Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Charlotte Maxeke Johannesburg Academic Hospital

Coordinates:26°10′36.42″S28°02′33.34″E / 26.1767833°S 28.0425944°E /-26.1767833; 28.0425944
From Wikipedia, the free encyclopedia
Hospital in Gauteng, South Africa
Charlotte Maxeke Johannesburg Academic Hospital
Charlotte Maxeke Johannesburg Academic Hospital
Map
Geography
LocationParktown,Johannesburg,Gauteng, South Africa
Organisation
Care systemPublic
FundingPublic hospital
TypeDistrict General, Teaching
Affiliated universityUniversity of the Witwatersrand
Services
Emergency departmentYes
Beds1088
History
Opened1979
Links
ListsHospitals in South Africa

TheCharlotte Maxeke Johannesburg Academic Hospital is an accredited general hospital inParktown,Johannesburg,Gauteng,South Africa.

History

[edit]

Background

[edit]

The land on Parktown ridge where the future hospital was built was at one time owned byOtto Beit.[1]: 215  He donated the 22 ha of land and itsHohenheim residence in 1915 to the Johannesburg General Hospital, at that time based inHillbrow.[1]: 215  Apart from the Otto Beit Convalescent Home and Baumann Convalescent Home for Babies, built in 1938, the rest of the land was unused.[1]: 215  In October 1968, the Transvaal Provincial Authority and the University of the Witwatersrand announced that the site would be the choice for a new academic teaching hospital for Johannesburg.[1]: 215  The proposal was for a 2,000-bed hospital with residential housing for 1,500 nurses and training facilities for 200 final year medical students and academic staff.[1]: 215 

Design

[edit]

Hospital

[edit]

The plan consisted of twin North and South complexes, 370 metres long and 90 metres wide, divided into five hospital blocks.[1]: 215  The two complexes were divided by a wide enclosed walkway namedHospital Street that contained the lifts, public and staff facilities, cafes, post office, bank, chapel, library, and childcare centre.[1]: 215  Parking areas were to be located below the hospital.[1]: 215  Levels 0 to 4 consisted of access and service tunnels and parking areas.[2]: 97  Levels 5, 7, 9, 11, and 13 were to be service levels while level 16 was to be a technical area.[2]: 97  Levels 6 and 8 were to be medical treatment areas and 10, 12 and 14 were nursing wards.[2]: 97 

Medical school

[edit]

This area was to consist of three buildings. A two-storey teaching area with contact with patients, a four-storey science teaching block, and a four-storey university administration and library block.[1]: 215 

Nurses residence

[edit]

Plan called for five eight to eighteen storey buildings for accommodating 1500 nurses, with gardens, dining and assembly halls, and recreation areas.[1]: 216 

Construction

[edit]

The project went out to tender during November 1971 and two tenders were received.[2]: 97  Neither were accepted but negotiations took place with the two tenderers.[2]: 97  The contract was awarded on 21 August 1972[1]: 217  to a consortium of contractors consisting of German, Italian and South African firms ofHochtief, Impresa Ing. F Federici, Impress Italiane All’Esterc Impresit,Concor, Combrink, and Prodilog Construction.[1]: 219  The contract was worth R72,463,000 with a completion date in 81 months.[1]: 219  Initially the construction was to be a steel frame building but the main consortium member convinced the client of a concrete frame, precast, prestressed and post-tensioned structure, built a Chloorkop and an onsite factory in Parktown resulting in a faster and cheaper construction.[1]: 216  The initial cost was reduced by 25%.[2]: 97  167 cubic metres of the Parktown ridge was blasted and 250,000 cubic metres of earth moved.[1]: 217 

Opening

[edit]

The main structure was opened in 1979.

Size and capability

[edit]

Currently the facility has 1,088 usable beds. The hospital's professional and support staff exceeds 4,000 people.

Issues

[edit]

In 2012 theSunday Times of South Africa reported on a critical shortage of equipment and manpower that compromised medical care.[3] In 2022 the hospital was over R200 million in arrears with its bills formunicipal services.[4]

2021 fire

[edit]

The hospital's parking structure caught on fire on the morning of 17 April 2021. The fire started in a storeroom for dry surgical supplies, according to officials. Flames were thought to have been extinguished but reignited later that same day, collapsing the third level of the parking garage. This necessitated the evacuation and closure of the hospital for seven days.[5] The fire destroyed an estimated R40 million worth of medical stock andpersonal protective equipment.[6]

The following month, it was revealed that although the hospital did not comply with fire safety standards, it had passed a fitness audit earlier in the year. Johannesburg's Emergency Management Services claimed that the firefighting equipment inside the hospital had no water[7] although the Gauteng health department claimed that the provincial Department of Infrastructure had audited the building in late 2020.[8] Smoke doors, used to prevent the spread of smoke in a building in the event of a fire, had been recommissioned because their magnets had stopped working; fire hydrant couplings had been stolen and so were not compatible with the fire hoses on fire engines; fire suppression systems were not working; and fire exits had been locked due to security concerns.[9] It was later discovered that the hospital had not been evaluated for fire safety since 2017, four years prior to the fire.[10]

While the building underwent assessments and awaited compliance certificates in May,[11] R30 million worth of copper piping that made up its water systems was stolen, and televisions in the paediatric oncology unit were also taken.[12]

The oncology unit was the first to reopen on 28 June 2021.[13]

Training

[edit]

It is also the mainteaching hospital for theUniversity of the Witwatersrand, faculty of Health Sciences. The institution provides the service base for undergraduate and post-graduate training in all areas of health professions.

The joint staff produces research and collaborates with several universities on the continent and abroad.[citation needed] The hospital offers tertiary, secondary and highly specialized services.[citation needed]

The costs of providing these services to the population of Gauteng Province, in addition to the neighbouring provinces, are funded by a National Tertiary Services Grant, as well as Provincial allocation.

The hospital also serves as a referral hospital for a number of hospitals in its referral chain.[14]

Clinical departments

[edit]

Allied medical departments

[edit]
  • Dietary Services
  • Occupational Therapy
  • Pharmacy
  • Physiotherapy
  • Speech Therapy & Audiology
  • Social Work
  • Clinical Psychology
  • Clinical Technology

Coat of arms

[edit]

The hospital registered a coat of arms at theBureau of Heraldry in 1980 :Azure, on a Latin cross nowy, the arms potent and the foot throughout, Argent, a pomme charged with a gold stamp Or, between on the arms three potents and on the foot a rod of Aesculapius, Vert, the rod entwined of a serpent Or.[15]

Remedial works

[edit]

Following a major fire in April 2021 that damaged parts of the facility, remedial works are underway at the Charlotte Maxeke Johannesburg Academic Hospital. The initiative is a collaboration between the Development Bank of Southern Africa (DBSA) and the Gauteng Department of Health (GDoH).[16]

The project focuses on restoring Blocks 4/5 North, the section most affected by the fire, to full operational capacity. The scope of work includes structural repairs, reinstatement of building services, demolition and reconstruction of damaged areas, and compliance with national building regulations (SANS 10400) and procurement guidelines (FIDPM).[17]

The DBSA appointed the Henry Fagan Health Consortium in November 2023 to lead the implementation, with Gwendie Drury serving as the project manager.[18] The programme is structured in seven stages, from initiation through design, construction, and final handover.[19]

The estimated project value is R240 million, and work is being coordinated with the broader hospital-wide fire compliance upgrades planned for subsequent phases.[20]

References

[edit]
  1. ^abcdefghijklmno"The new Academic Hospital Johannesburg".Civil Engineering = Siviele Ingenieurswese.1975 (8):215–219. August 1975.hdl:10520/AJA10212019_17048.
  2. ^abcdef"Site visit to Johannesburg's new academic hospital by members of the Structural Division".Civil Engineering = Siviele Ingenieurswese.1975 (4):97–99. April 1975.hdl:10520/AJA10212019_22601.
  3. ^Child, Katherine; Prince, Chandre (14 August 2012)."Doctors warn that Johannesburg hospital is terminally SICK!".The Sunday Times. South Africa. Retrieved16 June 2014.
  4. ^Staff Writer (13 February 2022)."Pay up or else — Johannesburg warning after Pretoria power cuts". MyBroadBand. Retrieved21 February 2022.
  5. ^"Nearly 700 Patients Evacuated in Johannesburg Hospital Fire".Voice of America. Retrieved2021-07-25.
  6. ^"Structural repairs needed at Charlotte Maxeke Hospital after fire".TimesLIVE. Retrieved2021-07-25.
  7. ^"Nehawu says Charlotte Maxeke fire could have been avoided".SABC News. 2021-04-20. Retrieved2021-07-25.
  8. ^Nicolson, Greg (2021-04-20)."CHARLOTTE MAXEKE BLAZE: A litany of alleged failures leaves Johannesburg's crucial hospital shuttered".Daily Maverick. Retrieved2021-07-25.
  9. ^Ho, Ufrieda (2021-05-13)."SPOTLIGHT: 'Lies and cover-ups': What the Charlotte Maxeke fire tells us about health and safety at Gauteng hospitals".Daily Maverick. Retrieved2021-07-25.
  10. ^"Inside Charlotte Maxeke Hospital's glaring fire safety plan failures".The Citizen. 2021-07-19. Retrieved2021-07-25.
  11. ^"Charlotte Maxeke hospital still closed, lacks compliance certificate".The Citizen. 2021-05-10. Retrieved2021-07-25.
  12. ^"The looting of Charlotte Maxeke hospital".BusinessLIVE. Retrieved2021-07-25.
  13. ^Monama, Tebogo."Charlotte Maxeke Hospital reopens oncology unit after fire damage".News24. Retrieved2021-07-25.
  14. ^Official websiteArchived September 22, 2009, at theWayback Machine
  15. ^http://www.national.archsrch.gov.za[permanent dead link]
  16. ^DBSA Project Report, RFP054/2023, January 2024
  17. ^DBSA Project Report, RFP054/2023, January 2024
  18. ^DBSA Project Report, RFP054/2023, January 2024
  19. ^DBSA Project Report, RFP054/2023, January 2024
  20. ^DBSA Project Report, RFP054/2023, January 2024
Geology
Topography
Rivers and
wetlands
Vaal-Orange basin
Limpopo basin
Climate
Cradle of
Humankind
Fossil sites
Biodiversity
Vegetation types
Parks and gardens
Nature reserves
Human impact
Communities
Inner City
Northern
suburbs and
environs
Southern
suburbs and
environs
East Rand
West Rand
Cityscape
Landmarks
Public art
Statues
Civic
buildings
Office
buildings
Skyscrapers
Residential
buildings
Skyscrapers
Structures
Urban planning
Heritage conservation
Government
National government
Courts
Chapter nine institutions
Provincial government
Municipalities
African Union
Politics
Governing parties
Political organisations
and parties based in
Greater Johannesburg
Political parties
Trade unions
Other political
organisations
Fortifications
Monuments
and memorials
Cemeteries
Historical
sites
Houses
Historical
companies and
organisations
Companies
Political
organisations
Other organisations
Events
Cultural heritage
Performance art
Musical ensembles
Theatres
Events and festivals
Museums and art
galleries
Defunct
Clubs and societies
Places of
worship
Churches
Anglican
Baptist
Calvinist
Catholic
Maronite
Greek
Orthodox
Latter-day
Saints
Lutheran
Synagogues
Orthodox
Historical
Progressive
Mosques
Hindu temples
Scientology centres
Mass media
Magazines
Defunct
Newspapers
Defunct
Radio stations
Television channels
Defunct
Film studios
Defunct
Record labels
Game studios
Cultural references
Companies
Companies based inGreater Johannesburg
Diversified
conglomerates
Airlines
Defunct
Construction
and engineering
Energy
Financial
Banks
Hospitality
ICT
Legal
Manufacturing
Media
Mining
Retail and
marketing
Restaurant
franchises
Services
Transport
State-owned
enterprises
Professional
associations
Mining
Mines
Shopping centres
Hotels and resorts
Venues
Restaurants, bars,
clubs and cafés
Tourism
Cultural villages
Civil aviation
Airports
Defunct
Road transport
Rail transport
Train stations
Sports governing
bodies based in
Greater Johannesburg
Teams
Soccer
Former
Rugby
Cricket
Basketball
Equestrian sports
Sports events
Sports venues
Stadia and
arenas
Defunct
Golf courses
Equestrian
venues
Motorsports
venues
Libraries
Universities
University of Johannesburg
Campuses
Faculties
University of the Witwatersrand
Faculties
Other tertiary
institutions
Business schools
Religious institutions
State schools
Private schools
Alternative schools
International schools
Services
Hospitals
Historical
Water supply
and sanitation
Dams
Water towers
Electricity supply
Defunct power stations
Law enforcement and
emergency services
Charities and NGOs
Military units and formations
Army units
Regular
Reserve
SAMHS units
Disbanded units
Army
Commandos
Special Forces
SAAF
People
History
Faculties
Knowledge
Campus Life
Affiliated Hospitals
International
National
Other

26°10′36.42″S28°02′33.34″E / 26.1767833°S 28.0425944°E /-26.1767833; 28.0425944

Retrieved from "https://en.wikipedia.org/w/index.php?title=Charlotte_Maxeke_Johannesburg_Academic_Hospital&oldid=1313429111"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp