| British Rail Class 144 Pacer | |
|---|---|
ANorthern Rail Class 144 atLancaster (2012) | |
Northern Rail refurbished Class 144 saloon | |
| In service | 1986–2020 |
| Manufacturer | |
| Orderno. |
|
| Family name | Pacer |
| Constructed | 1986–1987[1] |
| Refurbished |
|
| Number built | 23 (13 × 2-car, 10 × 3-car) |
| Number preserved | 19 |
| Number scrapped | 4 |
| Formation | 2 or 3 cars per unit: |
| Diagram |
|
| Fleet numbers |
|
| Capacity |
|
| Owners | Porterbrook |
| Operators | |
| Depots | Neville Hill (Leeds)[1] |
| Lines served | |
| Specifications | |
| Car body construction | Steel underframe,aluminium alloy body and roof |
| Car length |
|
| Width | 2.695 m (8 ft 10.1 in) |
| Height | 3.725 m (12 ft 2.7 in) |
| Floor height | 1.288 m (4 ft 2.7 in) |
| Doors | Double-leaf folding(3 or 5 per side) |
| Wheelbase | 9.000 m (29 ft 6.3 in) |
| Maximum speed | 75 mph (121 km/h) |
| Weight |
|
| Axle load | Route Availability 1[2] |
| Prime mover(s) | |
| Engine type | Inline-64-stroketurbo-diesel[4][5] |
| Displacement | |
| Power output | |
| Transmission | |
| Minimum turning radius | 70 m (230 ft) |
| Braking system(s) | Electro-pneumatic (tread)[2] |
| Safety system(s) | |
| Coupling system | BSI |
| Multiple working | Within class and withClasses14x,15xand170[2] |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in)standard gauge |
| Notes/references | |
| Specifications as at December 1987[7] except where otherwise noted. | |
TheBritish Rail Class 144Pacer is a retired class ofdiesel multiple unit (DMU) passenger trains built atDerby between 1986 and 1987. British Rail, seeking to procure improved derivatives of the earlierClass 141, placed an order with the manufacturersBritish Rail Engineering Limited (BREL) andWalter Alexander to construct their own variant, the Class 144. A total of 23 units were constructed.[8] All units were retired from main line service by 2020, though the majority of the units have been acquired for preservation onheritage railways and for other uses. As of December 2022, 19 out of the 23 units have been purchased following withdrawal, of which 14 units are in operational condition.
By the beginning of the 1980s,British Rail (BR) operated a large fleet offirst generation DMUs, which had been constructed in prior decades to various designs.[9] While formulating its long-term strategy for this sector of its operations, BR planners recognised that there would be considerable costs incurred by undertaking refurbishment programmes necessary for the continued use of these aging multiple units, particularly due to the necessity of handling and removing hazardous materials such asasbestos. In light of the high costs involved in retention, planners examined the prospects for the development and introduction of a new generation of DMUs to succeed the first generation.[6]
In the concept stage, two separate approaches were devised, one involving a so-calledrailbus that prioritised the minimisation of both initial (procurement) and ongoing (maintenance & operational) costs, while the second was a more substantial DMU that could deliver superior performance than the existing fleet, particularly when it came to long-distance services.[6] While the more ambitious latter requirement would ultimately lead to the development of theClass 150 and the widerSprinter group of DMUs, BR officials recognised that a cheaper unit was desirable for service on the smaller branch lines that would not be unduly impacted by lower performance specs or a high density configuration. As such, work to progress both approaches was undertaken by BR's research department during the early 1980s.[6]
During this period, a number of prototypes were constructed to explore different designs and approaches for implementing the railbus concept. One such vehicle was a single two-car unit, designated as theClass 140, that was constructed between 1979 and 1981.[10] This prototype was introduced with much fanfare during June 1981.[10] Initial testing with the Class 140 uncovered several issues, such as difficulty detecting the type viatrack circuits; this was reliably resolved by swapping the material of the brake blocks from acomposite toiron.[6] Two less easily addressable drawbacks were the high level of noise generated during transit, particularly on olderjointed rails, which was a consequence of the railbus's direct connection between the underframe and suspension with the body that transmitted impact forces across the body. It was also observed that the inclusion of strengthening members in the mass-produced bus body added significantly to the overall production cost, which eliminated much of the cost advantage that was the primarily goal of the type.[6]
The Class 140 was viewed to be an overall success, and thus BR issued an order for an initial production model, designated Class 141, toBritish Leyland during 1984 with production commencing thereafter.[6] During its early years of service, the Class 141 experienced numerous issues, particularly with thetransmission and ride quality; work undertaken at BR's direct resulted in the quick development of numerous improvements to at least partially address these shortcomings. When it came to ordering more railbuses, however, it was decided that instead of placing these follow-on orders for further Class 141, it would be more desirable to procure improved derivatives of the Class 141.[6] Accordingly, BR placed orders for two new models of the Pacer family with separate manufacturers, these being theClass 142 andClass 143 respectively. Thereafter, another and final Pacer model would be ordered, this being the Class 144.[6]
A total of 23 Class 144 units were constructed.[8] The units have a maximum speed of 75 mph (121 km/h) and are externally similar to the earlier Class 143 Pacers, sharing a near-identical body built byWalter Alexander. The first thirteen of the class – numbers 144001 to 144013 – are two-car units, while the remaining ten – 144014 to 144023 – have a third vehicle that was added later.[2] These ten Pacers are the only ones to use intermediate vehicles.[11]
Units are formed of two driving motors, one of which contains a toilet. The three-car units have an additional intermediate motor. All vehicles have standard-class seating only. The technical description of the formation is DMS-(MS-)DMSL. Individual vehicles are numbered as follows:[1]
As originally built, the traction arrangement of the Class 142 consisted of a 200 horsepower (150 kW) Leyland TL11 engine, aSelf-Changing Gears mechanical automatic gearbox and aGmeinder final drive unit on each car driving only a single axle.[10] This propulsion arrangement was in part taken from the Leyland National bus, as well as shared with the earlier Class 141.[6] Starting in the early 1990s, every member of the class was mechanically upgraded due to the original parts being determined to be a major source of unreliability.[11] The most substantial change was the replacement of the Leyland-built engine with a more powerfulCummins LTA10-R[3] as well as the original mechanical transmission being substituted for aVoithhydrokinetic unit.[1][11]
The Class 144 units are equipped withBSI couplers. This allows them to work in multiple with Classes142,143,150,153,155,156,158,165,166 and170 units, as well as units of the same class.[2]

The first Class 144 units were delivered during 1986.[11] They were produced specifically to perform local services sponsored by theWest Yorkshire Passenger Transport Executive (since rebranded asMetro). As such, the fleet was painted in the crimson/cream West Yorkshire Metro livery, although three units (nos. 144011–013) were later repainted intoRegional Railways livery.[citation needed] During the British Rail era, the type was normally used on services such as theHarrogate Line between York, Harrogate, and Leeds, theHuddersfield Line's Wakefield section between Leeds and Huddersfield, along with the Huddersfield branch of theCalder Vale line. Class 144s were also operated on theHallam Line between Leeds, Barnsley, and Sheffield; thePenistone Line between Huddersfield, Barnsley, and Sheffield; and thePontefract Line between Wakefield and Pontefract.[citation needed]
The Class 144 was also tasked with additional routes, including theLeeds-Morecambe services, services betweenScunthorpe andAdwick toSheffield andLincoln. More recently from 2008, they have been working betweenManchester Victoria and Leeds (usually viaBrighouse) amongst others.[citation needed] Prior to 1994, they were also used onLeeds/Bradford-Ilkley andLeeds/Bradford-Skipton services. These lines were electrified in 1994, and passenger services were operated byClass 308electric multiple units.[citation needed]
Early operations of the type were marred by unreliability to the extent where the Class 144 was commonly substituted for at the last minute by either first generation DMUs orlocomotive-hauled trains.[11] Their poor serviceability was common to all production Pacer types. According to industry periodicalRail magazine, the Class 144's mechanical transmission was frequently attributed as being the largely single cause of these issues, while undesirable instances of wheel slippage was another common occurrence.[11] As a consequence, the propulsion systems of not only the Class 144 but its Classes 142 and 143 siblings were replaced after only a few years of service. This refit not only resolved much of the unreliability issues but also gave the Pacer greater acceleration through the installation of a more powerful engine.[11]
Since theprivatisation of British Rail, the Class 144 has been operated by several franchises. The first private operator wasNorthern Spirit, which was later taken over byArriva Trains Northern; the latter opted to refurbish its fleet between 2002 and 2004 to enable its continued service.[12] Post-refurbishment, the units emerging in a new silver and redMetro livery complete with refurbished interior. In December 2004, the fleet was transferred to the then-new Northern rail franchise. Northern Rail replaced the silver and red Metro livery with Northern Purple and Blue. By April 2010, all Class 144s had been repainted into this new livery.[8]
Around 2010, Northern Rail subjected their fleet of Class 144s to another refurbishment programme. The first unit to be refurbished was 144006; it had also the first one to be refurbished in the joint Arriva Trains Northern/WYPTE Metro programme in 2002. The refurbishment enhancements involved numerous interior changes, including the installation of 'easy to mop' flooring, an extended area for bike storage at one end of the car by removing a bulkhead wall and extending the perch seats from three to four, repainted hand grips and stanchions, new dado side panels and repainted wall ends, retrimmed seats in the purple Northern Rail moquette, a repainted ceiling, and repainted driving cab.[13][14]
During April 2016, Northern Rail's Class 144s were all transferred to the new franchisee Arriva Rail North; in turn,Northern Trains took over operations of the fleet on 1 March 2020.[citation needed]
Rail Vehicle Accessibility (Interoperable Rail System) Regulations 2008[15] and the subsequent Persons of Reduced Mobility - Technical Specification for Interoperability (PRM-TSI) require that all public passenger trains must be accessible by 1 January 2020. As originally delivered, the Class 144 does not meets this requirement and has to be withdrawn without modifications to become compliant. During the 2010s, the rolling stock leasing companyPorterbrook proposed an extensive refurbishment of the Class 143 and Class 144 fleets with the purpose of satisfying the diverse needs of this requirement; it was noted that the envisioned modifications would necessitate a significant reduction in the number of seats available.[16][17] All were to be withdrawn by December 2019. Northern ordered theClass 195 andClass 331 units to replace the Pacers, as well as taking on spare stock from other operators.[18][19] However, due to the late delivery of the new trains, the 144s were to remain in service in the South Yorkshire area until the middle of 2020.[20] Northern accordingly sought and received a dispensation allowing continued use until 31 August 2020, on certain specified routes only.[21]

Followingthe outbreak of COVID-19 in the UK in March 2020 and the resulting curtailment of passenger services,[22] Northern withdrew the entire fleet prematurely and, by mid-April, had placed all 23 units in storage; 18 units at theKeighley and Worth Valley Railway and the remaining five atHeaton Traction Maintenance Depot inNewcastle-upon-Tyne.[23][24][25] Three units were subsequently scrapped, while the other 20 were distributed to preservation groups and other non-railway users.
The Class 144 Evolution (or144e) proposal was publicised by fleet owner Porterbrook in 2015, as a way of bringing the fleet into compliance with the PRM-TSI requirements and thus extending its life past the compliance deadline at the end of 2019.[17] One unit, number 144012, was refurbished to the Evolution standard and displayed as a proof-of-concept of upgrades including:[17][26]


Porterbrook stated that it had paid £800,000 to prepare the demonstrator unit, but claimed that a price of £175,000 per train carriage, totalling £350,000 per two-car train or £525,000 per three-car train, could be achieved in volume production.[27] It was planned that the demonstrator would enter public service in April 2015, but this was delayed until later in the year.[28][17] Following withdrawal it was sold in 2021 toNetwork Rail, but later scrapped.[29][30]
A Northern Rail three-car Class 144 unit caught fire nearSmithy Bridge inRochdale on 21 November 2013.[31][32]
A total of 23 Class 144 units were built. The first thirteen of the class (nos. 144001 to 144013) are two-car units, while the remaining ten (nos. 144014 to 144023) have a third vehicle that was added later in 1987.[2]
| Class | Status | Qty. | Year built | Cars per unit | Unit nos. |
|---|---|---|---|---|---|
| 144 | Converted for non-railway use | 4 | 1986–1987 | 2 | 144001–144002,[citation needed] 144008,[citation needed] 144010[33] |
| Preserved | 8 | 144003, 144004–144007,[a] 144009, 144011, 144013[30] | |||
| 8 | 3 | 144014, 144016–144019, 144020, 144022–144023[30] | |||
| Scrapped | 2 | 2 | 144005,[a] 144012[34][30] | ||
| 2 | 3 | 144015, 144021[30] |
Unit 144001 received the nameThe Penistone Line Partnership[35]
Fourteen Class 144 units have been preserved in operational condition.
| Unit | Vehicle numbers | Livery | Location | Notes | ||
|---|---|---|---|---|---|---|
| DMS | MS | DMSL | ||||
| 144003 | 55803 | — | 55826 | Northern Rail (unbranded) | Great Central Railway (Nottingham) | Delivered on 3 September 2020.[36] |
| 144004 | 55804 | — | 55827 | Aln Valley Railway | Delivered on 15 December 2020.[37] | |
| 144006 | 55806 | — | 55829 | Cambrian Heritage Railway | Delivered on 22 May 2020.[38] | |
| 144007 | 55807 | — | 55830 | Cambrian Heritage Railway | Delivered on 22 May 2020.[38] | |
| 144009 | 55809 | — | 55832 | Great Midlands Trains (Fictitious) | East Lancashire Railway | Delivered in September 2020 originally for use as a fire service training rig, later purchased for preservation.[39] |
| 144011 | 55811 | — | 55834 | MetroTrain(red and white) | Keighley and Worth Valley Railway | Acquired on 26 June 2020.[40] |
| 144013 | 55813 | — | 55836 | Northern Rail (unbranded) | Telford Steam Railway | Delivered on 1–2 July 2020.[41] |
| 144014 | 55814 | 55850 | 55837 | Tyseley Locomotive Works | For main line use.[42] | |
| 144016 | 55816 | 55852 | 55839 | Aln Valley Railway | Delivered on 16–17 December 2020.[43] | |
| 144017 | 55817 | 55853 | 55840 | Appleby Frodingham Railway | Acquired by Scunthorpe Industrial Heritage Railways in November 2020, in use for driver experience at British Steel Scunthorpe works.[44] | |
| 144018 | 55818 | 55854 | 55841 | Mid Norfolk Railway | Delivered to Dereham in late 2020.[45] | |
| 144019 | 55829 | 55855 | 55852 | Tyseley Locomotive Works | For mainline use.[42] | |
| 144020 | 55830 | 55856 | 55853 | Wensleydale Railway[46] | ||
| 144022 | 55822 | 55858 | 55845 | Keith & Dufftown Railway | Delivered on 4 September 2020[47] | |
| 144023 | 55823 | 55859 | 55846 | Tyseley Locomotive Works | For mainline use.[42] | |
Five Class 144 units have been acquired by non-railway organisations. Two of them, numbers 144001 and 144008, were distributed to community organisations via the Department for Transport's "Transform a Pacer" competition.[48]
| Unit | Vehicle numbers | Livery | Location | Notes | ||
|---|---|---|---|---|---|---|
| DMS | MS | DMSL | ||||
| 144001 | 55801 | — | — | Northern Rail (unbranded) | Airedale General Hospital | "Transform a Pacer" winner, to be used as a non-clinical space for children's ward patients.[49][50] |
| — | 55824 | Grey, with Platform 1 branding | Huddersfield railway station | "Transform a Pacer" winner, to be used by the Platform 1 mental health charity as an educational kitchen.[51][52] | ||
| 144002 | 55802 | — | 55825 | TEXO Foundation (black and orange)[53] | The Dales School,Blyth | To be used as a classroom and library.[54][55] |
| 144008 | 55808 | — | — | Northern Rail (unbranded) | Fagley Primary School,Bradford | "Transform a Pacer" winner, to be converted into a science lab to promoteSTEM learning.[56][57][58] |
| — | 55831 | Corby and District Model Railway Society | Used as a static exhibit, for special events and birthday parties.[59] | |||
| 144010 | 55810 | — | 55833 | East Lancashire Railway | Purchased by theGreater Manchester Fire and Rescue Service for use as a training rig, being stripped of parts prior to transfer.[60] | |