Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Changchun Qiao station

Coordinates:39°57′31″N116°17′39″E / 39.958527°N 116.294255°E /39.958527; 116.294255
From Wikipedia, the free encyclopedia
Beijing Subway station
‹ ThetemplateInfobox station is beingconsidered for merging. ›
Changchun Qiao[1]

长春桥
Beijing Subway
Line 12 platform
General information
LocationChangchun Bridge (长春桥)
Landianchang North Road (蓝靛厂北路) / Landianchang South Road (蓝靛厂南路) and Yuanda Road (远大路) / Changchunqiao Road (长春桥路)
Haidian District,Beijing
China
Coordinates39°57′31″N116°17′39″E / 39.958527°N 116.294255°E /39.958527; 116.294255
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Lines     Line 10
     Line 12
Platforms4 (2island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
OpenedDecember 30, 2012; 12 years ago (2012-12-30) (Line 10)
December 15, 2024; 11 months ago (2024-12-15) (Line 12)
Services
Preceding stationBeijing SubwayFollowing station
Chedaogou
outer loop / anticlockwise
Line 10Huoqiying
inner loop / clockwise
LandianchangLine 12Suzhou Qiao
towardsDongbabei
Location
Changchun Qiao[1] is located in Beijing
Changchun Qiao[1]
Changchun Qiao[1]
Location in central Beijing

Changchun Qiao station[1] (simplified Chinese:长春桥站;traditional Chinese:長春橋站;pinyin:Chángchūn Qiáo zhàn) is aninterchange station betweenLine 10 andLine 12 of theBeijing Subway.[2] The Line 10 station opened on December 30, 2012.[3] The Line 12 station opened on December 15, 2024.

Station layout

[edit]

The station has undergroundisland platforms for both Line 10 and Line 12.

Location and name

[edit]
Notice about the connection to Golden Resources Shopping Mall at Changchun Qiao Station, Line 12.

It is located a short distance from theGolden Resources Mall, one of the world's largest shopping malls. The station also serves the Yuanda residential area.

Changchun Bridge onJingmi Diversion Canal near Changchun Qiao Subway Station.

The station is named after Changchun Bridge (simplified Chinese:长春桥;traditional Chinese:長春橋;pinyin:Chángchūn Qiáo), a bridge onJingmi Diversion Canal.

Exits

[edit]

There are 6 exits, lettered A1, A2, B, C, D1, and D2. Exits A1, A2, C and D2 have accessible elevators.

Gallery

[edit]
  • Platform (Line 10)
    Platform (Line 10)
  • Concourse (Line 10, July 2013)
    Concourse (Line 10, July 2013)
  • Concourse (Line 10, February 2021)
    Concourse (Line 10, February 2021)
  • Platform (Line 10, November 2018)
    Platform (Line 10, November 2018)
  • Concourse (Line 12, December 2024) (Picture 1)
    Concourse (Line 12, December 2024) (Picture 1)
  • Concourse (Line 12, December 2024) (Picture 2)
    Concourse (Line 12, December 2024) (Picture 2)
  • Exit A1, Line 10
    Exit A1, Line 10
  • Exit A2, Line 10
    Exit A2, Line 10
  • Elevator at Exit A2, Line 10
    Elevator at Exit A2, Line 10
  • Exit B, Line 12
    Exit B, Line 12
  • Exit C, Line 12
    Exit C, Line 12
  • Elevator at Exit C, Line 12
    Elevator at Exit C, Line 12
  • Exit D1, Line 10
    Exit D1, Line 10
  • Exit D2, Line 10
    Exit D2, Line 10
  • Elevator at Exit D2, Line 10
    Elevator at Exit D2, Line 10

References

[edit]
  1. ^ab"JPG格式线路图下载 北京地铁官方网站". Archived fromthe original on 14 February 2025.
  2. ^(Chinese)地铁车站首次下穿立交桥.新浪.Archived from the original on 29 January 2022. Retrieved28 January 2022.
  3. ^(Chinese)轨道交通四条新线12月30日开通试运营. Beijing Municipal Transportation Administration Bureau. Archived fromthe original on 11 May 2013. Retrieved29 December 2012.

External links

[edit]
Line 10
Line 12
Stations that are unopened, disused, proposed, under planning or under construction are shown initalics.


Stub icon

This article related to theBeijing Subway is astub. You can help Wikipedia byexpanding it.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Changchun_Qiao_station&oldid=1303641516"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp