![]() Southern Portal of Blisworth Tunnel | |
Overview | |
---|---|
Location | Blisworth,Northants, England |
Coordinates | 52°09′22″N0°55′43″W / 52.1560°N 0.9285°W /52.1560; -0.9285 |
OS grid reference | SP734514 |
Status | Open, boat trips available. |
Waterway | Grand Union Canal |
Start | 52°10′11″N0°56′07″W / 52.1696°N 0.9354°W /52.1696; -0.9354 (Northern portal) |
End | 52°08′45″N0°55′18″W / 52.1458°N 0.9217°W /52.1458; -0.9217 (Southern portal) |
Operation | |
Constructed | 1793-1805 |
Opened | 25 March 1805 |
Rebuilt | 1984 |
Owner | Canal & River Trust |
Technical | |
Length | 3,076 yards (2,813 m) |
Tunnel clearance | 4 feet 6 inches (1.4 m) |
Width | 15 feet (4.6 m) |
Water Depth | 5 feet (1.5 m) |
Towpath | No |
Boat-passable | Yes |
Blisworth Tunnel is a canal tunnel on theGrand Union Canal inNorthamptonshire, England, between the villages ofStoke Bruerne at the southern end andBlisworth at the northern end.
The northern end is about 18 miles (29.0 km) from the northern end of theGrand Junction Canal atBraunston, Northamptonshire and the southern end about 20 miles (32.2 km).At 3,076 yards (2,813m) long it is the third-longest navigable canal tunnel on theUK canal network afterStandedge Tunnel andDudley Tunnel (and the ninth-longest canal tunnel in the world). At its deepest point it isca.143 feet (ca.43m) below ground level.
The tunnel has no tow path inside, but is wide enough for twonarrowboats to pass in opposite directions.
Work began in 1793, but errors by the contractor left a wiggle in the tunnel, and after three years’ work it collapsed due toquicksand, claiming the lives of 14 men. It was then decided to begin again with a new tunnel.[1]
By the time the rest of the Grand Junction Canal had opened betweenLondon andBraunston, Northamptonshire in 1800, apart from the crossing of theRiver Great Ouse, the section of canal from Blisworth to the lower end ofStoke Bruerne locks was the only section unfinished. This was despite the tunnel having been under construction for seven years: the gap was filled by a temporary horse-drawn tramway over the top of the hill, with goods being transported from boat to wagon and back again. The tramway, built in 1801, wasNorthamptonshire's firstrailway. In March 1805, the tunnel was finally opened and the rails were used to connect the main line of the canal to theRiver Nene until the branch canal toNorthampton was constructed.
Until the 1870s travel through the tunnel was only achieved by men lying on their backs pushing the boats with their feet (legging). From 1871[2] steam tugs were used to pull boats through, and extra ventilation shafts were installed. Boaters wishing to avoid the extra cost involved in using the tugs could still leg their boats through, but by the 1930s motor boats (towing abutty boat) were common so the practice would have been unusual especially by the time the filmPainted Boats was filmed there in 1944.
Due to changes in the shape of the tunnel over time, the tunnel became unnavigable. There was major rebuilding of the tunnel in the 1980s, with sections lined with pre-cast concrete rings. It was also used to test out the materials that were later used on theChannel Tunnel. An unused ring is on display near the south portal.
Point | Coordinates (With links to map and aerial photo sources) |
---|---|
Northern portal | 52°10′11″N0°56′07″W / 52.1696°N 0.9354°W /52.1696; -0.9354 (Northern portal) |
Midpoint | 52°09′22″N0°55′43″W / 52.1560°N 0.9285°W /52.1560; -0.9285 (Mid point) |
Southern portal | 52°08′45″N0°55′18″W / 52.1458°N 0.9217°W /52.1458; -0.9217 (Southern portal) |