Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Bluebell Railway

Coordinates:51°01′58″N0°02′48″W / 51.0329°N 0.0467°W /51.0329; -0.0467
From Wikipedia, the free encyclopedia
Heritage railway in England

icon
This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Bluebell Railway" – news ·newspapers ·books ·scholar ·JSTOR
(November 2024) (Learn how and when to remove this message)
Bluebell Railway
British Railways Standard Class 4 No. 80151 and its train are seen at Horsted Keynes
TerminusEast Grinstead
Commercial operations
Built byLondon, Brighton and South Coast Railway
Original gauge4 ft 8+12 in (1,435 mm)standard gauge
Preserved operations
Operated byBluebell Railway Preservation Society
Stations4
Length11 mi (17.7 km)
Preserved gauge4 ft 8+12 in (1,435 mm)standard gauge
Commercial history
Opened1 August 1882
Closed17 March 1958
Preservation history
1960Re-opens to the public between Sheffield Park and Bluebell Halt
1962Extension opens from Bluebell Halt to Horsted Keynes
1994Extension to Kingscote re-opened
2013Extension to East Grinstead re-opened
HeadquartersSheffield Park station
Bluebell Railway
St Margaret's Junction
E. Grinstead H.L.(1883)
Second Station (1866)
Original Station (1855)
E. Grinstead Low Level(1882)
East GrinsteadNational Rail(1970)
│ Goods yard
East GrinsteadBluebell Railway
(
Bluebell
Railway
) (2013)
National
Rail
Bluebell
Railway
Imberhorne cutting
Kingscote
West Hoathly
Sharpthorne Tunnel (
731 yd
668 m
)
Horsted Keynes
Ardingly spur
Current limit of operation
Sheriff Mill Viaduct (demolished)
Lywood Tunnel (
218 yd
199 m
)
Ardingly
(now aggregates depot)
Copyhold Junction
Haywards Heath
National Rail
Bluebell Halt
Holywell Waterworks
Freshfield Halt
Ketches Halt
Sheffield Park
Newick and Chailey
Cinder Hill Tunnel
Barcombe
Culver Junction
Hamsey Loop (closed 1868)
Lewes Tunnel (
395 yd
361 m
)
LewesNational Rail

TheBluebell Railway is an 11-mile (17.7 km)heritage line inWest Sussex inEngland. It is managed by the Bluebell Railway Preservation Society.[1] It usessteam trains which operate betweenSheffield Park andEast Grinstead, with intermediate stations atHorsted Keynes andKingscote.

It is the first preservedstandard gauge steam-operated passenger railway in the world to operate a public service.[1] The society ran its first train on 7 August 1960, less than three years after the line fromEast Grinstead toLewes had been closed byBritish Railways.[1]

On 23 March 2013, the Bluebell Railway started to run through to its newEast Grinstead terminus station.[2] At East Grinstead there is a connection to the national rail network, the first connection of the Bluebell Railway to the national network in 50 years, since the Horsted Keynes –Haywards Heath line closed in 1963.

Today the railway is managed and run largely by volunteers. Having preserved a number of steam locomotives even before steam stopped running on British mainline railways in 1968, today it has over 30 steam locomotives, the 2nd largest collection in the UK after theNational Railway Museum.[1] The Bluebell also has almost 150 carriages and wagons, most of them pre-1939.[1]

History

[edit]
Lewes and East Grinstead Railway Act 1877
Act of Parliament
Long titleAn Act for incorporating the Lewes and East Grinstead Railway Company; and for other purposes.
Citation40 & 41 Vict. c. ccxviii
Dates
Royal assent10 August 1877
Text of statute as originally enacted

In 1877, anact of Parliament authorised construction of theLewes and East Grinstead Railway (L&EGR).[3] The line was sponsored by local landowners, including theEarl of Sheffield. A year later another act enabled theLondon, Brighton and South Coast Railway Company (LB&SCR), chaired bySamuel Laing, to acquire and operate the line.[3][4]

The branch line had six stations, but only Barcombe was within walking distance of a village. Chailey parish had two stations, one atSheffield Park and the other atNewick and Chailey. It was customary for a rural line supported by a company or individuals to have stations close to the residences of its sponsors.[4] Thus Sheffield Park station was built for the Earl of Sheffield, and Newick and Chailey for Newick Park and Reedens, the homes of two other sponsors.[4] The other stations were atKingscote,West Hoathly andHorsted Keynes. A branch ran from a junction at Horsted Keynes toArdingly andHaywards Heath on the LB&SCR main line.[4]

The 1877 and 1878 acts included a clause that:[3][4]

Four passenger trains each way daily to run on this line, with through connections at East Grinstead to London and to stop at Sheffield Bridges, Newick and West Hoathly

This imposed a legal requirement to provide a service, and the only way to remove this obligation was to pass another act.

Designed under instructions from LB&SCR Chief EngineerFrederick Banister,[5] the line was constructed to take double track. However, only the section between East Grinstead and Horsted Keynes (and thence to Haywards Heath via Ardingly) was laid as such; south of the junction at Horsted Keynes the line was single track with passing loops at stations. The line was opened in 1882.[4]

Goods traffic on the line consisted of local produce; milk: farm products and coal, and timber to and from Albert Turner & Son, a sawmill. The only time Sheffield Park received a substantial number of passengers was whenLord Sheffield entertained the Australian cricket team, with a match between them and Lord Sheffield's own team.

Accident

[edit]

On 31 July 1943, newlyweds Ronald Knapp and Winifred Standing were killed when they were pulled under a train from Lewes to East Grinstead.[6] The couple walked along the railway on a dark rainy night. When the train got to Horsted Keynes, the guard found a raincoat covered with blood on the engine. Another coat was found near two bodies in the middle of the tracks. The ganger who found them told the inquest the couple must have been walking with their backs to the train.

"There was a very heavy squall at the time and the couple would probably have not heard a thing," he said. The coroner said Ronald and Winifred were trespassing and no blame could be attached to any railway worker. Little more than a week after they were married, the couple's funeral was atSt Giles' Church, Horsted Keynes, where they are buried together in a grave marked by a War Graves Commission headstone.[7]

Closure

[edit]

In 1954, long before theBeeching Axe, the branch line committee of British Railways proposed closing the line fromEast Grinstead to Culver Junction nearLewes.[8] This was challenged by local residents, but closure was agreed in February 1955 for 15 June 1955, although the line was closed down on 29 May 1956 due to a rail strike.[3] An acrimonious battle between British Railways and the users of the Bluebell Line then ensued, and lasted three years.[8]

Shortly after closure, Margery Bessemer of Chailey discovered in the 1877 and 1878 acts the clause relating to the "Statutory Line", and demanded British Railways reinstate services. On 7 August 1956, British Railways reopened the line,[8] with trains stopping at stations mentioned in the acts. British Railways took the case to the House of Commons in 1957, resulting in a public inquiry.[3][8] British Railways were censured, but later the Transport Commission persuaded Parliament to repeal the special section of the act. By this means the line was finally closed down on 17 March 1958.[3][8]

Preservation

[edit]
Bluebell RailwaySECR P classBluebell 323

On 15 March 1959, a group that included the future president of the society,Bernard Holden, met in Ardingly and formed theLewes & East Grinstead Railway Preservation Society. The society elected John Leroy as the first chairman, and £940 was raised in donations to start the society. On a vote at the meeting, the society changed its name to theBluebell Railway Preservation Society.[1]

The society's initial aim was to reopen the whole line from East Grinstead to Culver Junction as a commercial service, using a two-carDMU.[1] The plans came to nothing: the society failed to buy the whole line, and most local residents were not interested.[1] The committee then recommended that the stretch of track betweenSheffield Park and Horsted Keynes could be run as a tourist attraction, with vintage locomotives and stock operated by unpaid volunteer staff.[1]

Sheffield Park to Horsted Keynes

[edit]
Bluebell RailwayA1Fenchurch taking on water atSheffield Park Station.

As B.R. still ran an electrified line from Horsted Keynes to Ardingly,[8] the society leased a stretch of track from BR just south of this.[8] In 1960, the interim line was opened, running from Sheffield Park to Bluebell Halt, 100 yards (91 m) south ofHorsted Keynes. In 1962, the society extended services to Horsted Keynes. Also in 1962, a halt was opened at Holywell (Waterworks). However, this was closed the following year. B.R. withdrew passenger services from Horsted Keynes to Haywards Heath in 1963; and with complete closure of the line north of Horsted Keynes, the Bluebell Line was severed from the British Rail system.

Horsted Keynes to Kingscote

[edit]

In 1974, the society purchased thefreehold of the demolishedWest Hoathly station, allowing the first steps to be taken towards an extension northwards towardsEast Grinstead station. It then purchased the freehold of the site ofKingscote station in January 1985.[9] These efforts culminated in apublic inquiry, with the Secretaries of State for theEnvironment andTransport givingplanning permission and aLight Railway Order for an extension to East Grinstead in 1985.[9]

The Bluebell Railway Preservation Society completed the extension from Horsted Keynes to Kingscote in April 1994,[9] re-laying track through Sharpthorne Tunnel, which at 731 yards or 668 metres is the longest on a UK heritage railway. At the north end of Sharpthorne Tunnel, the line passes through the site of the former West Hoathly railway station. It was demolished in 1967, but remains of the platforms and goods dock are still visible.

2010 marked the Bluebell's 50th anniversary of running trains.[1][10] To mark the event, the railway held a gala over 6–8 August 2010 with all available home engines and two visitor engines.[11] Some of the society's founder members gathered at Horsted Keynes to mark the arrival of a commemorativeLB&SCR A1X class No. 55Stepney-hauled steam train. The entourage then travelled towards Sheffield Park.[10]

Kingscote to East Grinstead via Imberhorne

[edit]
This cutting between Kingscote and East Grinstead had been used as a rubbish tip, and the waste material had to be cleared before the line could be reopened. The track northeast of this point was relaid to allow the waste to be removed by rail.

From its inception, the society had always planned to work northwards towards East Grinstead, where the line would connect with the national network. BR donatedImberhorne Viaduct to the railway in 1992, but the purchase of the final pieces of the by then privately owned track bed north to East Grinstead was only completed in 2003,[1] allowing physical civil engineering activity to be undertaken from that year.[9]

A major problem was the formerlandfill site in the 30-foot-deep (9.1 m) cutting just south of Imberhorne Viaduct. It had been filled with domestic waste by East Grinstead Town Council in the 1960s and 1970s, but tests undertaken by contractors working for both the society and the borough council found the 96,000 cubic metres (3,400,000 cu ft) of waste within the 500-metre-long (1,600 ft) cutting were not toxic.[12]

The excavatedclay-cap covering the landfill site was taken south by rail, to fill the site of a removed viaduct and embankment on the oldArdingly spur. In January 2008 agreement was given to start clearing foliage on the section of the tip between Imberhorne Lane and Hill Place bridges. In a public launch event,BBC newsreaderNicholas Owen—a local resident and society volunteer—started removal of the actual waste on 25 November 2008.[12]

Initially rubbish was removed from the site by lorry, but, due to the substantial volume and cost of about £45/tonne, in 2009 a trial removal of spoil by rail was carried out byDB Schenker Rail (UK). At £25,000 per train and now undertaken byGB Railfreight,[13] this practice continued periodically as funds became available. However, an increase in the landfill tax was announced in 2008, and this was due to take effect from April 2012. It would increase the cost of removal from £25/tonne to £90/tonne. So the society formed an appeal to complete the removal of the landfill waste by the end of March 2012.[14] With the receiving site changed toAppleford,Oxfordshire[15] and thanks to the "tenner for the tip" appeal, the cash target was met and the rubbish was removed by rail in time.[14]

In autumn 2008 work started on site clearance at East Grinstead for construction of the new station about 100 yards (91 m) south of the national rail station.[1] At the railway's 50th anniversary celebration weekend in 2010, East Sussex residentDame Vera Lynn launched a £3.8 million appeal; the greater part of this amount would be put towards reconnecting the line to East Grinstead.[16]Mid Sussex District Council responded with a one-off donation of £50,000 towards the reconnection.[17]

On 7 March 2013, the last section of track was formally joined using a white fishplate, with the honour of tightening the four bolts being given to Barbara Watkins, a long-standing Bluebell Railway volunteer.[18] The extension to East Grinstead was officially opened on Saturday 23 March, with a two-week opening festival starting that day.[19]

West: Horsted Keynes to Haywards Heath via Ardingly

[edit]
The Ardingly spur, just south ofHorsted Keynes
The trackbed just east of theHanson Aggregates depot,Ardingly

Originally built as a double-track line,[4] it waselectrified in the 1930s, with2-NOL units used for theSeaford-Horsted Keynes service. The line between Horsted Keynes and Ardingly was operated as single-track in its final years, with2-BIL/Class 401 and2-HAL/Class 402 units. The second track was left in place and used for carriage storage, most notably the new Kent Coast electric stock prior to its introduction and later the steam-hauled stock that it replaced.[9]

After the line's closure in 1963, the trackbed was purchased in its entirety by a member of the local gentry. In the 1990s the society bought the abandoned trackbed west between Horsted Keynes and Ardingly from his estate. This included up to theHanson Aggregates depot built on the formerArdingly railway station site.[1][9]

The society plans to reconnect the line withNetwork Rail at Copyhold Junction, to allow access to theLondon to Brighton Main Line.[1][20] Stations could either be located at Copyhold or Haywards Heath. There is a proposal that the line could be restored asthird rail electrified, allowing operation of the society's electric stock.[9]

While the 218-yard (199 m) Lywood Tunnel remains in good condition, there are two major areas of work that would be required to re-open the line, these being the replacement of a short girder-bridge span bridge and the 117-yard (107 m) Sheriff Mill Viaduct, which was demolished in 1969. The removed clay-cap from Imberhorne cutting has been deposited on the banks of the former Sheriff Mill viaduct to allow later bridging of the gap.[9] Also in 2013, the formerTewkesbury and Malvern Railway bridge that crossed over theM50 motorway was donated to the railway for eventual installation in the replacement bridge.

South: Sheffield Park to Lewes

[edit]
Looking south towards the former line toNewick andChailey and toLewes, fromSheffield Park

By the late Victorian era,Lewes station was the convergence point of three lines from the East Sussex coast and three lines to the north all of which reachedLondon viaCroydon.[4] Today, Lewes has a line to the north which joins the Brighton main Line atBurgess Hill and from there on to Gatwick Airport, East Croydon and London, a line west towards Brighton, a line south to Newhaven and Seaford, and a line east to Eastbourne, Hastings and Ashford.

Originally the Bluebell Line was the straightest and quickest route from Lewes to London.[4] The Bluebell Railway ran directly south from Sheffield Park to Culver Junction (at Culver Farm just south ofBarcombe Mills), with intermediate stations atNewick and Chailey andBarcombe.[4] At Culver Junction it joined the 1858Wealden Line (part of which is now restored as the nearby HeritageLavender Line), thereby gaining access to Lewes.[4] The section from East Grinstead to Culver Junction was closed in 1958, and the Lewes to Uckfield line in 1969 by British Railways.

Bluebell supporters and committee members have expressed interest in re-building the line south by three more stations to Lewes.[1] However, a substantial number of large civil engineering obstacles and intrusions onto the former track-bed make this a difficult project to envisage the completion of.[1] For execution, the project would require:[9]

  • The bridging of the raised, widened and re-alignedA275 road immediately south of Sheffield Park
  • The re-excavation of waste-infill under the former road bridges just south of Sheffield Park and Barcombe stations
  • The in-filling since of the cutting and former route under theA272 road
  • The re-excavation of waste-infill at the formerNewick and Chailey, which includes industrial waste producing large amounts ofmethane gas discharges[9]
  • The fact that a largeprivatehousing estate has been built on and surrounding the former Newick and Chailey site

The remaining undeveloped line from Lewes to Sheffield Park has been safeguarded as a bridleway and footpath.[21]

Stations

[edit]
Sheffield Park station
Horsted Keynes station
Kingscote station with AEC Routemaster bus on Route 473 East Grinstead – Kingscote service

The various stations have been restored to show different periods of the railway's life:

  • Sheffield Park has been restored to aVictorian ambience, as it would have appeared during the time of the London, Brighton and South Coast Railway (up to 1922)
  • Horsted Keynes emulates the Southern Railway from 1923 to 1947
  • West Hoathly (if built) will emulate the British Railways of the late 1940s
  • Kingscote echoes the British Railways of the 1950s
  • East Grinstead is an amalgam of British Railways of the 1950s and 1960s

Heritage railway

[edit]
East Grinstead to Sheffield Park
Horsted Keynes to Ardingly (proposed)

Original stations

[edit]
Lewes to East Grinstead (Low Level)
  • East Grinstead
  • Kingscote
  • West Hoathly
  • Horsted Keynes
  • Sheffield Park
  • Newick and Chailey
  • Barcombe
  • Lewes

Rolling stock

[edit]
Main article:Rolling stock of the Bluebell Railway
The new locomotive shed atSheffield Park

The Bluebell Railway preserved a number of steam locomotives before the cessation of steam service on British mainline railways in 1968. Today it has the largest collection—over 30—of steam locomotives in the UK after the National Railway Museum (NRM). The society also has a collection of almost 150 carriages and wagons, most of them pre-war.[citation needed]

The newly completed locomotive passing through Horsted Keynes on its second day in public service, 23 August 2024

On 29 October 2000 the Bluebell Railway announced its intention to reconstruct a replica of SR/BR periodLB&SCR H2 classAtlanticBeachy Head. By then, many surviving locomotive parts had been assembled including an ex-GNR 'Atlantic' boiler, and an ex-LB&SCR B4 class tender chassis.[22] The boiler was tested around August 2018. The locomotive rolled out and was coupled to its tender on 5 March 2024, to begin commissioning work prior to entering service,[23] which it did on 18 August 2024.[24]

In April 2008, theHeritage Lottery Fund provided a £2.8M grant towards new buildings next toSheffield Park, to provide weatherproof shelter for up to 17 carriages. The funds were also used to: create a museum and interpretation area; create new facilities for locomotive crews; create a rainwater catchment system from the roof of the carriage building, which is then processed and used to fill the steam engines' boilers; restore the railway's historic platform buildings.[25]

Twinning

[edit]

The Bluebell Railway is twinned with theMuseumstoomtram Hoorn – Medemblik, which linksHoorn andMedemblik,North Holland, theNetherlands.[26]

References

[edit]
  1. ^abcdefghijklmnopMichael Welch (31 May 2010).The Bluebell Railway: Five Decades of Achievement. Capital Transport Publishing.ISBN 978-1854143365.
  2. ^"Sussex sees first steam train on extended Bluebell Railway".BBC News. 23 March 2013. Retrieved23 March 2013.
  3. ^abcdefAwdry, Christopher (1990).Encyclopaedia of British Railway Companies. Sparkford: Patrick Stephens Ltd.ISBN 1-8526-0049-7.OCLC 19514063. CN 8983., pp 189-190.
  4. ^abcdefghijkTurner, John Howard (1979).The London Brighton and South Coast Railway 3 Completion and Maturity. Batsford.ISBN 0713413891.
  5. ^"Federick Dale Banister". GracesGuide.co.uk. Retrieved10 February 2013.
  6. ^Article on local news website
  7. ^"Casualty details: Knapp, Ronald". Commonwealth War Graves Commission. Retrieved30 August 2017.
  8. ^abcdefgJulian Holland (22 February 2013).Dr Beeching's Axe 50 Years On: Memories of Britain's Lost Railways. David & Charles.ISBN 978-1446302675.
  9. ^abcdefghij"Bluebell Railway Extension". Bluebell-Railway.co.uk. Retrieved10 February 2013.
  10. ^ab"Bluebell Railway in Sussex celebrates 50th anniversary".BBC News. 17 May 2010. Retrieved12 February 2013.
  11. ^"Bluebell Railway - 50th Anniversary Events".www.bluebell-railway.co.uk.
  12. ^ab"Rubbish cleared for steam trains".BBC News. 25 November 2008. Retrieved12 February 2013.
  13. ^Gemma Fennings (24 November 2011)."Bluebell Railway East Grinstead Extension".The Lewes Magazine. Archived fromthe original on 7 October 2012. Retrieved12 February 2013.
  14. ^ab"Bluebell Railway races to clear rubbish from cutting".BBC News. 31 May 2011. Retrieved12 February 2013.
  15. ^"Update: NEP Imberhorne Tip Waste by Rail". Bluebell Railway Society. 24 November 2011. Retrieved12 February 2013.
  16. ^"Dame Vera launches railway appeal".BBC News. 17 May 2010. Retrieved12 February 2013.
  17. ^"Steam railway in Mid Sussex receives cash boost".BBC News. 24 June 2010. Retrieved12 February 2013.
  18. ^"15 March 2013: The Line Is Joined!". Bluebell Railway. Retrieved21 March 2013.
  19. ^"East Grinstead Festival". Bluebell Railway. Retrieved21 March 2013.[permanent dead link]
  20. ^"Bluebell Railway ready to advance 'through' railway".www.railmagazine.com. Retrieved28 December 2022.
  21. ^"Lewes District Council Local Plan, Chapter 9, paragraph 9.19". Archived fromthe original on 14 June 2011.
  22. ^"Bluebell Railway Atlantic Group".www.bluebell-railway.co.uk.
  23. ^"'Beachy Head' Emerges!".facebook.com. Bluebell Railway. 6 March 2024. Retrieved6 March 2024.
  24. ^"LBSCR Class H2 No. 32424 'Beachy Head'". Bluebell Railway. Retrieved23 August 2024.
  25. ^"Steam railway awarded £2.8m grant". BBC News. 5 April 2008. Retrieved12 February 2013.
  26. ^"The most thrilling journey through time by steamtram and boat!". Museumstoomtram Hoorn-Medemblik. Archived fromthe original on 17 March 2013. Retrieved16 March 2010.

Further reading

[edit]
  • Thomas, Cliff (May 2013). "Bluebell links with main line at East Grinstead".The Railway Magazine. Vol. 159, no. 1345. Horncastle: Mortons Media Group. p. 6.ISSN 0033-8923.OCLC 750645684.

External links

[edit]
Wikimedia Commons has media related toBluebell Railway.
Wikivoyage has a travel guide forBluebell Railway.
Heritage railways, museums and preservation societies in England
Operational railways
Narrow-gauge
Standard-gauge
Centres and museums
Planned railways
Closed sites

51°01′58″N0°02′48″W / 51.0329°N 0.0467°W /51.0329; -0.0467

Retrieved from "https://en.wikipedia.org/w/index.php?title=Bluebell_Railway&oldid=1316838407"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp