Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

BTS Skytrain

From Wikipedia, the free encyclopedia
Elevated rapid transit system in Bangkok, Thailand

The Elevated Train in Commemoration of HM the King's 6th Cycle Birthday
Two CNR Changchun EMU-B1 at Ekkamai station.
TwoCNR Changchun EMU-B1 at Ekkamai station.
Overview
Native nameBangkok Mass Transit System
OwnerBangkok Metropolitan Administration (BMA)
Area servedBangkok Metropolitan Region
LocaleBangkok, Thailand
Transit typeRapid transit
People Mover
Number of lines3[1]
Number of stations64
Daily ridership723,167( BTS  and BTS )
7,550( MRL )
2024[2]
Websitewww.bts.co.th/eng/index.html
Operation
Began operation5 December 1999;
26 years ago
 (1999-12-05)
Operator(s)Bangkok Mass Transit System
Public Company Limited
CharacterFully elevated
Number of vehicles BTS  & BTS 
Siemens Modular Metro
EMU-A1 : 35 four-car trains
Siemens -Bozankaya
EMU-A2 : 22 four-car trains
CNR Changchun
EMU-B1 : 12 four-car trains
EMU-B2 : 5 four-car trains
CRRC Changchun
EMU-B3 : 24 four-car trains
 MRL 
AlstomInnovia APM 300
3 two-car trains
Headway2.40 - 6.00 mins( BTS )
3.45 - 6.00 mins( BTS )
8.00 - 15.00 mins( MRL )
Technical
System length70.05 km (43.53 mi)(operational)
36.84 km (22.89 mi)(planned)
106.89 km (66.42 mi)(total)
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
Electrification750 V DC third rail
Average speed35 km/h (22 mph)
Top speed80 km/h (50 mph)
System map

Eastern Outer Ring Road
N28
Khlong Ha
N27
Khlong Si
N26
Khlong Sam
N25
Khu Khot
N24
Yaek Kor Por Aor
N23
Royal Thai Air Force Museum
N22
Bhumibol Adulyadej Hospital
N21
Saphan Mai
N20
Sai Yud
N19
Phahon Yothin 59
N18
Wat Phra Sri Mahathat MRT 
N17
11th Infantry Regiment
N16
Bang Bua
N15
Royal Forest Department
N14
Kasetsart University
N13
Sena Nikhom
N12
Ratchayothin
N11
Phahon Yothin 24
N10
Ha Yaek Lat Phrao MRT 
N9
 BTS 
Mo Chit MRT 
N8
Saphan Khwai
N7
Sena Ruam
N6
Ari
N5
Sanam Pao
N4
 BTS 
Victory Monument
N3
W2
 SRT Yotse
Phaya Thai ARL 
N2
W1
National Stadium
Ratchathewi
N1
CEN
Siam
Siam
CEN
S1
Ratchadamri
Chit Lom
E1
S2
 MRT Sala Daeng
Phloen Chit
E2
S3
Chong Nonsi
Nana
E3
S4
Saint Louis
Asok MRT 
E4
S5
Surasak
Phrom Phong
E5
S6
ferry/water interchangeSaphan Taksin
Thong Lo
E6
Ekkamai
E7
S7
 BTS Krung Thon Buri
Phra Khanong
E8
S8
Wongwian Yai
On Nut
E9
S9
Pho Nimit
Bang Chak
E10
S10
Talat Phlu
Punnawithi
E11
S11
Wutthakat
Udom Suk
E12
S12
 MRT Bang Wa
Bang Na
E13
S13
Bang Waek
Bearing
E14
S14
Krachom Thong
Samrong MRT 
E15
S15
Bang Phrom
Pu Chao
E16
S16
Intharawat
Chang Erawan
E17
S17
Boromratchonnanee
Royal Thai Naval Academy
E18
S18
 SRT Taling Chan
Pak Nam
E19
S19
Bang Kruai
Srinagarindra
E20
S20
Rama 5
Phraek Sa
E21
S21
Thanon Bang Kruai–Sai Noi
Sai Luat
E22
S22
Triam Udom Suksa Pattanakarn School Nonthaburi
Kheha
E23
S23
Om Non
Sawang Khaniwat
E24
S24
Bang Rak Noi
Mueang Boran
E25
S25
 MRT Bang Rak Noi It
Sichan Pradit
E26
Bang Pu
E27
This diagram:

TheBangkok Mass Transit System, commonly known as theBTS Skytrain (Thai:รถไฟฟ้าบีทีเอสRTGSrot fai fa[BTS]), is an elevatedrapid transit system inBangkok,Thailand. It is operated byBangkok Mass Transit System PCL (BTSC), a subsidiary ofBTS Group Holdings, under a concession granted by theBangkok Metropolitan Administration (BMA) which owns the lines. The system consists of 62 stations along three lines with a combinedroute length of 70.05 kilometers (43.53 mi). TheBTS Sukhumvit Line runs northwards and south-eastwards, terminating atKhu Khot andKheha respectively. TheBTS Silom Line which serves Silom and Sathon Roads, the central business district of Bangkok, terminates atNational Stadium andBang Wa. TheGold Line people mover runs fromKrung Thon Buri toKlong San and servesIconsiam. The lines interchange atSiam station andKrung Thon Buri. The system is formally known as "The Elevated Train in Commemoration of HM the King's 6th Cycle Birthday" (รถไฟฟ้าเฉลิมพระเกียรติ 6 รอบ พระชนมพรรษา).

Besides the three BTS lines,Bangkok's rapid transit system includes the underground and elevatedMass Rapid Transit (MRT) lines, theBus Rapid Transit System (BRT), and the elevatedAirport Rail Link (ARL), serving several stations before reachingSuvarnabhumi Airport, and theSRT Red Lines of theState Railway of Thailand.

History

[edit]
icon
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed.(January 2025) (Learn how and when to remove this message)
Map of Bangkok urban transit systems
Skytrain departingSala Daeng station
Interior of a train
A typical BTS station platform, showing platform screen doors

Plans for mass transit in Bangkok began in the early 1980s. An early version of the Skytrain project was known as theLavalin Skytrain because it was designed using theVancouver SkyTrain as a model, adopting technology developed bySNC-Lavalin. Due to political interference, the concession with Lavalin was cancelled in June 1992,[3] despite Bangkok's chronictraffic congestion. TheThai government focused on increasing road andexpresswayinfrastructure in an attempt to reduce congestion. This had little impact, as the number of cars on the road continued to increase dramatically. The routes considered as part of the Skytrain project would become the basis for theMRT system and are mainly underground. In the early 1990s, foundations and a viaduct for the Lavalin Skytrain were constructed in the middle of thePhra Pok Klao Bridge across theChao Phraya River. The viaduct was redeveloped into asky park in June 2020.

Another abortive attempt at building an elevated rail network was theBangkok Elevated Road and Train System (BERTS), which was terminated in 1998 after only 13.77 percent had been completed.[4]

Shortly after it became clear that the Lavalin Skytrain had stalled, then-Governor Major GeneralChamlong Srimuang asked his deputy, CaptainKritsada Arunwong na Ayutthaya, to create a new feeder system with a route alongSukhumvit andSilom Roads. Krisda and his team from the Bangkok Metropolitan Administration (BMA) succeeded in finding a private investor. Krisda also convinced everyone concerned to allow the city supervise the project.Keeree Kanjanapas founded the Bangkok Transit System Corporation (BTSC) and it successfully financed the system and grew it from a feeder system to a full mass transit project.Thanayong Public Company Limited[5]Thai:บริษัท ธนายง จำกัด (มหาชน)) had a 28 percent stake in BTSC when the Skytrain began, and therefore in its early days the system was sometimes referred to as the "Thanayong Skytrain".

Siemens, the supplier of the railway technology, and the Thai contractor, Italian Thai Development, built the system for BTSC. The "Skytrain" name was bestowed later by the press following the Vancouver example where the elevated metro had been named "Skytrain". Originally, the Skytrain depot was to be built underneathLumphini Park, but due to widespread objections from Bangkok residents it was constructed on a parcel of land onPhahonyothin Road, replacing the old northern/northeastern bus terminal (Mo Chit). The current depot at Mo Chit is part of the proposed "Bangkok Terminal" project, where a large complex composed of a new regional bus terminal,park and ride facility, and other commercial development can be built directly above it.

The Skytrain system was opened on 5 December 1999[6] by PrincessMaha Chakri Sirindhorn. It initially had lower-than-predicted ridership, with 200,000 passenger trips per day. Ticket revenue was only enough to meet the trains' operating cost, and not sufficient to service construction loans. The Skytrain's daily passenger numbers have steadily increased since then. On 9 December 2005, more than 500,000 single trips were made on the Skytrain on a single day for the first time. By September 2012, the Skytrain served around 600,000 passengers on an average day, increasing to 650,000 on an average weekday in 2013. A record 760,000 passengers traveled on Sunday, 22 December 2013, a day of mass political protest in Bangkok.[7] The normal Sunday average is 400,000 passengers. The BTS had a fleet of 52 four-car trains (208 carriages) by 2017. 46 new four-car trains (184 carriages) were ordered to address growing capacity requirements of the existing lines to cater for the Sukhumvit Line extensions south to Kheha and north to Khu Khot. They were delivered from 2018 to 2020.[8]: 51 

On 5 March 2020, the BTS made a song about theCOVID-19 pandemic, as an antidote to the grim warnings about the coronavirus, showing the staff dancing and keeping hygiene.[9][10]

Station layout

[edit]
icon
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed.(January 2025) (Learn how and when to remove this message)
Exterior view ofWongwian Yai station
The upper platform atSiam interchange station, for north- and west-bound trains

The system's stations are all elevated and designed with three distinct levels.[11] At street level, passengers can access the stations via stairs, escalators, and lifts. This level also typically houses supporting utility equipment like generators and water tanks, often situated on traffic islands.

The first elevated level houses the ticket booths, small kiosk-style shops, and fare gates. Passengers can reach the second level (or the third level in the case ofSiam station) using stairs, lifts, and escalators. This level is dedicated to the platforms and rails. Most stations adopt aside platform layout, with the notable exceptions of Siam Station, Ha Yaek Lat Phrao Station, andSamrong, which utilize island platforms. Siam Station featuresisland platforms to enable easycross-platform interchange between the two lines of the system.Saphan Taksin uses a unique single-track side platform layout due to space constraints.

The platform design accommodates the precise positioning of train doors, with equal distances between doors in all cars. Markings on the platform indicate where the doors will align once the train stops. Although the platforms are constructed to support six-car trains,[12] currently, only four-car trains are operational. For added safety and assistance, security personnel are stationed at every platform and in the ticketing halls.

The Skytrain system in Thailand features five key stations – Sala Daeng, Asok, Ha Yaek Lat Phrao, Bang Wa, and Mo Chit – that serve as interchanges with theMetropolitan Rapid Transit (MRT) system. Additionally, the Saphan Taksin station is conveniently connected to the adjacent Sathon Pier, which is a stop for theChao Phraya Express Boat services.[13] Many of these stations are also connected to nearby buildings and public amenities throughskybridges, providing easy and convenient access for pedestrians.

Since 2014,platform screen doors (half size) have been installed in several stations including On Nut, Phrom Phong, Asok, Chit Lom, Siam, Thong Lor, Phaya Thai, Victory Monument, Sala Daeng, Chong Nonsi and Surasak.[14] However, it's noteworthy that the installation process has not been without issues. For instance, the installation at Phrom Phong station in December 2013 led to a software problem, resulting in a six-hour shutdown of all BTS services. This shutdown caused significant traffic congestion in the city.[15]

Fares

[edit]
icon
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed.(January 2025) (Learn how and when to remove this message)
Ticketing machine atAri station.

Fares are determined by distance.[16]

Passengers can purchase single-journey tickets from ticket machines at all stations. These tickets are tapped at the fares gates to enter and inserted at the fare gates to exit, where they are retained. Additionally, passengers can purchase single-journey tickets to any station on theMRT Pink Line andMRT Yellow Line. This is possible becauseWat Phra Si Mahathat station has paid-area integration between the Sukhumvit Line and the MRT Pink Line. At Samrong station, passengers transferring between theSukhumvit Line and theMRT Yellow Line must insert their single-journey ticket into the fare gates. The fare gates will then return the ticket, which passengers can tap at the other fare gates to continue their journey.

In 2007, the BTS Smartpass was introduced. The BTS Smartpass was a stored-value card that could be used to travel across the BTS Skytrain network.[17]

In 2012, the BTS Smartpass was replaced by the Rabbit Card. The Rabbit Card is a more advanced stored-value card, not only covering fares for the BTS and the Bus Rapid Transit (BRT), but also functioning as a payment method for various restaurants, stores and services associated with the BTS.[18][19]

The Rabbit Card is not compatible with any other rail or bus network in Bangkok, such as the MRT or SRT. In contrast, these rail networks accept EMV (Europay, Mastercard, and Visa) contactless payment, allowing passengers to use their credit or debit cards directly at the fare gates. TheMangmoom Card, designed for use across multiple rail and bus networks, has experienced several delays. Originally planned for a 2015 launch, it is not yet valid for use on the BTS Skytrain as of 2026.[20]

BTS Network

[edit]
Main articles:Sukhumvit Line,Silom Line,Gold Line (Bangkok), andList of rapid transit stations in Bangkok

At its opening, the BTS had 23 stations on its two lines: 17 on theSukhumvit Line and 7 on theSilom Line, with both lines interchanging at Siam. Since then, 30 additional stations have opened on the Sukhumvit Line and 6 on the Silom Line, with the latest new three stations atGold Line.[citation needed]

Line

Name

CommencementLast ExtensionNext ExtensionTerminusLength

(km)

Stations
Rapid Transit
Sukhumvit Line5 December 1999; 26 years ago (1999-12-05)16 December 2020; 5 years ago (2020-12-16)TBAKhu KhotKheha53.58 km (33.29 mi)47
Silom Line8 February 2021; 5 years ago (2021-02-08)National StadiumBang Wa14.67 km (9.12 mi)14
People Mover
Gold Line16 December 2020; 5 years ago (2020-12-16)TBAKrung Thon BuriKhlong San1.80 km (1.12 mi)3
Total70.05 km (43.53 mi)64

BTS route extensions

[edit]
icon
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed.(January 2025) (Learn how and when to remove this message)

In 2002, the cabinet of then Prime MinisterThaksin Shinawatra amended laws in order to allow private firms to finance the cost of operating the train system, while the government would undertake civil engineering works to build new extensions.

Timeline of BTS openings

  • 5 December 1999 Sukhumvit Line: Mo Chit – On Nut;Silom Line: National Stadium – Saphan Taksin
  • 15 May 2009 Silom Line: Saphan Taksin (S6) – Wongwian Yai (S8)
  • 12 August 2011 Sukhumvit Line: On Nut (E9) – Bearing (E14)
  • 12 January 2013 Silom Line: Wongwian Yai (S8) – Pho Nimit (S9)[21]
  • 14 February 2013 Silom Line: Pho Nimit (S9) – Talat Phlu (S10)
  • 5 December 2013 Silom Line: Talat Phlu (S10) – Bang Wa (S12)
  • 3 April 2017 Sukhumvit Line: Bearing (E14) – Samrong (E15)
  • 6 December 2018 Sukhumvit Line: Samrong (E15) – Kheha (E23)
  • 9 August 2019 Sukhumvit Line: Mo Chit (N8) – Ha Yaek Lat Phrao (N9)
  • 4 December 2019 Sukhumvit Line: Ha Yaek Lat Phrao (N9) – Kasetsart University (N13)
  • 5 June 2020 Sukhumvit Line: Kasetsart University (N13) – Wat Phra Sri Mahathat (N17)
  • 16 December 2020 Sukhumvit Line: Wat Phra Sri Mahathat (N17) – Khu Khot (N24)
  • 8 February 2021 Silom Line: Saint Louis (S4, infill station)
TheSurasak BTS station passes throughSathon, a business district of Bangkok.

1st extension – Silom Line south to Wongwian Yai (2009)

[edit]

On 18 October 2005, with no approval from the central government forthcoming,Bangkok Metropolitan Administration (BMA) decided to fund and complete the 2.2 kilometers (1.4 mi) Silom Line route extension to Krung Thon Buri Station (S7) and Wongwian Yai Station (S8). Construction began on 13 December 2005 with completion originally expected within two years. However, problems with the tendering and installation of a new Bombardier open signalling system repeatedly pushed back the schedule. The extension finally opening on 15 May 2009. However, the single platformSaphan Taksin station which has only one track, has caused repeated delays during rush hour. In 2012, the BMA announced plans to demolish Saphan Taksin station in the future. There are now plans to construct new platforms and remove the bottleneck and keep the station which provides an important link between river boats. The plan includes redesigning the road bridges either side of the viaduct to fit the new station.

2nd extension – Sukhumvit Line east to Bearing (2011)

[edit]

A second extension, the 5.25 km On Nut station (E9) to Bearing station (E14) started construction in August 2006.[22] The 4 billion baht extension was again funded by the BMA.[23] The original scheduled opening date was mid-2009. However, an unusual, prolonged delay in the tendering of the contract for the electrical and signals resulted in a two-year delay. "The senior City Hall official responsible for making the purchase has apparently stalled the scheme over fears of being investigated if something went wrong with the purchase."[24]

The BTSC was contracted by the BMA to run the extension. Subsequently, the extension did not open until over two years later on 12 August 2011. The delay in opening prompted the BMA to offer free travel for this extension until the end of 2011 as compensation. A flat fare separate from the distance based fare normal in the BTS network was then charged for this section. However, distance based fares are now used for this extension.

3rd extension – Silom Line south to Bang Wa (2013)

[edit]

The third extension to the network, a 5.3 km, four station extension from Wongwian Yai (S8) to Bang Wa (S12) in Phasi Charoen District began construction in the 2nd quarter of 2011 with a deadline of the end of 2012. Only the stations had to be constructed as the viaduct had been completed some years prior. However, construction was delayed for many months by the2011 Thailand floods. It eventually opened in stages. Pho Nimit opened on 12 January 2013, Talat Phlu opened on 14 February 2013, with the last two stations opening on 5 December 2013.[25] For most of 2013, passengers changed platforms and trains at Wongwian Yai for a shuttle service to S09 and S10 as there was no turnout at S10 for through trains. Since the opening of the final section of the extension to Bang Wa station on 5 December 2013, this is no longer the case.

4th extension – Sukhumvit Line east to Kheha (2017-2018)

[edit]

Construction started in April 2012 for a 12.6 km (7.8 mi), seven station extension fromBearing station (E14) to Samut Prakan Station (E23). The extension is being built byCh. Karnchang.[26] Two stations (E18 & E22) will be built at a later date. The extension was funded by the MRTA as it is outside BMA city limits. The extension was planned to open in 2017. In April 2013, the MRTA awarded Ch Karnchang the contract for track laying and electrical systems.[27] Construction was completed in 2017, but arguments over who should operate the line delayed the opening. One station,Samrong opened earlier, on 3 April 2017. The full extension opened on 6 December 2018 and the BTSC has announced that the free travel concession on this section will continue until the new train sets arrive to allow for the new section to be fully functional.

5th extension – Sukhumvit Line north to Khu Khot (2019-2020)

[edit]
  • 1) Mo Chit station to Saphan Mai: 11.4 km, 12 stations (N9–N20).
  • 2) Saphan Mai to Khu Khot: 7.5 km, four stations (N21-N24).

An 11.4 km, 12 station northern extension fromMo Chit station toSaphan Mai inDon Mueang District has been planned since the Sukhumvit Line opened. Originally, this extension was scheduled to be completed by 2008. However, due to a combination of changes in government, a prolonged environmental study, and problems with locating a suitable train depot, the extension has been continually delayed.

A further 16.5 km, nine station extension from Saphan Mai to Lam Lukka was also planned once the extension to Saphan Mai had been completed. This was subsequently split into two extensions. A 7.5 km, four station extension to Khu Khot and a 9 km, five station extension along Lam Luk Ka Road to Lam Luk Ka.

Due to the significant delay in the northern extension plans, in mid-2013 it was decided by the MRTA to tender extensions (1) & (2) at the same time by the end of 2013. However, the dissolution of parliament in November 2013 delayed this yet again. A tender was finally released in January 2014[28] with an April deadline before being delayed until late May 2014 due to concerns from bidders.[29]

Amilitary coup in late-May suspended the bidding process while the military administration reviewed all major projects. In late-June, the military administration affirmed the tender which will proceed before the end of 2014. In mid-August, the MRTA announced that the new tender deadline would be 30 September 2014.[30] Five bidders qualified with successful bids to be announced by December.[31] The contract to construct the line for both extensions (1) & (2) was finally signed in April 2015 and the full extension was scheduled to open in 2020.[32][33]

Testing of the final 9.8 km, 7 station section from Wat Phra Sri Mahathat (N17) to Khu Khot (N24) began on 5 October and continued until the full extension opens.[34] It was officially inaugurated on 16 December 2020 by the Prime Minister.[35]

Opening dates

  1. The first section to Ha Yaek Lat Phrao station (N9) opened on 9 August 2019;
  2. the next 4 stations from Ha Yaek Lat Phrao station (N9) to Kasetsart University (N13) opened on 4 December 2019;
  3. further 4 stations from Kasetsart University (N13) to Wat Phra Sri Mahathat (N17) opened on 5 June 2020;
  4. the remaining section of 9.8 km and 7 stations from Wat Phra Sri Mahathat (N17) to Khu Khot (N24) opened on 16 December 2020.

Saint Louis (S4) infill station – Silom Line (2021)

[edit]

In 2018, it was decided to finally build the missingSaint Louis BTS Station (S4) station (originally named Sueksa Wittaya), the EIA was finalised in March 2019.[36] Construction of the station began in August 2019 and by the end of 2019 had reached 25% progress.[37] By August 2020, construction had reached 50% but was 30% behind schedule due to COVID related delays.[38]

The station opened on 8 February 2021.[39]

Future extension plans

[edit]
icon
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed.(January 2025) (Learn how and when to remove this message)

BTS Group Holdings will tender to operate more BTS and MRT lines in the future through financing from its BTS Rail Mass Transit Growth Infrastructure Fund after it received approval from the Thai Securities and Exchange Commission in March 2013. The IPO raised US$2.1 billion, the largest in Thailand's history.[40]

Sukhumvit Line, north

[edit]

A further 9 km, five station extension from Khu Khot station to Wongwaen-Lam Luk Ka station is planned to be constructed by 2029.[citation needed]

Sukhumvit Line, east

[edit]
  • A further 7 km, five-station extension from Kheha station to Bang Pu station is planned to be constructed by 2029.[citation needed]
  • A spur line from Bang Na toSuvarnabhumi Airport (terminating at future South Passenger Terminal of Suvarnabhumi Airport). However, this may also be built as alight rail.[citation needed]

Silom Line, south

[edit]

After the opening of Wutthakat (S11) and Bang Wa (S12) stations 5 December 2013, the BMA announced a new proposal to further extended the Silom Line by 7 km fromBang Wa (S12) station, by six stations toTaling Chan.[41] At Taling Chan it would connect with theSRT Light Red line.

A public hearing was held in 2015.[42] Three route options were considered, with construction intended to start in 2017.[43] Part of the basis for this further extension by the BMA is that it would provide proximate access to the Southern Bus Terminal. The BMA Transport and Traffic Office completed an economic evaluation of the extension in October 2018 which found a cost benefit ratio of 2.37.[44] The study recommended that an EIA be completed in 2019 but this was delayed.[citation needed]

In 2022, Department of Rail Transport ("DRT") was announced that the Silom Line will be part of the new M-Map 2 action plan. This plan will be extended the Silom Line from Bang Wa (S12) to Bang Rak Noi Tha It (S23) on the Ratchaphruek road by 18 kilometers and 11 stations. The first part of the extension will be end at Taling Chan (S16) to connect with the SRT Light Red line. The second part of the extension will be end at Bang Rak Noi Tha It (S23) inNonthaburi province to connect with theMRT Purple Line at currentMRT station. In this extension, DRT proposed the new main depot to separate the system depot from the Sukhumvit Line. Which make the Silom Line will be completely standalone system. However, the extension will be start until theSaphan Taksin station (S6) was renovated into double track.[citation needed]

Silom Line, west

[edit]

The Silom Line is planned to be extended by one or two stations west along Rama 1 from National Stadium (W1) to link with theSRT Dark Red Line at Yot Se station. However, no time frame for this extension has been announced and this section of theSRT Dark Red Line will not be built until after 2022.[citation needed]

Originally, the plan was to extend the Silom Line west from National Stadium into Chinatown, then north to Democracy Monument where it would then run west to Rattanakosin Island and Sanam Luang, tunnel under the river to the Thonburi side before terminating at Phran Nok. However, this plan was shelved in 2009 and much of this route has been replaced by routing changes to the plannedMRT Orange Line.[citation needed]

Future plans
Line NameNamePlanned opening dateTerminusLength (km)StationsStatus
Rapid Transit
Sukhumvit LineLam Luk Ka ExtensionTBAKhu KhotEastern Ring Road Lam Luk Ka7.8 km (4.8 mi)4Postponed
Tamru ExtensionKhehaTamru10.1 km (6.3 mi)4
Infill station betweenAri andSaphan Khwai stations Sena Ruam-1
Silom LineYot Se ExtensionNational StadiumYot Se1.2 km (0.75 mi)1Planning
Bang Wa to Taling Chan SectionBang WaTaling Chan7.94 km (4.93 mi)6
Taling Chan to Bang Rak Noi Tha It SectionTaling ChanBang Rak Noi Tha It8.60 km (5.34 mi)7
People Mover
Gold LinePrachadhipok ExtensionTBAKhlong SanPrachadhipok1.2 km (0.75 mi)1Postponed
Total36.84 km (22.89 mi)24

Terminal stations

[edit]

Terminal stations and physical ends of their lines areKhu Khot,Kheha,National Stadium,Bang Wa.[citation needed]

Some trains terminate early and resume travel in the opposite direction atKasetsart University,Mo Chit, andSamrong. This allows more frequent trains on the central sections of the lines without added investment in carriages.[citation needed]

Rolling stock

[edit]
icon
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed.(January 2025) (Learn how and when to remove this message)

The BTS Skytrain uses two variations ofelectric multiple unitrolling stock. All operate on1,435 mm (4 ft 8+12 in)standard gauge. All trains have four doors on each side per car, an air-conditioning unit, and LCD monitors for public announcement and advertising. Public announcements are spoken by actressRatklao Amaradit [th]. The power supply for all trains is at 750 V DC from thethird rail.

Siemens trains

[edit]

First order (EMU-A1)

[edit]
Siemens Modular Metro train (EMU-A1)

The rolling stock of BTS Skytrain, in use when the line opened in 1999, consisted of 35Siemens Modular Metro trains fromSiemens. These initial trains had three cars, two motor cars and one trailer in the center. The Sukhumvit Line used 20 trains, and the Silom Line had 15.

After the 12 new car CNR trains were delivered for the Silom Line in December 2010, the 15 Siemens trains on the Silom Line were transferred to the Sukhumvit Line.

Second order: extra cars to expand to four-car train operations (EMU-A1)

[edit]

To increase capacity, in October 2010, BTSC ordered an extra 35 single cars from Siemens to make each train a four car set.[45][46]

These extra cars were progressively introduced into operation from November 2012 to March 2013, when all 35 sets of Siemens rolling stock finally became four car sets.[47]

The Silom Line cars have been modified to support a signaling system fromBombardier Transportation since the extension fromSaphan Taksin toWong Wian Yai.

EMU-A1 Formation[48]

 Bang Wa,Kheha       National Stadium,Khu Khot
Car No.1234
DesignationM1Tc1Tc2M2
Length(mm)21,80021,50021,50021,800
Numbering1101
1103
1105
:
1169
3101
3102
3103
:
3135
3201
3202
3203
:
3235
1102
1104
1106
:
1170

• Car 3 was added later

Third order: new four-car sets for extension operations (EMU-A2)

[edit]
Siemens EMU-A2

To serve the Sukhumvit Line Extension (East) BTSC ordered 22 new Siemens four-car trains from a consortium ofSiemens andBozankaya in May 2016.[49]

These trains were manufactured in the Bozankaya factory in Ankara,Turkey. Siemens supplied bogies, traction, braking, and auxiliary systems and was responsible for project management, development, construction, and commissioning of the trains. Siemens will also take on service and maintenance for 16 years.

The first set of the new batch of rolling stock arrived in early August 2018 for testing and approval by the BTSC. These new trains increase capacity from 1,490 passengers per train to 1,572.[50][51] As of the opening of the new Sukhumvit Line extension to Kheha Samut Prakan on 6 December 2018, only 3 sets of the 22 sets had been delivered. This resulted in a limited 10-minute frequency, shuttle service for the new extension as an interim measure until more rolling stock is delivered. All 22 vehicles began their operation on 5 December 2019.[52]

The train features: Perch Seats, LCD Dynamic Route Map (AKA. Passengers Information Display)

 Bang Wa,Kheha       National Stadium,Khu Khot
Car No.1234
DesignationM1Tc1Tc2M2
Length(mm)21,80021,50021,50021,800
Numbering1353
:
1374
3153
:
3174
3253
:
3274
1453
:
1474

CNR Changchun trains

[edit]

First order (EMU-B1)

[edit]
Changchun Railway Vehicles train (EMU-B1, EMU-B2)

In early 2008, the BTSC ordered 12 new trains (12 sets of four cars) fromChangchun Railway Vehicles (EMU B class) to cater for the then soon to open Wong Wian Yai extension of the Silom Line. Their design was modified to the existing BTS's Siemens Modular Metro. The new trains were delivered late and only began service the Silom Line in December 2010. This was some 18 months after theWong Wian Yai andKrung Thonburi stations were opened in May 2009 during which time there was severe overcrowding on the Silom Line.

These trains consist of two-motor cars and two-trailer cars (i.e., four-car trainset) and feature LCD TVs for public announcements and advertising. An advanced digital voice announcement (DVA) and passenger information systems was installed.

Second order (EMU-B2)

[edit]

In September 2011, the BTSC ordered five more four-car trainsets of CNR rolling stock for 1.5 billion baht to prepare for the Silom Line extension toBang Wa which was then due to open in December 2012.[53] These five new train sets of rolling stock entered service on 29 November 2013 after the first two stations of the Silom Line extension to Bang Wa opened in January and February 2013, respectively. This second batch of CNR EMUs (B Class) differ slightly from the first batch in exterior fitting out such as with the LCDs screens, LED route displays, signage, and passenger communication units.

EMU-B1/B2 Formation

 Bang Wa,Kheha       National Stadium,Khu Khot
Car No.1234
DesignationTc1M1M2Tc2
Length(mm)21,86021,77021,77021,860
Numbering1936
:
1952
2936
:
2952
2836
:
2852
1836
:
1852

CRRC Changchun trains (EMU-B3)

[edit]
Changchun Railway Vehicles train (EMU-B3)

In May 2016, BTSC has signed a contract to order 24 more four-car trains ofCRRC Changchun Railway Vehicles rolling stock to prepare for the Sukhumvit Line extension (North) and to cater for increasing demand, with expected delivery in 2018.[49]

It has delivered 24 of its cars to Mo Chit Depot. 24 cars are now operating its service on the Silom Line and Sukhumvit Line (Car 75–98). These vehicles began their operation with the launch of the northern extension in December 2019.[54]

This train features: Perch Seats, LCD Dynamic Route Map (AKA. Passengers Information Display)

 Bang Wa,Kheha       National Stadium,Khu Khot
Car No.1234
DesignationMc1T1T2Mc2
Length(mm)21,86021,77021,77021,860
Numbering1975
:
1998
2975
:
2998
2875
:
2898
1875
:
1898

Ridership

[edit]
BTS Skytrain ridership
YearDaily ridership
2006
383,635
2007
361,977
2008
372,551
2009
386,145
2010
392,376
2011
458,275
2012
530,422
2013
571,855
2014
598,984
2015
629,218
2016
647,752
2017
657,784
2018
658,123

Source:[citation needed]

The first years of operations saw limited ridership. The line had few direct ramps into malls and lacked escalators. Little by little, while escalators were installed and side bridges added, patronage increased. The opening ofSiam Paragon Mall in 2004, at the time Thailand's most luxurious mall, boosted crowds at the system's central Siam station. The redevelopment of theRatchaprasong andSiam districts as well as new "skywalks" fostered growing accessibility.[citation needed]

Ridership grew steadily with incremental expansion of the lines, and at peak hour, the trains sometimes depart without being able to take all waiting passengers. Average daily ridership first surpassed 200,000 in June 2001, 300,000 in November 2003, 400,000 in March 2006, 500,000 in August 2011, 600,000 in August 2013 and 700,000 in November 2017.[55] Ridership decreased significantly during theCOVID-19 pandemic in Thailand.

From 25 January to 31 January 2025, Prime MinisterPaetongtarn Shinawatra has implemented a policy of free public transportation in Bangkok for one week. This measure aims to address the worsening air pollution caused by surging dust levels across all districts of the capital.[56]

Sukhumvit and Silom Lines

[edit]

Ridership

[edit]
BTS Skytrain Ridership
YearQuarterQuarterly RidershipDaily RidershipAnnual RidershipRemarks
1999169,8424,585,743[55] BTS  fromMo Chit toOn Nut, and BTS  fromNational Stadium toSaphan Taksin opened.
2000150,46955,092,671
2001202,68574,025,652
2002256,03393,493,981
2003280,379102,348,697
2004316,068115,681,448Mo Chit andSala Daeng stations became connecting stations to MRT 
2005348,795127,350,084
2006383,635140,048,849
2007361,977132,070,502
2008372,551136,350,007
2009386,145140,957,969 BTS  extended fromSaphan Taksin toWongwian Yai.
2010392,376143,102,971Phaya Thai station became a connecting station to ARL 
2011458,275167,348,070 BTS  extended fromOn Nut toBearing.
2012530,422194,113,068
2013571,855208,764,971 BTS  extended fromWongwian Yai toBang Wa.
2014598,984219,422,367
2015629,218229,853,593
2016647,752237,047,435
2017Q162,946,441699,405241,067,194
Q260,863,929668,835 BTS  extended fromBearing toSamrong on 3 April 2017.
Q365,172,468708,370
Q463,745,855692,890
2018Q163,045,888700,510252,728,693[57]
Q259,978,033659,100
Q364,294,989698,859
Q465,374,718710,595 BTS  extended fromSamrong toKheha 6 December 2018.
2019Q166,097,625734,419272,019,716
Q264,822,835712,339
Q370,115,254762,123 BTS  extended fromMo Chit toHa Yaek Lat Phrao on 9 August 2019.

Bang Wa station became a connecting station to MRT  on 24 August 2019.

Q470,984,002771,566 BTS  extended fromHa Yaek Lat Phrao toKasetsart University on 4 December 2019.
2020Q159,291,978651,561182,192,9951st wave ofCOVID-19 outbreaks (January 2020 - May 2020)

 BTS  extended fromKasetsart University toWat Phra Si Mahathat on 5 June 2020.

Q222,939,540252,083
Q348,955,508532,126
Q451,005,969554,4132nd wave ofCOVID-19 outbreaks (December 2020 - February 2021)

 BTS  extended fromWat Phra Si Mahathat toKhu Khot on 16 December 2020.

2021Q138,232,160424,802108,173,568
Q222,526,522241,5453rd wave ofCOVID-19 outbreaks (April 2021 - June 2021)
Q315,183,932165,0434th wave ofCOVID-19 outbreaks (July 2021 - early 2022)
Q432,230,954350,336
2022Q133,475,581371,951194,380,472
Q242,464,069466,639
Q355,921,417607,842
Q462,519,405679,559
2023Q1264,066,131[58]Data from January to July 2023 is not announced.

Samrong station became an interchange station with MRT  on 3 July 2023.

Q2
Q346,793,194*767,102*
Q469,958,534760,419
2024Q164,550,586709,348263,955,804Wat Phra Si Mahathat station became an interchange station with MRT  on 7 January 2024.
Q261,665,894677,648
Q368,982,349749,809
Q468,756,975747,359
2025Q167,727,296752,526261,364,984Free public transportation policy was implemented between 25 and 31 January 2025.[56]
Train services were temporarily suspended due to2025 Myanmar Earthquake on 28 March 2025.[59]
Q260,286,523662,490
Q366,939,489727,604
Q466,411,676721,867As of December 2025.[60][61][62]

Stations

[edit]
Busiest stations[63]
No.StationYear total passengers (2021)[64]
1Siam6,160,924
2Asok5,542,521
3Mo Chit5,166,915
4On Nut4,238,083
5Victory Monument4,193,569
6Ha Yaek Lat Phrao4,181,874
7Phrom Phong3,664,227
8Samrong3,186,681
9Chit Lom3,154,058
10Sala Daeng3,043,054
Least-used stations
No.StationYear total passengers (2021)[64]
1Royal Thai Air Force Museum171,534
2Sai Luat280,772
3Bhumibol Adulyadej Hospital321,744
4Pho Nimit328,396
5Srinagarindra472,787

Network map

[edit]

Map

See also

[edit]

References

[edit]
  1. ^"BTS SkyTrain System – Structure of Routes and Stations". Bangkok Mass Transit System Public Company Limited. Archived fromthe original on 20 June 2014. Retrieved26 June 2014.
  2. ^""ปริมาณผู้ใช้บริการระบบขนส่งทางราง ประจำปี "พ.ศ. 2567"".กรมการขนส่งทางราง กระทรวงคมนาคม (in Thai). 31 August 2024. Retrieved4 September 2024.
  3. ^Unger, Danny (28 September 1998).Building Social Capital in Thailand: Fibers, Finance and Infrastructure. Cambridge University Press.ISBN 9780521639316.
  4. ^Tribune, Thomas Crampton (14 October 1998)."Thais Revisit a Troubled Mass-Transit Project".The New York Times.ISSN 0362-4331.Archived from the original on 28 July 2018. Retrieved4 December 2016.
  5. ^"Our History". BTS Group Holdings Public Company Limited. Archived fromthe original on 26 December 2015. Retrieved26 June 2014.
  6. ^Mydans, Seth (6 December 1999)."Bangkok Opens Skytrain, but Will It Ease Car Traffic?".The New York Times.ISSN 0362-4331.Archived from the original on 20 December 2016. Retrieved4 December 2016.
  7. ^'Trains gain as rallies clog roads',Bangkok Post, 26 December 2013
  8. ^BTS Group Holdings Annual Report 2017/18(PDF). Bangkok: BTS Group Holdings PCL. 2018.Archived(PDF) from the original on 28 July 2018. Retrieved28 July 2018.
  9. ^COVID-19_BTS,archived from the original on 10 March 2020, retrieved9 March 2020
  10. ^"VIDEO: In a Thai antidote to the grim warnings over the #coronavirus, Bangkok's overground train service (BTS) releases a jaunty track named 'COVID-19: Dance Against The Virus'pic.twitter.com/b0MuD20ZTJ".@AFP. AFP. 8 March 2020.Archived from the original on 9 March 2020. Retrieved9 March 2020.
  11. ^"Structure of Routes and Stations". Bangkok Mass Transit System Public Company Limited. Archived fromthe original on 31 October 2015. Retrieved26 June 2014.
  12. ^"Skytrain takes off with a bang".Railway Gazette.Archived from the original on 20 December 2016. Retrieved4 December 2016.
  13. ^"Explore Bangkok by BTS : BTSC".www.bts.co.th.Archived from the original on 30 November 2016. Retrieved4 December 2016.
  14. ^"BTS stations to get platform doors".Bangkok Post. 17 September 2012. Retrieved17 September 2012.
  15. ^"Commuters caught in chaos after Skytrain shuts down in morning".The Nation. Bangkok. 25 December 2013.
  16. ^"Ticket Info : BTSC".www.bts.co.th. Archived fromthe original on 20 November 2016. Retrieved4 December 2016.
  17. ^"Ticket Info : BTSC".www.bts.co.th. Archived fromthe original on 6 December 2016. Retrieved4 December 2016.
  18. ^"What is Rabbit". Bangkok Smartcard System Company Limited (BSS). Archived fromthe original on 29 July 2014. Retrieved26 June 2014.
  19. ^"BTS Rabbit Cards". Bangkok BTS. Archived from the original on 28 July 2018. Retrieved26 June 2014.
  20. ^Mahitthirook, Amornrat (19 February 2012)."One-ticket system for BTS and MRT expected by 2015".Bangkok Post. Retrieved29 November 2012.
  21. ^"Sukhumbhand woos commuters".The Nation. nationmultimedia.com. 16 January 2013. Archived fromthe original on 18 January 2013. Retrieved26 June 2014.
  22. ^Groundbreaking starts on new BTS extension,Daily News, 15 August 2006
  23. ^BTS extension budget cut,Bangkok Post, 15 December 2006
  24. ^Skytrain link tests delayed,Bangkok Post, 19 September 2009
  25. ^"BTS Skytrain starts it's [sic] new station Pho Nimit today and comimg more near to metro park sathorn".metroparksathorn.com. 12 January 2013. Archived fromthe original on 1 January 2014. Retrieved26 June 2014.
  26. ^"Ch. Karnchang wins Green Line bid".Bangkok Post. 14 November 2012. Retrieved15 November 2012.
  27. ^"Ch Karnchang gets Phase 2 of Bearing-Samut Prakan route"The Nation, 13 April 2013
  28. ^Invitation to tender the MRT Green Line (North) Project: Mo Chit–Saphan Mai–Khu Khot section (GRN)(PDF), Ministry of Transport: Mass Rapid Transit Authority of Thailand, archived fromthe original on 14 July 2014{{citation}}: CS1 maint: publisher location (link).
  29. ^http://www.prachachat.net/news_detail.php?newsid=1401076541Archived 14 July 2014 at theWayback Machine "รฟม.ปรับทีโออาร์หมอชิต-คูคต กลางปี59 เปิดให้บริการสายสีม่วง"Prachachat News, 26 May 2014
  30. ^(มหาชน), บริษัท มติชน จำกัด."รฟม.เร่งยิกประมูลรถไฟฟ้าสายสีเขียว "หมอชิต-คูคต" 2.9 หมื่นล้าน ดีเดย์ 30 ก.ย. เปิดยื่นซองราคา".Archived from the original on 11 June 2016. Retrieved25 November 2016.
  31. ^(มหาชน), บริษัท มติชน จำกัด."5กลุ่มบริษัทผ่านคุณสมบัติสร้างรถไฟสีเขียว คาดหาผู้รับเหมาได้ไม่เกินต้นปี58". Archived fromthe original on 4 March 2016. Retrieved25 November 2016.
  32. ^สร้างรถไฟฟ้าไปคูคตเซ็นสัญญาวันนี้ลงพื้นที่กลางปีArchived 19 November 2015 at theWayback Machine,Dailynews, 3 April 2015
  33. ^Bangkok Sukhumvit Line extension contractsArchived 20 November 2015 at theWayback Machine, Railway Gazette, 13 April 2015
  34. ^"BTS tests Green Line trains at 7 new stations before public opening at year-end".The Nation. 7 October 2020. Archived fromthe original on 19 August 2013. Retrieved16 May 2021.
  35. ^"Bangkok metro extension opens".Metro Report International. DVV Media International Ltd. 18 December 2020. Retrieved18 December 2020.
  36. ^"ไฟเขียว BTS ขึ้นค่าตั๋วส่วนต่อขยาย 16 เมษาฯ เร่งเชื่อม'หมอชิต-เซ็นทรัลลาดพร้าว' สิงหาฯนี้".Prachachat. Bangkok. 4 March 2019.Archived from the original on 2 December 2020. Retrieved4 December 2020.
  37. ^"20 ปีบีทีเอสจาก 35 ขบวนจ่อ 98 ขบวน ปีที่ 21 ของรถไฟฟ้าสายแรกเมืองไทย".Thairath. Bangkok. 30 December 2019.Archived from the original on 28 November 2020. Retrieved4 December 2020.
  38. ^"บีทีเอส"สร้างครึ่งทางแล้วเปิดต้นปี 64".Dailynews. Bangkok. 25 August 2020. Archived from the original on 9 July 2018. Retrieved4 December 2020.
  39. ^"BTS 'Ghost Station' Opens After Charging Fare for 22 Years".Khaosod English. Bangkok: Matichon Pcl. 8 February 2021.Archived from the original on 14 February 2021. Retrieved17 February 2021.
  40. ^Maierbrugger, Arno (17 March 2013)."Thailand's largest ever IPO a done deal".Inside Investor.Archived from the original on 21 October 2013. Retrieved18 March 2013.
  41. ^"One month free on metro between Taksin and Bang Wa".Thai Rath. 4 December 2013.Archived from the original on 20 December 2013. Retrieved4 September 2014.
  42. ^"BTS Silom Line extension to Taling Chan moves forward".Coconuts Bangkok. 5 March 2015.Archived from the original on 20 December 2016. Retrieved4 December 2016.
  43. ^"Skytrain looks West".Bangkok Post. Retrieved4 December 2016.
  44. ^"เกาะติดเมกะโปรเจ็กต์ : รถไฟฟ้าสายสีเขียว (บางหว้า-ตลิ่งชัน) ยกระดับคุณภาพชีวิตด้านการเดินทาง".Thansettakij.com. Bangkok. 25 October 2018.Archived from the original on 10 January 2022. Retrieved10 January 2022.
  45. ^"Bangkok's Skytrain increases train fleet".International Railway Journal. 11 October 2010.Archived from the original on 24 September 2015. Retrieved8 August 2014.
  46. ^Wiriyapong, Nareerat (29 August 2012)."Sukhumvit BTS line to get four-car trains in October".Bangkok Post. Retrieved29 November 2012.
  47. ^"News & Events – BTS takes delivery of new train cars from SIEMENS". BTS Group Holdings Public Company Limited. 18 July 2012.Archived from the original on 9 August 2014. Retrieved8 August 2014.
  48. ^Siemens AG."Metro System – Skytrain Bangkok BTS, Thailand"(PDF).
  49. ^abSiemens and CRRC trains for BangkokArchived 25 September 2018 at theWayback MachineMetro Report International 20 May 2016
  50. ^"First of new BTS trains to undergo testing".The Bangkok Post. 7 August 2018.
  51. ^Siemens and Bozankaya roll out Bangkok Skytrain vehicleArchived 25 September 2018 at theWayback MachineMetro Report International 19 June 2018
  52. ^"All New Metro Trains for Bangkok Skytrain Now in Service".Railway-News. 5 December 2019. Retrieved1 June 2025.
  53. ^"More 4-car trains on BTS shopping list".The Bangkok Post. 29 September 2011. Retrieved8 August 2014.
  54. ^"中国造列车亮相曼谷轻轨延长线开通仪式 - 国际在线移动版".news.cri.cn. Retrieved1 June 2025.
  55. ^ab"BTS Ridership".BTS Group Holdings Public Company Limited. Archived fromthe original on 3 May 2020. Retrieved30 January 2019.
  56. ^abBoyle, Gary (25 January 2025)."PM orders week of free public transport to combat PM2.5".Bangkok Post. Retrieved25 January 2025.
  57. ^"BTS 2560-2565".
  58. ^"ปริมาณผู้ใช้บริการรถไฟโดยสารประเทศไทย พ.ศ. 2566".กรมการขนส่งทางราง กระทรวงคมนาคม (in Thai). 5 January 2024. Retrieved5 December 2024.
  59. ^"รถไฟฟ้า BTS และ MRT เปิดปกติแล้ว ยกเว้น สายสีเหลือง-สายสีชมพู ปิดต่ออีก 1 วัน".www.sanook.com/news (in Thai). 29 March 2025. Retrieved18 April 2025.
  60. ^"ปริมาณผู้ใช้บริการระบบขนส่งทางราง ประจำเดือนตุลาคม 2568".กรมการขนส่งทางราง กระทรวงคมนาคม (in Thai). 6 November 2025. Retrieved12 November 2025.
  61. ^"ปริมาณผู้ใช้บริการระบบขนส่งทางราง ประจำเดือนพฤศจิกายน 2568".กรมการขนส่งทางราง กระทรวงคมนาคม (in Thai). 5 December 2025. Retrieved13 December 2025.
  62. ^"Facebook".www.facebook.com. Retrieved9 January 2026.
  63. ^"เปิดโผท็อปไฟฟ์สถานีบีทีเอส "สยาม-อโศก-หมอชิต" ทะลุแสนคน" [Revealed! Top 5 BTS Stations. Siam-Asok-Mo Chit above 100,000 per day].ประชาชาติธุรกิจ [Nation] (in Thai). 20 April 2018.Archived from the original on 27 October 2020. Retrieved12 September 2019.
  64. ^ab"สถิติจำนวนผู้โดยสารที่ใช้บริการรถไฟฟ้าระบบขนส่งมวลชนกรุงเทพ (รถไฟฟ้า BTS)".Archived from the original on 9 April 2023. Retrieved9 April 2023.

External links

[edit]
Wikimedia Commons has media related toBTS Skytrain.
Railways
Inter-city rail and
High-speed rail
Open
Under construction
Planned
Commuter rail
Rapid transit
Monorail
People mover
Light railandTram
Main stations
Seal of Bangkok Metropolitan
Roads
Expressways
Motorways
Open
  • ()
  • ()
Under construction
  • (2025)
  • (2025)
  • (2025)
Planned
National highways
  • ()
  • ()
  • ()
  • ()
Buses
Operators and Routes
Terminals
Water transport
River
Canals
Thailand Urbanpublic transport networks and systems inThailand
High-speed rail
Commuter rail
Rapid transit
Monorail
AGT,Light rail &Tram
Bus rapid transit
Annual
Riderships
by cities
1 billion or more
500 million – 999 million
100 million – 499 million
50 million – 99 million
10 million – 49 million
5 million – 9.9 million
1 million – 4.9 million
Note: Under construction & planned lines are inItalics
 Armenia
 Azerbaijan
 Bangladesh
 China (PRC)
 Georgia
 India
 Indonesia
 Iran
 Israel
 Japan
 Kazakhstan
 Mongolia
 North Korea
 Malaysia
 Pakistan
 Philippines
 Qatar
 Russia
 Saudi Arabia
 Singapore
 South Korea
 Taiwan (ROC)
 Thailand
 Turkey
 United Arab Emirates
 Uzbekistan
 Vietnam
* Under construction.
Retrieved from "https://en.wikipedia.org/w/index.php?title=BTS_Skytrain&oldid=1333239988"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp