Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

China Railway CR400BF

From Wikipedia, the free encyclopedia
(Redirected fromCR400BF)
Chinese high-speed train model
China Railway CR400BF
CR400BF-A-3032 departing from depot at Guangnan,Beijing as G509
Stock typeElectric multiple unit
In service
  • BF: 15 August 2016 (2016-08-15)
  • BF-A: 12 June 2018 (2018-06-12)
  • BF–B: 5 January 2019 (2019-01-05)
  • BF–G: 9 June 2019 (2019-06-09)
  • BF–C: 30 December 2019 (2019-12-30)
  • BF–Z, BF–GZ, BF–BZ: 25 June 2021 (2021-06-25)
  • BF–AZ: 20 July 2022 (2022-07-20)
  • BF–BS: 15 June 2024 (2024-06-15)
ManufacturerCRRC Changchun Railway Vehicles
DesignerAustralia Industrial Design Alliance (iDA)
Family nameFuxing
ReplacedCRH2C,CRH3C,CRH380A,CRH380B
Formation
  • BF, BF-C, BF-G, BF-Z, BF-GZ, BF-J, BF-S, BF-GS: 8 cars/trainset (4M4T)
  • BF-A, BF-AZ, CRH-0306: 16 cars/trainset (8M8T)
  • BF-B, BF-BZ, BF-BS: 17 cars/trainset (8M9T)
OperatorsChinaChina Railway Corporation
Specifications
Train length
  • BF, BF–G: 209 m (685 ft 8 in)
  • BF–0031: 210 m (689 ft 0 in)
  • BF–C, BF–Z, BF–GZ, BF–J, BF–G–0051, BF–S, BF–GS: 211 m (692 ft 3 in)
  • BF–A: 414 m (1,358 ft 3 in)
  • BF-AZ: 416.2 m (1,365 ft 6 in)
  • BF–B: 439.8 m (1,442 ft 11 in)
  • BF–BZ, BF–BS: 442 m (1,450 ft 2 in)
Width3,360 mm (11 ft 0 in)
Height4,050 mm (13 ft 3 in)
Platform height1,250 mm (4 ft 1.2 in)
Maximum speed
  • Service:
  • 350 km/h (220 mph)
  • Design:
  • 400 km/h (250 mph)
  • Record:
  • CR400BF: 420 km/h (260 mph)
  • CR400BF-J: 450 km/h (280 mph)
Axle load<17 t (16.7 long tons; 18.7 short tons)
Traction systemWater coolingIGBT-VVVF inverter control (Zhuzhou CRRC Times Electric)
Traction motorsYJ-268A and YJ-305A external sector 3-phase AC induction motor (Zhuzhou CRRC Times Electric)
Electric system(s)25 kV 50 Hz ACOverhead catenary
Current collectionPantograph
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
CR400BF prototype testing in the National Railway Test Center, Beijing

TheCR400BFFuxing (Chinese:复兴号;pinyin:Fùxīng Hào) is a Chinese electric high-speed train that was developed and manufactured byCRRC Changchun Railway Vehicles. As part of the China Standardized EMU, The CR400BF is designed to operate at a cruise speed of 350 km/h (217 mph) and a maximum speed of 420 km/h (261 mph) in commercial service. Development on the project started in 2012, and the design plan was finished in September 2014. The first EMU rolled off the production line on 30 June 2015.[1] The series received its current designation of Fuxing in June 2017, with the nicknameGolden Phoenix.[2] It is among the world's fastest conventional high-speed trains in regular service, with an operating speed of 350 km/h (217 mph).[3]

Variants

[edit]

CR400BF

[edit]

8-car standard production model with standard maximum speed of 420 km/h (261 mph). It is manufactured byCRRC Changchun Railway Vehicles.

CR400BF–A

[edit]

16-car version manufactured byCRRC Changchun Railway Vehicles.[4] Testing of this variant started on March 9, 2018.[5] The first CR400BF-A started operation of theBeijing–Shanghai high-speed railway on June 29, 2018.[6] These sets are 415 m (1,361 ft 7 in) and have a passenger capacity of 1,193 people.[6]

CR400BF–B

[edit]

17-car version. It is manufactured byCRRC Changchun Railway Vehicles.[7]

CR400BF–C

[edit]

8-carATO enabled version with redesigned interior and exterior used on theBeijing–Zhangjiakou intercity railway in preparation for the2022 Winter Olympics. It is manufactured byCRRC Changchun Railway Vehicles.[8] The interior design incorporates snow and ice elements with blue ambient light. The train is also equipped with high-definition LED destination displays, wireless charging for business class seats, andsmart glass windows. Additional features include snowboard storage andurine sampling areas.[9][10] The trains are manufactured byCRRC Changchun Railway Vehicles. CR400BF–C started operating on December 30, 2019, with the opening of the Beijing–Zhangjiakou ICR.[11]

CR400BF–G

[edit]

8-car sandstorm and cold climate resistant version for use in more extreme weather. It is manufactured byCRRC Changchun Railway Vehicles.[12] Shares same exterior style as the CR400BF.

CR400BF–Z

[edit]

8-car variant with redesigned and upgraded interior and exterior. It is manufactured byCRRC Changchun Railway Vehicles.

CR400BF–AZ

[edit]

16-car variant with upgrade new train in December 2023. Manufactured byCRRC Changchun Railway Vehicles.

CR400BF–BZ

[edit]

17-car variant with redesigned and upgraded interior and exterior. It is manufactured byCRRC Changchun Railway Vehicles.

CR400BF–GZ

[edit]

8-car sandstorm/cold resistant version with redesigned interior and exterior. It is manufactured byCRRC Changchun Railway Vehicles.

CR400BF–J

[edit]

8-carHSR inspection train with redesigned exterior, similar to CR400BF-C and BF-Z series.

CR400BF–BS

[edit]

Like theCR400AF-BS, an upgraded 17-car variant called the CR400BF-BS was introduced in April 2024 for use on the Beijing-Shanghai high speed railway from 15 June 2024. This variant features interior enhancements to accommodate more passengers and a new seating class called Premium First Class, which is intermediate between First Class and Business Class.

Specification

[edit]
icon
This sectiondoes notcite anysources. Please helpimprove this section byadding citations to reliable sources. Unsourced material may be challenged andremoved.(January 2023) (Learn how and when to remove this message)
Train typeCar dimensionsTotal lengthTop speedSeating capacityFormationPower output
(under 25 kV)
Entry into Service
CR400BF/BF–A/BF–B/BF–C/BF–S/BF–G
CR400BFEnd cars length: 27.089 m (88 ft 10.5 in)
Inter cars length: 25.65 m (84 ft 2 in)
Width: 3.36 m (11 ft 0 in)
Height: 4.05 m (13 ft 3 in)
Calculated: 209.1 m (686 ft 0 in)
Real: 209 m (685 ft 8 in)
Test: 420 km/h (261 mph)
Design: 400 km/h (249 mph)
Continuous operation: 400 km/h (249 mph)
Current operation: 350 km/h (217 mph)
556: 10 business, 28 first and 518 standard
576: 10 business, 28 first and 538 standard
4M4T10.14 MW (13,598 hp)August 15, 2016
CR400BF–C576: 10 business, 28 first and 538 standard
541: 10 business, 28 first and 503 standard
December 30, 2019
CR400BF–G576: 10 business, 28 first and 538 standardJune 9, 2019
CR400BF–ACalculated: 414.26 m (1,359 ft 1 in)
Real: 414 m (1,358 ft 3 in)
1193: 22 business, 148 first and 1023 standard8M8T20.28 MW (27,196 hp)June 12, 2018
CR400BF–SUNKNOWNUnder testing
CR400BF–BCalculated: 438.928 m (1,440 ft 0.6 in)
Real: 439.8 m (1,442 ft 11 in)
1283: 22 business, 148 first and 1113 standard8M9TJanuary 5, 2019

Formation

[edit]

Power Destination

  • M – Motor car
  • T – Trailer car
  • C – Driver cabin
  • P – Pantograph


Coach Type

  • ZY – First Class Coach
  • ZE – Second Class Coach
  • ZEC – Second Class Coach/Dining Car
  • ZYS – First Class/Business Coach
  • ZES – Second Class/Business Coach
  • WR – Soft Sleeper Car
  • WRC – Soft Sleeper/Dining Car
  • DGN – Multi-function Coach

CR400BF, CR400BF–C, CR400BF–Z, CR400BF–G, CR400BF–GZ, CR400BF–GS, CR400BF–S

[edit]
Coach No.12345678
Type1456ZYSZEZECZEZES
Type23ZYSZEDGNZEZES
Power ConfigurationMcTpMTMTpMc
Power UnitsUnit 1Unit 2
Capacity15+28907563905+40
Capacity25+28907548905+40
Capacity36+28907548906+40
Capacity46+28907563906+40
Capacity55+28907563906+40
Capacity65+32937883936+43
  • ^1 Remaining series
  • ^2 CR400BF–C–5145 trainset
  • ^3 CR400BF–C–5162 trainset
  • ^4 Remaining CR400BF–Z and CR400BF–GZ series
  • ^5 CR400BF–Z–3146–3156, CR400BF–GZ–5256–5262, CR400BF–Z–5263–5275 series
  • ^6 CR400BF–GS and CR400BF–S series

CR400BF–A, CR400BF–AZ

[edit]
Coach No.12345678910111213141516
Type12SWZYZEZECZEZYZYS
Power ConfigurationTcMTpMTpMTMTpMTpMTc
Power UnitsUnit 1Unit 2Unit 3Unit 4
Capacity15+126090754890605+28
Capacity26+126090754890606+28
  • ^1 CR400BF–A series
  • ^2 CR400BF–AZ series

CR400BF–B, CR400BF–BZ, CR400BF–BS

[edit]
Coach No.1234567891011121314151617
Type123SWZYZEZECZEZYZYS
Power ConfigurationTcMTpMTpMTMTpMTpMTTc
Power UnitsUnit 1Unit 2Unit 3Unit 4
Capacity15+126090754890605+28
Capacity26+126090754890606+28
Capacity36+146293787393625+24
  • ^1 CR400BF–B series
  • ^2 CR400BF–BZ series
  • ^3 CR400BF–BS series

Distribution

[edit]

As of January 2025, there are 589 CR400BF series EMU in service.

Train model letter identification

  • G – Cold-resistant
  • C, Z – Intelligent
  • S – Enhanced-technology
  • E – Sleeper
  • A – 16-car trainset
  • B – 17-car trainset


Vehicle number distinction

  • 0X0X, 00XX – Sample vehicles, test vehicles
  • 03XX, 05XX – Vehicles or sample vehicles purchased by non-national railway groups
  • 3XXX: Trains produced from CRRC Tangshan Locomotive and Rolling Stock
  • 5XXX: Trains produced from CRRC Changchun Railway Vehicles

OperatorQuantitySerial numberDepotNotes
CR400BF
Beijing Railway Bureau290031, 0503, 3067, 3068, 3085, 3087, 3090, 3091, 5006, 5027–5032, 5034, 5035, 5037, 5070–5072, 5076, 5077, 5106–5110, 5112Caozhuang0503 is the prototype trainset
0031 was the 400kph high-speed test trainset
43086, 5025, 5026, 5033Dachuang
75022, 5036, 5040-5042, 5074, 5111Langfang
Shanghai Railway Bureau83106, 3107, 5043-5045, 5073, 5075, 5078Shanghai Hongqiao3106 and 3107 equipped with cab side door
403001, 3003, 3005, 3008, 3013, 3017, 3019, 3021, 3034, 3035, 3037–3043, 3045–3047, 3049, 3059, 3061–3063, 3065, 3069–3077, 3079, 3081–3084Nanjing South
473002, 3004, 3006, 3007, 3009-3012, 3014-3016, 3018, 3020, 3022, 3023, 3036, 3044, 3048, 3060, 3064, 3066, 3078, 3080, 3088, 3089, 5001–5004, 5007–5013, 5016-5019, 5023, 5024, 5046, 5068, 5079–5081Hangzhou West
Guangzhou Railway Group100507, 5005, 5014, 5015, 5020, 5021, 5038, 5039, 5047, 5069Guangzhou South0507 is the prototype trainset
Shenyang Railway Bureau10305Shenyang NorthModel car
CR400BF–A
Beijing Railway Bureau53029, 3050, 3054, 3056, 3092Beijing South
83024, 3028, 3031, 3033, 5082–5084, 5087Caozhuang
73025, 3030, 3032, 3051–3053, 3055Xiong'an
Shanghai Railway Bureau263096–3105, 5048, 5049, 5053, 5054, 5057–5059, 5061, 5065, 5066, 5090–5092, 5094–5096Shanghai Hongqiao
213026, 3027, 3057, 3058, 3093–3096, 5050–5052, 5055, 5056, 5060, 5062–5064, 5067, 5088, 5089, 5093Nanjing South
Zhengzhou Railway Group85085, 5086, 5156–5161Zhengzhou East
CR400BF–B
Shanghai Railway Bureau145097–5105, 5151–5155Shanghai Hongqiao
CR400BF–G
Shenyang Railway Bureau145113, 5115, 5117, 5123, 5129–5134, 5175, 5176, 5199, 5200Shenyang NorthTrainsets numbered 5175 afterwards equipped with cab side door
185116, 5118–5122, 5124, 5125, 5177–5184, 5201, 5202ChangchunTrainsets numbered 5177 afterwards equipped with cab side door
Beijing Railway Bureau205114, 5146, 5149, 5150, 5164-5170, 5186, 5187, 5189-5192, 5195-5197Beijing NorthTrainsets numbered 5164 afterwards equipped with cab side door
123108–3116, 5147, 5148, 5163ChaoyangAll equipped with cab side door except 5147
40051, 5173, 5185, 5198DachuangAll equipped with cab side door
0051 was the 400kph high-speed train testset
75126, 5171, 5172, 5174, 5188, 5193, 5194Caozhuang5188 equipped with cab side door
Hohhot Railway Bureau105127, 5128, 5135-5142Hohhot East
CR400BF–C
Beijing Railway Bureau35144, 5145, 5162Beijing North5162 painted specifically for2022 Winter Olympics and equipped with cab side door
CR400BF–Z
Beijing Railway Bureau290311, 0312, 3138–3145, 5210–5213, 5220–5227, 5269–5275Beijing South
Shanghai Railway Bureau220521–0524, 3125–3137, 5263–5268Hangzhou West0524 painted specifically for2022 Asian Games
Zhengzhou Railway Bureau40511–0514Zhengzhou East
Guangzhou Railway Bureau223117–3124, 5228–5241Guangzhou South
Wuhan Railway Bureau105242–5251Wuhan
Xi'an Railway Bureau113146–3156Xi'an North
CR400BF–AZ
Zhengzhou Railway Group60515–0520Zhengzhou East
Shanghai Railway Group45252–5255Nanjing South
CR400BF–BZ
Shanghai Railway Group25208, 5209Shanghai Hongqiao
CR400BF–GZ
Harbin Railway Bureau195143, 5203-5207, 5214–5219, 5256–5262Harbin West5143 was originally a BF-C trainset
CR400BF–S
Beijing Railway Bureau203189–3197, 3206–3209, 3215, 3218-3223Beijing South
83212, 3213, 5291-5296Caozhuang
Shanghai Railway Group553157–3188, 3198-3205, 3210, 3211, 3214, 3216, 3217, 5297–5306Shanghai Hongqiao
Guangzhou Railway Bureau165281–5287, 5320-5323, 5328-5332Guangzhou South
Zhengzhou Railway Group115288–5290, 5324-5327, 5333-5336Zhengzhou East
CR400BF–AS
Shanghai Railway Group53224–3228Nanjing South
55364-5368Shanghai Hongqiao
CR400BF–BS
Shanghai Railway Group75276–5280, 5347, 5348Shanghai Hongqiao
CR400BF–GS
Beijing Railway Bureau215307-5314, 5317-5319, 5337-5340, 5349-5354Chaoyang
Shenyang Railway Bureau45315, 5316, 5345, 5346, 5352-5354Shenyang North
45341-5344, 5361-5363Changchun
Harbin Railway Bureau35355-5357Harbin West
CR400BF-J (CR450 Project)
China Railway of Academy Sciences10001Original trainset was 0511 and use a CR400BF-C headtype
CR400BF-J (Inspection Train)
China Railway10003Use a CR400BF-C headtype and equipped with cab side door
CRH-0306
10306Sleeper EMU test trainset, using CR400BF head type
CR400BF-S
10001Double-decker EMU test train
Longitudinal sleeper EMU
1Longitudinal sleeper EMU test trainset using CR400BF-C head

Gallery

[edit]

See also

[edit]

References

[edit]
  1. ^"350km/h China Standard EMU Rolled Off the Line".China Railway. June 30, 2015.
  2. ^"China EMU train linking Datong and Xi'an passes high speed test".Xinhua. November 18, 2015. Archived fromthe original on 20 November 2015.
  3. ^""复兴号"CR400BF型动车组".
  4. ^"加长版复兴号下月京沪间开跑". Archived fromthe original on 12 June 2018. Retrieved9 June 2018.
  5. ^"世界首列加长版"复兴号"正试验 时速350公里".www.guancha.cn. Retrieved2020-06-11.
  6. ^ab"7月1日全国铁路调图 加长版复兴号将首次上线京沪高铁-新华网".www.xinhuanet.com. Archived fromthe original on 1 July 2018. Retrieved2020-06-11.
  7. ^"Three New Types of Fuxing Bullet Trains Unveiled_Media_news Details_CRRC".www.crrcgc.cc. Retrieved2020-06-10.
  8. ^"京张高铁昨日首发 350公里时速 车厢智能随手触-新华网".www.xinhuanet.com. Archived fromthe original on 2020-01-01. Retrieved2020-06-11.
  9. ^"京张高铁今日开通,列车全球首次时速350公里以上自动驾驶".www.guancha.cn. Retrieved2020-06-11.
  10. ^"京张高铁智能动车组上线联调联试-新华网".www.xinhuanet.com. Archived fromthe original on 30 December 2019. Retrieved2020-06-11.
  11. ^蘇子牧 (2019-12-30)."京張高鐵今開通 全球首次實現時速350公里自動駕駛".香港01 (in Chinese (Hong Kong)). Retrieved2020-06-11.
  12. ^Feng, David (2019-09-11)."Linking China's Railways from the Capital to The Great Northeast".Medium. Retrieved2020-06-10.
Wikimedia Commons has media related toChina Railway CR400BF.
High-speed demonstrativemaglev
Coastal
Hangshen
parallel
other branches
Beijing–Shanghai
West route
East route
branches
Beijing–Hong Kong (Taipei)§
ToHong Kong
ToTaipei
Harbin–Hong Kong (Macau)§
Hohhot–Nanning
Beijing–Kunming
Branch lines
Baotou (Yinchuan)–Hainan
Lanzhou (Xining)–Guangzhou
Suifenhe–Manzhouli
Beijing–Lanzhou
Qingdao–Yinchuan
Eurasia Continental
Yangtze River
Old line
Shanghai–Kunming
Xiamen–Chongqing
Guangzhou–Kunming
Intercity and
long-distance
North China
Northeast China
East China
Central and South China
Northwest China
Southwest China
Intercity railway
networks
Upgraded lines with
operating speeds
≥ 200 km (120 mi)
  • Italics: under construction or currently not operational
  • (-), Place A-: section under construction or currently not operational
  • §: in/related to Hong Kong, Macau, Taiwan
  • (Place A–Place B): share tracks with other lines
Technologies
Proposed
High-speed trains
by service speed
or planned service speed
400 km/h
(249 mph)
or more
350–399 km/h
(217–248 mph)
300–349 km/h
(186–217 mph)
250–299 km/h
(155–186 mph)
200–249 km/h
(124–155 mph)
High-speed railway line
By countries and territories

planned networks in italics
Africa
Americas
Asia
Europe
Oceania
Multiple units of China Railway
Centralized
power
Pre-CRH era
Fuxing EMU
Distributed
power
Pre-CRH era
CRH
200–250km/h
350–380km/h
Others
Intercity
multiple units
CJ-series intercity units
CRH intercity EMU
Fuxing EMU
200–300km/h
300–400km/h
400–450km/h
Centralized power
Distributed power
S = single set
Retrieved from "https://en.wikipedia.org/w/index.php?title=China_Railway_CR400BF&oldid=1305557313"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp