Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Central Silk Board metro station

Coordinates:12°54′59″N77°37′14″E / 12.91652°N 77.62056°E /12.91652; 77.62056
From Wikipedia, the free encyclopedia
Namma Metro's Yellow Line and upcoming Blue Line interchange metro station

‹ ThetemplateInfobox station is beingconsidered for merging. ›
Central Silk Board
This metro station underYellow Line as of July 2025
General information
LocationOuter Ring Rd, Central Silk Board Colony, Stage 2, BTM Layout, Bengaluru, Karnataka 560068
Coordinates12°54′59″N77°37′14″E / 12.91652°N 77.62056°E /12.91652; 77.62056
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineYellow LineBlue Line
PlatformsSide platform
Platform-1Rashtreeya Vidyalaya Road
Platform-2Delta Electronics Bommasandra
Side platform(TBC)
Platform-3 - Train Terminates Here
Platform-4 -Krishnarajapura orKIAL Terminals
Platform numbers (TBC)
Tracks4 (2 Operational under Yellow Line + 2U/C under Blue Line)
Construction
Structure typeElevated,double track
Platform levels3
ParkingTwo-Wheeler Parking only
AccessibleYesDisabled access
Architect HCC - URC ConstructionJV
  AFCONS Ltd.
Other information
Status  Operational and Staffed
  Under construction
Station codeSBJT
History
Opened  10 August 2025; 3 months ago (10 August 2025)
Opening  December 2026; 12 months' time (December 2026)(TBA)
Electrified750VDCthird rail
Services
Preceding stationNamma MetroFollowing station
BTM LayoutYellow LineBommanahalli
TerminusBlue Line
(Future Service)
HSR Layout
Route map
Rashtreeya Vidyalaya Road
Ragigudda
Jayadeva Hospital
Pink Line
Under construction
BTM Layout
Central Silk Board
Blue Line
Under construction
Bommanahalli
Hongasandra
Kudlu Gate
Singasandra
Hosa Road
Beratena Agrahara
Electronic City
Infosys Foundation Konappana Agrahara
Huskur Road
Biocon Hebbagodi
Mainline rail interchangeHebbagodi Depot
Delta Electronics Bommasandra
Central Silk Board
HSR Layout
Agara
Ibbaluru
Bellandur
Embassy TechVillage Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Indian Railways TowardsUpperLeft arrowHosur and
LowerRight arrowBanaswadi orBaiyyappanahalli
Doddanekundi
Bagmane Developers - DRDO Sports Complex
Sarasvathi Nagara
KrishnarajapuraKrishnarajapuram railway station
Indian Railways TowardsLeft arrowKrishnarajapuram and
Down arrowYelahanka Jn orBengaluru Cantt.Right arrow
Mainline rail interchangeBaiyappanahalli Depot(U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura
HebbalaHebbal railway station
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation(no scope)
Indian Railways Towards
Left arrowKSR Bengaluru andYelahanka JnRight arrow
Yelahanka
Bagalur Cross
Bettahalasuru(no scope)
Chikkajala(future)
Doddajala
Indian Railways Towards
Left arrowKolar andYelahanka JnRight arrow
Mainline rail interchangeDoddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals
Location
Map

Central Silk Board is an elevated interchange metro station on the north-south corridor of theYellow Line and the upcomingBlue Line[1] ofNamma Metro inBengaluru, India. This metro station serves theCentral Silk Board area.

History

[edit]

Yellow Line

[edit]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Central Silk Board metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 kmYellow Line of Namma Metro. On 16 May 2017,HCC-URC CementationJV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[2] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

TheYellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime MinisterNarendra Modi, with four trainsets which are ready for operations after arriving fromTitagarh Rail Systems in Kolkata.[3][4][5][6][7][8][9] The opening was delayed from May 2025 as previously announced by theNamma Metro Managing Director, Maheshwar Rao.[10][11][12]

Gallery

[edit]
  • Station under construction in December 2023
    Station under construction in December 2023
  • Station signage being installed in November 2024
    Station signage being installed in November 2024
  • Station building seen from Ragigudda - Silk Board Flyover in November 2024
    Station building seen fromRagigudda - Silk Board Flyover in November 2024
  • Final stages of construction in March 2025
    Final stages of construction in March 2025
  • Station Entrance as of July 2025 entering from Central Silk Board heading towards HSR Layout
    Station Entrance as of July 2025 entering from Central Silk Board heading towardsHSR Layout
  • Station Entrance as of July 2025 entering from Central Silk Board heading towards Banashankari
    Station Entrance as of July 2025 entering from Central Silk Board heading towardsBanashankari
  • Fully constructed Central Silk Board metro station in July 2025
    Fully constructed Central Silk Board metro station in July 2025

Blue Line

[edit]

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Central Silk Board metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 kmBlue Line of Namma Metro. On 13 October 2020,Afcons Infrastructure was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates.[13] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

The elevated section ofBlue Line covering a distance of 58.2km from Central Silk Board toKIAL Terminals viaKrishnarajapura is expected to be operational by June 2026.

Station layout

[edit]

Yellow Line

Central Silk Board track layout
Station with two tracks and two side platforms
GStreet levelExit/entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2Side platform | Doors will open on the leftDisabled access
Platform 2
Eastbound
Towards →Delta Electronics Bommasandra
Next station:Bommanahalli
Platform 1
Westbound
Towards ←Rashtreeya Vidyalaya Road
Next station:BTM Layout
Side platform | Doors will open on the leftDisabled access
L2

Blue Line(TBC)

Central Silk Board track layout(TBC)
P# toHSR Layout **
P# to Train Terminates Here
Station with two tracks and two side platforms
** Under Construction
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2Side platform | Doors will open on the leftDisabled access
Platform #
Eastbound
Towards →Krishnarajapura **
Next station:HSR Layout
Platform #
Westbound
Towards ← Train Terminates Here
Side platform | Doors will open on the leftDisabled access
L2Note: ** To be further extended toKIAL Terminals in future

Entry/Exits

[edit]

There are three entry/exit points – A , B and C. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards Central Silk Board side
  • Entry/Exit point B: Towards Textile Testing Lab side
  • Entry/Exit point C: Towards Central Silk Board Colony side
    • Wheelchair accessibility has been provided for both entry/exit points A, B and C.

See also

[edit]
Portals:

References

[edit]
  1. ^"Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty".timesproperty.com. Retrieved14 December 2023.
  2. ^"HCC-URC JV Lowest Bidder for Bangalore Metro's RV Rd - HSR Layout".The Metro Rail Guy. 16 May 2017. Retrieved23 October 2024.
  3. ^Mishra, Anupriya (10 August 2025)."As PM Narendra Modi Inaugurates Namma Metro Yellow Line, Here's All About This New Route".Curly Tales. Retrieved10 August 2025.
  4. ^"PM Modi to inaugurate Bengaluru metro Yellow Line, launch Phase-3 expansion on August 10".The Indian Express. 3 August 2025. Retrieved3 August 2025.
  5. ^"Namma Metro Yellow Line Updates, Metro Delay Bengaluru: Yellow Line Launch Pushed to July-End Amid Snags | Bengaluru Metro News".Deccan Herald. Retrieved27 May 2025.
  6. ^"Bengaluru's Yellow Line Metro faces further delay, unlikely to open before July-end: Report".Hindustan Times. 27 May 2025. Retrieved27 May 2025.
  7. ^"Bengaluru Namma Metro Update: Yellow Line Operations To Start In June | Check Status, Key Stations".English Jagran. 6 April 2025. Retrieved6 April 2025.
  8. ^"Bengaluru Metro Yellow Line: Operations To Start By June? Check Current Status & Key Stations".Times Now. 5 April 2025. Retrieved6 April 2025.
  9. ^Parangi, Shankrappa (6 April 2025)."Namma Metro Yellow line: ಏಪ್ರಿಲ್ ಅಂತ್ಯಕ್ಕೆ 3ನೇ ರೈಲು, ಹಳದಿ ಮಾರ್ಗ ಕಾರ್ಯಾಚರಣೆ ಅಪ್ಡೇಟ್".kannada.oneindia.com (in Kannada). Retrieved6 April 2025.
  10. ^"Bengaluru Metro Yellow Line To Become Operational By May 2025, Pink Line To Be Ready For Public Use By..."Times Now. 11 March 2025. Retrieved12 March 2025.
  11. ^"Bengaluru: Namma Metro Yellow Line From RV Road To Bommasandra, Connecting Electronics City, Set To Open By May 2025".English Jagran. 10 March 2025. Retrieved12 March 2025.
  12. ^"Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway".Deccan Herald. Retrieved7 January 2025.
  13. ^"Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work".The Metro Rail Guy. 13 October 2020. Retrieved24 October 2024.

External links

[edit]
Wikimedia Commons has media related toNamma Metro.
Wikivoyage has a travel guide forBengaluru.
Operational
Planned
  • Narayana Hospital
  • Chandapura
  • Attibele Industrial Area
  • Attibele
Phase-2A
Phase-2B
Not in Scope
Depot(s)
  • Hebbagodi
  • Baiyappanahalli & Doddajala
See also
*Stations initalics are Under Construction
Retrieved from "https://en.wikipedia.org/w/index.php?title=Central_Silk_Board_metro_station&oldid=1321936321"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp