Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Brecon and Merthyr Tydfil Junction Railway

From Wikipedia, the free encyclopedia
Railway company in Wales
icon
This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Brecon and Merthyr Tydfil Junction Railway" – news ·newspapers ·books ·scholar ·JSTOR
(December 2024) (Learn how and when to remove this message)

TheBrecon and Merthyr Tydfil Junction Railway (B&MR) was a railway company inWales. It was originally intended to link the towns in its name. Finding its access toMerthyr difficult at first, it acquired theRumney Railway, an old plateway, and this gave it access toNewport docks. This changed its emphasis from rural line to mineral artery.

It opened at theBrecon end to a point nearDowlais in 1863, and in 1865 it opened a disconnected section fromRhymney toNewport. In due course the company connected the two sections and reached Dowlais and Merthyr, but had to concede sharing a route with the powerfulLondon and North Western Railway.

TheB&MR was always short of money, and was notable for its prodigious gradients, but it survived until the grouping of 1923, when it became part of theGreat Western Railway. Its network declined steeply after 1945, and passenger operation ceased in 1962. Goods and mineral operation also lost its market, and as of 2020, only a short stub to a quarry atMachen remains rail connected.

History

[edit]
System map of the Brecon and Merthyr Railway in 1884

Brecon was an important regional centre in mediaeval times, due to its location at the confluence of theRiver Honddu and theRiver Usk. Its relatively remote location meant that transport was always an important consideration.

The difficult terrain southwards would require crossing the ridge of theBrecon Beacons into the high ground at the head of the South Wales Valleys, and the first turnpike connected eastward toAbergavenny and south-westward toSwansea.

The Brecknock and Abergavenny Canal, later part of theMonmouthshire and Brecon Canal, was opened to Brecon in 1800 continuing the alignment to the east.[1][page needed][2]

In 1816 theHay Railway was opened; this was a horse-drawn plateway 24 miles long, connecting Brecon toHay, and laterEardisley.[3][page needed]

Industry south of the Brecon Beacons was linked in to the canal when the Brinore Tramway (orBryn Oer Tramway opened in 1815. It connected the industrial site of Brinore, near Trevil, north ofTredegar, toTalybont-on-Usk, on the Brecknock and Abergavenny Canal.[4][page needed]

Brecon and Merthyr Railway Act 1859

[edit]

In the 1859 session of Parliament, the Brecon and Merthyr Bill was considered. It proposed a railway from a junction with the Dowlais Railway of 1851 near its terminus at Dowlais, to Brecon near the head of the canal. The Dowlais Railway was built chiefly to serve the Dowlais iron company, so that the proposedB&MR would provide an outlet, via the canal, for its products. It also connected Dowlais and Merthyr in difficult terrain—it included a rope worked incline—that might save expense for theB&MR in reaching Merthyr.[5][page needed][6]

Brecon and Merthyr Junction Railway Act 1859
Act of Parliament
Citation22 & 23 Vict. c. lxviii

During the progress of the bill the Brecon to Talybont section was dropped, conceding the part of the route to another planned railway company; this failed to get authorised, but this was too late for theB&MR to reinstate the omitted section. The railway as authorised by theBrecon and Merthyr Junction Railway Act 1859 (22 & 23 Vict. c. lxviii) on 1 August 1859 was from Dowlais to Talybont.[7]

A railway further north got authorised: theHereford, Hay and Brecon Railway (HH&BR). It had made arrangements with the largerNewport, Abergavenny and Hereford Railway to work it.

The Hay Railway was intent as this stage on selling its line, and the Hereford, Hay and Brecon Railway proposed to purchase it, simplifying the issue of land acquisition. After considerable negotiation, theHH&BR agreed to partition the Hay Railway, conceding part to theMid Wales Railway and the southern section from Talyllyn to Brecon was granted to the B&M. These arrangements were ratified by theHay Railway Act 1860 (23 & 24 Vict. c. clxxix) of 6 August 1860.[5][page needed][8][page needed][9]

Brecon and Merthyr Railway (Extensions) Act 1860
Act of Parliament
Citation23 & 24 Vict. c. xvii
Dates
Royal assent15 May 1860
Text of statute as originally enacted

Accordingly, relying on the confirmation of the agreement, theB&MR was able to get powers to extend from Talybont through Talyllyn to Brecon, byBrecon and Merthyr Railway (Extensions) Act 1860 (23 & 24 Vict. c. xvii) of 15 May 1860. A triangular junction would be formed at Talyllyn with the Mid Wales Railway. Mutual running powers arrangements were agreed.[5][page needed]

Construction

[edit]

The first sod was turned on 18 January 1860; the contractors wereDavid Davies andThomas Savin, and a lease arrangement was concluded with them for ten years in which they guaranteed the proprietors 5% interest on capital.

The Beacon Tunnel (official railway name 'Torpantau Tunnel') was completed by 11 January 1862 and on 28 August 1862 a trial run for the directors was undertaken between Pant and Talyllyn. The section between Talyllyn and Brecon was much slower to construct, partly because it was still in use by the Hay Railway; Talyllyn tunnel needed to be opened out with that traffic in operation.

It was possible to run a locomotive through to Brecon on 1 January 1863, and on 12 February Captain Rich of theBoard of Trade carried out an inspection for approval of passenger operation. There was still a delay, but some revenue goods train operation took place in April 1863.[5][page needed]

Opening

[edit]

The entire line between Brecon andPant, 19 miles of single line, opened on 1 May 1863.[7] First stations were Brecon (temporary station), Talyllyn (temporary station), Talybont, Dolygaer, and Pant. A horse omnibus connected for Merthyr; in due course the Dowlais Railway was to make the connection to the ironworks for mineral traffic.[5][page needed] The engineer for the line wasHenry Conybeare, who described it as a good locomotive road throughout. Coming south, locomotives were going to have to ascend the Seven Mile Bank, making a 925 feet climb.[3][page needed]

Extending the network

[edit]
Brecon and Merthyr Railway Extensions Act 1861
Act of Parliament
Long titleAn Act to enable the Brecon and Merthyr Tydfil Junction Railway Company to make certain new Lines of Railway; and for other Purposes.
Citation24 & 25 Vict. c. ccxxxv
Dates
Royal assent6 August 1861

While construction was in progress, theB&MR was busy getting Parliament to approve its plans for extension. In the 1861 session it obtained authority in theBrecon and Merthyr Railway Extensions Act 1861 (24 & 25 Vict. c. ccxxxv) to build down the Bargoed Rhymney valley, but theRhymney Railway was given similar powers in theRhymney Railway (Capital and Branch) Act 1861 (24 & 25 Vict. c. cxliv) and they were mutually exclusive. Eventually the powers were divided, the Rhymney Railway building up to Deri Junction, and theB&MR building down to that point from the north.

Brecon and Merthyr Railway Act 1862
Act of Parliament
Long titleAn Act to enable the Brecon and Merthyr Tydfil Junction Railway Company to make new Railways, and for other Purposes.
Citation25 & 26 Vict. c. clxxxiv
Dates
Royal assent29 July 1862
Text of statute as originally enacted

TheB&MR got powers in theBrecon and Merthyr Railway Act 1862 (25 & 26 Vict. c. clxxxiv) to abandon the Dowlais Railway connection that had become superfluous, and to connect directly to theTaff Vale Railway at Merthyr.[5][page needed]

The Rumney Railway

[edit]
Main article:Rumney Railway
Torpantau station in 1957

The Rumney Railway had been incorporated in 1825 and opened in 1826 as a horse operated plateway, running from the ironworks at Rhymney toBassaleg, near Newport, connecting there with theSirhowy Railway and giving access to Newport Docks. Some steam locomotive operation was undertaken after about 1854, and theRumney Railway Act 1861 (24 & 25 Vict. c. ccxxvii) gave powers to modernise the line and adapt it for passenger operation. It is evident that the true objective was to sell the line to one or other more modern neighbouring company as a going concern. It was the Brecon and Merthyr Railway that acquired it for £90,000 under theRumney and Brecon and Merthyr Railways Act 1863 (26 & 27 Vict. c. ccii) of 28 July 1863.[5][page needed][10]

TheB&MR had got hold of an obsolescent railway but with it came access to Newport over theMonmouthshire Railway from Bassaleg. TheB&MR now had to set about the modernisation of the line itself, including a considerable amount of easing of the sharp curves. Captain Rich, after two refusals, agreed to reopening for passenger operation following his inspection on 7 June 1865, and the line opened to passenger operation betweenPengam and Newport Dock Street (Monmouthshire Railway) on 14 June 1865; the operation was extended up to Rhymney from 16 April 1866, and in 1867 coal traffic started running.[7]

The Rhymney station was about a mile down the valley from the Rhymney Railway's equivalent.[11][page needed]

Passenger stations on theB&MR section of this route were now Rhymney, New Tredegar, Bargoed, Pengam, Maesycwmmer, Bedwas, Machen, Church Road, Rhiwderin, and Bassaleg. This part of theB&MR was detached by ten miles from the section towards Brecon, running down the east side of the Rhymney River, opposite the Rhymney Railway itself on the west side.[5][page needed][11][page needed]

Financial danger

[edit]

The company's trains were being worked by Thomas Savin and John Ward, who paid the proprietors 5% on their capital, but early in 1866 [or 1865[12]] the contractor failed. Suddenly theB&MR was unable to deal with its own financial commitments and it starting to miss debenture payments, and the company went into administration. This meant that it was unable to complete the Merthyr branch, and the restrictive clauses in its acts of Parliament meant that it oriented from opening the line through to Newport.[3][page needed]

In 1868 and again in 1870 financial arrangements were made with creditors, which enabled the company to carry on; debentures were converted to debenture stock and the company was enabled to continue.[5][page needed]

Completing to Merthyr, Dowlais and Newport

[edit]

Finishing the line to Merthyr was the obvious priority, and Alexander Sutherland was commissioned to find a means to do so. The obstruction hitherto had been the objection of the Crawshay Estate to the line coming through the grounds ofCyfarthfa Castle. Sutherland redesigned the route further west avoiding the Estate. This was at the expense of much difficulty of engineering, and of operation later.[5][page needed]

The line was opened in part, fromPontsticill to Cefn, on 1 August 1867.[7] The new line joined theVale of Neath Railway line at Rhydycar Junction, immediately south of Merthyr station, opening on 1 August 1868. The VoNR station at Merthyr was used.[3][page needed]

This now released the legal obstruction to the opening to Newport; the part of this from Pant to Dowlais Top had opened on 1 August 1867,[7] and from Dowlais Top to Pengam was opened on 1 September 1868.[7] Three trains ran daily from Brecon to Newport Dock Street.

This section from Dowlais to Pengam ran through the Bargoed Rhymney Valley. Both theB&MR and the Rhymney Railway had wished to build a line through this, but the defile near Bargoed made that physically impossible and at length a compromise was reached: the Rhymney Railway would build up from Bargoed to Deri Junction, and theB&MR would build down from Dowlais to Deri Junction. There would be a limited mutual exchange of running powers.

At Bargoed the Rhymney Railway and theB&MR trains exercising running powers were on the west side of the valley, and theB&MR from its Rhymney station was on the east side. A north-west to south-east diagonal connection was built as part of the work.[3][page needed][11][page needed]

The location of the stations at Dowlais was determined by the through lines on which they were sited, and in 1865 theB&MR had obtained powers to make a short branch to a central location in Dowlais. It opened from Pant on 23 June 1869. The Dowlais station, at Lloyd Street, was later (in 1924) renamed Dowlais Central.[5][page needed][3][page needed][7]

LNWR connections

[edit]

The London and North Western Railway was encroaching from the east by means of theMerthyr, Tredegar and Abergavenny Railway which it had acquired, and it was obvious that it sought to reach Dowlais and Merthyr. In theLondon and North Western Railway (New Lines) Act 1867 (30 & 31 Vict. c. cxiii) of 15 July 1867 it obtained authority to make junctions with theB&MR near Dowlais Top and near Dowlais (Central), where its new alignment would bring the two railways close together. The LNWR line was to pass Dowlais heading north, in tunnel under Pant station, curving west and south to join theB&MR line at Morlais Junction. The connections were made on 1 January 1873.

The connection at Dowlais Top was used for the exchange of goods and mineral traffic, and was removed about 1933. The connection near theB&MR central station at Dowlais was made by curving from northward to join theB&MR southward at Ivor Junction just outside theB&MR station; LNWR trains used theB&MR station from that time. On 4 May 1885 the LNWR opened a station at Dowlais High Street, somewhat to the east of Dowlais, and from that date transferred its passenger calls to that station.[5][page needed][3][page needed]

The goods traffic of the LNWR (and its successors) continued to be exchanged at Dowlais (Central)B&MR station until 22 November 1954, from which date such traffic ran viaPontsticill Junction.

The LNWR still wanted good access to Merthyr and in 1874 promoted a Bill for a new line getting access to the town. TheB&MR opposed this in Parliament, but a compromise was reached by which theB&MR's own Merthyr line would be made joint with the LNWR in consideration of the LNWR refunding half the original cost of construction of that line. This was agreed, but the LNWR had to build an expensive connecting line from a new junction, Penywern Junction, on its line to theB&MR Dowlais (Central) station, running northward in tunnel to a westward junction with theB&MR line at Morlais Junction.

The line took four years to construct, but the LNWR took formal joint ownership of the relevant part of theB&MR line in 1875, ensuring that it retained access in the event of theB&MR negotiating with rivals. The LNWR line opened on 1 June 1879, when the LNWR trains were able to run to Merthyr High Street station.[5][page needed]

Hereford, Hay and Brecon Railway

[edit]
Main article:Hereford, Hay and Brecon Railway
East end of Brecon station in 1949

The Brecon and Merthyr Railway had opened its first main line between Brecon and Pant on 1 May 1863. Trains of the Hereford, Hay and Brecon Railway, worked by the Mid Wales Railway, started working in to Brecon from 19 September 1864

An east loop was built at Talyllyn, forming a triangular junction there, enabling goods trains from Merthyr to the north to run direct; this opened on 21 September 1864.

Brecon and Merthyr Railway (Amalgamation) Act 1865
Act of Parliament
Citation28 & 29 Vict. c. cccxxiv

The original partitioning of the Hay Railway had been a negotiated compromise, and led to an arrangement that was less than ideal; the Hereford, Hay and Brecon Railway agreed to amalgamate with the Brecon and Merthyr Railway, and this was ratified by theBrecon and Merthyr Railway (Amalgamation) Act 1865 (28 & 29 Vict. c. cccxxiv) of 5 July 1865.[9]

Brecon and Merthyr Railway Arrangement Act 1868
Act of Parliament
Long titleAn Act for suspending legal Proceedings with reference to the Brecon and Merthyr Tydfil Junction Railway Company; for converting the Mortgage and other Debts into Debenture Stock; for authorizing the Completion of certain Lines of Railway; for regulating the Capital and future Management of the Company; and for other Purposes.
Citation31 & 32 Vict. c. cxlii
Dates
Royal assent13 July 1868

This appeared to be satisfactory, but it emerged in 1867 that the preference shareholders had not been agreed by the preference shareholders, and the amalgamation was held to be void. TheBrecon and Merthyr Railway Arrangement Act 1868 (31 & 32 Vict. c. cxlii) confirmed the separation of the two companies once again and theHH&BR was reincorporated by theHereford, Hay and Brecon Railway Act 1869 (32 & 33 Vict. c. cxl) of 26 July 1869. It needed a company to work its trains for it, and after a false start theMidland Railway performed this task, from 1 October 1869. The Midland Railway had a presence at Hereford using running powers, and had long sought an entry into South Wales.[3][page needed][8][page needed]

The working arrangement was converted into a lease (of theHH&BR by the Midland) from 1874 and acquired theSwansea Vale Railway in the same year. When it negotiated an arrangement to run its trains over theNeath and Brecon Railway from 1877, it had achieved its goal of reaching Swansea. This brought a considerable volume of additional traffic to the route, and proved lucrative for the Brecon and Merthyr, whose line formed part of the chain from Hereford to Swansea.[5][page needed][9]

Brecon arrangements

[edit]
Brecon Free Street station, looking west towards Neath in 1962

The first Brecon and Merthyr Railway station at Brecon was at Watton; it was always intended as a temporary station, but the arrival of theHH&BR trains and Mid Wales Railway's own trains overloaded the accommodation significantly.

The Neath and Brecon Railway opened its line at Brecon from the west in 1867, but during its construction it became clear that its attitude to theB&MR was unfriendly. It was also desperately short of money, and opened its line to a separate temporary station at Free Street. A connection was made between the two stations, but it was not suitable for passenger operation.[5][page needed] Nevertheless, Barrie observes:

As late as July 1869… the Neath and Brecon Engineer, admitted to a House of Lords select committee that if any passengers for east of Brecon arrived by train at Mount Street their tickets were collected, they were put on the engine, and run forward on the high level line to a point opposite and above the Watton station. (There was also a loop line direct from the Free Street extension into Watton Yard, but the Neath & Brecon witnesses claimed that the B&M would not let them use it, but kept the points locked.[13]

By 1870 a contract was let to build a new station at Free Street, intended to be a Joint station for all the railway companies (although wholly owned by theB&MR), and it opened on 1 March 1871. Nonetheless, the Neath and Brecon Railway continued to use its own station until 1874, when its passenger trains moved to Free Street, the former station being relegated to goods traffic. Watton had already adopted that role.[5][page needed]

Caerphilly

[edit]

The Old Rumney Railway had secured authorisation in theRumney Railway Act 1861 (24 & 25 Vict. c. ccxxvii) for a line from Machen toCaerphilly, and after the acquisition of the Old Rumney by theB&MR this was constructed, opening in 1867.[7] It served mainly collieries and factories.

On 8 August 1878 thePontypridd, Caerphilly and Newport Railway (PC&NR) was incorporated. It was heavily sponsored by the Alexandra (Newport) Dock Company, which wished to bring the coal resources of the Rhondda and Cynon (Aberdare) valleys to Newport Docks. Traffic agreements were secured with the Taff Vale Railway to achieve the connection, as well as with theB&MR and the Rhymney Railway.

In 1882 theB&MR decided to double the line between Bassaleg, Machen and Abertysswg in anticipation of considerable extra business on the route.[5][page needed]

The Great Western Railway (GWR), by now owner of the Monmouthshire Railway system, was less cooperative. ThePC&NR[note 1] was to use theB&MR from Machen to Bassaleg, but needed to pass over a mile or so of the Monmouthshire Western Valley line to reach Newport Docks, and theGWR did not make the facility available at first, on 7 July 1884. After a stand-off the use of the line was conceded.

In 1882 the Newport Docks company reconstituted itself as theAlexandra (Newport and South Wales) Docks and Railway and was clearly in the lead over the affairs of thePC&NR, and it obtained powers in 1883 to build an additional double track alongside the Western Valley line from Bassaleg. This opened in April 1886.

The approach to Machen on theB&MR Caerphilly branch was on a steeply graded single line, and working the heavy mineral traffic over it was inconvenient; thePC&NR obtained powers to build a second, nearly parallel single line on easier gradients: the Machen Loop. This was opened on 14 September 1891[7] an immediately transferred toB&MR ownership. The new and old single lines were operated as a double track. Waterloo and Fountain Bridge platforms for the railmotor stopping trains, were on the separated single lines and accordingly had a service in one direction only respectively.[5][page needed]

Barry Railway

[edit]
Main article:Barry Railway Company

The Barry Railway was founded to provide an alternative port for the export of the coal and mineral resources of South Wales, following decades of dissatisfaction with the facilities at Cardiff and Newport, and with the railway connections to those places.

The first section of line opened in 1888 and in the following year coal was hauled from theRhondda Valley, and the Company moved on to providing a connection from the Rhymney Railway at Penrhos, west of Caerphilly.

In 1898 it obtained powers to make another connection, this time with theB&MR between Bedwas and Maesycwmmer. This was a significant civil engineering undertaking, crossing the Rhymney Valley on a large structure known asLlanbradach viaduct.

The new line opened on 2 January 1905. The Barry Railway had running powers for mineral traffic in the upper part of theB&MR network in the Rhymney Valley; other traffic was hauled by the local company and exchanged at Duffryn Isaf.[5][page needed]

Grouping

[edit]

Most of the railways of Great Britain were formed into one or other of four new larger companies, in a process referred to as the "grouping", following theRailways Act 1921. The Brecon and Merthyr Railway was a subsidiary[note 2] of the new Great Western Railway; the change took effect on 1 July 1922.

There had, of necessity, been capital reconstructions in 1882 and 1902. In the twentieth century interest was paid on preference shares, and in 1918 – 1921 this was as high as 4%, but on preference shares only.[5][page needed]

At 31 December 1921, theB&MR had issued capital of £2.07 million; net income in 1921 of £66,577; dividend in 1921 on ordinary shares: nil; locomotives taken over by theGWR: 47; number of passenger carriages 90; number of freight wagons 640; employees 842. Single track mileage was 82miles-44chains en route mileage of 59miles-66 chains.[14][page needed]

From 1923

[edit]

Many of the ironworks of the Merthyr and Dowlais areas were declining steeply or indeed closing in this period, and theB&MR network's dependency on those industries made it extremely vulnerable. A traffic pooling arrangement for mineral traffic between theGWR and theLondon Midland and Scottish Railway was agreed in 1933, and this resulted in a switch for much traffic to more efficient routes, avoiding the long and difficult climb through the Brecon Beacons and Talyllyn, and this reduced the volume of traffic.

The hillside above New Tredegar had shown itself to be unstable resulting in temporary closure of the line in 1916,[7] and more serious slips took place in September 1928, April 1929 and April 1930. This resulted in the closure of the upper portion of the branch from 14 April 1930; the only working colliery on the affected section could equally well be served by the former Rhymney Railway branch.[5][page needed][11][page needed]

From 1948

[edit]

Under British Railways ownership after nationalisation, the decline in use of the railway continued, affecting all classes of traffic.

The passenger service between Dowlais Central (the formerB&MR terminus at Dowlais) and Pant was withdrawn from 28 June 1952. For a period workmen's trains continued but these were ended on 2 May 1960.

The Machen to Pontypridd passenger service, instituted but not worked by thePC&NR, was closed down on 15 September 1956.

The Merthyr to Pontsticill service was withdrawn from 13 November 1961 and the main line service from Newport to Brecon, and also the New Tredegar branch closed from 31 December 1962. On the same date, the services from Hereford and Moat Lane were also closed down, so that Brecon had no passenger train service.

There remained a Caerphilly – Machen – Newport unadvertised service for workmen as the only passenger operation on theB&MR network; that too closed on 1 July 1963.[5][page needed]

Goods and mineral traffic between Deri Junction and Pant was withdrawn on 5 August 1963, followed by that between Brecon and Merthyr, and also Pontsticill and Dowlais Central, on 4 May 1964. Brecon continued as a non-rail-connected coal depot until 9 November 1964.

Bedwas to Pengam closed completely on 31 December 1962. The Waterloo section of line, built to ease gradients and congestion approaching Machen, was closed on 20 July 1964, but the residual freight traffic was diverted through Radyr and the Caerphilly to Machen section closed from 20 November 1967.[5][page needed]

Ogilvie Colliery on the Deri line remained in use until 3 September 1978.[11][page needed]

By 1980 only one short section of 10.5 miles (16.9 km) survived, serving coal traffic toBedwas Navigation Colliery, from Newport via Bassaleg and Nine Mile Point. When the Bedwas colliery closed, the section of the branch between Bedwas and Machen was also closed, in 1985. The section between Machen and Bassaleg Junction has experienced sporadic stone traffic fromHanson Aggregates' limestone quarry, east of Machen.[5][page needed]

1878 accident

[edit]

TheB&MR was subject to a number of accidents; the extreme gradients were often a cause. On 2 December 1878 a particularly tragic accident took place. A goods and mineral train was descending the seven-mile bank, and inadequate wagon brakes had been applied. The train got out of control, and derailed near Talybont, running down the embankment slope. The train consisted of 22 wagons of coal, three of goods, 11 empties, and a brake van; it was worked by three 0-6-0 saddle tank engines; the aggregate weight of the train was 397 tons. Two drivers and two firemen were killed.[7]

Rolling stock

[edit]

Initially, theB&MR was worked by the contractorThomas Savin, who provided locomotives and rolling stock from a fleet that was also used to work several other Welsh lines, such as theMid Wales Railway. Savin went bankrupt in February 1866 and fourteen of his 56 locomotives then came intoB&MR ownership.[15]

Later locomotive classes of the Brecon and Merthyr Tydfil Junction Railway
WheelsQuantityFinalB&MR nos.BuilderYearToGWRFirstGWR nos.ToBRExtinctNotesRef
2-4-0210, 21Sharp, Stewart & Co.18651904Ordered by Savin. No. 21 originally 9[16]
0-6-0ST1218–29Sharp, Stewart & Co.1865–721905Ordered by Savin[17]
0-6-0ST230–31Avonside Engine Co.18741921Ex-Neath and Brecon Railway, acquired 1877[18]
0-6-0ST217–18Sharp, Stewart & Co.188122190–11934No. 18 originally 11[19]
0-6-0ST121–8, 13–161884–86122177–881934[20]
2-4-0T69–12, 21, 25Robert Stephenson & Co.1888–89, 1898, 190451402/12/52/8/601924[21]
0-6-2ST419, 20/3/6Vulcan Foundry1894, 190541674/7/92, 18331928[22]
0-6-0ST522, 24, 27–291896, 190052169–731932[23]
0-6-0ST332–34Swindon Works1886–8731685/93/41934Ex-GWR 1661 Class, acquired 1906–07[24]
4-4-0PT135Swindon Works18981916Ex-GWRNo. 1490, acquired 1908[24]
0-6-2T836–43Robert Stephenson & Co.1909–10, 1914811, 21, 332, 504, 698, 888, 1084, 111371951Allotted 421–8 in 1946; except for 11, 332, 504, 1084 these were renumbered in 1947.[25]
4-4-2T144Beyer Peacock & Co1879113911922Ex-LSWR 46 class, acquired 1914[26]
0-6-2T645–50Robert Stephenson & Co.1915, 192161372–5, 1668/7061954Renumbered 431–6 during 1947–50[26]
0-6-0T135Kerr, Stuart & Co.1917121611929Ex-Railway Operating Division, acquired 1920[27]

Whilst theB&MR was absorbed by theGWR on 1 July 1922, its locomotives were not taken into stock until the four-week period that ended on 8 October that year. At the time, there were 47 locomotives allocated to five depots: Bassaleg (29 locomotives), Brecon (13), Dowlais (2), Rhymney (2) and Talyllyn (1). All weretank locomotives: most were of the0-6-0T (23 locomotives) and0-6-2T (18) wheel arrangements, there were also2-4-0T (5) and4-4-2T (1). Many of the locomotives were withdrawn by the end of 1934, leaving 14 0-6-2T; of these, one was withdrawn in 1947 and the remainder were inherited by British Railways in 1948, the last two being withdrawn in 1954.[28]

Bassaleg locomotive depot opened in 1875. TheGWR gave it the code BSG, and it closed in 1926 – the locomotives were transferred to Newport (Ebbw Junction) depot.[29]

Brecon locomotive depot was shared with the Cambrian Railways, it opened in 1863 on the southern side ofWatton station. TheGWR gave it the code BCN and number 39. At the end of 1947, it had 14 locomotives: nine 0-6-0, four 0-6-0PT and one 0-4-2T. British Railways initially gave it the code 89B but in November 1959 it became a sub-shed of Oswestry, so the locomotives allocated to Brecon carried the 89A code of Oswestry. Regional boundary changes at the end of 1960 moved Oswestry into the London Midland Region, but Brecon remained in the Western Region, and again gained its own code, this time 88K. It closed in December 1962.[30]

Dowlais locomotive depot was on the western side ofDowlais Central station; it opened in 1898. TheGWR gave it the code CVU and number 78, altering the code to DLS in 1940. At the end of 1947, it had a single locomotive – ex-TVR O4 class 0-6-2T no. 292. British Railways made it a sub-shed of Merthyr, so the locomotives allocated to Dowlais carried the 88D code of Merthyr. It closed in May 1960.[31]

Rhymney closed by 1930. Talyllyn was a sub-shed of Brecon, and closed in 1922.[32]

There were 114 coaching stock vehicles (76 four-wheel and 38 six-wheel) taken intoGWR stock on 24 July 1922, of which 91 (60 third-class, 18 composite, 11 brake third and two saloons) were passenger carrying, and the remainder (17 brake vans, three horse boxes, two carriage trucks and an inspection car) non-passenger. There were also three "market vans", authorised to run in passenger trains. Virtually all of these were withdrawn within a few years of grouping – only two were still in stock at the end of 1928: a third-class coach, withdrawn in 1930; and a brake van (used as a breakdown van), withdrawn in 1948.[33]

  • Goods vehicles (mainly coal): 629. By 1913, the line carried nearly 3.5 million long tons a year of coal and 227,000 long tons of other minerals.

The main workshops for locomotives, carriages and wagons were at Machen; it was open by 1863, and was reconstructed in 1875. The works was about half a mile east of Machen station on the northern side of the line (51°35′44″N3°07′49″W / 51.5956°N 3.1303°W /51.5956; -3.1303 (Machen works)). Although overhaul of the whole rolling stock fleet was carried out there, new construction was confined to wagons, including the three "market vans". One locomotive, no. 25, part-built byRobert Stephenson & Co., was completed at Machen during 1898. After the Grouping, theGWR rationalised the workshops inherited from the various railways of South Wales, and the Caerphilly works of the former Rhymney Railway was selected for enlargement. The work was completed in 1926, and Machen works, just a few miles to the north-east, was then closed.[34][35][36][37]

Traffic managers and general managers

[edit]

Alfred Henshaw, 1863 – 1894.John Gall 1894 – 1903.Herbert R. Price 1903 – 1922.[5][page needed]

Locomotive Superintendents

[edit]
  • John Thomas Simpson: 1863 – 10 June 1869 (killed inaccident at Maesycwmmer)
  • Thomas Mason: 1869 – November 1871 (resigned)
  • Charles Long: January 1872 – May 1888 (retired)
  • George C. Owen: 1888 – 18 April 1909 (killed in accident at Machen)
  • James Dunbar: 1909[38] – February 1922 (died in office)[34]

Following the death of Dunbar, the post remained vacant until theGWR absorbed theB&MR locomotive stock on 1 July 1922. During this period, H. F. H. Gibson, the chief draughtsman, was in charge of theB&MR locomotive department.[34]

Topography

[edit]
Brecon & Merthyr Tydfil Junction Railway
Brecon (Watton)
Brecon Free Street
Groesffordd Halt
Talyllyn Tunnel
674 yd
616 m
Merthyr High Street
Talyllyn Junction
Maerdy Junction
Brandy Junction
Ynysfach Junction
Talybont-on-Usk
Ynysfach Ironworks
Rhydycar Junction
Pentir Rhiw
Cyfarthfa Junction
Cwm Colliery
Llwyngelyn Junction
Heolgerrig Halt
Cyfarthfa Steelworks
Cefn Viaduct
Cefn Coed
667 yd
610 m
Pontsarn Halt
Torpantau
Pontsarn Viaduct
Dolygaer
Morlais Junction
Pontsticill Junction
Dowlais Central
Morlais Tunnel
1040 yd
951 m
Pontsticill Junction
Pantysgallog
(High Level) Halt
Pant Junction
Pant
Brecon & Merthyr Rly
Brecon Mountain Rly
Dowlais Top
(LNWR)
 
Dowlais Top Junction
Pantywaun Halt
Fochriw Colliery
Fochriw Junction
Fochriw
Ogilvie Village Halt
Rhymney Lower & Pontlottyn
Ogilvie Colliery
Abertysswg
McLaren Colliery Halt
Darran and Deri
New Tredegar Colliery Platform
New Tredegar
Groes-Faen Colliery
Elliot Pit Halt
Groesfaen Colliery Platform
Cwmtysswg Colliery
Cwmsyfiog Halt (2nd station)
Cwmsyfiog Halt (1st station)
Bargoed North Junction
Aber Bargoed (2nd station)
Bargoed
Aber Bargoed (1st station)
Bargoed South Junction
Bargoed Colliery Halt
Aberbargoed Junction
Pengam
Fleur-de-Lis Platform
Maesycwmmer Junction
toPontypool
 
Gwernydomen Halt
Maesycwmmer
Barry Railway
to Barry Junction
Fountain Bridge Halt
Waterloo Halt
Bedwas
Trethomas
Machen
Machen Quarry
Church Road
Rhiwderin
Bassaleg
to Alexandra Docks
 

The Pontsarn viaduct is 455 feet (139 m) long and 92 feet (28 m) height, whilst the Cefn Coed (or Pontycapel) viaduct is 770 feet (230 m) long with a height of 115 feet (35 m).

Torpantau tunnel through the Beacons was 667 yards (610 m) long. At an elevation of 1,313 feet (400 m), it was the highest railway tunnel above sea level anywhere in Britain.[39] Exiting from south-east portal of the tunnel, the line descended for 7 miles (11 km) along a 1:38 (2.6%) gradient by the side of Glyn Collwyn and the (later: 1931) Talybont reservoir.[39]

Talyllyn tunnel was situated at the west end of the former Talyllyn station, about 5 miles (8.0 km) to the east of Brecon. It is 674 yards (616 m) long, and was originally built in 1816 for theHay Railway.[5][page needed][3][page needed]

Location list, Brecon to Dowlais

[edit]
  • Brecon Mount Street (N&B station); opened 3 June 1867; closed 1872;
  • Brecon Free Street; opened 1 March 1871; closed 31 December 1962;
  • Watton (on spur); opened 23 April 1863; closed 1 March 1871;
  • Heol Lladron Junction; convergence of Watton spur;
  • Groesfford Halt; opened 8 September 1934; closed 31 December 1962;
  • Talyllyn Tunnel; 674 yards;
  • Talyllyn Brynderwen; opened 23 April 1863; closed 1 October 1869;
  • Talyllyn Junction; opened 1 October 1869; closed 31 December 1962;
  • Talyllyn East Junction;
  • Talybont; opened 19 March 1863; renamed Talybont-on-Usk 1898; closed 31 December 1962;
  • Pentir Rhiw; opened April 1897 for limited use; closed 31 December 1962;
  • Torpantau Tunnel; 667 yards;
  • Torpantau; opened 18 June 1863; closed 31 December 1962;
  • Dolygaer Halt; opened 19 March 1863; closed 31 December 1962;
  • Pontsticill Junction; opened 19 March 1863; closed 31 December 1962;
  • Dowlais; opened 19 March 1863; renamed Pant(Glam) 1869; closed 31 December 1962;
  • Pantysgallog Halt; opened 1 October 1910; renamed Pantysgallog Halt High Level 1950; closed 2 May 1960;
  • Dowlais; opened 23 June 1869; renamed Dowlais Central 1924; closed 2 May 1960.

Merthyr loop line

[edit]
  • Pontsticill Junction; above;
  • Pontsarn; opened June 1869; closed 13 November 1961;
  • Cefn; opened 1 August 1867; renamed Cefn Coed 1920; closed 13 November 1961;
  • Morlais Junction; convergence of LNWR line;
  • Heolgerrig Halt; opened 31 May 1937; closed 13 November 1961;
  • Cyfarthfa Junction with ironworks lines;
  • Ynysfach Junction;
  • Rhydycar Junction.

Bargoed Rhymney line

[edit]
  • Pant; above;
  • Dowlais Top; opened 1 August 1867; closed 31 December 1962;
  • Pantywaun Halt; opened 22 December 1941; closed 31 December 1962;
  • Fochriw; opened September 1867; closed 31 December 1962;
  • Ogilvie Colliery Halt; miners' platform; opened 8 June 1925; closed 31 December 1962;
  • Ogilvie Village Halt; opened 16 May 1935; closed 31 December 1962;
  • Deri Junction; junction with Rhymney Railway.

Rhymney to Newport

[edit]
  • Rhymney
  • Rhymney Lower and Pontlottyn: opened 16 April 1866: closed 14 April 1930;
  • Abertysswg; opened 1 August 1905; closed 14 April 1930;
  • Mclaren Colliery Halt; in use in 1930; opening date uncertain; closed 14 April 1930;
  • New Tredegar colliery platform; in use in late 1920s, opening date uncertain; closed 14 April 1930;
  • White Rose; opened 16 April 1866; renamed New Tredegar & White Rose 1885; renamed New Tredegar & Tirphil 1906; renamed New Tredegar 1924; closed 31 December 1962;
  • Elliot Pit Halt; miners' platform; opened by September 1926; closed 31 December 1962;
  • Cwmsyfiog Halt; opened 5 July 1937; closed 31 December 1962;
  • Cwmsyfiog & Brithdir; opened 1 February 1908; renamed Cwmsyfiog 1924; closed 5 July 1937; reopened as Cwmsyfiog Colliery Halt for miners only 6 December 1937; closed 31 December 1962;
  • Aberbargoed; opened 16 April 1866; renamed Aberbargoed & Bargoed 1 September 1905; relocated 10 chains north 1 July 1924; relocated to original site and renamed Aberbargoed 30 September 1935; closed 31 December 1962;
  • Bargoed Colliery Halt; opened 1926; closed 31 December 1962;
  • Pengam; opened 14 June 1865; closed 31 December 1962;
  • Fleur de lis platform; opened 29 March 1926; closed 31 December 1962;
  • Maesycwmmer Junction; divergence to Taff Vale Extension line;
  • Maesycwmmer; opened 14 June 1865; closed 31 December 1962;
  • Llanbradach Colliery Halt; opened by September 1928; closed between 1948 and 1954, date uncertain;
  • Barry Junction; divergence of Barry Railway;
  • Bedwas; opened 14 June 1865; closed 31 December 1962;
  • Trethomas; opened 4 January 1915; closed 31 December 1962;
  • Machen; convergence of Caerphilly lines; opened 14 June 1865; closed 31 December 1962;
  • Church Road; opened 14 June 1865; closed 16 September 1957;
  • Rhiwderin; opened 14 June 1865; closed 1 March 1954;
  • Bassaleg; opened 14 June 1865; closed 31 December 1962;
  • Bassaleg Junction; convergence with Western Valley line.

Caerphilly to Machen

[edit]
  • Caerphilly; Rhymney Railway station;
  • Gwernydomen Halt; opened from October 1908; closed 17 September 1956;
  • [down and up lines separate];
  • Fountain Bridge Halt; down line only; opened from October 1908; closed 17 September 1956;
  • Waterloo Halt; up line only; opened October 1908; closed 17 September 1956;
  • White Hart Halt; opened 12 May 1947; closed 30 June 1952;
  • Machen; above.[40][page needed][41][page needed][42][page needed][11][page needed]

Brecon Mountain Railway

[edit]
Main article:Brecon Mountain Railway

TheBrecon Mountain Railway operates a narrow-gauge steam-hauled tourist line along the former Brecon and Merthyr Railway trackbed over a 5.5-mile (8.9 km) section of theB&MR, from Pant through Pontsticill to Torpantau, a distance of five miles.[43]

Remaining vehicles

[edit]

Only oneB&MR coach has survived into the present day; the body (only) of coach No.111 stands in a private residence at Armscote. (2017)[44] A goods wagon, no.197 is currently (2017) at theSevern Valley Railway.[45]

National Cycle Network

[edit]

Some sections of the route have become part of theNational Cycle Network. These routes are NCN 4 (Celtic Trail) between Machen and Trethomas, NCN 469 between Bargoed and Fochriw and NCN 8 (Taff Trail) between Torpantau and Talybont Reservoir. NCN 468 runs from Aberbargoed northwards.

Notes

[edit]
  1. ^There was another, unconnected PC&NR in the vicinity: thePontypool, Caerleon and Newport Railway.
  2. ^Only the larger lines qualified to be "constituents". The Rhymney Railway was not much greater in capitalisation, but its net income was nearly seven times that of theB&MR; the constituent companies were theGWR itself; the Alexandra (Newport and South Wales Docks and Railway, the Barry Railway, theCambrian Railways, theCardiff Railway, the Rhymney Railway and the Taff Vale Railway.

References

[edit]
  1. ^Hadfield, Charles (1967).The Canals of South Wales and the Border (second ed.). Newton Abbot: David and Charles.ISBN 0-7153-4027-1.
  2. ^Barrie, D.S. (May 1960). "Railways to Brecon—1".Railway Magazine.
  3. ^abcdefghiBarrie, D.S.M. (1994).A Regional History of the Railways of Great Britain: volume 12: South Wales. revised by Peter Baughan. Nairn: David St John Thomas.ISBN 0-946537-69-0.
  4. ^Evans, Christopher J. (1912).Breconshire. Cambridge University Press.
  5. ^abcdefghijklmnopqrstuvwxyzBarrie, D.S.M. (1980) [1957].The Brecon and Merthyr Railway. Trowbridge: The Oakwood Press.ISBN 0-85361-087-8.
  6. ^"The Dowlais Railway".Railway Magazine. the Why and the Wherefore. October 1937.
  7. ^abcdefghijkHopwood, H.L. (August 1918). "The Brecon and Merthyr Railway: Its History and Locomotives".Railway Magazine.
  8. ^abChristiansen, Rex (1981).A Regional History of the Railways of Great Britain - volume 13 - Thames and Severn. Newton Abbot: David & Charles.ISBN 0-7153-8004-4.
  9. ^abcClinker, C.R. (June 1960). "Railways to Brecon—2".Railway Magazine.
  10. ^Thompson, Norman (April 1909). "The Brecon and Merthyr Tydfil Junction Railway".Railway Magazine.
  11. ^abcdefMitchell, Vic; Smith, Keith (2009).Rhymney and New Tredegar Lines. Midhurst: Middleton Press.ISBN 978-1-906008-48-2.
  12. ^Barrie 1980, p. 115.
  13. ^Barrie 1980, p. 121.
  14. ^Semmens, Peter (1990) [1985].History of the Great Western Railway: 1: Consolidation, 1923 – 1929 (Studio Editions reprint ed.). London: George Allen and Unwin.ISBN 0-04385104-5.
  15. ^Davies, F. K.; Firth, J. M.; Lucking, J. H.; Thomas, R. E.; Allcock, N. J.; Sterndale, A. C.; Barrie, D. S. M.; Reed, P. J. T.; Mountford, E. R. (April 1966). White, D. E. (ed.).The Locomotives of the Great Western Railway, part ten: Absorbed Engines, 1922–1947.RCTS. pp. K196–7.ISBN 0-901115-20-7.
  16. ^Davies et al. 1966, p. K200.
  17. ^Davies et al. 1966, pp. K200–1.
  18. ^Davies et al. 1966, p. K201.
  19. ^Davies et al. 1966, pp. K201–2.
  20. ^Davies et al. 1966, p. K202.
  21. ^Davies et al. 1966, p. K204.
  22. ^Davies et al. 1966, pp. K204–5.
  23. ^Davies et al. 1966, p. K205.
  24. ^abDavies et al. 1966, p. K206.
  25. ^Davies et al. 1966, pp. K206–7.
  26. ^abDavies et al. 1966, p. K208.
  27. ^Davies et al. 1966, p. K209.
  28. ^Davies et al. 1966, pp. K196, K207, K208, K210–1
  29. ^Sterndale, A.C.; Parker, L.T.; Smith, C.; Reed, P.J.T.; Tabor, F.J.; Davies, F.K.; Allcock, N.J.; Lucking, J.H. (May 1974). White, D.E. (ed.).The Locomotives of the Great Western Railway, part twelve: A Chronological and Statistical Survey. Kenilworth:RCTS. pp. M25, M26.ISBN 0-901115-28-2.OCLC 499807460.
  30. ^Lyons, E.T. (1974) [1972].An Historical Survey of Great Western Engine Sheds 1947. Headington: Oxford Publishing Co. pp. 260, 272.ISBN 0-902888-16-1.
  31. ^Lyons 1974, p. 243.
  32. ^Sterndale et al. 1974, p. M26.
  33. ^Mountford, E.R. (1978).A Register of G.W.R. Absorbed Coaching Stock 1922/3. Blandford: Oakwood Press. pp. 45–49.
  34. ^abcDavies et al. 1966, p. K196
  35. ^Mountford 1978, pp. 45, 48
  36. ^Sterndale et al. 1974, pp. M18–M19.
  37. ^Kidner, Roger W. (1995).The Rhymney Railway. The Oakwood Library of Railway History. Headington: Oakwood Press. p. 54.ISBN 0-85361-463-6. OL9.
  38. ^Locomotive Magazine 15 June 1909 page 106
  39. ^abHolland, Julian (2013).Exploring Britain's Lost Railways. London: Times books. p. 184.ISBN 9780007505418.
  40. ^Quick, M.E. (2002).Railway Passenger Stations in England Scotland and Wales—A Chronology. The Railway and Canal Historical Society.
  41. ^Cooke, R.A. (1997).Atlas of the Great Western Railway, 1947. Didcot: Wild Swan Publications Limited.ISBN 1-874103-38-0.
  42. ^Cobb, Col M.H. (2003).The Railways of Great Britain – A Historical Atlas. Shepperton: Ian Allan Publishing Limited.ISBN 07110-3003-0.
  43. ^"Home".Brecon Mountain Railway. Archived fromthe original on 29 December 2005.
  44. ^"Brecon & Merthyr 111 Five Compartment".Vintage Carriages Trust. Archived fromthe original on 1 October 2020.
  45. ^"B&MR 197 Goods Wagon built 1902".Vintage Carriages Trust. Archived fromthe original on 5 August 2020.

Further reading

[edit]
  • A Brief History of Merthyr Tydfil, by Joseph Gross. Starling Press, 1980
  • The Early History of the Old South Wales Iron Works, John Lloyd, 1906

External links

[edit]
Historic Welsh railway companies
Great Western
Railway
London and North
Western Railway
Joint lines
Independent lines
Industrial railways
International
National
Other
Retrieved from "https://en.wikipedia.org/w/index.php?title=Brecon_and_Merthyr_Tydfil_Junction_Railway&oldid=1323795984"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp