From Wikipedia, the free encyclopedia
Philippine government infrastructure program
This article is part of
a series about
Bongbong Marcos
Incumbent






TheBuild Better More (BBM) is the infrastructure program of theMarcos administration (2022–2028). It superseded theBuild! Build! Build! infrastructure program of theDuterte administration (2016–2022). The following Infrastructure Flagship Projects (IFP)s were identified by theNational Economic and Development Authority (NEDA).

The Marcos administration approved 194 infrastructure projects, ranging from public transport, power, health, information technology, water resources, and agriculture.[1][2] 77 of those project were carried from past administrations while 123 are “new and initiated” by the Marcos administration.[3] The total cost for the Build Better More program is9 trillion.[3]

List of infrastructure flagship projects

[edit]

  Project was carried over from theBuild! Build! Build! infrastructure program of the previousDuterte administration (2016-2022).

Public transportation

[edit]
ProjectConstructionStatusCompletion dateRef.
Rail transportation
West ExtensionProposed
Cavite Extension2019–Under-construction2024
Metro Manila Subway2019–Under-construction2032 (partial), unknown (full)[4]
Mindanao Railway (Phase 1)Proposed
MRT Line 3 Rehabilitation Project (Phase 2)Proposed
MRT Line 3 South Extension ProjectProposed
MRT Line 4Proposed
MRT Line 72016–Under-construction2025
North–South Commuter Railway2019–Under-constructionDecember 2027 (Phase 1), October 2028 (Phase 2), January 2032 (full)[5]
PNR South Long HaulProposed2025
Subic–Clark RailwayProposed2025
North Triangle Common Station2017Under-construction2025
Urban transportation
Cebu Bus Rapid Transit System2023–Under-construction
Davao Public Transport Modernization ProjectUnder-construction
Taguig City Integrated Terminal Exchange2024Under-construction2028

Roads

[edit]
ProjectConstructionStatusCompletion dateRef.
Arterial Road Bypass Project Phase III (Plaridel Bypass)CompletedOctober 2023
Bacolod-Negros Occidental Economic Highway2017–Under-constructionDecember 2024[6]
Boracay Circumferential Road2018–2022CompletedMarch 12, 2022[7]
Cagayan de Oro Coastal Road1997–Under-construction
Sariaya Bypass Construction ProjectCompletedOctober 21, 2022
Davao City Coastal Road Project, including Bucana bridge2017–Under-construction2025[8][9]
Improving Growth Corridors in Mindanao Road Sector ProjectProposed
Laguna Lakeshore Road Network Development, Phase IProposed
Metro Manila Bridges Project (under ADB Financing Facility) - 3 BridgesProposed
Pasacao-Balatan Tourism Coastal HighwayProposed
Priority Bridges Crossing Pasig-Marikina River & Manggahan Floodway Bridges

Construction Project (under China Government Facility) - 3 Bridges

Proposed
Road Network Development Project in Conflict Affected Areas in MindanaoProposed
Samar Pacific Coastal Road Project (SPCR)2018–2023CompletedJuly 14, 2023[10][11][12]
Sindangan-Bayog-Lakewood Road, Zamboanga del Sur and Zamboanga del NorteProposed
Surallah-T’Boli-San Jose Road, South CotabatoCompleted
Expressways
C-5 Southlink ExpresswayUnder-construction
Cavite-Laguna Expressway (CALAX)2015Under-construction2019 (Mamplasan to Sta. Rosa), 2021 (Sta. Rosa to Tibig-Kaong Road), Summer 2023 (Tibig-Kaong Road to Aguinaldo Highway) 2023/2024 (Aguinaldo Highway to Kawit)
Camarines Sur Expressway2022-Under-construction
Central Luzon Link Expressway (CLLEX), Phase IUnder-construction
Davao City ExpresswayProposed
Las Piñas–Muntinlupa ExpresswayProposed
Mega Manila SkywayProposed
Metro Cebu Expressway (Cebu Circumferential Road)2020–Under-construction
NLEX Connector2019–2024CompletedMarch 2023 (partial), December 2024 (full)
North Luzon Expressway (NLEX) Segment 8.22019–2024Under-construction
South Luzon Expressway (SLEX) Toll Road 4 (TR4)Under-construction
South Luzon Expressway (SLEX) Toll Road 5 (TR5) Segment 12019–2024Under-construction
Southeast Metro Manila ExpresswayUnder-construction
Inter-island Bridges
Bataan–Cavite Interlink Bridge2023–2027Under-construction2027
Cebu-Bohol BridgeProposed
Cebu-Mactan Bridge (4th Bridge) and Coastal RoadProposed
Panay–Guimaras–Negros Island BridgesProposed

2030

Panglao-Tagbilaran City Offshore Bridge ConnectorProposed
Panguil Bay Bridge2021–2024Completed2024[13]
Samal Island-Davao City Connector Bridge2024Under-construction2027

Airports

[edit]
ProjectConstructionStatusCompletion dateRef.
New Manila International Airport2020–2026Under-construction2026[14]
Sangley Point International Airport Development Project Phase 22022Under-construction
New Bukidnon Airport2022Under-construction
Ninoy Aquino International Airport Rehabilitation ProjectProposed
New Dumaguete Airport Development Project (Bacong International Airport)2024Under-construction
Clark International Airport New Terminal Building2017Completed2022

Seaports

[edit]
ProjectConstructionStatusCompletion DateRef.
Davao Sasa PortProposed
New Cebu International Container PortUnder-constructionMarch 28, 2024
Upgrading and improvement of the Iloilo International Container PortUnder-construction
Calapan Port Passenger Terminal Building2021Completed2023

Urban development

[edit]
ProjectConstructionStatusCompletion dateRef.
Ambal Simuay River andRio Grande de Mindanao River Flood Control and Riverbank Protection ProjectProposed
Cavite Industrial Area Flood Risk Management ProjectProposed
Climate Change Adaptation Works National Irrigation Systems (NIS)Under-construction
Construction of Farm-to-Mill RoadsUnder-construction
EDSA GreenwaysProposed2027[15]
Emergency Assistance for Reconstruction and Recovery of Marawi (Output 2: Reconstruction and Development Plan for a Greater Marawi, Stage 2)Proposed
Expansion/Upgrading/Improvement of General Santos Fish Port, South CotabatoUnder-construction
Flood Risk Improvement and Management Project for Cagayan De Oro RiverProposed
FMRDP - Farm-to-Market Road (FMR) ProjectsUnder-construction
Iconic Bridge Projects for Socio Economic Development, Phase I (UK-Assisted)Proposed
Improvement of Service Roads in National Irrigation Systems (NIS)Under-construction
Integrated Disaster Risk Reduction and Climate Change Adaptation (IDRR-CCA) Measures in the Low-Lying Areas of Pampanga Bay Project Stage IIProposed
Integrated Flood Resilience and Adaptation (InFRA) Project - Phase IProposed
Metro Manila Flood Management Project, Phase IProposed
Metro Manila Priority Bridges for Seismic Improvement ProjectProposed
Pasig-Marikina River Channel Improvement Project, Phase IVProposed
Pasig-Marikina River Channel Improvement Project, Phase VProposed
Parañaque Spillway ProjectProposed[16]
Philippines Seismic Risk Reduction and Resilience ProjectProposed
Pambansang Pabahay para sa Pilipino Housing ProjectsUnder-construction
Regional Fish Port Project for Greater Capital Region (formerly Upgrading/Rehabilitation of the Navotas Fish Port ComplexUnder-construction

Information and communications technology

[edit]
ProjectConstructionStatusCompletion dateRef.
Digital Transformation Centers (Upgraded "Tech4ED" Project)Proposed
Maritime Safety Enhancement ProjectOngoing
National Broadband Program (NBP)Proposed
National Government Data Center (NGDC)Proposed
Philippine Identification System2020Ongoing
Philippine Sim Card Registration2022Ongoing

Health

[edit]
ProjectConstructionStatusCompletion dateRef.
Health System Enhancement to Address and Limit (HEAL) COVID-19 ProjectProposed
Philippines COVID-19 Emergency Response Project (PCERP)Proposed
UPPGH Cancer Center ProjectProposed
Virology and Vaccine InstituteProposed
Philippine Center for Disease Control and PreventionProposed

Agriculture, forestry and aquaculture

[edit]
ProjectConstructionStatusCompletion dateRef.
Requirements of the Program Beneficiaries Development Component of the Comprehensive Agrarian Reform ProgramOn-going
Construction/Rehabilitation/Improvement of Fish Ports and Other Fishery Post Harvest FacilitiesUnder-construction
Convergence Area Agro-Forestry Abundance & Productivity Using Integrated Technologies Through Barangay-based Agricultural Ventures and AdvancementOn-going
Halal Infrastructure Modernization ProjectOn-going
Rice Infrastructure Modernization ProjectOn-going
Second Additional Financing for Philippine Rural Development ProjectOn-going

Energy and power

[edit]
ProjectConstructionStatusCompletion dateRef.
Agus-Pulangi Hydropower Plant Complex (APHC) Rehabilitation under Series of Project (SOP 1)Proposed

Water resources

[edit]
ProjectConstructionStatusCompletion dateRef.
Angat Water Transmission Improvement Project - Aqueduct No. 7Proposed
Bayabas Small Reservoir Irrigation ProjectUnder-construction
Establishment of Groundwater Pump Irrigation ProjectUnder-construction
Extension/Expansion of Existing National Irrigation SystemsUnder-construction
Jalaur River Multipurpose Project - Stage II, Iloilo2019–Under-construction[17]
Mindanao Irrigation Development ProjectUnder-construction
New Centennial Water Source -Kaliwa Dam Project2021–Under-construction[18][19]
Repair of Communal Irrigation SystemsUnder-construction
Repair of National Irrigation Systems (NIS)Under-construction
Restoration of Communal Irrigation SystemsUnder-construction
Restoration of National Irrigation SystemsUnder-construction
Small Irrigation ProjectUnder-construction
Wawa Bulk Water Supply ProjectUnder-construction2025
Water District Development Sector Project (WDDSP)Proposed

References

[edit]
  1. ^Gregorio, Xave (December 29, 2022)."Goodbye 'Build, Build, Build'; P1.196-T sought for PBBM's 'Build, Better, More' infrastructure program".The Philippine Star. Archived fromthe original on December 29, 2022. RetrievedDecember 30, 2022.
  2. ^"Marcos admin bares P9-T flagship infra projects; 45 to funded by PPPs".PhilStar Global. March 9, 2023. RetrievedMarch 10, 2023.
  3. ^ab"NEDA Board OKs ₱9-T infra projects".CNN Philippines. March 9, 2023. Archived fromthe original on March 10, 2023. RetrievedMarch 10, 2023.
  4. ^Sampang, Dianne (2025-03-19)."Due to delays, Metro Manila subway may be operational by 2032 – DoTR".INQUIRER.net. Retrieved2025-04-09.
  5. ^"Economy and Dev't Council approves PPP for North-South Commuter Railway operations".ABS-CBN News. 2025-07-16. Retrieved2025-07-17.
  6. ^Gutierrez, Dennis (April 21, 2022)."Mark Villar vows to push for continuation, completion of Bacolod-Negros Occidental Economic Highway".Philippine Daily Inquirer. RetrievedJuly 16, 2023.
  7. ^"Boracay Circumferential Road Phase 3 Now Open".Department of Public Works and Highways. March 16, 2022. RetrievedJuly 16, 2023.
  8. ^Gita-Carlos, Ruth Abbey (July 1, 2023)."PBBM wants timely completion of Davao City Coastal Road segments".Philippine News Agency. RetrievedJuly 16, 2023.
  9. ^Cordero, Ted (July 1, 2023)."Davao City coastal road project inaugurated by Marcos".GMA Integrated News. RetrievedJuly 16, 2023.
  10. ^Meniano, Sarwell (July 14, 2023)."Marcos inaugurates Korean-funded Samar Pacific Coastal Road".Philippine News Agency. RetrievedJuly 16, 2023.
  11. ^Unite, Betheena (July 14, 2023)."'Korea stayed': Marcos gives SoKor a shoutout for help in PH's projects".Manila Bulletin. RetrievedNovember 6, 2023.
  12. ^Flores, Helen (July 15, 2023)."President Marcos inaugurates Northern Samar road project".Philippine Star. RetrievedJuly 16, 2023.
  13. ^"Panguil Bay Bridge to open in June 2024". PortCalls. May 12, 2023. RetrievedMay 16, 2023.
  14. ^Vera, Ben O. de (March 9, 2020)."2 major airport projects prepare for 2020 liftoff".Philippine Daily Inquirer.Archived from the original on October 17, 2020. RetrievedOctober 12, 2020.
  15. ^Abadilla, Emmie V. (May 24, 2023)."P14-B EDSA Greenways project to be completed in 2027 - DOTr". Manila Bulletin. Retrieved3 July 2023.
  16. ^Recuenco, Aaron (9 August 2022)."DPWH eyes Parañaque Spillway project to address Metro Manila flooding". Manila Bulletin. Retrieved12 July 2023.
  17. ^"Construction begins on phase 2 of $216m Jalaur dam project in Philippines". World Construction Network. February 28, 2019.Archived from the original on November 28, 2020. RetrievedJanuary 26, 2021.
  18. ^"TUNNEL BORING MACHINE (TBM) FOR THE KALIWA DAM PROJECT READY TO ROLL | METROPOLITAN WATERWORKS AND SEWERAGE SYSTEM". Archived fromthe original on 2021-07-09. Retrieved2021-07-03.
  19. ^"Kaliwa Dam excavation to start in December".TheManila Bulletin. 2021-06-07. Archived fromthe original on 2021-06-06. Retrieved2021-06-18.

External links

[edit]
Presidency
Policies
Legislation
Speeches
Domestic issues
Natural disasters


Elections
Family
Political affiliation
Related