Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Camberwell railway station (England)

Coordinates:51°28′25″N0°05′52″W / 51.4736°N 0.0977°W /51.4736; -0.0977
From Wikipedia, the free encyclopedia
Disused railway station in England

‹ ThetemplateInfobox London station is beingconsidered for merging. ›
Camberwell
The former station building in 2016
LocationCamberwell
Local authorityLondon Borough of Southwark
Number of platforms4[1]
Railway companies
Original companyLondon, Chatham and Dover Railway
Key dates
6 October 1862Opened
3 April 1916Closed to passengers
18 April 1964Closed to all traffic
Other information
London transport portal

Camberwell is aclosed railway station inCamberwell,South London,England. It opened in 1862 but was closed to passengers in 1916 and closed to all traffic in 1964. The possibility of the station's re-opening has been raised in recent years.

History

[edit]

Camberwell station was opened on 6 October 1862 by theLondon, Chatham and Dover Railway (LC&DR) as part of the company's ambitious "City Branch" from Herne Hill to Blackfriars. It was constructed on aviaduct with entry at street level. On 1 May 1863 the name was changed toCamberwell New Road. The station initially had two facing platforms, but was expanded to four lines with the addition of a central island lines with the additional lines opening on 1 January 1866. Thesignal box built at the northern end of the island in the late 1890s isGrade II listed.

In 1879 the LCDR was running the following services that stopped at Camberwell:[2]

  • Frequent trains between Moorgate and Victoria, calling at all stations[a]
  • Half-hourly trains between Moorgate and Clapham Junction, calling at all stations[b]
  • Through trains from Kentish Town to Victoria, calling at all stations[c]

The LCDR was part of the jointly managedSouth Eastern and Chatham Railway from 1899. In October 1908 the station name reverted to Camberwell. As with many other London stations duringWorld War I, wartime restraints forced it to close to passenger traffic on 3 April 1916. Before the outbreak of war, the station had suffered dwindling passenger usage following the introduction of electric tram services in the area. It remained in use for goods traffic until 18 April 1964.[3]

Modern use

[edit]

Today, the original station building located on the west side of Camberwell Station Road is in converted use as a mechanic's garage.[4] At track level, nothing of the two side platforms remain but small fragments of the degradedisland platform are still visible. The goods yard is now occupied by a residential development.

Camberwell station was mentioned in the 1956 filmPrivate's Progress as a good place to get off a train and avoid paying a fare. It was made to sound like a working station, despite the fact that it had closed nearly 40 years before the film was set.

Possible re-opening

[edit]

The station was considered byBritish Rail for reopening as part of theThameslink route in the 1980s, along withSouthwark Park andWalworth Road.[5]

In 2002, a study undertaken by a rail expert, Nick Alexander, concluded that a "station located at the old Camberwell station site should be considered if the option were to be considered in future".[citation needed]

In June 2014,Transport for London (TfL) commissionedSteer Davies Gleave to undertake a feasibility study to consider the possibility of re-opening Camberwell andWalworth railway stations on the line where trains run non-stop betweenLoughborough Junction orDenmark Hill andElephant & Castle. The study concluded that a re-opened Camberwell station could cater for 8- or 12-car trains, but that complete reconstruction might be required. The cost of a 12-car station would be £27.5m (£20.7m cheaper than Walworth). 40% of the cost was the cost of rebuilding four bridges.[6]

In December 2015, TfL announced that its proposedBakerloo line extension would follow a route via theOld Kent Road toLewisham, rather than through a new underground station inCamberwell andPeckham to the same destination.[7] In March 2016, it was reported thatMayor of LondonBoris Johnson understood the Bakerloo line extension did not solve Camberwell's poor rail connectivity, adding that TfL were investigating the re-opening of Camberwell railway station in consultation with stakeholders, including theLondon Borough of Southwark and theLondon Borough of Lambeth, and that initial feasibility studies indicate it would be possible to construct a modern station on the site if timetables could be modified to accommodate Camberwell as an additional stop.[8][9]

In June 2017, Steer Davies Gleave produced a TfL-commissioned report discussing the possibility of the station's re-opening in 2026 in three future land use densities across three levels of operational use (four 8-car trains per hour, six 8-car trains per hour and six 12-car trains per hour) to give a total of nine scenarios. It estimated the capital cost of an 8-car station at £36.74m and a 12-car station at £38.50m. Its transport user analysis concluded that no scenario produced a net benefit, because Camberwell station users' journey time benefit would be more than offset by those travelling into London from further afield. It also concluded the wider economic impact would be negative and that the increase to land value in the area would be modest.[10] SDG's journey time benefit analysis was based on aMott MacDonald report that reached similar conclusions, but that the journey time cost would be unlikely to be noticed by users, and that the overall impact of the opening of the station would be minimal.[11]

TheLabour Party included a promise to campaign for the station's re-opening in its manifesto ahead of the2018 Southwark London Borough Council election held in May.[12]

In September 2018, TfL published a strategic business case to explore the station's reinstatement. It acknowledged the area's poor transport connectivity and that the reopening of theNational Rail station was the best of eight options examined. While it concluded the local area would benefit from the station's re-opening, its conclusions were similar to Steer Davies Gleave's 2017 report.[13]

In July 2020, the station was included in a shortlist of stations under consideration for reopening as part of the third round of theNew Stations Fund scheme, but ultimately was not successful.[14]

See also

[edit]

Notes

[edit]
  1. ^Trains called at Moorgate Street, Aldersgate Street, Snow Hill, Ludgate Hill, Blackfriars, Borough Road, Elephant and Castle, Walworth Road, Camberwell, Loughborough Junction, Brixton and South Stockwell, Clapham and North Stockwell, Wandsworth Road, Battersea Park Road, Grosvenor Road and Victoria
  2. ^Trains ran as for the Moorgate to Victoria service, calling only at Clapham Junction after Wandsworth Road.
  3. ^Trains called at Kentish Town, King's Cross (York Road), King's Cross (Metropolitan), Farringdon Street, Snow Hill then as for the Moorgate to Victoria service.

References

[edit]
  1. ^London Railway Atlas (4th ed.). p. 39.[full citation needed]
  2. ^Cook's Handbook For London. London: Thomas Cook & Son. 1879.
  3. ^"Camberwell Station".Subterranea Britannica. 26 February 2020.
  4. ^Hazzard, Jago (24 June 2022)."Camberwell Station: It's Abandoned!".Camberwell Station: It's Abandoned!. YouTube. Retrieved7 October 2022.
  5. ^Carter, Rita (1 July 1985).Thames News.Thames Television.
  6. ^Gleave, Steer Davies (18 July 2014). South London Stations Report (Camberwell Stations) (Report).
  7. ^"Bakerloo line extension to improve transport links in south London by 2030" (Press release). Transport for London. 17 December 2015.
  8. ^"Abandoned Camberwell Station could be reopened after 100 years to solve 'travel misery'". 17 April 2017.
  9. ^"TfL 'investigating' reopening of Camberwell disused station". 7 March 2016. Archived from the original on 14 April 2016. Retrieved30 March 2016.
  10. ^Gleave, Steer Davies (6 June 2017). Camberwell Station Re-instatement Economic Appraisal (Report).
  11. ^MacDonald, Mott (6 September 2017). Camberwell Station Reopening (Report).
  12. ^Southwark Labor."Labor Manifesto 2018"(PDF).
  13. ^"Camberwell station business case".Transport for London. Retrieved14 January 2019.
  14. ^"Beeching reversal: Fifty disused rail lines on track to reopen".The Times. 1 July 2020. Retrieved1 July 2020.

External links

[edit]


Preceding stationDisused railwaysFollowing station
Walworth Road
Line open, station closed
 London, Chatham
& Dover Railway

City Branch
 Loughborough Junction
Line and station open
Rail infrastructure projects in the United Kingdom
Current projects
Projects
Electrification
Stations
Proposed projects
Projects
Stations
Heritage railways
Cancelled projects
Projects
Stations

51°28′25″N0°05′52″W / 51.4736°N 0.0977°W /51.4736; -0.0977

Retrieved from "https://en.wikipedia.org/w/index.php?title=Camberwell_railway_station_(England)&oldid=1283779117"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp