Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Bridge of Weir Railway

From Wikipedia, the free encyclopedia
Former railway line in Scotland

Bridge of Weir Railway
Overview
LocaleScotland
Dates of operation21 April 1864–1 August 1865[1]
SuccessorGlasgow and South Western Railway
Technical
Track gauge4 ft 8+12 in (1,435 mm)
Bridge of Weir Railway
Bridge of Weir
Houston
Linwood Goods
Cart Junction
Johnstone Junction
Elderslie West Junction
Johnstone
Elderslie

LowerLeft arrowGlasgow, Paisley, Kilmarnock and Ayr RailwayLowerRight arrow

TheBridge of Weir Railway was an independent railway company that built a line fromJohnstone toBridge of Weir. It was taken over by theGlasgow and South Western Railway (G&SWR) in 1865 and formed the base of a line that extended toGreenock, giving the G&SWR access to the harbour facilities there, competing with the rivalCaledonian Railway.

The Greenock branch, as it had become, was given a direct access fromElderslie (about midway betweenPaisley and Johnstone), and fast passenger trains ran betweenGlasgow and Greenock.

In the second half of the twentieth century usage of the line declined substantially, and the line closed in January 1983.

Formation

[edit]
icon
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed.(January 2025) (Learn how and when to remove this message)
System map of the Bridge of Weir Railway

By the 1860s theGlasgow and South Western Railway (G&SWR) had established itself in the south-western quadrant of Scotland, while the rivalCaledonian Railway was dominant in the central region, with an important branch line to Greenock. There was bitter rivalry between the two companies, and each sought to retain primacy in its own area.

In September 1861 local interests approached the G&SWR, hoping for support for a scheme to build a branch railway to Bridge of Weir, but the G&SWR rebuffed them, as its priorities lay elsewhere at the time. Undeterred the local promoters formed a provisional scheme to build from Johnstone to Bridge of Weir, and possibly later to Kilmacolm; capital was estimated at £25,000. Now the G&SWR agreed to subscribe £8,000 to the proposal, fearing that if they did not, the Caledonian Railway would. Working arrangements were finalised on 26 March 1862: the G&SWR would work the line for 42.5% of gross revenue.

Conceived only as a branch line, the proposed route curved into Johnstone station facing away from Glasgow. There was a goods and mineral branch to Linwood, then a centre of industry, joining the main line by means of a backshunt.[2]

The Bridge of Weir Railway was authorised by an act of Parliament[which?] on 7 July 1862. At this time money was hard to come by, but the new company was able to let a construction contract to George Hunter for £15,931.

The line opened to goods trains on 25 April 1864, and to passengers on 20 June 1864. The company was now short of cash and the G&SWR agreed to defer its charges for working the line for five years at 5% interest—in effect a substantial loan.[3]

Absorption, and extending to Greenock

[edit]
icon
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed.(January 2025) (Learn how and when to remove this message)

The Caledonian Railway had a monopoly of the lucrative rail traffic to Greenock, and the G&SWR were interested in competing. Discussions took place in October 1864, which crystallised in a proposedGreenock and Ayrshire Railway, which would extend from Bridge of Weir. The G&SWR was to contribute £150,000 to such a scheme.

The Bridge of Weir line had always been worked by the G&SWR and by the G&SWR Amalgamation Act of 5 July 1865, the Bridge of Weir Railway company was vested in the G&SWR.

The G&SWR wished to proceed with the line to Greenock, and needed to upgrade and widen the Bridge of Weir line; to carry out the work it closed the line from 18 May 1868. It reopened on 30 August 1869 for goods traffic, together with the curve from Elderslie to Cart Junction, enabling direct running between Glasgow and the Greenock direction. At about the same time the extension to Greenock opened too. Passenger operation on the line started on 23 December 1869. The Greenock station was named Albert Dock, but the Princes Pier was built by the Greenock Harbour Trust, and when that was ready the Greenock station was renamedGreenock Princes Pier.

The G&SWR developed passenger traffic to resorts in the Firth of Clyde, as well as goods traffic from Greenock trans-shipped to coastal vessels. A significant business also developed in the emigration trade.[3]

Topography

[edit]

The line was short; the passenger stations were:

  • Windyhill; opened after the end of the independent existence of the BoWR on 3 April 1871; renamed Crosslee May 1871; renamed Houston 1 January 1874; renamed Houston (Crosslee) 1 January 1875; renamed Houston 7 May 1973; closed 10 January 1983;
  • Tweeniehills;[2]
  • Bridge of Weir; the station was closed on 18 May 1868 for the upgrading work in connection with the extension to Greenock; when the line re-opened the station on the Greenock and Ayrshire line opened, on 23 December 1869; it closed on 10 January 1983.[4]

Rationalisation

[edit]

In the 1950s British Railways determined that having two competing routes to Greenock was unsustainable, and passenger trains ceased running beyond Kilmacolm in February 1959.[citation needed] The line closed completely to passengers in January 1983.[citation needed]

References

[edit]
  1. ^Awdry (1990), page 63
  2. ^abCol M H Cobb,The Railways of Great Britain: A Historical Atlas, Ian Allan Publishing Limited, Shepperton, 2003,ISBN 07110 3003 0
  3. ^abDavid Ross,The Glasgow and South Western Railway: A History, Stenlake Publishing Limited, Catrine, 2104,ISBN 978 1 84033 648 1
  4. ^R V J Butt,The Directory of Railway Stations, Patrick Stephens Limited, Sparkford, 1995,ISBN 1 85260 508 1

Sources

[edit]
Historical Scottish railway companies
Primary companies
Caledonian
Railway
Lines built by the Caledonian Railway
Balerno line
CR Cleland and Midcalder
CR Main Line
CR Douglas Branch
CR Hamilton Branch
CR Hamiltonhill Branch
CR The Switchback
Independent lines worked by the Caledonian Railway
Callander and Oban
Killin Railway
Glasgow and South
Western Railway
Great North of
Scotland Railway
Highland Railway
North British
Railway
Joint lines
Other lines
Retrieved from "https://en.wikipedia.org/w/index.php?title=Bridge_of_Weir_Railway&oldid=1267990555"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp