Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

A83 road

From Wikipedia, the free encyclopedia
Road in Scotland

A83 shield
A83
Route information
Length97.9 mi[1] (157.6 km)
Major junctions
Northeast endA82 inTarbet (NN319044)
Southwest endB842 inCampbeltown (NR720204)
Location
CountryUnited Kingdom
Constituent countryScotland
Council areasArgyll and Bute
Primary
destinations
Glasgow,Inveraray,Lochgilphead,Campbeltown
Road network
A82A84

TheA83 is a major road in the south ofArgyll and Bute,Scotland, running fromTarbet, on the western shore ofLoch Lomond, where it splits from theA82, toCampbeltown at the southern end of theKintyre peninsula. The road is best known for its section across theRest and be Thankful pass through theArrochar Alps between the heads ofLoch Long andLoch Fyne.

Route

[edit]
View south along the A83 road overLoch Fyne

From Tarbet the A83 runs west across thewatershed between Loch Lomond and Loch Long toArrochar near the head of Loch Long. It then goes round the head of the loch, and along the western shore for a short distance, before turning northwest through the Rest and be Thankful mountain pass throughGlen Croe in the Arrochar Alps, from the shore of Loch Long to that of Loch Fyne. It was near this spot that an RAF Tornado crashed on 2 July 2009.[2]

The wordsREST & BE THANKFUL are inscribed on a stone near the junction of the A83 and the B828, placed there by soldiers who built the original military road in 1753, now referred to as theDrovers' Road. The original stone fell into ruin and was replaced by a commemorative stone at the same site.

The section is so named as the climb out ofGlen Croe is so long and steep at the end that it was customary for travellers to rest at the top, and be thankful for having reached the highest point. The current road no longer keeps to the floor of Glen Croe but steadily climbs across the southern slopes ofBeinn Luibhean, on the north side of the Glen, to the highest point of the pass. The westward descent toLoch Fyne is throughGlen Kinglas. AtCairndow the A815, the main road down theCowal peninsula, branches off south toDunoon and finallyToward at the A815 road end, both on theFirth of Clyde.

On reaching the shore of Loch Fyne, the A83 follows the eastern shore of the loch northwards to its head and then goes south west along the western shore throughInveraray and then on toLochgilphead andArdrishaig, where it crosses the entrance to theCrinan Canal.

From Ardrishaig the road continues south toTarbert, where it crosses over to the western shore of theKintyre peninsula. In the final section it passes through the villages ofWhitehouse,Clachan,Tayinloan,Muasdale andBellochantuy before finally crossing back to the east of the peninsula, on theFirth of Clyde coast, as it approachesCampbeltown.

  • Glen Croe viewed from Rest and be thankful viewpoint
    Glen Croe viewed fromRest and be thankful viewpoint
  • Glen Croe, 18 November 2006
    Glen Croe, 18 November 2006

Rest and Be Thankful closures

[edit]

The stretch south of theRest and Be Thankful junction has been closed on a number of occasions due tolandslides, causing significant disruption to local traffic. The closure results in a 59-mile (93 km) diversion viaCrianlarich when the military road is also affected.[3] The many communities affected by the closures of the trunk road are campaigning for a permanent solution to be constructed byTransport Scotland. Suggestions include arock shed, so future slips flow over the trunk road, and a new road route.[4][5][6]

Transport Scotland has, in recent years, spent £80M on landslip prevention schemes, none of which has improved the situation on the trunk road.[7] The many wire slip capture nets and supporting cables have failed on many occasions and some have criticised these, saying they blight the picturesque area.[8]

  • The trunk road was closed here due to a 400-tonne landslide on 28 October 2007.[9] The road was partially reopened on Monday 10 November.[10]
  • A 1,070 tonne landslide closed the trunk road around noon on 8 September 2009.[11] The road reopened at 15:00 on 10 September 2009.[12]
  • A landslip on 1 December 2011 closed the trunk road for 24 hours.[13]
  • Another landslip closed the trunk road from 22 February 2012, and an even more substantial landslip in August 2012 resulted in further major delays and closures.[14]
  • On 3 October 2013, the trunk road was reopened at 17:30, having been closed between the A815 and the B828 since the previous night.[15][16]
  • On 30 December 2015,Storm Frank caused a 200 tonne landslide; two cars were caught up in the debris but no one was harmed. The trunk road reopened the following afternoon.[17][18]
  • The A83 trunk road closed again for a period of nine days in October 2018, in response to landslides triggered during the start of Storm Callum.
  • In August 2020 a landslip happened as the area experienced heavy rains, again closing the trunk road.[19]
  • In September 2020, after being re-opened for only five days, a further landslip happened as the area again experienced heavy rains, closing the trunk road.[20]
  • In October 2023, after heavy rain, the A83 was closed after seven separate landslides. The road was closed for five days.[21][22] Ten people were airlifted by helicopter, after becoming trapped between landslips while traveling on the road.[23]

Landslides have become increasingly frequent in recent years despite remediation efforts. In March 2020Transport Scotland said it was investing in the further construction of catch pits which it hoped would mitigate against landslides along the A83 trunk road route.[24] A 10-year woodland creation project is currently in progress; it is thought that the subsequent ground stabilisation will help prevent further landslides.[25]

In March 2022, Transport Scotland shortlisted five consultants to design a long-term solution to landslip problems on the A83 at Rest and Be Thankful. Five options including tunnelling are being considered. Transport Scotland has looked at Norway's processes and methods for developing and constructing tunnelling projects to deal with conditions similar to those at Rest and Be Thankful.[26]

A83

[edit]
Council areaLocationmi[1]kmDestinationsNotes
Argyll and ButeTarbet0.00.0A82 toA85 –Glasgow,Crianlarich,Fort William,ObanNortheastern terminus
Arrochar1.62.6A814 south –Helensburgh,GarelochheadGarelochhead signed northeast only; northern terminus of A814
12.520.1A815 south toA886 –Dunoon,Isle of Bute,ColintraiveNorthern terminus of A815
Inverary23.437.7A819 north toA85 –Oban,CrianlarichSouthern terminus of A819
Lochgilphead48.077.2A816 north –ObanSouthern terminus of A816
Tarbet61.198.3A8015 east (Harbour Street) – East Loch Pier, Cowal FerryCowal Ferry signed northeast only; western terminus of A8015
Campbeltown97.9157.6Main Street (B842) / Hall Street –Town centreSouthwestern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

[edit]
  1. ^ab"56.2033469, -4.7111178 to The Royal Hotel, Main St, Campbeltown PA28 6AG, United Kingdom".Google Maps. Retrieved7 January 2026.
  2. ^"Two killed in RAF Tornado crash". 2 July 2009 – via news.bbc.co.uk.
  3. ^"Road workers abused over 59 mile diversion". 21 August 2020 – via www.bbc.co.uk.
  4. ^Council, Argyll and Bute (5 March 2020)."Council Leader calls again for a permanent solution for A83".Argyll and Bute Council.
  5. ^"Rest and Be Thankful: Cross-party calls for work on permanent solution to start next year". 11 August 2020.
  6. ^"Transport Scotland | Rest and Be Thankful".www.transport.gov.scot.
  7. ^"It's the pits: £80m taxpayers' money 'wasted' over multiple failed fixes to iconic Scots road".HeraldScotland. 6 August 2020.
  8. ^"REPORT PPR743"(PDF).
  9. ^"'Flatout' efforts to reopen A83".BBC News. 5 November 2007.
  10. ^"A83 Rest and be Thankful Open - Single Lane only".Islay Weblog. 9 November 2007.
  11. ^"Landslip as winds batter Scotland".BBC News. 8 September 2009.
  12. ^"Road open 48 hours after landslip".BBC News. 10 September 2009.
  13. ^"Slip could close A83 Rest and Be Thankful for 24 hours".BBC News. 1 December 2011.
  14. ^"Landslip closes A83 Rest and Be Thankful in Argyll".BBC News. 23 February 2012.
  15. ^Dalton, Alastair."A83 could reopen today as work resumes to clear Rest and Be Thankful landslide".The Scotsman. Archived fromthe original on 10 November 2013.
  16. ^"A83 at Rest and be Thankful reopens following landslip".BBC News. 3 October 2013.
  17. ^"Argyll News: A83 now closed with landslide at Rest & Be Thankful".For Argyll. 30 December 2015. Archived fromthe original on 18 January 2016. Retrieved14 December 2016.
  18. ^Campbell, Rita (30 December 2015)."Storm Frank: Cars caught up in Rest and Be Thankful landslide".The Press and Journal. Retrieved14 December 2016.
  19. ^"Boulders 'as big as cars' at Rest and Be Thankful".BBC News. 5 August 2020. Retrieved7 August 2020.
  20. ^"A83: Rest and Be Thankful to remain closed overnight due to landslide".Herald Scotland. 13 September 2020. Retrieved13 September 2020.
  21. ^"Rest and Be Thankful road hit by seven landslips". 9 October 2023 – via www.bbc.co.uk.
  22. ^Dewar, Caitlyn (11 October 2023)."Landslide-hit Rest and Be Thankful reopens following major flooding".STV News.
  23. ^"Ten people airlifted from vehicles after major route closed by landslip".Helensburgh Advertiser. 7 October 2023.
  24. ^"Rest and Be Thankful: New pit to combat landslips on A83".BBC News. 5 March 2020. Retrieved5 March 2020.
  25. ^"Rest and Be Thankful woodland creation - Forestry and Land Scotland".forestryandland.gov.scot.
  26. ^"Five designers shortlisted for A83 landslip remedy".The Construction Index. 4 March 2022. Retrieved4 March 2022.

External links

[edit]
A roads in Zone 8 of theGreat Britain road numbering scheme
Retrieved from "https://en.wikipedia.org/w/index.php?title=A83_road&oldid=1331754635"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp