Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Chaoyang–Linghai high-speed railway

From Wikipedia, the free encyclopedia
High speed rail line in China
Chaoyang–Linghai
high-speed railway
朝凌高速铁路
Overview
StatusOperational
Termini
Service
Operator(s)China Railway High-speed
Technical
Line length107 km (66 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)
Route map

km
0
Liaoning Chaoyang
35
Batuying
82
Jinzhou North
105
Linghai South
This diagram:

TheChaoyang–Linghai high-speed railway is ahigh-speed railway line in China. The railway is 107 kilometres (66 mi) long[1] and has a design speed of 350 kilometres per hour (220 mph).[2] The railway opened on August 3, 2021.[1]

History

[edit]

Construction officially began in October 2017. Tracklaying was completed in December 2020.[3] The railway opened on August 3, 2021.[1]

Stations

[edit]
Station Name[1]ChineseChina Railway
transfers/connections
Liaoning Chaoyang辽宁朝阳Beijing–Shenyang high-speed railway
Batuying巴图营
Jinzhou North锦州北
Linghai South凌海南Qinhuangdao–Shenyang passenger railway

References

[edit]
  1. ^abcde唐佳丽 (2021-08-02)."朝凌高铁即将开通 昨日开始售票 大连、锦州至北京分别缩短47分钟和35分钟". Archived fromthe original on 2021-08-02. Retrieved2021-08-02.
  2. ^"朝凌高铁桥梁施工进入关键阶段!通车后大连至北京缩短1.5小时" [Chaoyang-Linghai high-speed railway bridge construction into a critical stage! Dalian to Beijing will be shortened by 1.5 hours after opening].China Railway (in Chinese). 20 September 2018. Retrieved10 March 2021.
  3. ^"朝凌高铁完成无砟轨道施工" [Chaoling high-speed rail completed the construction of the track].news.cnstock.com (in Chinese). 1 December 2020.Archived from the original on 2021-08-01. Retrieved10 March 2021.


Stub icon

This People's Republic of China rail-related article is astub. You can help Wikipedia byexpanding it.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Chaoyang–Linghai_high-speed_railway&oldid=1177365809"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp