making the service the largest bike sharing program in the United States. Further expansions for Citi Bike are planned to extend its service area across the Bronx, Brooklyn, Manhattan, and Queens, and increase the number of bikes to 40,000.

In October 2017 the system reached a total of 50 million rides and in July 2020 the system reached 100 million rides. As of 2023[update], there are 180,000 annual subscribers. Monthly average ridership numbers increased above 100,000 for the first time in June 2021. The all-time record for ridership in a single month occurred in October 2024[update], when the system had 5.13 million rides.[3]

History

[edit]

In an effort to reduce emissions, road wear, collisions, and road and transit congestion and to improve public health, theNew York City Department of Transportation (NYCDOT) researched alternative forms of transportation in the 2000s, publishing a strategic plan in 2008.[4]: 51–68  According to NYCDOT statistics, 56% of all automobile trips within the city were under 3 miles (4.8 km) (with 22% under 1 mile (1.6 km) and 10% under 0.5 miles (0.80 km)), well within distances readily served by bicycle. To encourage residents to use bicycles more, the city committed to expanding bike lane miles, bike racks, and bike-parking shelters.[4]: 17  In the 2009 bicycle share feasibility report, theNew York City Department of City Planning (DCP) recommended building out the system in three phases in the four most populous boroughs, but no timeline was made public.[5]

Alta Bicycle Share operation

[edit]

Development and delays

[edit]
Customers atLafayette Street at Citi Bike's opening in May 2013

The city, which had already been encouraging cycling as transportation, decided to establish a bicycle share program of the kind that had seen success in other cities. In 2011, it selectedAlta Bicycle Share to operate the bike share in New York City.[6] Citi Bike was created as apublic–private partnership operated by NYC Bike Share LLC, a wholly owned subsidiary of Alta.[6][7] The system, which was first supposed to start in fall 2011,[5] was pushed back to summer 2012 due to uncertainties about where to place the rental stations. The city had originally intended to place Citi Bike stalls mostly on sidewalks and public plazas, but there were some locations where stalls would take up parking spaces.[6] Only one phase of the program was to be implemented in 2012, with more phases to come later.[8]

Software problems delayed the planned start until March 2013.[9][10] These problems were also reported by Alta programs inChicago[9] and inChattanooga, Tennessee.[11] The problems reportedly occurred because the Public Bike System Company, a Canadian affiliate of Alta, was involved in a dispute with software supplier8D Technologies.[11] Then,Hurricane Sandy damaged 1,000 bicycles and 60 stations[12] in storage atBrooklyn Navy Yard.[13] As planning progressed, some residents expressed dismay at the lack of docking stations in their neighborhoods[14] while others fought against stations on their blocks.[15]

Deployment

[edit]

Citi Bike began operations on May 27, 2013, with 332 stations.[16][17] The stations were located inManhattan south of59th Street and inBrooklyn north ofAtlantic Avenue and west ofNostrand Avenue.[18] Officials said the system opened with 6,000 bikes.[19] At the time of implementation, it was the largest bikesharing program in the United States.[19][16] When launched, the system was slated to expand to 10,000 bicycles and 600 stations in Manhattan south of79th Street, plus stations in several Brooklyn neighborhoods, includingGreenpoint,Crown Heights,Bedford-Stuyvesant,Park Slope andCarroll Gardens as well as parts ofQueens. At first, the timeline for the expansion was not made publicly available,[16] but it was later announced that the expansion would be complete by the end of 2016.[20] There has been increasing interest in further expansion across New York City;[21] for example, in June 2013 a Brooklyn politician opened a petition drive to accelerate deployment in Greenpoint.[22] In contrast, the May 2013 installation deliberately bypassed SouthWilliamsburg.[23]

Throughout the first year, there were more than 100,000 registered members who rode over 14,700,000 miles (23,700,000 km),[24] including 70,000 members in the first three months alone.[25] On August 6, 2013, riders took 42,010 trips, the largest single-day total for any North American bike-sharing system.[26] In Citi Bike's first few months, some kiosks docked too many bikes while others did not have enough, so the company started using a fleet of box trucks to carry bikes between different kiosks every day.[25] The kiosks also had some software problems in their early months. Problems included stations that did not accept payment information; kiosks where passersby could take bikes without paying because the bikes were not locked securely; and bike docks that did not work at all, forcing riders to travel to other stations.[27]

The deployment of a clean energy public transit system such as Citi Bike coincides with the sixth IPCC report on mitigation's call for an increase of modes of public transportation such as biking and walking. According to the report, "Case studies suggest that active mobility could reduce emissions from urban transport by 2%- 10% depending on the setting".[28]

Popularity

[edit]
People being instructed in using the system

Citi Bike's massive, unexpected popularity caused problems within a year.[12] In January 2014, the designer of Citi Bike's bicycles and docking stations filed for bankruptcy protection. Officials withMontreal,Quebec-basedPublic Bike System Company (also known asBixi) said they were $46 million in debt, partly because the operators of Citi Bike andChicago'sDivvy bikeshare had withheld a combined $5 million in payments because of software glitches in the docking stations.[29] Alta officials, who operate Citi Bike, Divvy, andCapital Bikeshare inWashington, D.C., said they anticipated no interruptions of service,[29] though they did want $20 million to expand the system to 10,000 bikes and 600 stations.[12]

Due to Citi Bike's various problems, expansions to theUpper East andUpper West Sides were delayed for at least a year. Its general manager resigned in March 2014.[12] The new mayor,Bill de Blasio, stated that he wanted to expand Citi Bike's reach, but that he could not make city funds available for such an expansion at that time.[12] By May, the city government wanted Motivate to pay $1 million to compensate for the parking spaces that had been removed for the docking stations.[30][31]

Citi Bike workers joinedTransport Workers Union of America Local 100 in July 2015.[32] The company had about 200 employees joining the union at the time.[33] That September, in the face of overwhelming support for unionization, Citi Bike agreed to recognize TWU Local 100's representation of Citi Bike's labor force.[34]

Motivate operation

[edit]

Reorganization

[edit]

On October 28, 2014, Alta Bicycle Share and NYCDOT announced a plan to improve and expand the Citi Bike program.[35] Bikeshare Holdings LLC, a new entity formed by the partners at real estate developerRelated Companies and gym chainEquinox Fitness, acquired Alta Bicycle Share—renamedMotivate—and namedJay Walder as the new chief executive.[24][36] The increase of funding included $5 million from Bikeshare Holdings; $70.5 million from a 10-year extension of the Citigroup sponsorship; and $15 million from theGoldman Sachs Urban Investment Group.[35][24][37] As part of the restructuring deal, Walder moved the company headquarters fromPortland, Oregon, to New York City. The Citi Bike system would continue to be operated by NYC Bicycle Share, a subsidiary of Alta Bicycle Share. By 2017, Citi Bike was to expand its operations by 6,000 bikes and add 375 new docking stations.[35] Motivate was to pay the city $5 million per year in parking fees.[38] This agreement also called for improvements to the system's operations, including upgrades to its software and technology. The company was also appointing a vice president for technology.[37]

Following two years of software errors in the bike share system, Motivate shut down the Citi Bike system over the last weekend of March 2015 to replace the existing system software with that of 8D Technologies.[39][40] The newmobile platform was developed by the Polishsoftware houseNetguru.[41][42] Since then, the Citi Bike system has continued to expand its installations using the 8D Technologies as its software and station equipment supplier.[43] Through that summer, Motivate also refurbished all of the system's 6,000 bikes,[43] as well as fixed the bicycle stations' kiosks and improved the bike docks at these stations.[39]

Expansion to Jersey City and Queens

[edit]
Bike delivery to station by van

In early 2015, as part of its expansion, NYCDOT and Motivate increased the price of annual memberships from $95 to $149 plus taxes, although annual rates forNew York City Housing Authority residents and members of some Community Development Credit Unions will remain at $60 per year.[35][44] That year, the company installed 91 new stations in Queens and Brooklyn, with 12 of these stations in Long Island City and the other 79 in Greenpoint, Williamsburg, and Bedford-Stuyvesant.[45] Citi Bike also added 48 new stations on the Upper East and Upper West Sides, up to 86th Street.[45] The system expanded across theHudson River toJersey City, New Jersey, on September 21, 2015, with 35 stations and 350 bikes.[46] However, some Jersey City residents objected to the implementation of Citi Bike there, complaining of lost parking spots for cars.[47][48] In July 2016, the Jersey City Citi Bike system was expanded for the first time, with another 15 stations and an additional 150 bikes.[49]

In August 2016, the company started installing 139 new stations in Manhattan up to 110th Street[50][51] and in Brooklyn betweenRed Hook andProspect Park.[52] The stations in the new installation were closer together than in previous phases because the previous phases had not fulfilledNational Association of City Transportation Officials' recommended bike share-station density of 28 per square mile (11/km2).[53] Some residents ofPark Slope were outspoken in opposition to the loss of car parking.[54] One month later, on September 13, 2016, the system saw 64,672 trips, the highest recorded in one day at the time.[55]

After the December 2016 announcement of a further expansion toHarlem andAstoria, some city politicians proposed expanding the system further tothe Bronx andStaten Island.[56] By the end of 2017, Citi Bike planned to double its bike fleet to 12,000, with the possibility that some of the expansion could be publicly funded.[57] On May 18, 2017, Motivate presented a proposal to expand the system in all five boroughs, including adding new stations to the Bronx and Staten Island, without any public funding. To make up for the lost tax funding, Motivate asked the city to waive fees charged for placing stalls inside former parking spots, as well as redesigning the payment hierarchy and possibly adding more ad space on pay stations.[58]

In 2017, officials proposed dockless bike sharing for the Citi Bike network, which would allow bikes to be rented without being tethered to docks. This was proposed after several bike sharing companies announced their intent to operate in New York City.[59] That August, the dockless bike-sharing companySpin had started a dockless operation in theRockaways but was told tocease and desist because the NYCDOT had licensed Citi Bike as the only official bike-share operator in New York City.[59][60][61] By the end of August, Citi Bike started designing a dockless prototype that could lock its own wheels based on whether the customer had paid.[62] The 140 new stalls and 2,000 new bikes in Harlem,Crown Heights,Prospect Heights,Long Island City, and Astoria were installed in September 2017.[63][64] The system saw its 50 millionth rider in early October 2017, as the new stalls were being activated.[65] The new docking stations in Brooklyn led to an imbalance in the number of bikes in certain neighborhoods, since there were more bikes being docked in lower-elevation areas such asDowntown Brooklyn, while fewer riders docked bikes in high-elevation neighborhoods such as Prospect Heights and Crown Heights.[66]

Lyft operation

[edit]

Takeover and expansion plans

[edit]
E-bikes. Red light indicates not for use.

Lyft took over Citi Bike when it acquired Motivate in July 2018.[67][68][69] The next month, Citi Bike started testing 200 pedal-assistedelectric bicycles,[70][71] which soon became popular among customers.[72] Additional e-bikes were planned to be added in advance of the14th Street Tunnel shutdown, which was originally supposed to close a major subway tunnel entirely.[73][74]

Lyft announced a further expansion of Citi Bike service in November 2018. TheUS$100 million, five-year expansion would double the bike-share system's service area to 35 square miles (91 km2). In addition, the number of bicycles would more than triple, from 12,000 to 40,000.[75][76][77] This would make Citi Bike among the largest bike-share systems in the world.[78] TheGothamist website, citing a Lyft employee, stated that electric bikes would make up the "vast majority" of the new bikes.[79] In February 2019, it was announced that the Citi Bike system would have 4,000 electric bikes by that June, up from 200.[80][81] Because of the popularity of the electric bikes, a $2 fee would be added to each electric bike trip starting April 27.[82] On April 14, the company announced that all their electric bikes would be removed from service due to accidents while braking.[83][84]

High density docks, 2022

In July 2019, Citi Bike announced a timeline for its phase 3 expansion, which would double its service area. At the time, new bike-share stalls were being installed inEast Williamsburg, Brooklyn;Bushwick, Brooklyn; andRidgewood, Queens, along the route of theBMT Canarsie Line, which serves theL train. By 2020, stalls would be installed in the remainder of Upper Manhattan (namelyHamilton Heights,Washington Heights, andInwood) and in theSouth Bronx. Before 2023, new stalls would also be installed in southwest, southeast, and eastern Brooklyn, includingBrownsville,East Flatbush,Kensington,Prospect Lefferts Gardens,Sunset Park, and the remaining portions ofBedford–Stuyvesant andCrown Heights. Stalls would also be installed in northwestern Queens, namelySunnyside,Maspeth,Elmhurst,Jackson Heights, andCorona.[85][86][87] That September 5, Citi Bike reached 91,529 trips, the highest-ever single-day ridership.[88]

2020s

[edit]
Number of daily Citi Bike rides from 2013 to 2020

E-bikes returned to the Citi Bike fleet in February 2020.[89] That May, the system expanded into the Bronx and further north into Manhattan.[90][91] Amid theCOVID-19 pandemic in the United States, Citi Bike recorded its 100 millionth ride that year, as the pandemic resulted in an increase in bicycle usage.[92] During August 2020, the governments of Jersey City andHoboken, New Jersey, finalized an agreement with Lyft to operate Citi Bike stations in both cities for at least five years. The changes included upgrades to 51 existing Citi Bike stations in Jersey City and the addition of 46 additional stations in both cities during 2020 and 2021. In total, there would be nearly 1,000 Citi Bikes and 95 stations in New Jersey as part of the agreement. Hoboken had previously been served by a bike share system named JerseyBike, which was incompatible with Citi Bike,[93][94] The Jersey City Municipal Council and the Hoboken City Council both approved their respective portions of the expansion in early 2021.[95][96] Citi Bike launched in Hoboken in May 2021;[97] within a year, there were just over 850,000 Citi Bike trips in Hoboken.[98] Monthly average ridership numbers were above 100,000 for the first time in June 2021,[99] and on September 11, 2021, Citi Bike set a single day ridership record of 135,005 rides.[100]

Citi Bike prices were increased in each year between 2022 and 2024.[101][102] Further expansions were planned between 2021 and 2024, bringing half of city residents within a five-minute walk of a Citi Bike stall, although no stalls were to be installed in Staten Island.[103] An expansion toMaspeth andRidgewood in Queens was announced in early 2022,[104][105] followed by an expansion toDitmas Park, Brooklyn, at the end of that year.[106] Many residents of Maspeth and Ridgewood opposed the proposed expansion of Citi Bike into their neighborhoods, resulting in delays in the installation of Citi Bike stations in these neighborhoods.[107] Lyft also announced in 2022 that it would roll out a second e-bike model with a longer range; there would be 4,000 such e-bikes throughout the city.[108] Citigroup renewed its sponsorship of Citi Bike in May 2023 for ten years.[109] Lyft was considering selling the service by the middle of that year,[110][111] at which point there were over 1,900 stations across four boroughs, Jersey City, and Hoboken.[112][113] Citi Bike officials announced in mid-2023 that the service would be extended by the end of that year toJackson Heights, Queens,[114] and to the northwestern Bronx.[115] That November, Lyft announced plans to double the number of electric bikes in the Citi Bike fleet.[116]

Lyft announced in July 2024 that it would increase fares for e-bikes.[117][118] That September, city councilmanLincoln Restler introduced a bill that would set a maximum fee for certain Citi Bike rides.[119][120] Citi Bike announced a further expansion that December as part of phase 3.5, as well as additional stalls in neighborhoods with existing Citi Bike stalls.[121] This expansion would bring Citi Bike stalls toBay Ridge,Brownsville,East New York, andKensington in Brooklyn; areas west ofFlushing Meadows–Corona Park in Queens;[122][123] andNorwood andRiverdale in the Bronx.[124] The first two e-bike charging stations in the Citi Bike network were installed in 2024,[125][126] and additional charging stations were announced in mid-2025.[127][128] Additional docks in Hoboken were also installed in 2025.[129][130] That June, MayorEric Adams ordered that Citi Bike limit the speeds of its electric bikes to 15 miles per hour (24 km/h),[131][132] prompting the company to rapidly install speedometers on its e-bikes.[133] The Adams administration and Lyft officials announced plans that August to implementage verification, preventing riders under 16 years old from renting bikes.[134][135]

Company

[edit]
A Citi Bike pay station in Midtown Manhattan, with a few bikes shown at right. A LinkNYC booth for free internet and phone calls is located on the left.
Citi Bike pay station in Midtown Manhattan; at left is aLinkNYC booth.

Citi Bike is not funded by any public funds or taxpayer dollars.[136]Citigroup spentUS$41 million to be its lead sponsor for six years, and in return was allowed to put its name on the bikes;[137] in 2014, Citigroup injected an additionalUS$70.5 million and extended its sponsorship through 2024.[37] However, the bikeshare is owned by NYC Bike Share LLC, a subsidiary of Alta Bicycle Share, Inc.[138][6][7] Jay Walder was the CEO of Bikeshare Holdings,[24] which includes Alta Bicycle Share, and in turn, NYC Bike Share LLC and Citi Bike,[139] until 2018 when the company was acquired by Lyft.[140] In February 2017, Motivate and 8D Technologies merged, with Citi Bike ultimately being operated under the purview of the combined companies.[141][62] Citi Bike became the largest bike-sharing system in the United States when it opened in 2013.[16][19] Citi Bike had 130,000 members by July 2017,[142] a number that grew to 180,000 by May 2023[update].[112]

On average, Citi Bike trips wholly within Midtown Manhattan are at least 2 miles per hour (3.2 km/h) faster, 2–3 minutes shorter, and $6 cheaper than ataxi between the same two points, with most taxi trips in that area being less than 1 mile (1.6 km) long. For trips between 1 and 1.5 miles (1.6 and 2.4 km) long, average Citi Bike trips are at least 5 minutes faster and $11.75 cheaper as opposed to the comparable taxi trip.[143]: 20  A software developer atGenius extrapolated that from July 2016 to June 2017, forty percent of all taxi trips taken within neighborhoods served by Citi Bike were slower than the same trip via bike.[144] Over half of all Citi Bike trips occurred during rush hours in 2016,[143]: 21  but there were at least 10 times as many taxi trips as Citi Bike trips in Midtown during rush hour in 2015.[143]: 21  The NYCDOT publishes a list of Citi Bike usage statistics on its website.[145]

In Citi Bike's first three years of operation, no one died while riding a Citi Bike. This was partly attributed to the bikes' design, as well as the higher concentration of cyclists on New York City roads before and since Citi Bike's launch.[146] The first death involving a Citi Bike occurred in June 2017, when a cyclist inChelsea was struck by a bus.[147]

Bikes

[edit]

Design

[edit]

As of 2023[update], there are about 33,000 bicycles in the Citi Bike fleet,[2]: 3  a number that had increased to 35,000 by 2025.[128][148]

Standard bicycles

[edit]
Transporting bikes on abicycle trailer

The Citi Bike fleet has 20,000utility bicycles as of 2025.[128] They have a unisexstep-through frame with an upright seating position, weighing about 45 pounds (20 kg) each.[149] Their one-piece aluminum frame and handlebars conceal cables and fasteners in an effort to protect them from vandalism and bad weather;[149] the handlebars are located above the seat, allowing riders to sit upright and thereby maintain balance.[146] They are equipped withShimano Nexus three-speed, grip-shifter-operatedinternally-geared hubs, fullmudguards/fenders andchain guard.[149] The heavy-dutytires are puncture-resistant and filled with nitrogen to maintain proper inflation pressure longer.[150][149] The tires are also wider, leading to increased stability.[146] Twin LED rear lights of a pre-2015 design are integrated into the frame;[149] the frame's bright-blue color increases the bikes' visibility.[146]

The bikes are built inSaguenay, Quebec, byCycles Devinci[146][151] and are assembled inDetroit.[152] The Citi Bike utility bicycles are slower than most utility bicycles, averaging only 8.3 miles per hour (13.4 km/h) as opposed to regular bicycles' average speed of 11 to 12 miles per hour (18 to 19 km/h), which increases safety due to a lowered risk of a high-speed collision.[146][151]

In 2015,Ben Serotta helped redesign the bicycle to include a new seat, a simpler gear shifting mechanism, fewer and brighter lights, and a European-style centerkickstand.[153] All of Citi Bike's bicycles were to be renovated to include this new design.[43] In 2016, a thousand of the newly redesigned Citi Bikes were taken out of service due to a part in the front wheel degrading faster than expected.[154] In 2017, CitiBike began addingNuVinci gear hubs that offercontinuous-gear shifting. In early 2017, as part of a pilot program with a firm named Blaze, 250 bikes received anterior laser lights that project a teal silhouette on the ground to warn drivers and pedestrians in their path.[155]

E-bikes

[edit]

In addition to the regular utility bicycles, Citi Bike operates a fleet of pedal-assistede-bikes; as part of a 2018 agreement between Lyft and the city government, e-bikes may not comprise more than one-fifth of the total fleet.[156] By 2023, there were over 5,000 e-bikes;[156] this had increased to 15,000 e-bikes by 2025.[128] E-bikes comprised one-third of Citi Bike's fleet in 2024, accounting for two-thirds of all Citi Bike trips.[126]

The bikes come in two models.[156] The older model, introduced in 2018, has a range of 30 miles (48 km)[108] and is a pedal-assist model that could theoretically travel up to 20 miles per hour (32 km/h).[71] Silver e-bikes were introduced in 2022.[156] The silver bikes have a 60-mile (97 km) range, hydraulic brakes, a single gear transmission, front lights, an LCD screen, and wider seats and can theoretically travel up to 20 miles per hour (32 km/h).[108][157] Originally, neither model can be charged at a dock; employees manually removed dead batteries and charge them at a Citi Bike facility.[156] Since 2024, there have been a limited number of e-bike charging stations.[125][126] As of June 2025[update], the e-bike motor disengages when traveling faster than 15 miles per hour (24 km/h).[131][132]

Docking and transport

[edit]
Bicycles awaiting rush hour

As of September 2023[update], Citi Bike has 1,915 docking stations.[2]: 3  Citi Bike moves thousands of bikes each day from places where they accumulate to places where they are scarce, sometimes using vans to accomplish this task.[25] Since May 2016, Citi Bike members have been allowed to move bikes between stations to earn incentives, including points that can be redeemed for cash.[158] These members, called "Bike Angels", can earn rewards such as gift cards and renewed memberships.[158][159] Almost 2,000 members participated in the program in the nine months after it was introduced,[160] and there were 40,000 participants by 2018.[161] As of 2022[update], there were 44,000 Bike Angels; the highest-paid angels sometimes earned several thousand dollars in a single month.[162] Some angels participate in "station flipping", a controversial practice in which angels swap bikes between two nearby stations to maximize how many points they received.[159]

If a user does not re-dock their bike within a certain time limit—45 minutes for members or 30 minutes for non-members—they will be charged an extra fee. Annual members are charged $2.50 for every 15 minutes of further use, day pass users are charged $4 for every 15 minutes of further use, and single ride users are charged $3 for every 30 minutes of additional use.[163] If a bike is not returned at all within 24 hours, a maximum "late fee" of $1,200 can be charged, though the fine may be reduced based on financial circumstances.[164] If a Citi Bike is lost or stolen, the member who last used it must file a theft report with theNew York City Police Department within 24 hours, and they would be charged the maximum late fee.[165] Before the expansion of the Citi Bike network into these areas, stolen Citi Bikes were found in parts of Brooklyn[166] and in Upper Manhattan.[167] At least one man has ridden a Citi Bike as far asCalifornia.[168]Citi Bike Boyz, a popular Instagram account, has become famous for posting daredevil stunts performed on a Citi Bike.[169]

Payment

[edit]
Close-up of pay station on the Lower East Side

As of July 2025[update], annual membership costs $219.99, or $18.33 per month.[170] A reduced-fare pass is available toNew York City Housing Authority residents who are 16 or older, members of selectedcredit unions, or recipients of SNAP benefits.[171]Citibank card holders receive a 10% discount when purchasing annual memberships through the Citi Bike website.[163] Annual pass members receive a key and can make trips of up to 45 minutes without added charge, after which they pay a fee for each additional 15 minutes.[163]

Initially, both daily and weekday passes were sold at Citi Bike docking stations.[19] As of July 2025[update], Citi Bike a day pass, costing $25 and allows unlimited 30 minute rides, and a single ride pass for $4.99, also limited to 30 minutes.[170] For every minute past the 30 minute limit, riders are charged $0.38/min for every minute thereafter.[170] The 8.875%New York State sales tax is added to the cost of all passes.[164] Day pass users pay an additional fee if they upgrade to an electric bike.[172]

TheLyft Pink All Access subscription, which costs $199 per year, launched in August 2021 and also allows passholders to make unlimited Citi Bike trips.[173] Pink All Access Subscribers are also allowed to ride up to 45 minutes and are charged a reduced amount of $0.25/min for every minute thereafter as of July 2025.[170]

Trips on electric bikes cost an additional fee per minute, though members pay discounted rates.[174]

All payments are by credit card; Wageworks and Transitchek prepaidcommuter cards are not accepted, as bike sharing programs do not qualify as eligible commuting expenses under US tax law.[175]

Usage

[edit]

In Citi Bike's first year, the majority of riders were male; women made a quarter of the trips and comprised a third of membership.[176] Citi Bike had 5.8 million annual trips in 2013, increasing to 8 million trips in 2014; 10 million in 2015; 14.1 million in 2016; 16.4 million in 2017; and 17.6 million in 2018.[177] When Citi Bike recorded 70,286 trips on July 26, 2017, it was called "the highest single-day ridership of any [bike share] system in the Western world outside of Paris";[142] at the time, most riders were still male and in their 30s or younger.[178] Ridership reached nearly 21 million in 2019; despite a slight downturn in 2020 due to the COVID-19 pandemic, ridership grew further to 28 million in 2021.[179] By 2022, the service saw almost 30 million trips a year.[180] Just over half of riders came from majority-minority communities in May 2023[update].[109]

As of May 2025, there were on average 142,553 rides per day and each bike was being used 1.99 times per day. 14,597 annual members and 202,737 casual members signed up or renewed in May 2025 and total annual membership was at 131,451 annual members. 18,957 single-day passes were purchased in May 2025. There also were 2,806 stations active with 37,652 bikes in the fleet as of May 31, 2025. 86,887 bike/dock actions occurred during May 2025, averaging 2,802 actions per day.[148]

Issues

[edit]

When Citi Bike first launched, at least one bike shop owner said that he was forced to close down his business in 2014 due to the popularity of Citi Bike.[181]Dorothy Rabinowitz ofThe Wall Street Journal said, a few days after the system opened, that under the "autocratic" mayoralty ofMichael Bloomberg, "we now look at a city whose best neighborhoods are absolutely begrimed by these blazing blue Citibank bikes."[182] Some people disliked the bright blue color and branding of the bicycles,[183] while others pointed out that the stations blocked fire hydrants on the street.[184] The concrete wheel stops at the end of each kiosk also posed a hazard, acting as a sudden, sharp speed bump.[185] Another complaint was that bike stations take up a car parking space for each eight bikes, a sentiment repeated in future dock installations.[186][47]

Later expansions had too few stations: oneStreetsblog writer noted that the stations in the expansions were spaced farther apart than the stations in the original service area, which would make the Citi Bike stations in these areas harder to access.[187] In September 2017, a reporter forTime Out magazine wrote that the system did not serve the outer boroughs adequately, with stations only located in wealthier areas of Manhattan, Brooklyn, and Queens that were closer to the Manhattan central business districts.[188] ACurbed reporter wrote in mid-2023 that Citi Bike's e-bikes were often broken.[156] A November 2023 report by New York City ComptrollerBrad Lander found that issues with Citi Bikes, such as empty or full docking stations and broken bicycles, were most prevalent in neighborhoods with high minority populations, including several in Brooklyn. Additionally, the Bronx had higher rates of non-functional stations than the other boroughs with Citi Bike stations.[180]

See also

[edit]

References

[edit]
  1. ^March 2025 Monthly Report(PDF) (Report). Citi Bike; Lyft. RetrievedNovember 17, 2023.
  2. ^abcSeptember 2023 Monthly Report(PDF) (Report). Citi Bike; Lyft. RetrievedNovember 17, 2023.
  3. ^"October 2024 Citibike Monthly Report"(PDF).Citibikenyc.com.
  4. ^ab"Sustainable Streets: Strategic Plan for the New York City Department of Transportation, 2008 and Beyond"(PDF).nyc.gov.New York City Department of City Planning. April 2008. RetrievedFebruary 16, 2017.
  5. ^ab"Bike-Share Opportunities in New York City"(PDF).nyc.gov.New York City Department of City Planning. Spring 2009. pp. 94–113. Archived fromthe original(PDF) on December 28, 2016. RetrievedFebruary 15, 2017.
  6. ^abcdHaughney, Christine (September 11, 2011)."New York Chooses Company to Run Bike-Share Program".The New York Times. RetrievedSeptember 14, 2011.
  7. ^ab"NYC Bike Share, LLC: Private Company Information".Bloomberg. February 14, 2017. RetrievedFebruary 14, 2017.
  8. ^Bernstein, Andrea (May 7, 2012)."Breaking: Citibank Is Sponsor of NYC Bike Share, "Citibike." [Updated w/Pics and Details]".WNYC. RetrievedFebruary 14, 2017.
  9. ^abBernstein, Andrea (August 17, 2012)."Bloomberg: NYC Bike Share Delayed Until Spring (Updated)".WNYC. RetrievedFebruary 14, 2017.
  10. ^"Software Issues Delay Implementation Of NYC's Bike Sharing Program".CBS News. August 17, 2012. RetrievedFebruary 14, 2017.
  11. ^abFlegenheimer, Matt (August 17, 2012)."Bike Share Delayed Until Spring, Mayor Says".The New York Times.ISSN 0362-4331. RetrievedJune 19, 2013.
  12. ^abcdeFlegenheimer, Matt (March 26, 2014)."Citi Bike System Successful, but Wobbly From the Start".The New York Times.ISSN 0362-4331. RetrievedFebruary 14, 2017.
  13. ^Flegenheimer, Matt (November 14, 2012)."Bike-Share Equipment Apparently Damaged by Flooding".The New York Times.ISSN 0362-4331. RetrievedFebruary 14, 2017.
  14. ^Wall, Patrick (May 8, 2013)."Bronx Cyclists wonder whether they will get City Bike".dnainfo.com. Archived fromthe original on June 9, 2013. RetrievedJune 19, 2013.
  15. ^"Residents Fight Citi Bike Program".The Real Deal New York Real Estate. May 6, 2013. Archived fromthe original on July 2, 2013. RetrievedJune 19, 2013.
  16. ^abcd"New York City launches nation's largest bike share".WABC TV.Archived from the original on September 26, 2013. RetrievedMay 27, 2013.
  17. ^Clark, Roger (May 27, 2013)."Bike Share Launches for Riders with Annual Memberships".NY1. Archived fromthe original on June 18, 2013.
  18. ^"New York City Bike Share".Citi Bike Station Map. May 27, 2013. Archived fromthe original on September 13, 2012. RetrievedJune 20, 2017.
  19. ^abcdFlegenheimer, Matt (May 27, 2013)."Out for a First Spin: City's Bike Share Program Begins".The New York Times.ISSN 0362-4331. RetrievedJune 8, 2013.
  20. ^Barone, Vincent (May 19, 2016)."Citi Bike to expand in Manhattan, Brooklyn this summer".AM New York. RetrievedJune 20, 2017.
  21. ^Wall, Patrick (May 8, 2013)."Bronx Cyclists Wonder Whether Borough Will Get in Citi Bike Share Program".DNAinfo New York. Archived fromthe original on August 27, 2013. RetrievedAugust 25, 2013.
  22. ^Evans, Lauren (June 11, 2013)."Will Citi Bike Launch In Greenpoint Before The G Train Shuts Down This Summer?".Gothamist. Archived fromthe original on June 14, 2013. RetrievedJune 30, 2013.
  23. ^Ali, Muhammad; Wichselbaum, Simone (May 22, 2013)."CityBike black hole in black hat Williamsburg".Daily News. New York. RetrievedSeptember 20, 2013.
  24. ^abcdChaban, Matt A.V. (October 28, 2014)."New Leader Will Drive Expansion of Citi Bike".The New York Times.ISSN 0362-4331. RetrievedNovember 3, 2014.
  25. ^abcFlegenheimer, Matt (August 14, 2013)."The Balancing Act That Bike-Share Riders Just Watch".The New York Times.ISSN 0362-4331. RetrievedFebruary 14, 2017.
  26. ^"Citi Bike System Data".Citi Bike NYC. RetrievedAugust 12, 2013.
  27. ^Flegenheimer, Matt (June 11, 2013)."Bike-Share Effort Draws Riders and Hits Snags".The New York Times.ISSN 0362-4331. RetrievedFebruary 14, 2017.
  28. ^"WG III contribution to the Sixth Assessment Report"(PDF).report.ipcc.ch. Archived fromthe original(PDF) on May 24, 2022. RetrievedJuly 7, 2022.
  29. ^ab"Citi Bike supplier rides into bankruptcy".Crain's New York Business. January 22, 2014. RetrievedNovember 27, 2014.
  30. ^Tangel, Andrew (May 27, 2014)."Citi Bike needs to pay about $1 million in lost parking revenue to New York because their stations take up spots".The Wall Street Journal.ISSN 0099-9660. RetrievedNovember 17, 2023.
  31. ^Coscarelli, Joe (May 27, 2014)."Citi Bike Owes NYC $1 Million in Lost Parking".Intelligencer. RetrievedNovember 17, 2023.
  32. ^Fitzsimmons, Emma G. (July 9, 2015)."Citi Bike Workers in New York Get Union Contract".The New York Times.ISSN 0362-4331. RetrievedFebruary 14, 2017.
  33. ^"Citi Bike Workers Negotiate First Ever Union Contract".Gothamist. Archived fromthe original on August 18, 2015. RetrievedFebruary 17, 2017.
  34. ^Donohue, Pete (September 17, 2014)."Citi Bike workers join Transport Workers Union Local 100".NY Daily News. RetrievedOctober 12, 2017.
  35. ^abcd"NYC DOT, Alta and Citi Announce Agreement to Expand and Enhance Citi Bike Program in New York City".New York City Department of Transportation. October 28, 2014. Archived fromthe original on November 3, 2014. RetrievedNovember 3, 2014.
  36. ^Rubinstein, Dana (October 28, 2014)."Citi Bike's new leadership: 'We will overhaul every bike'".Politico PRO. RetrievedFebruary 19, 2017.
  37. ^abcTangel, Andrew (October 28, 2014)."Citi Bike to Get Millions in Financial Boost".The Wall Street Journal. RetrievedNovember 3, 2014.
  38. ^Velsey, Kim (November 20, 2014)."Citi Bike to Pay New York $5 M. Annually for Parking, Not Much Else at the Moment".Observer. RetrievedNovember 17, 2023.
  39. ^abFitzsimmons, Emma G. (March 31, 2015)."Citi Bike Says Shutdown Was for Fixing Software".The New York Times. RetrievedJune 20, 2017.
  40. ^Hawkins, Andrew J. (April 26, 2015)."Cycle of Citi Bike suffering ends here". RetrievedAugust 23, 2016.
  41. ^"About us – Company".Netguru.com. RetrievedFebruary 27, 2019.
  42. ^Meyer, Julie (June 13, 2016)."Warsaw: The New Hub For Entrepreneurs".Netguru Blog. RetrievedFebruary 27, 2019.
  43. ^abcHinds, Kate (March 30, 2015)."Citi Bike 2.0". RetrievedAugust 23, 2016.
  44. ^Fermino, Jennifer (November 1, 2014)."Citi Bike tells members its rates would increase 'in the coming days' but make the switch 12 hours later".New York Daily News. RetrievedNovember 3, 2014.
  45. ^abJamerson, Joshua (July 24, 2015)."Citi Bike to Begin Service in Queens and Expand in Brooklyn and Manhattan".The New York Times. RetrievedFebruary 17, 2017.
  46. ^Chaban, Matt A.V. (September 20, 2015)."Bike-Sharing Programs Gain a Toehold in New Jersey".The New York Times. RetrievedSeptember 21, 2015.
  47. ^ab"Grumbling in Jersey City over parking spots lost to Citi Bike stations".NJ.com. August 2, 2016. RetrievedFebruary 14, 2017.
  48. ^Panico, Rebecca (September 18, 2015)."Jersey City residents offer mixed reviews on placement of Citi Bike stations". RetrievedSeptember 20, 2015.
  49. ^McDonald, Terrence (July 20, 2016)."Jersey City unveils locations of 15 new Citi Bike stations".The Jersey Journal. RetrievedFebruary 17, 2017.
  50. ^"Mayor de Blasio Announces that Citi Bike's Latest Expansion Has Begun".The official website of the City of New York. August 2, 2016. RetrievedJune 30, 2017.
  51. ^Krisel, Brendan (August 1, 2016)."Citi Bike Launches 2016 Expansion With New Upper West Side Stations".Upper West Side, NY Patch. RetrievedJune 30, 2017.
  52. ^Albrecht, Leslie (May 20, 2016)."Citi Bike Reveals Locations of Docks for Brooklyn Expansion".DNAinfo New York. Archived fromthe original on May 21, 2016. RetrievedJune 30, 2017.
  53. ^Katz, Miranda (May 20, 2016)."Citi Bike Is Expanding In Brooklyn And Northern Manhattan This Summer".Gothamist. Archived fromthe original on November 8, 2016. RetrievedJune 20, 2017.
  54. ^Holiday, Amy (September 15, 2016)."Police Called To Scene Of Community Board 6 Meeting After Chaos Erupts Over Citi Bike Expansion".BKLYNER. RetrievedJune 20, 2017.
  55. ^@CitiBikeNYC (September 13, 2016)."NEW RECORD ALERT: Over 64k #CitiBike trips yesterday! #bikeshare" (Tweet) – viaTwitter.
  56. ^Fitzsimmons, Emma G. (December 5, 2016)."Citi Bike Under Pressure to Expand to Low-Income Neighborhoods".The New York Times.ISSN 0362-4331. RetrievedFebruary 14, 2017.
  57. ^Walker, Ameena (November 28, 2016)."Privately-funded Citi Bike could get public funding for expansion".Curbed NY. RetrievedFebruary 15, 2017.
  58. ^Barone, Vincent (May 17, 2017)."Citi Bike wants to roll out in the Bronx and Staten Island: Officials".am New York. RetrievedMay 18, 2017.
  59. ^abHu, Winnie (August 28, 2017)."No Room on a Bike Rack? Not a Problem for These Smart Bikes".The New York Times.ISSN 0362-4331. RetrievedSeptember 6, 2017.
  60. ^Barone, Vin (August 14, 2017)."Spin bike-share cancels rollout after cease-and-desist letter".am New York. RetrievedSeptember 6, 2017.
  61. ^Colon, David (August 12, 2017)."Dockless Bike Share Company Won't Begin Operations In New York".Gothamist. Archived fromthe original on October 31, 2017. RetrievedSeptember 6, 2017.
  62. ^abWhitford, Emma (August 30, 2017)."Citi Bike Operator Is Developing A Dockless Bike".Gothamist. Archived fromthe original on August 31, 2017. RetrievedSeptember 6, 2017.
  63. ^Mascali, Nikki M. (September 5, 2017)."Citi Bike's fall expansion to add 2K bikes, 140 stations".Metro US. RetrievedSeptember 7, 2017.
  64. ^Evelly, Jeanmarie (September 5, 2017)."140 New Citi Bike Stations Opening Across NYC Starting Next Week".DNAinfo New York. Archived fromthe original on September 7, 2017. RetrievedSeptember 7, 2017.
  65. ^Rivoli, Dan (October 4, 2017)."Citi Bike reaches 50-millionth ride milestone".NY Daily News. RetrievedOctober 12, 2017.
  66. ^Mixson, Colin (March 12, 2018)."Uphill battle: Citi Bike struggles to restock Bklyn docks in elevated nabes, exec says".Brooklyn Daily. Archived fromthe original on March 12, 2018. RetrievedMarch 13, 2018.
  67. ^de la Merced, Michael J. (July 2, 2018)."Lyft Follows Uber Into Bike-Sharing Lane, Buying Owner of CitiBike".The New York Times.ISSN 0362-4331. RetrievedNovember 16, 2023.
  68. ^O'Kane, Sean (July 2, 2018)."Lyft buys the biggest bike-sharing company in the US".The Verge. RetrievedNovember 16, 2023.
  69. ^Hardawar, Devindra (July 2, 2018)."Lyft buys the company behind CitiBike, announces Lyft Bikes".Engadget. RetrievedNovember 17, 2023.
  70. ^Berger, Paul (August 20, 2018)."Citi Bike Goes Electric, Giving Riders Uphill Relief".The Wall Street Journal.ISSN 0099-9660. RetrievedNovember 16, 2023.
  71. ^abPlitt, Amy (August 20, 2018)."Citi Bike rolls out 200 e-bikes in NYC".Curbed NY. RetrievedNovember 16, 2023.
  72. ^Plitt, Amy (November 26, 2018)."NYC's e-bike trial run proves immensely popular with riders".Curbed NY. RetrievedNovember 30, 2018.
  73. ^"Citi Bike adds e-bikes to aid L train commuters".am New York. August 20, 2018. RetrievedNovember 30, 2018.
  74. ^Offenhartz, Jake (June 27, 2018)."Citi Bike Expanding, Adding Pedal-Assist Options Ahead Of L Train Shutdown".Gothamist. Archived fromthe original on September 29, 2018. RetrievedNovember 30, 2018.
  75. ^Tieu, Van (November 30, 2018)."Citi Bike is Planning to Triple the Number of its Bikes in NYC".Spectrum News NY1 | New York City. RetrievedNovember 30, 2018.
  76. ^Plitt, Amy (November 29, 2018)."Citi Bike will dramatically expand its NYC footprint".Curbed NY. RetrievedNovember 30, 2018.
  77. ^"Lyft Expands Citi Bike in NYC, and Uber Is None too Happy".WIRED. November 29, 2018. RetrievedNovember 30, 2018.
  78. ^Hawkins, Andrew J. (November 29, 2018)."Citi Bike to triple in size, thanks to $100 million from new owner Lyft".The Verge. RetrievedNovember 30, 2018.
  79. ^Offenhartz, Jake (November 29, 2018)."'Vast Majority' Of Expanded Citi Bike Fleet Will Be E-Bikes".Gothamist. Archived fromthe original on November 29, 2018. RetrievedNovember 30, 2018.
  80. ^Robbins, Christopher (February 28, 2019)."Citi Bike To Roll Out 4,000 E-Bikes, For Riders Willing To Pay Extra".Gothamist. RetrievedNovember 16, 2023.
  81. ^Guse, Clayton (February 28, 2019)."CitiBike to roll out 4,000 new easy-riding e-bikes in NYC".New York Daily News. RetrievedNovember 16, 2023.
  82. ^Plitt, Amy (February 28, 2019)."Citi Bike will increase e-bike fleet by 4,000—and add $2 surcharge".Curbed NY. RetrievedMarch 1, 2019.
  83. ^Guse, Clayton (April 14, 2019)."Citi Bike pulls all of its e-bikes from service after riders thrown over handlebars".New York Daily News. RetrievedApril 16, 2019.
  84. ^Offenhartz, Jake (April 15, 2019)."Citi Bike Takes Entire Fleet Of E-Bikes Out Of Service Following Brake Issue".Gothamist. RetrievedNovember 16, 2023.
  85. ^Fitzsimmons, Emma G.; Randle, Aaron (July 16, 2019)."6 Years Later, Citi Bike Comes to the Bronx. (What Took So Long?)".The New York Times.ISSN 0362-4331. RetrievedJuly 17, 2019.
  86. ^"Citi Bike expanding into the Bronx, will double service area by 2023".ABC7 New York. July 16, 2019. RetrievedJuly 17, 2019.
  87. ^"Citi Bike To Double In Size (By 2023)".Gothamist. July 16, 2019. Archived fromthe original on July 17, 2019. RetrievedJuly 17, 2019.
  88. ^Cuba, Julianne (September 6, 2019)."Citi Bike Hits New Record With More Than 90,000 Rides in a Single Day".Streetsblog New York City. RetrievedOctober 3, 2019.
  89. ^Offenhartz, Jake (February 19, 2020)."Citi Bike's E-Bikes Are Back On The Street After Long Absence Due To Safety Issue".Gothamist. RetrievedNovember 16, 2023.
  90. ^Offenhartz, Jake (April 29, 2020)."Citi Bike Expands To The Bronx And Upper Manhattan, As Lyft Lays Off Workers".Gothamist. Archived fromthe original on May 7, 2020. RetrievedMay 22, 2020.
  91. ^Spivack, Caroline (April 29, 2020)."Citi Bike rolls out expansion to the Bronx, upper Manhattan amid pandemic".Curbed NY. RetrievedMay 22, 2020.
  92. ^Acevedo, Angélica (January 18, 2021)."Citi Bike to bring more than 50 new docking stations to Astoria – QNS.com".QNS.com. RetrievedMarch 4, 2021.
  93. ^Gannon, Devin (February 19, 2020)."Citi Bike to launch joint bike share program in Hoboken and Jersey City".6sqft. RetrievedMarch 4, 2021.
  94. ^"Jersey City, Hoboken Announce Partnership with Citi Bike".Jersey Digs. August 13, 2020. RetrievedMarch 4, 2021.
  95. ^"Mayor Announces Major Citi Bike Expansion".Jersey City Times. February 25, 2021. RetrievedMarch 4, 2021.
  96. ^Heinis, John (March 4, 2021)."Hoboken City Council approves Lyft deal to greenlight joint Citi Bike venture with Jersey City".Hudson County View. RetrievedMarch 4, 2021.
  97. ^Zeitlinger, Ron (May 12, 2021)."Fulop, Bhalla hit the road to launch Hoboken-Jersey City bikeshare program (PHOTOS)".nj. RetrievedNovember 17, 2023.
  98. ^McCann, Matt (August 10, 2023)."Hoboken And Lyft Adding More Citi Bike Docks At Hoboken Terminal".TAPinto. RetrievedNovember 17, 2023.
  99. ^"Citi Bike Monthly Operating Reports". RetrievedSeptember 21, 2021.
  100. ^Citi Bike [@CitiBikeNYC] (September 15, 2021)."If you rode Citi Bike this Saturday, it may have felt like the whole city was riding along with you... that's because we hit a new single day ridership record!! 135,005 rides !! 🎉 Thank you, Citi Bike fam 🚲💙" (Tweet) – viaTwitter.
  101. ^"Citi Bike ushers in new year with fare hikes".Crain's New York Business. January 2, 2024. RetrievedJanuary 6, 2024.
  102. ^Brosnan, Erica (January 3, 2024)."Citi Bike price increases to start taking effect Thursday".ny1.com. RetrievedJanuary 6, 2024.
  103. ^Bascome, Erik (February 26, 2023)."Getting to the bottom of it: Why Staten Island is the only NYC borough without a bike share program".silive. RetrievedAugust 29, 2023.
  104. ^Griffin, Allie (March 23, 2022)."DOT to Install More Than 50 Citi Bike Stations in Maspeth and Middle Village by Summer".LIC Post. RetrievedJuly 23, 2023.
  105. ^Moro, Julia (March 29, 2022)."More than 50 new Citi Bike locations coming to Ridgewood area before summer: DOT – QNS.com".QNS.com. RetrievedJuly 23, 2023.
  106. ^Culliton, Kathleen (November 10, 2022)."Citi Bikes Expanding In PLG And Flatbush, DOT Says".Prospect Heights-Crown Heights, NY Patch. RetrievedJuly 23, 2023.
  107. ^Hamilton, Elijah (December 15, 2022)."Citi Bike expansion in western Queens a hot topic of discussion at virtual Community Board 5 meeting – QNS.com".QNS.com. RetrievedJuly 23, 2023.
  108. ^abcOffenhartz, Jake (April 29, 2022)."Bigger, faster and flashier: New e-bikes join Citi Bike's fleet".Gothamist. RetrievedNovember 16, 2023.
  109. ^abBarron, James (May 26, 2023)."Citi Bike, 10 Years Old and Part of New York's Street Life".The New York Times.ISSN 0362-4331. RetrievedNovember 16, 2023.
  110. ^"Citi Bike operator could be worth up to $500M as Lyft weighs a sale".Crain's New York Business. July 27, 2023. RetrievedNovember 16, 2023.
  111. ^Brachfeld, Ben (July 24, 2023)."Lyft considers selling off Citi Bike amid financial woes".amNewYork. RetrievedNovember 16, 2023.
  112. ^abFinley, Louis (May 26, 2023)."Citi Bike celebrates 10 years in New York City".Spectrum News NY1. RetrievedNovember 17, 2023.
  113. ^Lissner, Caren (August 10, 2023)."Lyft And City Of Hoboken To Install New Citi Bike Docks Thursday By Train Station".Hoboken, NJ Patch. RetrievedNovember 17, 2023.
  114. ^"Citi Bike to Arrive In Jackson Heights By End Of 2023".Jackson Heights Post. July 16, 2019. RetrievedJuly 23, 2023.
  115. ^Schneider, Aliya (March 24, 2023)."Citi Bike to expand into CB6, CB8 areas, with opportunity to suggest station locations – Bronx Times".Bronx Times. RetrievedJuly 23, 2023.
  116. ^Lee, Ron (November 5, 2023)."Revel ending city moped service, CitiBike doubling e-bike fleet".Spectrum News NY1. RetrievedNovember 16, 2023.
  117. ^Lung, Natalie (July 3, 2024)."Lyft to Raise NYC Electric Citi Bike Fares 20%".Bloomberg. RetrievedJuly 3, 2024.
  118. ^Brachfeld, Ben (July 3, 2024)."Citi Bike hiking prices for second time this year, citing high costs of e-bike fleet".amNewYork. RetrievedJuly 3, 2024.
  119. ^Nessen, Stephen; Guse, Clayton (September 13, 2024)."Are electric Citi Bike fees too damn high for New Yorkers?".Gothamist. RetrievedSeptember 16, 2024.
  120. ^Khawaja, Noorulain (September 14, 2024)."Bill proposed to cap Citi Bike at cost of subway ride".Spectrum News NY1. RetrievedSeptember 16, 2024.
  121. ^Spivack, Caroline (December 13, 2024)."Citi Bike service will expand deeper into Brooklyn, Queens and Bronx".Crain's New York Business. RetrievedDecember 14, 2024.
  122. ^O'Neil, Meaghan McGoldrick (December 13, 2024)."Citi Bike expansion to bring new stations to Bay Ridge, Brownsville, East New York and Kensington".Brooklyn Paper. RetrievedDecember 14, 2024.
  123. ^Dawson, Athena (December 13, 2024)."Citi Bike to expand its footprint in the outer boroughs bringing bike service to 900,000 more New Yorkers in 2025".QNS. RetrievedDecember 14, 2024.
  124. ^"Mayor Adams announces Citi Bike service expansion".News 12 – Default. December 13, 2024. RetrievedDecember 14, 2024.
  125. ^abSimko-Bednarski, Evan (May 20, 2024)."NYC installs Citi Bike charging docks for e-bikes in Midtown and Brooklyn; more to come".New York Daily News. RetrievedMay 5, 2025.
  126. ^abcBrachfeld, Ben (May 20, 2024)."Citi Bike debuts first charging docks for e-bikes".amNewYork. RetrievedMay 5, 2025.
  127. ^Simko-Bednarski, Evan (May 5, 2025)."Citi Bike to expand e-bike charging dock locations in Manhattan, Brooklyn".New York Daily News. RetrievedMay 5, 2025.
  128. ^abcdAdcroft, Patrick (May 5, 2025)."City to electrify 13 Citi Bike stations across Manhattan and Brooklyn".Spectrum News NY1. RetrievedMay 5, 2025.
  129. ^"Citi Bike expands, relocates bike-share stations in N.J. city as demand jumps".nj. May 24, 2025. RetrievedMay 28, 2025.
  130. ^Heinis, John (May 24, 2025)."City of Hoboken expands Citi Bike program, including new Pillar docking system".Hudson County View. RetrievedMay 28, 2025.
  131. ^abSommerfeldt, Chris; Simko-Bednarski, Evan (June 6, 2025)."Citi Bike agrees to curb e-bike speeds at 15 mph after service suspension threat from Adams admin".New York Daily News. RetrievedJune 6, 2025.
  132. ^abRusso-Lennon, Barbara (June 6, 2025)."Adams mandates Citi Bike e-bike speed limit be lowered 'immediately' to 15 mph".amNewYork. RetrievedJune 6, 2025.
  133. ^Khalifeh, Ramsey (June 5, 2025)."Citing 'emergency threat to life,' Adams orders Citi Bike e-bikes be limited to 15 mph".Gothamist. RetrievedJune 6, 2025.
  134. ^Daly, Adam (August 16, 2025)."EXCLUSIVE: Age verification coming to Citi Bike in bid to put the brakes on underage riders".amNewYork. RetrievedAugust 17, 2025.
  135. ^Sundaram, Arya (August 17, 2025)."Citi Bike will implement age verification, NYC officials and Lyft say".Gothamist. RetrievedAugust 17, 2025.
  136. ^NYC – Department of Transportation (May 9, 2013)."NCY DOT and NYC Bike Share Announce Citi Bike to Begin May 27".Bloomberg L.P. RetrievedJune 8, 2013.
  137. ^Flegenheimer, Matt (May 7, 2012)."Citibank Pays to Put Name on Shared Bikes".The New York Times.ISSN 0362-4331. RetrievedJune 19, 2013.
  138. ^"About Citi Bike About".Citi Bike. RetrievedMay 29, 2013.
  139. ^"Bikeshare Holdings LLC Signs Agreement to Acquire Alta Bicycle Share | Business Wire".www.businesswire.com (Press release). October 28, 2014. RetrievedFebruary 14, 2017.
  140. ^"Walder leaving Citi Bike".Crain's New York Business. September 28, 2018. RetrievedJune 6, 2019.
  141. ^"Bike Share Leaders Motivate and 8D Technologies Announce Merger".Motivate. February 9, 2017. RetrievedSeptember 6, 2017.
  142. ^abHu, Winnie (July 30, 2017)."More New Yorkers Opting for Life in the Bike Lane".The New York Times.ISSN 0362-4331. RetrievedJuly 31, 2017.
  143. ^abc"Mobility Report"(PDF).nyc.gov.New York City Department of Transportation. October 2016. RetrievedFebruary 16, 2017.
  144. ^Toussaint, Kristin (September 28, 2017)."Which is faster, a taxi or bike ride? This interactive map of NYC will tell you".Metro US. RetrievedOctober 12, 2017.
  145. ^"Network and Statistics".nyc.gov.New York City Department of Transportation. RetrievedJune 19, 2014.
  146. ^abcdefNguyen, Clinton (June 11, 2016)."Citi Bike hasn't had any fatalities in more than 3 years – here's why".Business Insider. RetrievedFebruary 18, 2017.
  147. ^Haag, Matthew; Alani, Hannah (June 12, 2017)."Cyclist Killed by Bus in New York's First Citi Bike Fatality".The New York Times.ISSN 0362-4331. RetrievedJune 30, 2017.
  148. ^abAnon, Anon (May 31, 2025)."May 2025 Monthly Report"(PDF).Citibike NYC. RetrievedJuly 3, 2025.
  149. ^abcde"Meet The Bike".Citi Bike. Archived fromthe original on May 19, 2016. RetrievedFebruary 17, 2016.
  150. ^Lydall, Ross (May 21, 2010)."Taking a ride on Boris's hot wheels hire bikes".London Evening Standard. Archived fromthe original on June 29, 2010. RetrievedJune 29, 2010.
  151. ^abSchneider, Todd (January 13, 2016)."A Tale of Twenty-Two Million Citi Bike Rides: Analyzing the NYC Bike Share System".toddwschneider.com. RetrievedFebruary 18, 2017.
  152. ^Higgins, Tim (July 13, 2016)."Detroit-Made Bicycles Are Taking Over Bike-Share Programs".Bloomberg News. RetrievedJuly 15, 2016.
  153. ^Fermino, Jennifer (June 7, 2015)."Exclusive: Redesigned Citi Bikes hitting streets this month".NY Daily News. RetrievedJune 9, 2015.
  154. ^Culliton, Kathleen (March 31, 2016)."1,000 Citi Bikes Yanked From Docks Due to Faulty Part".DNAinfo New York. Archived fromthe original on February 18, 2017. RetrievedFebruary 17, 2017.
  155. ^Hackett, Robert (January 12, 2017)."Citi Bikes to Get 'Laserlights'".Fortune. RetrievedMarch 4, 2017.
  156. ^abcdefSurico, John (July 24, 2023)."Why Are Citi Bike's Electric Bikes Always Broken?".Curbed. RetrievedNovember 16, 2023.
  157. ^Hurford, Molly (May 9, 2022)."A New Fleet of Improved Citi E-Bikes Hits the Streets in NYC".Bicycling. RetrievedNovember 16, 2023.
  158. ^abRivoli, Dan (May 13, 2016)."Citi Bike offers freebies to riders rebalancing the system".NY Daily News. RetrievedFebruary 16, 2017.
  159. ^abMaag, Christopher (September 19, 2024)."Meet the Hustlers Who Make $6,000 a Month Riding Citi Bikes".The New York Times. RetrievedSeptember 19, 2024.
  160. ^Grabar, Henry (February 9, 2017)."How New York's Bike-Share System Pays Riders to Make It Run Better".Slate.ISSN 1091-2339. RetrievedFebruary 16, 2017.
  161. ^"Citi Bike's Better Angels : The Indicator from Planet Money".NPR. December 11, 2018. RetrievedSeptember 19, 2024.
  162. ^Mestel, Spenser (October 21, 2022)."How to Make $3,000 a Month Citi Biking".Bloomberg. RetrievedNovember 16, 2023.
  163. ^abc"Citi Bike Membership & Pass Options". RetrievedFebruary 28, 2016.
  164. ^ab"Citi Bike User Agreement".Citi Bike NYC. Archived fromthe original on August 12, 2016. RetrievedJune 3, 2016.The membership fee amount is listed on the Services' website at 'www.citibikenyc.com' ("Website") and is subject to applicable sales taxes and other local government charges
  165. ^Chung, Jen (June 25, 2014)."[Update] NYPD Has A Message For Citi Bike Thieves Who Do Bad Paint Jobs".Gothamist. Archived fromthe original on August 25, 2016. RetrievedFebruary 19, 2017.
  166. ^Sierra, Gabrielle (July 17, 2014)."Stolen & Battered Citi Bikes Litter Brooklyn Like Broken Dreams".Gothamist. RetrievedNovember 17, 2023.
  167. ^Evans, Lauren (June 16, 2014)."[UPDATE] Citi Bike Doesn't Seem Too Concerned About Recovering Stolen Bikes".Gothamist. Archived fromthe original on October 16, 2016. RetrievedFebruary 19, 2017.
  168. ^Blazier, Kelsie (December 26, 2015)."New Yorker on Extreme Citi Bike Ride Reaches California".NBC New York. RetrievedFebruary 19, 2017.
  169. ^Iscoe, Adam (January 16, 2023)."The Daredevil Behind Citi Bike Boyz".The New Yorker.ISSN 0028-792X. RetrievedAugust 25, 2023.
  170. ^abcd"Citi Bike Membership & Pass Options | Citi Bike NYC".citibikenyc.com. RetrievedJuly 3, 2025.
  171. ^"$5/month Bike Membership for NYCHA".Citi Bike NYC. Archived fromthe original on May 19, 2016. RetrievedJune 3, 2016.
  172. ^"Citi Bike Day Pass".Citi Bike NYC. RetrievedJanuary 9, 2023.
  173. ^"Lyft Introduces New Annual Membership Program with Perks for Both Riders and Bicyclists".Travel + Leisure. August 5, 2021. RetrievedMarch 20, 2023.
  174. ^"Meet the Citi Bike ebikes".Citi Bike NYC. RetrievedNovember 16, 2023.
  175. ^"Letter dated July 26, 2013"(PDF).Internal Revenue Service. September 27, 2013. RetrievedJune 3, 2016.
  176. ^Fitzsimmons, Emma G. (July 7, 2015)."A Mission for Citi Bike: Recruiting More Female Cyclists".The New York Times.ISSN 0362-4331. RetrievedFebruary 16, 2017.
  177. ^"Citi Bike Trips Per Day by Month"(PDF).nyc.gov. 2018. RetrievedFebruary 14, 2017.
  178. ^Levy, Nicole (February 27, 2017)."These Are the Most Popular Citi Bike Routes by Age and Gender".DNAinfo New York. Archived fromthe original on November 17, 2023. RetrievedNovember 17, 2023.
  179. ^"Riding Forward: Overhauling Citi Bike's Contract for Better, More Equitable Service".New York City Comptroller. November 15, 2023. RetrievedNovember 16, 2023.
  180. ^ab
  181. ^Tcholakian, Danielle (November 20, 2014)."Citi Bike Drove Me Out of Business, West Village Bike Shop Owner Says".DNAinfo New York. Archived fromthe original on February 15, 2017. RetrievedFebruary 14, 2017.
  182. ^Rabinowitz, Dorothy (May 31, 2013)."Opinion: Death by Bicycle".The Wall Street Journal. RetrievedAugust 2, 2017.
  183. ^Ephron, Delia (October 19, 2013)."Color Me Blue".The New York Times.ISSN 0362-4331. RetrievedOctober 9, 2014.
  184. ^"Opinion: Death by Bicycle".The Wall Street Journal. May 31, 2013. RetrievedFebruary 14, 2017.
  185. ^"Riders: Concrete Wheel Stops Make For Dangerous Hazard At CitiBike Stations".CBS New York. October 30, 2013. RetrievedFebruary 14, 2017.
  186. ^Miller, Stephen (July 2, 2014)."A Handful of Car Spaces, or a 27-Dock Citi Bike Station?".Streetsblog New York City. RetrievedFebruary 14, 2017.
  187. ^Fried, Ben (July 1, 2015)."Motivate and DOT Squabble, Jeopardizing Success of Bike-Share Expansion".Streetsblog New York City. RetrievedFebruary 17, 2017.
  188. ^Guse, Clayton (September 6, 2017)."Four new NYC neighborhoods are finally getting Citi Bikes".Time Out New York. RetrievedSeptember 7, 2017.

External links

[edit]
Wikimedia Commons has media related toCiti Bike.
Public transit
Private transit
Major
construction
projects
Currently operating
Canceled
Proposed/Future
Traffic proposals
Operators
Public
Current
Defunct
Private
Organizations
Other
Asia
East Asia
South Asia
West Asia
Central Asia
Europe
North America
Canada
Mexico
United States
Oceania
South America
Companies
Defunct
Bixi-based systems
Current
Former
Retrieved from "https://en.wikipedia.org/w/index.php?title=Citi_Bike&oldid=1306398712"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp