Coordinates:35°19′48″N119°54′36″W / 35.33000°N 119.91000°W /35.33000; -119.91000
From Wikipedia, the free encyclopedia
Photovoltaic power plant in California, US

California Valley Solar Ranch
California Valley Solar Ranch solar panels
CountryUnited States
LocationCarrizo Plain, northeast ofCalifornia Valley, CA
Coordinates35°19′48″N119°54′36″W / 35.33000°N 119.91000°W /35.33000; -119.91000
StatusOperational
Construction began2011
Commission dateOctober 2013
Construction cost$1.6 billion (2015)[1]
($2.06 billion in 2024 dollars[2])
OwnerNRG Solar
OperatorSunPower
Solar farm
TypeFlat-panel PV
Site area1,966 acres (796 ha)
Power generation
Nameplate capacity250 MWAC
Capacity factor30.8%(average 2014-2017)
Annual net output675 GW·h, 340 MW·h/acre
External links
Websitewww.californiavalleysolarranch.com
CommonsRelated media on Commons
Map

TheCalifornia Valley Solar Ranch (CVSR) is a 250 megawatt (MWAC)photovoltaic power plant in theCarrizo Plain, northeast ofCalifornia Valley. The project is owned byNRG Energy, andSunPower is the EPC contractor and technology provider.The project constructed on 1,966 acres (796 ha) of a 4,365-acre (1,766 ha) site of former grazing land.[3] It is utilizing high-efficiency, crystalline PV panels designed and manufactured by SunPower. The project includes up to 88,000 SunPowersolar tracking devices to hold PV panels that track the sun across the sky.

Project overview

[edit]

The project began construction in 2011, and began operation in 2012 with 22 MW completed. It was fully completed in October 2013.[4] At the time it was completed, "the California Valley Solar Ranch will power about 100,000 homes and will be one of the largest photovoltaic (PV) solar power plants in the world".[5]

The project is being constructed on 1,966 acres (796 ha) of a 4,365-acre (1,766 ha) site of former grazing land.[3] It is utilizing high-efficiency, crystalline PV panels designed and manufactured by SunPower. The project includes up to 88,000 SunPower solar tracking devices to hold PV panels that track the sun across the sky. The project delivers approximately 550 gigawatt-hours (GW·h) annually ofrenewable energy and has a capacity of 250 MW.[6] While the plant only has acapacity factor of 25%, its power is generated during the middle of the day, when demand for electricity — and price — is much higher than at night.

Power Purchase Agreement

[edit]

On August 14, 2008,Pacific Gas and Electric announced an agreement to buy all the power from the power plant.[7] A Conditional Use Permit application for the project was filed with the County of San Luis Obispo Planning and Building Department on January 14, 2009. On November 30, 2010,NRG Energy announced that it would buy CVSR from SunPower for "up to $450 million".[8] In September 2011, theDepartment of Energy (DOE) offered NRG Solar a $1.237 billion loan from the federal government to cover most of the construction cost.[9] The total cost of the project is estimated to be $1.6 billion.[10]

Panoramic view of construction, October 2012

Environment

[edit]

The Carrizo Plain is home to 13 species listed as endangered either by the state or federal government, including theSan Joaquin kit fox,giant kangaroo rat, and theCalifornia condor.[11] SunPower worked with the community to protect local wildlife habitat and migration patterns, and reduced the amount of traffic in the area during construction.[12] In 2012, it was reported that SunPower andFirst Solar had designed a plan to create a 19,000 acre reserve for the giant kangaroo rat, San Joaquin kit fox and golden eagle in order to address concerns abouthabitat destruction.[13]

Electricity production

[edit]
Generation (MW·h) of California Valley Solar Ranch[14]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
20124,0144,1905,5048,01921,727
201315,82420,63124,30428,13310,53325,45931,13151,64663,07356,74737,30034,583399,364
201435,85136,71054,65466,21078,96784,02477,52674,39860,78950,93936,70127,634684,403
201536,08743,20860,17567,92070,49277,66575,70575,69560,53648,79640,42131,553688,253
201627,06448,48558,57163,31771,27580,54582,60974,31063,25944,72037,63328,008679,796
201725,68528,68953,62957,22272,97279,04271,97866,59062,05257,16835,33737,178647,541
Average Annual Production (2014-2017675,000

Incidents

[edit]

A fire removed 84% of the generating capacity from service in June 2019 when poles and cables were damaged by an "avian incident."[15] Full service was expected to be restored within a month.[16]

See also

[edit]
Wikimedia Commons has media related toCalifornia Valley Solar Ranch.

References

[edit]
  1. ^Baker, David (2015-11-14)."Nuclear power's last stand in California: Will Diablo Canyon die?".San Francisco Chronicle.The California Valley Solar Ranch lies on a stretch of highway so remote that, ... Those panels, 750,000 in all, track east to west during the day, their movement almost imperceptible. Together, they can generate up to 250 megawatts of electricity, about 11 percent of Diablo's capacity. ... The $1.6 billion ranch represents one front in California's climate fight.
  2. ^Johnston, Louis; Williamson, Samuel H. (2023)."What Was the U.S. GDP Then?".MeasuringWorth. RetrievedNovember 30, 2023. United StatesGross Domestic Product deflator figures follow theMeasuringWorth series.
  3. ^abSneed, David (2008-08-15)."Calif. utility agrees to buy solar power from two proposed plants".The San Luis Obispo Tribune. Archived fromthe original on 2008-08-15. Retrieved2008-08-15.
  4. ^"NRG Energy, NRG Yield and SunPower Begin Commercial Operations at 250 MW California Valley Solar Ranch".BusinessWire. October 31, 2013. RetrievedJune 12, 2019.
  5. ^"NRG Energy Completes Acquisition of 250-Megawatt California Valley Solar Ranch from SunPower".MarketWatch. 30 September 2011.
  6. ^"California Utility Mainstreams Solar Photovoltaic Power". Environment News Service (ENS). August 15, 2008. Retrieved2011-04-15.
  7. ^"PG&E Signs Historic 800 MW Photovoltaic Solar Power Agreements With Optisolar and Sunpower".Pacific Gas and Electric. 2008-08-14. Archived fromthe original on 2008-10-04. Retrieved2008-08-15.
  8. ^Baker, David R. (2010-12-01)."NRG Energy to invest $450 million in SunPower".San Francisco Chronicle. Retrieved2011-04-15.
  9. ^"Energy Department Finalizes $1.2 Billion Loan Guarantee to Support California Solar Generation" (Press release).Department of Energy (DOE). September 30, 2011. Retrieved13 November 2011.
  10. ^Lipton, Eric; Clifford Krauss (November 11, 2011)."A Gold Rush of Subsidies in Clean Energy Search".The New York Times. Retrieved13 November 2011.
  11. ^Wesoff, Eric (August 25, 2010)."Huge Milestone for SunPower and Solar in 250MW California Valley Project". Greentech Media. Retrieved2010-08-26.
  12. ^SunPower Adds 40-MW to California Valley Solar RanchRenewable Energy World, 3 May 2010.
  13. ^"Pacific Southwest Region: California Solar Projects Will Provide Clean Energy and Restore Habitats for Wildlife".United States Fish and Wildlife Service. Retrieved2019-08-02.
  14. ^"California Valley Solar Ranch, Monthly".Electricity Data Browser.Energy Information Administration. RetrievedJanuary 31, 2019.
  15. ^Dent, Millicent (June 19, 2019)."'Avian Incident' Knocks Out 84% of Massive California Solar Farm".Bloomberg. RetrievedJune 20, 2019.
  16. ^"'Avian incident' causes fire at California solar farm". AP News. June 20, 2019.

External links

[edit]
Battery
storage
(≥10MW)
Biomass
(≥10MW)
Coal
Geothermal
Natural
gas
Nuclear
Hydro-
electric
Conventional
Pumped-
storage
Solar
PV
Thermal
Wind
By state
Power plants
Companies
Organizations
Other
Retrieved from "https://en.wikipedia.org/w/index.php?title=California_Valley_Solar_Ranch&oldid=1298993297"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp