This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Ambala–Chandigarh Expressway" – news ·newspapers ·books ·scholar ·JSTOR(August 2014) (Learn how and when to remove this message) |
| Ambala Chandigarh Expressway | |
|---|---|
| Route information | |
| Length | 35 km (22 mi) |
| Major junctions | |
| West end | Ambala |
| East end | Chandigarh |
| Location | |
| Country | India |
| States | Haryana,Punjab |
| Highway system | |
Ambala Chandigarh Expressway is four-lane 35 km long,[1] high-traffic density corridor of Ambala-Chandigarh section (km 5.735 to km 39.960 onNH-152 and 0 km to 0.871 km onNH 5) on BOT basis, was completed in 30 months at a cost of₹2.98 billion (US$35 million)[2] The expressway has been operational since December 2009 and was constructed by theGMR Group with assistance from theWorld Bank.
38 km south of Ambala at existingNH152 (Ambala-Pehowa-Narwana-Fatehabad-Sirsa), it connects with the controlled access tolledAmbala–Narnaul Expressway (Trans-Haryana Expressway).