| ADNOC Headquarters | |
|---|---|
| General information | |
| Status | Completed |
| Type | Commercial - Multi-Storey Project |
| Location | Abu Dhabi,United Arab Emirates |
| Current tenants | Abu Dhabi National Oil Company (ADNOC) |
| Construction started | 2009 |
| Completed | 2017 |
| Cost | $316.45 million (estimated) |
| Owner | Adnoc (UAE Government) |
| Height | 342 m (1,122 ft) |
| Technical details | |
| Floor count | 76 |
| Floor area | 190,000 square meters |
| Design and construction | |
| Main contractor | Six Construct Co |
ADNOC Headquarters is askyscraper office complex located inAbu Dhabi,United Arab Emirates and is the corporate headquarters of theAbu Dhabi National Oil Company (ADNOC).[1]
The building incorporatesenergy efficiency andsustainable engineering technologies, such as a double skin façade,LED exterior lighting. Designed byHOK, the overall building complex consists of more than 65 floors with an office tower, corniche club, SPC and Crisis Management Centre, a heritage museum and other supporting facilities.[2]
24°27′43″N54°19′27″E / 24.46194°N 54.32417°E /24.46194; 54.32417
This United Arab Emirates structure article is astub. You can help Wikipedia byadding missing information. |