Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Adelaide-class frigate

From Wikipedia, the free encyclopedia
Class of Australian guided missile frigates

HMASDarwin, the fourth ship in theAdelaide class
Class overview
NameAdelaide class
Builders
Operators
Preceded byDaring-class destroyer
Succeeded byHobart-class destroyer
Built21 June 1978 – 21 February 1992
In service15 November 1980 – 27 September 2019
In commission15 November 1980 – 26 October 2019
Completed6
Active2 (Chile)
Retired4
General characteristics
Class & typeModifiedOliver Hazard Perry-classguided missile frigate
Displacement4,100 tons full load
Length
  • 408 ft (124 m) at waterline
  • 455 ft (139 m) overall
Beam45 ft (14 m)
Draught22 ft (6.7 m)
Propulsion2 ×General Electric LM2500 gas turbines, each providing 20,500 hp (15,287 kW). Total 41,000 hp (30,574 kW)
SpeedOver 29 knots (54 km/h; 33 mph)
Range4,500 nmi (8,300 km; 5,200 mi) at 20 knots (37 km/h; 23 mph)
Complement176–221
Sensors &
processing systems
Armament
Aircraft carried2 ×S-70B Seahawk or 1 × Seahawk and 1 ×AS350B Squirrel
NotesMk 41 VLS,ESSM capability, andSM-2MR capability installed during theFFG Upgrade project

TheAdelaide class of sixguided missile frigates was constructed in Australia and the United States for service in theRoyal Australian Navy.[1] Two were later sold to theChilean Navy. TheAdelaide class was based on theUnited States Navy'sOliver Hazard Perry-class frigates, but modified for Australian requirements. The first four vessels were built in the United States, and the final two were constructed inAustralia. The first ship entered service in November 1980.

Canberra andAdelaide werepaid off in 2005 and 2008, respectively, and later sunk asdive wrecks. Their decommissioning offset the cost of a A$1 billionweapons and equipment upgrade to the remaining four ships.[2] As theHobart-classair-warfaredestroyers entered service beginning in 2016, the remainingAdelaide-class ships were progressively decommissioned beginning withSydney in 2015.Darwin followed in 2017, andNewcastle andMelbourne went last in 2019. The final two were sold toChile in 2020.

Construction and acquisition

[edit]
HMASAdelaide, the first ship of the class, in 1982

Following the cancellation of theAustralian light destroyer project in 1973, the BritishType 42 destroyer and the AmericanOliver Hazard Perry-class frigate were identified as alternatives.[3] Although the Type 42 met theRoyal Australian Navy (RAN)'s requirements as a replacement for the cancelled light destroyers and theDaring-class destroyers, fitting the ship with theSM-1 missile would have been difficult.[3] On the other hand, theOliver Hazard Perry class was still at the design stage; a design that was described by assessment project staff as "a second rate escort that falls short of the DDL [light destroyer] requirements on virtually every respect".[3][4] Despite this, the Australian government approved the purchase of two US-builtOliver Hazard Perry-class ships in 1974.[3]

The risk of acquiring an unproven design was seen as acceptable because of the success of theUnited States Navy (USN)'sCharles F. Adams-class destroyer (of which the RAN operated three ships as thePerth class), when compared to the equivalent British ships the RAN would have purchased.[4] Final government approval to order two ships was granted in 1976, with a third ship ordered in 1977.[5] The order was expanded in April 1980 with the order of a fourth unit.[6] These four ships were built byTodd Pacific Shipyards ofSeattle, Washington, as part of the USN's shipbuilding program, and were assigned USNhull numbers during construction, which were replaced with RANpennant numbers upon entering service.[7] The first, HMASAdelaide (USN hull number FFG-17, RAN pennant number FFG 01) was built to the Flight I design, whileCanberra (FFG-18/FFG 02) andSydney (FFG-35/FFG 03) were the first and last ships of the Flight II design, respectively.[7] The final American-built ship wasDarwin (FFG-44/FFG 04); constructed to the Flight III design.[7] In 1980, two more ships (Melbourne andNewcastle) were ordered, but were built in Australia byAMECON ofWilliamstown, Victoria, and did not receive USN numbers.[6][7]

Armament

[edit]

From the withdrawal of thePerth-class destroyers in 2001 until the introduction of theHobart class in 2017, these ships were the RAN's primaryair defence vessels, armed with aMark 13 missile launcher forSM-2MR missiles. They also have significant anti-surface capability, being armed with a 76-millimetre (3.0 in) Mk 75 gun and theHarpoonanti-ship missile (also fired by the Mark 13 launcher), and a pair of tripletorpedo tubes foranti-submarine warfare (ASW). In addition, twoS-70B Seahawk helicopters are carried.

HMASCanberra firing a Harpoon anti-ship missile

From 2005 onwards, all RAN frigates deploying to thePersian Gulf are fitted with twoM2HB .50-calibre machine guns inMini Typhoon mounts, installed on the aft corners of the hangar roof.[8] Two TopLite EO directors are used with the guns.[8]

The Australian frigates were originally fitted with AmericanMark 46 ASW torpedoes, but by 2008, they had been replaced with the EuropeanMU90 Impact torpedo in three of the four frigates as part of theFFG Upgrade, with the conversion ofNewcastle underway at that point.[9]

Upgrades

[edit]

There have been two major upgrades distinguishing theAdelaide class from the AmericanOliver Hazard Perry-class frigates.

Lengthening

[edit]

The first three ships were constructed to theOliver Hazard Perry class' 'short' hull design (Flight I and II), with an identical length for both the main deck and the keel.[7] Ships from FFG-36 onwards (includingDarwin) were built with an increase in overall length—achieved by angling thetransom (the section between the fantail and the keel) to increase the area of the flight deck and allow the operation of Seahawk helicopters.[7]Adelaide,Canberra, andSydney were later upgraded to match the slightly larger ships, and were fitted with the updated sonars and ESM systems of the Flight III design.[7]

FFG Upgrade

[edit]
HMASSydney's Mk 41 VLS in 2007

In the mid-1990s,Paul Keating's Labor government decided to retain theAdelaide-class frigates instead of replacing them with the more expensive and more labour-intensive, but much more capableKidd-class destroyers, that the USN was selling off.[10][11] Upgrades to theOliver Hazard Perry class were problematic, due to "little reserved space for growth (39 tons in the original design), and the inflexible, proprietary electronics of the time", such that the "US Navy gave up on the idea of upgrades to face new communications realities and advanced missile threats". The USN had decommissioned 25 "FFG-7 Short" ships via "bargain basement sales to allies or outright retirement, after an average of only 18 years of service".[10]

Keating's administration was succeeded by the Liberal government ofJohn Howard, which commenced SEA 1390, also known as the FFG Upgrade Project.[10] Originally costing A$1 billion, which eventually increased to A$1.46 billion, the project included improvements to the combat and fire control system, the sonar suite, and the air defence missiles.[10] The upgrade was for four ships, and intended to expand their service life to approximately 2020.[10] The project cost was partly offset by the decommissioning of the two oldest units:[12]Canberra being decommissioned in 2005 andAdelaide in 2008. Modification of each ship took place at Garden Island Dockyard, withAustralian Defence Industries (ADI, nowThales Australia) selected as project leader for the upgrade phase of the project.[10]

By January 2008, the FFG Upgrade Project was running at least four years behind schedule.[13] The frigates' anti-missile and anti-torpedo detection and defense systems could not be integrated as intended, leaving the ships vulnerable to attack.[13] The first ship refitted, HMASSydney, was initially not accepted back into service by the RAN because of the problems, these issues also prevented any refitted ship from serving in a combat zone.[11] Australian Defence Association executives and serving navy personnel have blamed both political parties for the problems: while the Howard Liberal government was responsible for the project, the preceding Labor government chose to maintain the frigates instead of replacing them with theKidd-class destroyers in the early 1990s.[10][11]

Sydney (foreground) andDarwin alongside at Fleet Base East in 2011

By November 2008,Darwin's upgrade had been completed, while the problems experienced withSydney had been rectified in both ships.[14] It was planned to start deploying these warships to the Gulf in 2009.[14] The RAN and Thales subsequently claimed that the two upgraded ships were the "most capable ships in the history of the RAN", and that once the other twoAdelaides were upgraded, the navy would possess the "most lethal frigate fleet on earth".[14] It was reported at the same time that other nations operating guided missile frigates, including the United States, Canada, Greece, and Turkey were considering similar upgrades.[14]

After the four survivingAdelaide-class ships were refitted, they were capable of firingSM-2MR andRGM-84 Harpoon missiles from the Mark 13 launcher.[10] The replacement of theSM-1MR with theSM-2MR doubled the engagement range for air targets. An 8-cellMark 41 Vertical Launch System forEvolved Sea Sparrow Missile had also been installed forward of the Mark 13 launcher. ThePhalanx CIWS was upgraded to Block 1B, and the torpedoes, missiles, and other ship-mounted weapons were upgraded to the latest versions.[10]

Fates

[edit]

Canberra andAdelaide were decommissioned to offset the cost of upgrading the remaining four ships, withCanberra on 12 November 2005 andAdelaide on 19 January 2008.[12][15]

Adelaide sinking off Avoca Beach on 13 April 2011

Canberra was subsequently sunk as adive wreck on 4 October 2009, 2 nautical miles (3.7 km; 2.3 mi) offOcean Grove, Victoria, in 30 metres (98 ft) of water.[16]Adelaide was converted into a dive wreck, but plans to scuttle her offAvoca Beach, New South Wales in April 2010 were postponed following protests byresident action groups and a tribunal hearing. The tribunal ordered the removal of wiring and paint from sections of the frigate before she was sunk on 13 April 2011.[17][18][19]

Sydney entered port for the final time in February 2015, but remained commissioned as an alongside training ship until 7 November.[20][21] In May 2017, having not received any offers to convert the hull for use as a dive wreck,Sydney was sold for scrap.[22]

Darwin arrived in Sydney for the last time on 1 November 2017, prior to her decommissioningceremony on 9 December.[23][24]

The upgradedAdelaide-class frigates were replaced by three newHobart-class air warfare destroyers, equipped with theAegis combat system, starting around 2016.[citation needed]

In April 2017, the Polish government officially expressed interest in purchasing two of the remaining three frigates when they are retired from service.[25][26] Negotiations between the Australian and Polish Governments for the sale were unsuccessful. In January 2019 the Greek Government sent an expression of interest to the Department of Defence forMelbourne andNewcastle.[27] In May 2019 it was reported that Chile had also shown interest in the two frigates.[28] On 27 December 2019, it was announced thatMelbourne andNewcastle had been sold toChile.[citation needed]

On 15 April 2020 the ships were handed over to the Chilean Navy and renamedCapitan Prat (FFG-11) (ex HMASNewcastle) andAlmirante Latorre (FFG-14) (ex HMASMelbourne)[29]

Ships

[edit]
NamePennant numberBuilderLaid downLaunchedCommissionedPaid offStatus/fate
 Royal Australian Navy
AdelaideFFG 01Todd Pacific Shipyards,Seattle29 July 197721 June 197815 November 198019 January 2008Scuttled asdive wreck, 13 April 2011
CanberraFFG 021 March 19781 December 197821 March 198112 November 2005Scuttled asdive wreck, 4 October 2009
SydneyFFG 0316 January 198026 September 198029 January 19837 November 2015Broken up atHenderson, Western Australia[30]
DarwinFFG 043 July 198126 March 198221 July 19849 December 2017Broken up atHenderson, Western Australia[31]
MelbourneFFG 05AMECON,Williamstown12 July 19855 May 198915 February 199226 October 2019Sold to Chile, asAlmirante Latorre
NewcastleFFG 0621 July 198921 February 199211 December 199330 June 2019Sold to Chile, asCapitan Prat
 Chilean Navy
Almirante LatorreFFG 14AMECON, Williamstown12 July 19855 May 198915 April 2020In active service
Capitan PratFFG 1121 July 198921 February 199215 April 2020In active service

See also

[edit]

Equivalent frigates of the same era

References

[edit]
  1. ^McLaughlin, Andrew."Contract signed and work begins in Adelaide on first of navy's Hunter-class frigates".PS News. Retrieved4 October 2024.
  2. ^"Adelaide Class Frigate Models".SD Model Makers. Retrieved4 October 2024.
  3. ^abcdJones, in Stevens,The Royal Australian Navy, p. 220
  4. ^abFrame,Pacific Partners, pp. 102, 162
  5. ^Frame,Pacific Partners, p. 162
  6. ^abMacDougall,Australians at war, p. 345
  7. ^abcdefgHooton,Perking-up the Perry class
  8. ^abScott,Enhanced small-calibre systems offer shipborne stopping power
  9. ^Fish & Grevatt,Australia's HMAS Toowoomba test fires MU90 torpedo
  10. ^abcdefghi"Australias Hazard(ous) Frigate Upgrades: Done at Last".Defense Industry Daily.Archived from the original on 17 January 2008. Retrieved5 December 2021.
  11. ^abcMcPhedran,Frigates 'can't go to war' despite $1.4bn upgrade
  12. ^abSaunders (ed.),Jane's Fighting Ships 2008–2009, p. 28
  13. ^abKirk & staff,Dud frigates an inherited nightmare
  14. ^abcdMcPhedran,Australia's naval frigates 'worth the wait'
  15. ^Australian Department of Defence,HMASAdelaide Decommissions
  16. ^Draper,Old Warship sunk off Victoria's coast
  17. ^Harvey & West,Judge orders tough new rules for scuttling
  18. ^Fish,Australia's Adelaide ends 27 years of service
  19. ^Westbrook,Dolphins frolic, protesters sunk as frigate sent to the bottom
  20. ^"Final entry into Sydney for city's namesake warship" (Press release). Department of Defence. 27 February 2015. Archived fromthe original on 27 February 2015. Retrieved27 February 2015.
  21. ^"HMAS Sydney decommissioned after 32 years of service".ABC News. Australian Broadcasting Corporation. 7 November 2015. Retrieved7 November 2015.
  22. ^Minister for Defence Personnel (18 May 2017)."Ex-HMAS Sydney retires to Western Australia".Navy Daily (Press release). Archived fromthe original on 21 May 2017. Retrieved26 May 2017.
  23. ^"HMAS Darwin sails into port for the last time ahead of decommissioning".PM with Dominique Schwarz. ABC. 1 November 2017. Retrieved19 December 2017.
  24. ^"Navy farewells HMASDarwin after 33 years of service".Navy News. Royal Australian Navy. 9 December 2017. Archived fromthe original on 22 December 2017. Retrieved19 December 2017.
  25. ^Kerr, Julian (30 March 2017)."Ex-RAN FFGs for Poland?".Australian Defence Magazine. Sydney, Australia. Retrieved14 April 2017.
  26. ^Adamowski, Jaroslaw (29 March 2017)."Poland eyes frigates from Australia, new submarines".Defense News. Warsaw, Poland. Retrieved14 April 2017.
  27. ^Levick, Ewan (24 January 2019)."Greece shows interest in buying RAN FFGs".Australian Defence Magazine. Retrieved16 June 2019.
  28. ^"Australia preparing possible transfer of 2 Adelaide-class frigates to Chile".Asia Pacific Defense Journal. 30 May 2019. Retrieved29 September 2019.
  29. ^Gain, Nathan (21 April 2020)."Ex-RAN Adelaide-Class Frigates Commissioned With The Chilean Navy".Naval News. Retrieved22 April 2020.
  30. ^"Retired Australian frigate leaves Sydney for scrapping".Naval Today. 18 May 2017. Retrieved29 May 2017.
  31. ^"Ex-HMAS Darwin to be scrapped at Henderson".Cockburn Express. Archived fromthe original on 12 October 2019. Retrieved30 January 2019.

Citation

[edit]

Books

[edit]
  • Frame, Tom (1992).Pacific Partners: a history of Australian-American naval relations. Rydalmere, NSW: Hodder & Stoughton.ISBN 0-340-56685-X.OCLC 27433673.
  • Jones, Peter (2001). "1972–1983: Towards Self-Reliance". In Stevens, David (ed.).The Royal Australian Navy. The Australian Centenary History of Defence (vol III). South Melbourne, VIC: Oxford University Press.ISBN 0-19-555542-2.OCLC 50418095.
  • MacDougall, Anthony Keith (2002) [1991].Australians at war: a pictorial history (2nd (revised and expanded) ed.). Noble Park, Vic: The Five Mile Press.ISBN 1-86503-865-2.OCLC 260099887.
  • N.A. (1990). "Australian Defence Boost".Warship International.XXVII (2):192–194.ISSN 0043-0374.
  • Saunders, Stephen, ed. (2008).Jane's Fighting Ships 2008–2009. Jane's Fighting Ships (111th ed.). Surrey: Jane's Information Group.ISBN 978-0-7106-2845-9.OCLC 225431774.

Journal articles

[edit]
  • Fish, Tim; Grevatt, Jon (24 June 2008). "Australia's HMAS Toowoomba test fires MU90 torpedo".Jane's Navy International. Jane's Information Group.
  • Fish, Tim (1 March 2008). "Australia's Adelaide ends 27 years of service".Jane's Navy International. Jane's Information Group.
  • Hooton, E.R. (1 December 1996). "Perking-up the Perry class".Jane's International Defence Review.9 (9). Jane's Information Group.
  • Scott, Richard (12 December 2007). "Enhanced small-calibre systems offer shipborne stopping power".International Defence Review. Jane's Information Group.

News articles

[edit]

Websites and other media

[edit]

Further reading

[edit]
  • Earnshaw, Dr. Paul (September–October 1997)."The Australian Frigate Project"(PDF).Australian Defence Force Journal (127). Department of Defence. Retrieved24 April 2009.

External links

[edit]
Wikimedia Commons has media related toAdelaide class frigates.
Portals:
Command
Organisation
Fleet Command
Navy Headquarters
Ships and
equipment
Installations
Personnel
Current
operations
History
Other
Former
entities
CategoryPortal
 Royal Australian Navy
 Chilean Navy
 United States Navy
 Royal Australian Navy
Adelaide class
 Republic of China Navy
Cheng Kung class
 Spanish Navy
Santa María class
Other operators
 Royal Bahraini Naval Force
 Egyptian Navy
Mubarak class /Alexandria class
 Pakistan Navy
 Polish Navy
 Turkish Naval Forces
G class
 Republic of China Navy
Frigates of theChilean Navy (modern era)
Frigates
Commissioned ships
Adelaide class (2020–Present)
Type 23 (2006–Present)
Karel Doorman class (2005–Present)
Type 22 (2003–Present)
Decommissioned ships
Jacob van Heemskerck class (2005–2020)
Leander class (1991–2006)
Condell class (1973–2007)
River class (1946–1966)
Footnotes
  1. ^Later renamed asBaquedano.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Adelaide-class_frigate&oldid=1337971209"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp