Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

A10 motorway (Romania)

From Wikipedia, the free encyclopedia
Motorway in Romania

A10 motorway shield}}
A10 motorway
Map of the A10 motorway, as of July 2018
Autostrada A 10 (2).jpg
Route information
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România
Length70 km (43 mi)
Existed2018–present
Major junctions
South endA 1 nearSebeș
North endA 3 nearTurda
Location
CountryRomania
CountiesAlba, Cluj
Major citiesAlba Iulia,Aiud
Highway system
A 9A 11

TheA10 motorway (Romanian:Autostrada A10), also known as theSebeș–Turda Motorway (Romanian:Autostrada Sebeș–Turda), is amotorway in the central-western part ofRomania, connecting theA1 andA3 motorways, between the cities ofSebeș andTurda, also providing access toAlba Iulia andAiud. It is 70 km long, with a total cost of 420 million euro, which is financed in proportion of 85% from the European Union funds, the rest of 15% being insured from the state budget. The motorway's construction was divided into four lots:[1] works for lots 3 and 4 began on 20 May 2014, whereas for the other two lots began in 2015.[2]

Since 2021, it has been operational on its entire length. NearOiejdea, however, initially it was only operational on two lanes, due to alandslide that occurred in the area that was still not resolved.[3] The motorway became fully operational on 19 November 2022.[4]

Sections

[edit]

The construction was split into the following four segments, the contracts for which have been awarded in December 2013:[5]

  • Lot 1: 17.0 km, from the highway entrance near the interchange with theA1 motorway atSebeș to Alba Iulia North interchange, awarded to the building consortium of Impresa Pizzarotti & Pomponio Construcții SRL, for a cost of 541,739,137 lei. Includes a complex node with A1.[6]
  • Lot 2: 24.3 km, from Alba Iulia North interchange toAiud, awarded to building consortium of Aktor SA & Euroconstruct Trading '98 SRL for a cost of 549,332,493 lei.
  • Lot 3: 12.5 km, fromAiud to the Decea interchange, awarded to the building consortium of Tirrena Scavi SpA andSocietà Italiana per Condotte d'Acqua, for a cost of 420,511,921 lei.
  • Lot 4: 16.3 km, from the Decea interchange to the interchange with theA3 motorway nearTurda, awarded to Porr Construct SRL and Porr Bau GmbH, for a cost of 470,004,894 lei.

Openings timeline

[edit]
  • The Aiud – Turda segment (26.4 km) opened to traffic on 30 July 2018.[7][8]
  • The Sebeș – Alba Iulia North segment (14.8 km) opened to traffic on 3 December 2020.[9]
  • The Alba Iulia North – Aiud segment (28.8 km) opened to traffic on 30 November 2021.[3]
The A10 motorway nearUnirea, October 2018

Exit list

[edit]
This article contains a bulleted list or table of intersections whichshould be presented in a properly formatted junction table. Please consultthis guideline for information on how to create one. Pleaseimprove this article if you can.(November 2021)
CountyLocationKmMiExitDestinationsNotes
AlbaSebeș00A1A1Deva,Timișoara,Sibiu,Bucharest

DN1DN1Sebeș North (southbound)

Southern terminus.
Alba IuliaServicesParking
84.92DN1DN1Alba Iulia South
17103DN1DN1Alba Iulia North
TeiușServicesParkingUnder construction.
26164DN14B DN14B –Teiuș,Blaj
Aiud44275DN1DN1Aiud
ServicesParking
Decea53326DN1DN1Decea,Unirea,Ocna Mureș
Unirea5735U-turn exit
ServicesParking
6137U-turn exit

Centru de Întreținere și Coordonare (C.I.C)

ClujMihai Viteazu70437A3A3Târgu Mureș,Brașov,Cluj-Napoca,Borș

DN1DN1Turda

Northern terminus.
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

[edit]

References

[edit]
  1. ^"Licitație pentru autostrada Sebeș-Turda. Proiectul a fost împărțit în patru loturi" (in Romanian). Adevărul. 22 July 2013.
  2. ^"AUTOSTRADA SEBEȘ-TURDA: Au început lucrările pe loturile 3 și 4, faza de proiectare, de la intrarea în Aiud până la Turda" (in Romanian). Alba24. 20 May 2014.
  3. ^abUnirea, Ziarul (30 November 2021)."VIDEO| Se CIRCULĂ pe TOATĂ autostrada A10 Sebeș-Turda: Alba Iulia, legată de Cluj, Sibiu și Deva prin drumuri de mare viteză".Ziarul Unirea.
  4. ^"Pe întreaga autostradă Sebeş-Turda (A10) se circulă în regim de 4 benzi, anunță Compania de Administrare a Infrastructurii Rutiere | www.actualdecluj.ro".actualdecluj.ro. Retrieved7 January 2025.
  5. ^"Autostrada 10 Sebes-Turda" (in Romanian). 130 km.ro. Retrieved24 December 2013.
  6. ^"VIDEO| Pe autostrada A10 Sebeș-Turda se lucrează la ultima pilă de la nodul rutier Sebeș" (in Romanian). Ziarul Unirea. 31 October 2020.
  7. ^"Circulația a fost deschisă pe cei 29 km de pe Loturile 3 și 4 din autostrada A10 Sebeș – Turda, la patru ani de la demararea lucrărilor" (in Romanian). Hotnews.ro. 30 July 2018.
  8. ^"Şoferii au încă 30 de km de autostradă în România" (in Romanian). Digi24.ro. 30 July 2018.
  9. ^"Autostrada Sebeș – Turda: S-a deschis circulația pe lotul 1 Update FOTO VIDEO". 3 December 2020.

External links

[edit]
Motorways
In service
Under construction
Planned
Expressways
In service
Under construction
Main national roads
Other national roads
Retrieved from "https://en.wikipedia.org/w/index.php?title=A10_motorway_(Romania)&oldid=1272453614"
Category:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp