Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Baltimore Light RailLink

Route map:
From Wikipedia, the free encyclopedia
Light rail system in Baltimore

Not to be confused with theBaltimore Metro SubwayLink, a rapid transit line also in Baltimore, orLink light rail, a light rail system in Seattle.
Light RailLink
A train at Convention Center station in 2010
A train atConvention Center station in 2010
Overview
LocaleBaltimore,Maryland, United States
Transit typeLight rail
Number of lines3
Number of stations33
Daily ridership14,500 (weekdays, Q2 2025)[1]
Annual ridership5,015,100 (2024)[2]
Operation
Began operationApril 1992
Operator(s)Maryland Transit Administration
Technical
System length30 mi (48.3 km)
Track gauge4 ft 8+12 in (1,435 mm)standard gauge
Minimum radius of curvature100 ft (30 m)
ElectrificationOverhead line750 V DC
System map

TheBaltimore Light RailLink (formerlyBaltimore Light Rail, also known simply as the "Light Rail") is alight rail system servingBaltimore,Maryland, United States, and its northern and southern suburbs. It is operated by theMaryland Transit Administration (MTA Maryland).

In downtown Baltimore, it usesstreet-embedded tracks. Outside the central portions of the city, the line is located on privaterights-of-way, mostly from the defunctNorthern Central Railway,Baltimore and Annapolis Railroad andWashington, Baltimore and Annapolis Electric Railway. The system had a ridership of 5,015,100, or about 14,500 per weekday, as of the second quarter of 2025.

History

[edit]

Initial segment

[edit]
Hunt Valley, the terminus of the 5-station northern extension opened in 1997, pictured here in 2014
Construction work in progress in June 2003 to add a second track to the bridge over the Middle Branch of the Patapsco River

The origins of the Light RailLink lie in a 1966 Baltimore area transit plan that envisioned six rapid transit lines radiating from the city center. By 1983, only one of the plan's lines—the "Northwest" line—had been built, becoming theMetro SubwayLink. Much of the plan's "North" and "South" lines ran alongrights-of-way once used byinterurban streetcar lines and thecommuter rail routes of theNorthern Central Railway,Washington, Baltimore and Annapolis Electric Railway, andBaltimore and Annapolis Railroad.

Beginning in the late 1980s, Governor of Maryland and former Baltimore mayorWilliam Donald Schaefer pushed for a transit line along the plan's "North" and "South" corridors, motivated in part by a desire to establish a rail transit link to the new baseball park being built atCamden Yards for theBaltimore Orioles. Light RailLink was built quickly and inexpensively without federal funds, a rarity for a U.S. transit project. The initial system was a single 22.5-mile (36.2 km) line, all at-grade except for a bridge over the Middle Branch of thePatapsco River just south of downtown Baltimore. The line ran fromTimonium inBaltimore County in the north toGlen Burnie inAnne Arundel County in the south.

The line opened in stages over a 14-month period. The initial segment from Timonium Fairgrounds station (nowFairgrounds station) toCamden Yards station opened for limited service for Orioles games onApril 2, 1992, and for full service on May 17.[3][4] A three-station extension toPatapsco opened on August 20, 1992, followed by a 4-station extension toLinthicum on April 2, 1993, and an additional 2-station extension toGlen Burnie on May 20, 1993.[3][4]

Station placement and design were intended to be flexible and change over time, as stations could be built or closed at low cost.[citation needed] However, they were at times dictated by politics rather than planning: proposed stops inRuxton, Riderwood, andCross Keys were not built due to local opposition, while Mt. Royal station (nowMt. Royal/MICA station) and Timonium Business Park station (nowTimonium station) were built despite nearly being removed from the plan because theUniversity of Baltimore and a local business group funded them.Falls Road station was built with less parking than ridership required because community requests and a fence prevented riders from accessing a nearby commercial building.[5]

Expansion

[edit]

Three extensions to the system were added in 1997. On September 9, the line was extended north 4.5 miles (7.2 km) toHunt Valley, adding five stations that served a majorbusiness park and a mall.[6] On December 6, two short but important branches were added to the system: a 0.3-mile (0.48 km) spur in Baltimore that provided a link to thePenn Station intercity rail hub, and a 2.7-mile (4.3 km) spur to the terminal ofBWI Airport.[6][4]

On September 6, 1998, the Hamburg Street station (nowStadium/Federal Hill station) opened as aninfill station between the existingWestport and Camden Yards stations.[7][3] Adjacent toM&T Bank Stadium, it was initially only open duringRavens games and other major stadium events, but became a full-time stop on July 1, 2005.[4]

To save money, much of the system was built with only a single track. While this allowed the system to be constructed and opened quickly, it limited the system's flexibility: much of the line was restricted to 17-minuteheadways, with no way to reduce headways during peak hours. Federal money was acquired to double track most of the system; much of the line south of downtown Baltimore was shut down in 2004 and north of downtown shut down in 2005 in order to complete this project. The northern section up to Timonium reopened in December 2005; the rest opened in February 2006. The line north of Gilroy Road and the BWI Airport spur remain single tracked.

The Camden Yards–Penn Station route was suspended in September 2019 and replaced by a bus bridge due to a lack of available operators.[8] Service later resumed, but was again suspended in 2022 due to Amtrak construction at Penn Station. Light rail service to Penn Station resumed in June 2025.[9]

Incidents

[edit]

On July 10, 2019, part of the northbound platform atConvention Center station fell into a sinkhole caused by a broken water main.[10] The line was closed between Camden and North Avenue until August 19.[11]

On December 7, 2023, MTA Maryland announced the system would shut down indefinitely after inspections revealed a fire hazard in the rolling stock.[12] A free shuttle bus service connected Light Rail stations as repairs were made to the 53-car fleet.[13] Service resumed on December 23.[14]

Operation

[edit]

Routing and schedules

[edit]
Main article:List of Baltimore Light RailLink stations

The Light RailLink system consists of a main north–south line on which 28 of the system's 33 stops are located. There are two branches on the southern end to BWI Airport and Glen Burnie that have two stations each and one spur in Baltimore City forPenn Station that can only be entered heading north and exited heading south. There are still single-track sections north of Timonium, whereheadways are limited to 15 minutes.

The Light RailLink system has two train runs. One runs the full length of the main line between Hunt Valley and either BWI Airport or Glen Burnie, alternating between the two every other trip, with some off-peak trains originating or terminating at eitherNorth Avenue or Fairgrounds instead of Hunt Valley. The other—the Penn-Camden Shuttle—only runs through downtown between Penn Station and Camden Station.[15]

The light rail operates from 4:00 a.m. to 12:45 a.m. on weekdays, 4:15 a.m. to 12:45 a.m. on Saturdays, and 10 a.m. to 10 p.m. on Sundays and major holidays. At peak hours on weekdays (from the first trains of the day until 10 a.m., and from 4 p.m. to 6 p.m.), the BWI–Hunt Valley and Glen Burnie–Fairgrounds routes see 20-minute headways; at other times on weekdays and all day on weekends, there are 30-minute headways on both routes (with Glen Burnie trains traveling all the way to Hunt Valley). The Camden Yards-Penn Station route sees 30-minute headways at all times. Because there is significant overlap on these routes, most of the system sees 10-minute peak and 15-minute off-peak headways; stations in the downtown section between Mt. Royal and Camden Yards are served by six trains an hour off-peak and eight trains an hour at peak. (Paradoxically, the Fairgrounds-Hunt Valley section actually sees longer headways at peak hours.)

Most of the light rail's route is on dedicatedright-of-way that hasgrade crossings equipped withcrossing gates. The remainder of the route in downtown Baltimore between Camden Station and Mt. Royal usesshared right of way on Howard Street, where trains mix with automobile traffic and their movement is controlled by traffic signals. In 2007, a transit signal priority system was implemented on this section, resulting in time savings of 25%.[16] From south of Falls Road to North Avenue, the light rail runs parallel to theJones Falls Expressway, and from Camden Yards to north of Westport, it parallelsInterstate 395. North of Falls Road and south of Westport, it follows its own path towards its respective termini.

Fares and transit connections

[edit]

MTA fares are identical for the Metro SubwayLink, Light RailLink, and local buses: a one-way trip costs $2.00.[17] Daily, weekly, and monthly unlimited-ride passes are also available that are good on all three transit modes. A passenger with a one-way ticket can change Light RailLink trains if necessary to complete their journey, the only instance of a one-way MTA ticket being good for a ride on more than one vehicle, but transferring to a bus or the Metro requires a new one-way fare or a pass. Automated ticket vending machines that sell tickets and passes are available at all Light RailLink stations.

The Light RailLink's ticketing is based on aproof-of-payment system. Passengers must have a ticket or pass before boarding.Maryland Transit Administration Police officers ride some trains and randomly check passengers to make sure that they are carrying a valid ticket or pass and can issuecriminal citations for those without one. Civilian Fare Inspectors also conduct ticket checks, alighting those without fare.

Most Light RailLink stations are served by several MTA bus routes and passengers can make platform-to-platform transfers with the MARC Camden Line at Camden Yards and with the MARC Penn Line at Penn Station. There are no cross-platform connections with the Metro SubwayLink. The Lexington Market subway and light rail stations are a block apart and connected only via surface streets.

Ridership

[edit]
This section needs to beupdated. Please help update this article to reflect recent events or newly available information.(October 2019)
  • FY 2011 – 27,595 average weekday; 8,655,209 annual[18]
  • FY 2012 – 27,253 average weekday; 8,539,996 annual[19]
  • FY 2013 – 27,537 average weekday; 8,647,381 annual[20]
  • FY 2014 – 25,183 average weekday; 8,105,743 annual[21]
  • FY 2015 - 7,657,256 annual
  • FY 2016 - 7,431,060 annual
  • FY 2017 - 7,345,442 annual
  • FY 2018 - 7,416,504 annual
  • FY 2019 - 6,966,072 annual
  • FY 2020 - 4,652,718 annual
  • FY 2021 - 2,458,661 annual
  • FY 2022 - 2,903,523 annual
  • FY 2023 - 3,434,185 annual[22]

Rolling stock

[edit]
A typical two-car train at Lutherville station in 2014

Baltimore's Light RailLink vehicles (LRVs) were built byABB Traction, the U.S. division ofABB. The initial set was delivered in 1991–1992 as the line was being built; a supplemental order of similar cars built byAAI Corporation was delivered in 1997, when the extensions came into service.

Baltimore LRVs are larger than traditionalstreetcars and those used on San Francisco'sMuni Metro or Boston'sGreen Line. Thearticulated cars are 95 feet (28.96 m) long over coupler faces, 9.5 feet (2.90 m) wide, and 12.5 feet (3.81 m) high, and can accommodate 85 seated and 91 standing passengers. The cars operate on4 ft 8+12 in (1,435 mm)standard gauge track. One-, two- and three-car trains are all routinely seen in service. Trains are powered by 750 volt DC fromoverhead lines via apantograph, and have a maximum speed of 60 miles per hour (97 km/h). When delivered, they were the first transit vehicles in the United States to employ A/C propulsion. Each LRV is powered by four 275 hp (205 kW) motors (1,100 hp or 820 kW total); the middle truck of three-car trains is unpowered.

Interior of a Baltimore Light RailLink vehicle

As of 2024, the MTA had 53 individual light rail cars. During typical weekday peak-time service, approximately 30 to 35 cars are required; a somewhat higher number of cars are put into service immediately after Orioles and Ravens games. For weekday service, as well as days of Orioles games or events at theCFG Bank Arena orBaltimore Convention Center, trains going from Hunt Valley to Cromwell and BWI Airport are generally run with two cars, while three-car trains are put into service for Ravens games and major downtown events. The Penn Station-Camden Yards shuttle is typically operated with one-car trains. The MTA also owns a variety of maintenance of way equipment, which can use diesel power in emergencies.

A mid-life upgrade of the light rail vehicles began in 2013.[23] On September 9, 2013, a contract for mid-life overhauls of the light rail vehicles was awarded toAlstom. Five vehicles at a time were sent for rebuilding, involving testing, removal of all interior and exterior components and replacement with new propulsion systems. The overhaul is scheduled for completion in March 2018.[24] The overhauled cars began testing in early 2016.[25] By 2021 the original order of ABB vehicles had their interiors upgrades with security cameras, LED lighting, andLCD screens that show the train's position along the line.

In February 2024, the Maryland Transit Administration announced that they had been awarded $213,696,341 in grant funding from the U.S. Department of Transportation’s Federal Transit Administration’s Rail Vehicle Replacement program to replace all 52 aging Light Rail vehicles in its fleet with new, modern railcars.[26]

Future

[edit]

While there are several plans and proposals to expand the system, none are approved or funded. An independent commission on Baltimore-area transit made a number of suggestions in a 2002 report for new lines and expansions of existing lines.[27] Newer proposals include expanding service on the existing Central Light RailLink line by extending Sunday service via the BaltimoreLink plan, as well as new stations and spurs.[28]

Texas station

[edit]
The incomplete Texas station in 2014

There are plans to add aninfill station between the existing Timonium and Warren Road stations in Texas,Cockeysville. An island was built at this point on the line in conjunction with the 2005 double-tracking work to provide a turn-back point for trains not going all the way to Hunt Valley, which could be converted into a station at a later date.

Stockholm Street station

[edit]

In the 2015 South Baltimore Gateway Masterplan, the city of Baltimore proposed a new light rail stop along the Central Light RailLink line at Stockholm Street, in between Hamburg Street andWestport. The new station would be located near a proposed newMARC station west of Russell Street,[29] and would provide additional access to theBaltimore Greyhound Bus Terminal, theHorseshoe Casino, and new businesses in the Carroll-Camden Industrial Area.[30]

Port Covington extension

[edit]

In January 2016, plans were unveiled by Sagamore Development Company, owned byUnder Armour CEOKevin Plank, regarding the redevelopment ofPort Covington inSouth Baltimore.[31] The new plan for Port Covington calls for two proposed new light rail stations, along with new residential and commercial development. The first station would be located west of Hanover Street, and the other would be located at the intersection of East McComas Street and East Cromwell Street, just south ofFederal Hill.[32] This proposed extension would create a new spur from the Central Light RailLink line by crossing the Middle Branch of thePatapsco River south ofInterstate 95.

Low floor vehicles

[edit]

The MTA plans to transition the system from high floor vehicles tolow floor LRVs and requested information from low-floor LRV vendors in January 2023.[33]

Red Line

[edit]
Main article:Red Line (Baltimore)

TheRed Line is a planned 14.1-mile (22.7 km), 19-station light rail line traveling east–west that would intersect with the existing Light RailLink downtown;[34] this would be a separate service, with no track connection to the existing Light RailLink, though there would be opportunities for transfer between the two in the vicinity ofUniversity Center / Baltimore Street. The line would operate in a total of 4.7-mile (7.6 km) of tunnels through the downtown area (and along Cooks Lane), with the majority of the rest of the system operating at-grade and just a few aerial sections, as well as in the median of the formerInterstate 170 freeway. The Red Line was cancelled by GovernorLarry Hogan, who had campaigned against it in the2014 Maryland gubernatorial election, on June 25, 2015.[35]Wes Moore, his successor, indicated his intention to revive it shortly afterbeing elected, and formally announced the return of the project in a ceremony with Baltimore mayorBrandon Scott on June 15, 2023.[36]

See also

[edit]

References

[edit]
  1. ^"Transit Ridership Report Second Quarter 2025"(PDF).American Public Transportation Association. August 27, 2025. RetrievedAugust 29, 2025.
  2. ^"Transit Ridership Report Fourth Quarter 2024"(PDF).American Public Transportation Association. February 19, 2025. RetrievedFebruary 25, 2025.
  3. ^abcLogan, Mary (December 1, 2005)."MAJOR TRANSPORTATION MILESTONES IN THE BALTIMORE REGION SINCE 1940"(PDF). Baltimore Metropolitan Council. p. 13. Archived fromthe original(PDF) on June 23, 2015. RetrievedOctober 24, 2017.
  4. ^abcd"House Bill 1185: Maryland Transit Administration – Public Transit Services – Efficiency and Performance Standards"(PDF). Department of Legislative Services, Maryland General Assembly. July 1, 2008. p. 4.Archived(PDF) from the original on October 24, 2017. RetrievedOctober 24, 2017.
  5. ^Gunts, Edward (May 17, 1992)."Baltimore's light rail 'more than ready' to roll for regular service MTA says beauty of light-rail system is its flexibility".Baltimore Sun.
  6. ^ab"Maryland Department of Transportation Maryland Transit Administration Media Guide"(PDF). Maryland Department of Transportation Maryland Transit Administration. 2017. pp. 15–16. Archived fromthe original(PDF) on April 12, 2018.
  7. ^Peckham, Geoff (September 6, 2008)."Stadium Celebrates 10-Year Anniversary" (Press release). Baltimore Ravens. Archived fromthe original on November 17, 2017. RetrievedNovember 17, 2017.
  8. ^Campbell, Colin (September 11, 2019)."MTA suspends Light Rail Penn-Camden shuttle in Baltimore due to shortage of operators". Baltimore Sun.Archived from the original on September 16, 2025. RetrievedJanuary 22, 2025.
  9. ^Zawodny, Daniel (June 17, 2025)."Baltimore's light rail resuming service to Penn Station".The Baltimore Banner.Archived from the original on June 18, 2025. RetrievedJune 18, 2025.
  10. ^Dance, Scott; Duncan, Ian; Reed, Lillian (July 10, 2019)."Large hole opens in downtown Baltimore street, swallowing part of Light Rail station; crews preparing for heavy rain Thursday".Baltimore Sun.Archived from the original on July 17, 2019. RetrievedAugust 21, 2019.
  11. ^Davis, Phil (August 18, 2019)."Light Rail service near Howard and Pratt Street sinkhole to resume Monday".Baltimore Sun. Archived fromthe original on August 21, 2019. RetrievedAugust 21, 2019.
  12. ^"MTA to suspend all Light Rail services effective Friday - CBS Baltimore".www.cbsnews.com. December 7, 2023.Archived from the original on December 7, 2023. RetrievedDecember 7, 2023.
  13. ^Starkey, Josh (December 7, 2023)."Light rail services to be suspended starting Friday".WBAL.Archived from the original on December 7, 2023. RetrievedDecember 7, 2023.
  14. ^Ng, Greg (December 23, 2023)."Back on track: Light Rail resumes Saturday following shutdown".WBAL.Archived from the original on December 29, 2023. RetrievedDecember 29, 2023.
  15. ^"Light rail". Department of Transportation Maryland Transit Administration.Archived from the original on September 17, 2012. RetrievedApril 25, 2015.
  16. ^Reflections in MotionArchived February 7, 2009, at theWayback Machine 2007 MTA Annual Report (PDF), page 12. Retrieved February 9, 2010.
  17. ^"Regular Fares". Maryland Transit Administration.Archived from the original on April 10, 2023. RetrievedApril 10, 2023.
  18. ^"Trends in Transit Annual Report 2011"(PDF). Maryland Transit Administration. p. 24. RetrievedApril 25, 2015.
  19. ^"Transit Matters annual report AR12"(PDF). Maryland Transit Administration. p. 6.Archived(PDF) from the original on March 4, 2016. RetrievedApril 25, 2015.
  20. ^"Forward Focus Annual Report 2013 A Year in Review"(PDF). Maryland Transit Administration. p. 4. RetrievedApril 25, 2015.
  21. ^"MTA Maryland 2014 Annual Report"(PDF).Archived(PDF) from the original on February 7, 2017. RetrievedJuly 10, 2017.
  22. ^"Federal Transit Administration Complete Monthly Ridership".Archived from the original on March 11, 2024. RetrievedMarch 7, 2024.
  23. ^A Strategic Plan to Enhance the Howard Street Corridor. Howard Street Steering Committee Recommendations, April 22, 2009 Draft
  24. ^Maryland selects Alstom for Baltimore light rail overhaul. Alstom Press Release, September 9, 2013
  25. ^"Nate Lawrence – Your light rail more seats leak and the... | Facebook".www.facebook.com.Archived from the original on January 14, 2016. RetrievedAugust 6, 2015.
  26. ^"MARYLAND TRANSIT ADMINISTRATION AWARDED $213 MILLION FEDERAL GRANT TO REPLACE ENTIRE LIGHT RAIL VEHICLE FLEET".www.mta.maryland.gov. RetrievedJuly 1, 2024.
  27. ^"Baltimore Regional Rail System Plan"(PDF).Maryland Transit Administration. August 2002. Archived fromthe original(PDF) on September 9, 2011.
  28. ^"Home – MTA BaltimoreLink". Mta.maryland.gov. RetrievedJune 29, 2016.
  29. ^Public Gateway Report[dead link]
  30. ^"South Baltimore Gateway Master Plan". South Baltimore Gateway Master Plan.Archived from the original on June 14, 2016. RetrievedJune 29, 2016.
  31. ^Melody Simmons (January 7, 2016)."Kevin Plank's real estate firm offers first look at multibillion-dollar Port Covington project".Baltimore Business Journal.Archived from the original on July 3, 2016. RetrievedJanuary 10, 2016.
  32. ^"Kevin Plank's Sagamore Development reveals Port Covington master plan". Baltimore Sun. January 7, 2016.Archived from the original on June 16, 2016. RetrievedJune 29, 2016.
  33. ^Request for Information: Low Floor LRV Fleet Transition, Maryland Department of Transportation, Mass Transit Administration, January 11, 2023, RFI-23-041-EQ
  34. ^"Baltimore Red Line". Maryland Transit Administration. Archived fromthe original on December 11, 2008. RetrievedApril 25, 2015.
  35. ^"Hogan says no to Red Line, yes to Purple".The Baltimore Sun. June 2015.Archived from the original on June 27, 2015. RetrievedJuly 27, 2015.
  36. ^Wintrode, Pamela Wood,Daniel Zawodny,Brenda (June 27, 2024)."Baltimore's Red Line will be light rail, not rapid buses, governor says".The Baltimore Banner.Archived from the original on June 28, 2024. RetrievedJuly 3, 2024.{{cite web}}: CS1 maint: multiple names: authors list (link)

External links

[edit]
Template:Attached KML/Baltimore Light RailLink
KML is from Wikidata
Wikimedia Commons has media related toBaltimore Light Rail.
Metro SubwayLink
Light RailLink
Purple Line(2027)
Rapid rail transit
Baltimore area
Washington area
Passenger rail
Bus services
Other topics
Italics denote services currently under construction
Transportation in MetropolitanBaltimore
Agencies
Local Rail
MARC Train
Bus
Other
Aviation
Automobile
Intrastate
Interstate
Future projects
Currently operatinglight rail andstreetcar systems in theUnited States
Arizona
Arkansas
California
Colorado
District of Columbia
Florida
Georgia
Illinois
Louisiana
Maryland
Massachusetts
Michigan
Minnesota
Missouri
New Jersey
New York
North Carolina
Ohio
Oklahoma
Oregon
Pennsylvania
Tennessee
Texas
Utah
Virginia
Washington
Wisconsin
Italics denote non-transit streetcar lines, operating only on limited dates and usually not year-round, for tourism or educational purposes.

Other transit in the United States:

Retrieved from "https://en.wikipedia.org/w/index.php?title=Baltimore_Light_RailLink&oldid=1317937186"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp