Line 12 platform | ||||||||||||||||
| General information | ||||||||||||||||
| Location | Changchun Bridge (长春桥) Landianchang North Road (蓝靛厂北路) / Landianchang South Road (蓝靛厂南路) and Yuanda Road (远大路) / Changchunqiao Road (长春桥路) Haidian District,Beijing China | |||||||||||||||
| Coordinates | 39°57′31″N116°17′39″E / 39.958527°N 116.294255°E /39.958527; 116.294255 | |||||||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
| Lines | Line 10 Line 12 | |||||||||||||||
| Platforms | 4 (2island platforms) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Underground | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | December 30, 2012; 12 years ago (2012-12-30) (Line 10) December 15, 2024; 11 months ago (2024-12-15) (Line 12) | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Changchun Qiao station[1] (simplified Chinese:长春桥站;traditional Chinese:長春橋站;pinyin:Chángchūn Qiáo zhàn) is aninterchange station betweenLine 10 andLine 12 of theBeijing Subway.[2] The Line 10 station opened on December 30, 2012.[3] The Line 12 station opened on December 15, 2024.
The station has undergroundisland platforms for both Line 10 and Line 12.

It is located a short distance from theGolden Resources Mall, one of the world's largest shopping malls. The station also serves the Yuanda residential area.

The station is named after Changchun Bridge (simplified Chinese:长春桥;traditional Chinese:長春橋;pinyin:Chángchūn Qiáo), a bridge onJingmi Diversion Canal.
There are 6 exits, lettered A1, A2, B, C, D1, and D2. Exits A1, A2, C and D2 have accessible elevators.
This article related to theBeijing Subway is astub. You can help Wikipedia byexpanding it. |