Centering (masonry)

From Wikipedia, the free encyclopedia
(Redirected fromCentering (Masonry))
Temporary timber framework used in arch and bridge construction
It has been suggested that this article bemerged intoCentring. (Discuss) Proposed since October 2025.
icon
This articlemay incorporate text from alarge language model. It may includehallucinated information,copyright violations, claims notverified in cited sources,original research, orfictitious references. Any such material should beremoved, and content with anunencyclopedic tone should be rewritten.(October 2025) (Learn how and when to remove this message)

For the British practice of centering in the 19th century, seeCentring.

Centering is a form offalsework—temporary timber framework used to support the stones or bricks of anarch orvault until the structure becomes self-supporting. In American masonry construction practice, it was widely employed onturnpikes,canals, and laterrailroad andhighway works in the nineteenth century.[1]: 515–527 [2]

Terminology

[edit]

In British English the term is spelledcentring; American usage preferscentering. Major dictionaries define it as a temporary framework, especially of timber, used to support an arch during construction.[3][4]

Description and components

[edit]

For key parts of an arch, seearch terminology.

In American practice, centering consisted of timber ribs and lagging that formed theintrados line of the arch and carried thevoussoirs until thekeystone was placed and themortar had set. The ribs, often called “frames”, were erected at right angles to the bridge axis and covered with planks orlagging running lengthwise under the arch ring. The framework typically rested on timber supports near thespringing line and was adjusted bywedges to allow small vertical movements.[1]: 515–516  A simple non-trussed frame was termed a common centering.[1]: 518–519  For definitions ofintrados, haunches, and related terms in brickwork practice, industry notes remain in wide use.[5]

Engineering drawing showing a large masonry arch with timber centering beneath the intrados
Cabin John Bridge (Union Arch), 1859 drawing

Types of centering

[edit]

Several types were used in nineteenth-century United States work, distinguished by structural form and span.[1]: 522–525 

Solid wooden rib – For flat arches up to about 10 ft span and small openings; each rib cut from a single plank to the intrados curve and stiffened with cleats.

Built wooden rib – For spans roughly 10–30 ft; each rib made from two or three layers of short 2 in planks, fitted to break joints and fastened with nails or bolts, sometimes with iron plates; common in tunnel and culvert work.

Braced wooden rib – For semicircular arches about 15–30 ft; composite ribs with horizontal chords and diagonal braces for stiffness.

Trussed center – For large spans requiring high rigidity; essentially a timbertruss shaped to the intrados. Historical examples include the centering for theUnion Arch (Cabin John Bridge) and theOld Croton Aqueduct’s Sing Sing Kill Bridge (88-ft arch).[6][7]

Load and analysis

[edit]

Contemporary American texts analyzed the pressures transmitted to centering as a function of voussoir weight and friction between stone and timber. Because friction introduces uncertainty, conservative design values were commonly recommended for temporary work. Reaction forces were reported as highest near thehaunches rather than at the crown.[1]: 516–519 : 517–518 

Striking the centering

[edit]

Removal (striking) was carried out by gradually lowering the ribs using timber wedges at their supports. Contemporary practice included paired folding wedges and long compound wedges for uniform lowering at the rib ends.[1]: 526–527  On large spans, compound wedges about 10–12 inches square and 4–6 feet long were sometimes driven by a suspended ram. Sand jack supports were also used for controlled lowering of heavy centers.[1]: 526–527 

Nineteenth-century practice varied with how the arch ring was built:

Dry-laid or “dry-packed” rings. Some American and British work used dry-laid stone or brick (with joints later packed or grouted). Where no mortar had to gain strength, accounts noted that centers could be struck soon after completing and wedging the ring, and in some brick methods immediately; modern surveys document early dry-laid stone arches in U.S. practice.[8][9]

Mortared rings. Manuals advised withholding striking until the “solid part of the backing” was built and the mortar had set and hardened sufficiently, reflecting an empirical approach tocuring.[10] Treatises also recommended slight easing after the key was set to seat the ring, with full removal deferred until the mortar had adequatecompressive strength,months for major bridge arches, but sooner for small culverts and sewers.[1]: 526–527 

Period literature noted that mortars gain strength with time, but standardized acceptance ages (for example, 7- and 28-day tests) became codified in the early twentieth century. One 1889 text presented data on the “effect of time on the strength of mortars,” and a 1917 U.S. Bureau of Standards circular specified 7- and 28-day strength requirements forPortland cement, including that 28-day strength exceed 7-day strength.[1]: 89 [11] Modern brick-industry guidance recommends keeping centering in place at least seven days, with longer periods in cold weather or where structural analysis requires it.[12]

Application in American bridge construction

[edit]

Carpenters and masons working on turnpike, canal, and railroad projects in the early nineteenth century used timber centering built from locally available lumber. The technique remained standard for American masonry bridge work throughout the nineteenth century and persisted into the early twentieth century, after which steel framing and reinforced-concreteformwork became common for new construction.[1]: 515–516, 522–527  Contractors also adopted reusable steel truss centering for some reinforced-concrete arch programs; for example, thePhiladelphia and Reading Railroad’s Susquehanna River bridge reconstruction (1920–1924) seated steel truss centering in pier pockets and moved it span-to-span with a traveling crane.[13] State and federal historic-context studies document surviving masonry-arch highway and railroad bridges that relied on centering during construction.[14][15]

Legacy

[edit]

Centering illustrates the junction of craft and analysis in nineteenth-century American civil engineering. Historic drawings and field records preserved by theHistoric American Engineering Record (HAER) and related programs document typical falsework for turnpike culverts, canal aqueducts, and railroad masonry arches.[16] Pocket-book references used by American engineers also summarized centering types, striking methods, and rules of thumb for spans and rise.[17]

References

[edit]
  1. ^abcdefghijBaker, Ira O. (1889).A Treatise on Masonry Construction (7th ed.). New York: J. Wiley & Sons. RetrievedOctober 30, 2025.
  2. ^"Minnesota Masonry-Arch Highway Bridges (1870–1945)"(PDF).Minnesota State Historic Preservation Office. Minnesota Department of Administration. 2012. RetrievedOctober 30, 2025.
  3. ^"centring (British), centering (US) — definition".Collins English Dictionary. HarperCollins. February 13, 2020. RetrievedOctober 30, 2025.
  4. ^"centering — definition".Dictionary.com. Dictionary.com, LLC. RetrievedOctober 30, 2025.
  5. ^"Technical Notes 31: Brick Masonry Arches"(PDF).Brick Industry Association. January 1995. RetrievedOctober 30, 2025.
  6. ^"Old Croton Aqueduct, Sing Sing Kill Bridge — item record".Library of Congress, Prints & Photographs. Historic American Engineering Record. RetrievedOctober 30, 2025.
  7. ^"Centering for 88-Foot Arch (photo 4)".Library of Congress, Prints & Photographs. Historic American Engineering Record. RetrievedOctober 30, 2025.
  8. ^"Best Practices for Historic Masonry Repair and Rehabilitation"(PDF).Virginia Transportation Research Council. 2020. pp. 7–9. RetrievedOctober 30, 2025.
  9. ^"British Brick Society North Midlands Bulletin, No. 2"(PDF). British Brick Society. January 1975. p. 2. RetrievedOctober 30, 2025.
  10. ^Kidder, Frank E. (1905).The Architect's and Builder's Pocket-Book. New York: J. Wiley. RetrievedOctober 30, 2025.
  11. ^"United States Government Specification for Portland Cement (Circular of the Bureau of Standards No. 33, 3rd ed.)"(PDF). U.S. Department of Commerce,Bureau of Standards. 1917. p. 11. RetrievedOctober 30, 2025.
  12. ^"Technical Notes 31: Brick Masonry Arches"(PDF).Brick Industry Association. January 1995. p. 19. RetrievedOctober 30, 2025.
  13. ^"Philadelphia & Reading Railroad, Susquehanna River Bridge (HAER No. PA-523) — Written Historical and Descriptive Data"(PDF).Library of Congress. Historic American Engineering Record. 2001. p. 4. RetrievedOctober 30, 2025.
  14. ^"Section F: Associated Property Types — Railroad Bridges in Minnesota"(PDF).Minnesota Department of Transportation. 2007. RetrievedOctober 30, 2025.
  15. ^"Seventh Street Improvement Arches — National Register of Historic Places".National Park Service. November 6, 1989. RetrievedOctober 30, 2025.
  16. ^"Historic American Engineering Record (HAER)".National Park Service. September 20, 2023. RetrievedOctober 30, 2025.
  17. ^Trautwine, John C. (1904).The Civil Engineer's Pocket-Book (3rd ed.). New York: Wiley. RetrievedOctober 30, 2025.