Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Argonaut (lunar lander)

From Wikipedia, the free encyclopedia
European Space Agency lunar lander

Argonaut
ManufacturerItalyFranceUnited KingdomThales Alenia SpaceGermanyOHB SystemFinlandNorwayUnited KingdomNammoLuxembourgRedwire
OperatorEuropean Space Agency
ApplicationsLunar payload delivery and support
Specifications
Spacecraft typeUncrewedlunar lander
Launch mass10,000 kg (22,000 lb)[1]
Payload capacityup to 1,500 kg (3,300 lb)[1]
Dimensions
Length6 m (20 ft)
Diameter4.5 m (15 ft)
Production
Statusproposal selection
Builtnone
Maiden launch2030 (planned)
Related spacecraft
Launch vehicleAriane 64
Model of Argonaut atParis Air Show in 2025
3D digital model of Argonaut[2]
Artist's view of Argonaut on the Moon

Argonaut[3] orEuropean Large Logistics Lander (EL3) is a class oflunar landers designed by theEuropean Space Agency (ESA) in partnership withThales Alenia Space to deliverpayloads to the surface of theMoon.[4] The lander is being designed with a versatile set of uses in mind, including use as a power station, support for a rover, cargo delivery, and infrastructure delivery. It is envisioned to launch on theAriane 64 launch vehicle.[5][6][7]

Design

[edit]

The Argonaut lander will consist of a descent element, cargo platform, and payload. Capable of delivering up to 1,500 kg (3,300 lb),[8] the craft will reportedly be able to land with an accuracy of 250 meters[9] and to last up to five years on the Moon.[8] The lander'sreaction control system will consist of 24monopropellant thrusters.[9][10] Each of the three main engines, usingelectric pumps andMMH/MON aspropellants,[10] will be able of generating 6 kN of thrust[11] and will be throttleable to 50%.[10]

Background

[edit]

The lander is being developed under the ESA'sTerrae Novae programme for crewed and roboticspace exploration.[12][13]Thales Alenia Space (Italy) is the prime contractor and system integrator for the Lunar Descent Element.[14][15] Thales Alenia Space (France) is developing data-handling subsystems and computers.OHB System AG (Germany) is responsible forguidance, navigation, and control systems, as well as communication and electrical power systems includingsolar arrays and batteries. Thales Alenia Space (UK) is providing propulsion subsystems including propellant tanks.Nammo (UK) is providing the RELIANCE main engine.[16][17][18][19]Redwire Corporation (Luxembourg) is developing therobotic arm known as Manipulator for Argonaut Payload Needs and Unloading Support (MANUS).[20]

Project history

[edit]

In 2022,ESA successfully sought funding for the lander at its ministerial council.[21][12] In 2023, Neil Murray became the Engineering Team Leader for Argonaut.[8]

In 2024, ESA committed to an Argonaut mission in 2031[22] and awarded a contract to develop a robotic arm for use on the lander toRedwire Space.[23] Two designs were considered for the lander's main engine: the SPE-T developed byArianeGroup and tested first in 2024,[24] and the RELIANCE engine byNammo.[11][25]

On 30 January 2025, ESA awarded a contract toThales Alenia Space (Italy) to build the descent element of the lander[26][27] and later in 2025,Thales Alenia Space signed agreements with Thales Alenia Space in France,OHB in Germany, and Thales Alenia Space andNammo in the United Kingdom for supplying various subsystems of the Lunar Descent Element.[28][29][30][19] The first mission of Argonaut was scheduled for 2030.[16]

In March 2025, ESA andJAXA signed a statement of intent detailing possible future cooperation between the Argonaut lunar lander and theJapanese pressurised rover under development for theArtemis program, as well as possible Japanese scientific investigations on Argonaut.[31]

Before the ministerial council in November 2025, ESA has prepared a €600 million funding request for further development of Argonaut, leading to the first Moon landing in 2030, with a plan to build five landers.[32][9] The second mission was planned for 2033.[10]

Missions

[edit]

ArgoNET

[edit]

ArgoNET (Argo Navigation, Energy, and Telecommunications) will be the first operational flight of the programme, planned for launch in 2030. It will deliver navigation, energy, and telecommunications infrastructure and will serve as a selenodetic reference station for theMoonlight satellite constellation.[2][8] ArgoNET will include the NOVAMOON system, designed to enhance the accuracy of the Moonlight initiative'ssatellite navigation services to reach sub-meter levels across the entireLunar south pole.[33][34]

Astrophysical Lunar Observatory

[edit]

If approved, the Astrophysical Lunar Observatory (ALO) will be a low-frequency radiointerferometer on thefar side of the Moon consisting of several hundred antennas. The observatory is expected to be deployed by Argonaut around 2035.[35][36][37]

See also

[edit]

Lunar landing programmes by country

[edit]

References

[edit]
  1. ^ab"Argonaut".www.esa.int. Retrieved30 January 2025.
  2. ^ab"Argonaut: Europe's lunar lander programme".www.esa.int. Retrieved3 April 2025.
  3. ^"Argonaut: a lunar ship – ESA – Exploration". Retrieved27 February 2025.
  4. ^"The Moon in our sights | Airbus".www.airbus.com. 29 November 2022. Retrieved25 May 2024.
  5. ^"What is Argonaut?".www.esa.int. Retrieved25 May 2024.
  6. ^"Argonaut".www.esa.int. Retrieved25 May 2024.
  7. ^Airbus Defence and Space (14 October 2020).EL3 European Large Logistic Lander. Retrieved25 May 2024 – via YouTube.
  8. ^abcdShaw, Niamh."Europe's moonshot: Argonaut and the Irish engineer leading the way".The Irish Times. Retrieved27 September 2025.
  9. ^abc"Argonaut 'fully European' freighters will learn lessons from previous crashes".Aerospace America. 20 November 2025. Retrieved22 November 2025.
  10. ^abcd"ESA's Argonaut press conference".www.esa.int. Retrieved22 November 2025.
  11. ^abParsonson, Andrew (11 October 2024)."Nammo UK Submits Bid for Argonaut Lunar Lander Main Engine".European Spaceflight. Retrieved20 November 2025.
  12. ^ab"Ministers back ESA's bold ambitions for space with record 17% rise".www.esa.int. Retrieved22 November 2025.
  13. ^"TERRAE NOVAE: Preparing for ESA Council at Ministerial level 2025"(PDF).Archived(PDF) from the original on 14 August 2025.
  14. ^Parsonson, Andrew (31 January 2025)."ESA Awards €862M Argonaut Moon Lander Contract to Thales Alenia Space".European Spaceflight. Retrieved20 November 2025.
  15. ^"ESA taps Thales Alenia Space for lunar lander". Archived fromthe original on 27 April 2025. Retrieved27 September 2025.
  16. ^ab"Argonaut lunar lander family grows".www.esa.int. Retrieved20 November 2025.
  17. ^"ESA and Thales Alenia Space present the industrial consortium for Argonaut Lunar Descent Element".www.esa.int. Retrieved20 November 2025.
  18. ^"Argonaut 'fully European' freighters will learn lessons from previous crashes".Aerospace America. 20 November 2025. Retrieved22 November 2025.
  19. ^abSouthgate, Vix (24 November 2025)."NAMMO UK Wins Main Engine Supplier for ESA Argonaut Lunar Lander".The British Interplanetary Society. Retrieved24 November 2025.
  20. ^Parsonson, Andrew (25 May 2024)."ESA Awards Contract for Argonaut Robotic Arm to Redwire".European Spaceflight. Retrieved20 November 2025.
  21. ^Foust, Jeff (21 October 2022)."ESA finalizes package for ministerial".SpaceNews. Retrieved25 May 2024.
  22. ^Parsonson, Andrew (17 July 2024)."ESA Targets 2031 for First Argonaut Lunar Lander Mission".European Spaceflight. Retrieved21 July 2024.
  23. ^"Redwire Awarded Contract by European Space Agency to Develop Robotic Arm Prototype for Argonaut Lunar Lander to Support International Lunar Exploration".Redwire Space. 22 May 2024. Retrieved25 May 2024.
  24. ^Parsonson, Andrew (25 June 2024)."ESA Signs Off on Argonaut Lunar Lander Engine Test".European Spaceflight. Retrieved26 June 2024.
  25. ^"Rocket specialist surges ahead after touching down at new home| News | Westcott Venture Park".Westcott Venture Park. Retrieved20 November 2025.
  26. ^"Argonaut: a first European lunar lander".www.esa.int. Retrieved19 February 2025.
  27. ^Parsonson, Andrew (31 January 2025)."ESA Awards Thales Alenia Space €862M Argonaut Moon Lander Contract".European Spaceflight. Retrieved19 February 2025.
  28. ^Parsonson, Andrew (23 November 2025)."Thales Alenia Space Finalises Industrial Team for Lunar Lander".European Spaceflight. Retrieved23 November 2025.
  29. ^"ESA unveils Thales Alenia Space-led consortium for its Argonaut lunar lander".
  30. ^"Thales Alenia Space Signs Multiple Contracts to Shape the Consortium Carrying Out the Lunar Descent Element for ESA's Argonaut".
  31. ^"ESA and JAXA strengthen ties on Moon and Mars exploration".www.esa.int. Retrieved24 March 2025.
  32. ^"ESA Preps €600 Million Plea For Argonaut Lunar Lander Mission | Aviation Week Network".aviationweek.com. Retrieved22 November 2025.
  33. ^GNSS, Inside (11 April 2025)."NovaMoon: A New Paradigm in Lunar Exploration".Inside GNSS - Global Navigation Satellite Systems Engineering, Policy, and Design. Retrieved27 September 2025.
  34. ^"CM25 – Explore and Discover".www.esa.int. Retrieved18 November 2025.
  35. ^Parsonson, Andrew (18 October 2024)."ESA Publishes Call for Telescope on the Far Side of the Moon".European Spaceflight. Retrieved24 September 2025.
  36. ^"Astronomical Lunar Observatory".SciSpacE. Retrieved24 September 2025.
  37. ^"We're going to put a radio telescope on the back side of the Moon".University of Groningen. 21 September 2023. Retrieved24 September 2025.

External links

[edit]
Space Centres
Launch vehicles
Facilities
Communications
Programmes
Predecessors
Related topics
Science
Astronomy
& cosmology
Earth
observation
Planetary
science
Solar
physics
Human
spaceflight
Telecommunications
and navigation
Technology
demonstration
and education
Launch
and reentry
Proposed
Cancelled
Failed
Future missions initalics
General
Facilities
Earth-based
activities
Companies
Crewed
spacecraft
Active
Planned &
proposed
Retired
Cancelled
Space
stations
Active
Planned &
proposed
Retired
Cancelled
Cargo
spacecraft
Planned &
proposed
Retired
Missions
Space
Shuttle
Mir
ISS
(commercial)
Missions
Uncrewed
Crewed
Emblem of the Artemis program
Agencies
Facilities
Rockets
Crewed spacecraft
Robotic spacecraft
Exploration
programs
Active
missions
Orbiters
Landers
Rovers
Past
missions
Crewed landings
Orbiters
Impactors
Landers
Rovers
Sample return
Failed landings
Flybys
Planned
missions
Artemis
CLPS
Luna-Glob
CLEP
Chandrayaan
KLEP
Others
Proposed
missions
Robotic
Crewed
Cancelled /
concepts
Related
  • Missions are ordered by launch date. Crewed missions are initalics.
Lunar landing missions
Active
Robotic
Past
Crewed
Robotic
Failed
Planned
Artemis
CLEP
CLPS
KLEP
Luna-Glob
Others
Proposed
CLPS
Others
Retrieved from "https://en.wikipedia.org/w/index.php?title=Argonaut_(lunar_lander)&oldid=1323947545"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp