Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

79th Street station (IRT Broadway–Seventh Avenue Line)

Coordinates:40°47′02″N73°58′48″W / 40.784°N 73.98°W /40.784; -73.98
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
New York City Subway station in Manhattan
For the station at 79th Street and New Utrecht Avenue in Brooklyn, see79th Street station (BMT West End Line).

New York City Subway station in Manhattan, New York
 79 Street
 "1" train
View from northbound platform
Station statistics
AddressWest 79th Street & Broadway
New York, New York
BoroughManhattan
LocaleUpper West Side
Coordinates40°47′02″N73°58′48″W / 40.784°N 73.98°W /40.784; -73.98
DivisionA (IRT)[1]
LineIRT Broadway–Seventh Avenue Line
Services  1 all times (all times)
  2 late nights (late nights)
TransitBus transportNYCT Bus:M79 SBS,M104[2]
StructureUnderground
Platforms2side platforms
Tracks4
Other information
OpenedOctober 27, 1904; 121 years ago (1904-10-27)[3]
Traffic
20243,207,507[4]Decrease 8.9%
Rank102 out of 423[4]
Services
Preceding stationNew York City SubwayNew York City SubwayFollowing station
86th Street
1 all times2 late nights

Local
72nd Street
1 all times2 late nights
"3" train does not stop here
Location
79th Street station (IRT Broadway–Seventh Avenue Line) is located in New York City Subway
79th Street station (IRT Broadway–Seventh Avenue Line)
Show map of New York City Subway
79th Street station (IRT Broadway–Seventh Avenue Line) is located in New York City
79th Street station (IRT Broadway–Seventh Avenue Line)
Show map of New York City
79th Street station (IRT Broadway–Seventh Avenue Line) is located in New York
79th Street station (IRT Broadway–Seventh Avenue Line)
Show map of New York
Track layout

Street map

Map

Station service legend
SymbolDescription
Stops all timesStops all times
Stops late nights onlyStops late nights only

79th Street Subway Station (IRT)
MPSNew York City Subway System MPS
NRHP reference No.04001018[5]
NYCL No.1096
Significant dates
Added to NRHPSeptember 17, 2004
Designated NYCLOctober 23, 1979[6]

The79th Street station is a localstation on theIRT Broadway–Seventh Avenue Line of theNew York City Subway. Located at the intersection of79th Street andBroadway on theUpper West Side ofManhattan, it is served by the1 train at all times and the2 train during late nights.

The 79th Street station was constructed for theInterborough Rapid Transit Company (IRT) as part of thecity's first subway line, which was approved in 1900. Construction of the line segment that includes the 79th Street station began on August 22 of the same year. The station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway. The station's platforms have been lengthened since opening.

The 79th Street station contains twoside platforms and four tracks; express trains use the inner two tracks to bypass the station. The station was built with tile and mosaic decorations, although most of the original design has been replaced with a cinder block design. The platforms contain exits to 79th Street and Broadway and are not connected to each other withinfare control. The remaining portion of the original station interior is aNew York City designated landmark and listed on theNational Register of Historic Places.

History

[edit]

Construction and opening

[edit]
Original wall decorations and mosaics

Planning for asubway line inNew York City dates to 1864.[7]: 21  However, development of what would become thecity's first subway line did not start until 1894, when theNew York State Legislature passed the Rapid Transit Act.[7]: 139–140  The subway plans were drawn up by a team of engineers led byWilliam Barclay Parsons, the Rapid Transit Commission's chief engineer. It called for a subway line fromNew York City Hall inlower Manhattan to theUpper West Side, where two branches would lead north intothe Bronx.[6]: 3  A plan was formally adopted in 1897,[7]: 148  and all legal conflicts concerning the route alignment were resolved near the end of 1899.[7]: 161 

The Rapid Transit Construction Company, organized byJohn B. McDonald and funded byAugust Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[8] under which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[7]: 165  In 1901, the firm ofHeins & LaFarge was hired to design the underground stations.[6]: 4  Belmont incorporated theInterborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[7]: 182 

The 79th Street station was constructed as part of the IRT's West Side Line (now theBroadway–Seventh Avenue Line) from 60th Street to 82nd Street, for which work had begun on August 22, 1900. Work for that section had been awarded to William Bradley.[8] By late 1903, the subway was nearly complete, but theIRT Powerhouse and the system'selectrical substations were still under construction, delaying the system's opening.[7]: 186 [9] The 79th Street station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway fromCity Hall to145th Street on the West Side Branch.[3][7]: 186  The opening of the first subway line, and particularly the 79th Street station, helped contribute to the development of the Upper West Side.[5]: 9 The Apthorp apartment building, just outside one of the station's exits, was built in anticipation of the 79th Street station's opening.[10]

Service changes and station renovations

[edit]

1910s to 1930s

[edit]

After the first subway line was completed in 1908,[11] the station was served by local trains along both the West Side (now the Broadway–Seventh Avenue Line toVan Cortlandt Park–242nd Street) and East Side (now theLenox Avenue Line). West Side local trains had their southern terminus at City Hall during rush hours andSouth Ferry at other times, and had their northern terminus at 242nd Street. East Side local trains ran from City Hall toLenox Avenue (145th Street).[12]

To address overcrowding, in 1909, theNew York Public Service Commission proposed lengthening the platforms at stations along the original IRT subway.[13]: 168  As part of a modification to the IRT's construction contracts made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $50.6 million in 2024) spent on platform lengthening, $500,000 (equivalent to $16.9 million in 2024) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[14]: 15  Platforms at local stations, such as the 79th Street station, were lengthened by between 20 and 30 feet (6.1 and 9.1 m). Both platforms were extended to the north and south.[14]: 111  Six-car local trains began operating in October 1910.[13]: 168  The Broadway–Seventh Avenue Line opened south ofTimes Square–42nd Street in 1918, and the original line was divided into an H-shaped system. The original subway north of Times Square thus became part of the Broadway–Seventh Avenue Line, and all local trains were sent to South Ferry.[15]

In December 1922, the Transit Commission approved a $3 million (equivalent to $56,355,865 in 2024) project to lengthen platforms at 14 local stations along the original IRT line, including 79th Street and five other stations on the Broadway–Seventh Avenue Line. Platform lengths at these stations would be increased from 225 to 436 feet (69 to 133 m).[16][17] The commission postponed the platform-lengthening project in September 1923, at which point the cost had risen to $5.6 million (equivalent to $103,348,438 in 2024).[18][19]

1940s to 1960s

[edit]
Woman waiting for the train, May 1973

The city government took over the IRT's operations on June 12, 1940.[20][21] The IRT routes were given numbered designations in 1948 with the introduction of"R-type" rolling stock, which containedrollsigns with numbered designations for each service.[22] The Broadway route to 242nd Street became known as the1 and the Lenox Avenue route as the3.[23]

The original IRT stations north of Times Square could barely fit local trains of five or six cars depending on the configuration of the trains. Stations on the line from50th Street to96th Street, including this station but excluding the91st Street station, had their platforms extended in the 1950s to accommodate ten-car trains as part of a $100 million (equivalent to $1,078,652,968 in 2024) rebuilding program.[24] The contract to extend the platforms at 79th Street and 86th Street was awarded to Delma Engineering Corporation for $1,867,705 in 1957 (equivalent to $20,910,000 in 2024).[25] The platform extensions at the local stations were completed by early 1958.[24] Once the project was completed, all 1 trains became local and all 2 and 3 trains became express, and eight-car local trains began operation. Increased and lengthened service was implemented during peak hours on the 1 train on February 6, 1959.[26] Due to the lengthening of the platforms at86th Street and 96th Street, the intermediate 91st Street station was closed on February 2, 1959, because it was too close to the other two stations.[27][24]

In November 1959, the Warshaw Construction Company received a contract to remove fifteen entrance/exit kiosks on IRT lines, including two at the 79th Street station. This was part of a citywide initiative to remove the kiosks, which obstructed motorists' views of pedestrians.[28] On June 28, 1964, theNew York City Transit Authority (NYCTA) awarded a contract to construct additional entrances at the station to Delma Engineering Corporation for $212,874 (equivalent to $2,158,204 in 2024).[29] Work on the project was still underway in 1967.[30]

The uptown platform and control area in 1978

1970s to present

[edit]

In April 1988,[31] the NYCTA unveiled plans to speed up service on the Broadway–Seventh Avenue Line through the implementation of askip-stop service: the9 train.[32] When skip-stop service started in 1989, it was only implemented north of137th Street–City College on weekdays, and 79th Street was served by both the 1 and the 9.[33][34][35] Skip-stop service ended on May 27, 2005, as a result of a decrease in the number of riders who benefited.[36][37]

In 1979, theNew York City Landmarks Preservation Commission designated the space within the boundaries of the original station, excluding expansions made after 1904, as a city landmark.[6] The station was designated along with eleven others on the original IRT.[6][38] The original interiors were listed on theNational Register of Historic Places in 2004.[5] The southbound platform was closed for structural work in February 2024, followed by the northbound platform in March 2024.[39]

Station layout

[edit]
GroundStreet levelExit/entrance
Platform levelSide platform
Northbound local"1" train towardVan Cortlandt Park–242nd Street(86th Street)
"2" train towardWakefield–241st Street late nights(86th Street)
Northbound express"2" train"3" train do not stop here
Southbound express"2" train"3" train do not stop here →
Southbound local"1" train towardSouth Ferry(72nd Street)
"2" train towardFlatbush Avenue–Brooklyn College late nights(72nd Street)
Side platform

Like other local stations, 79th Street has four tracks and twoside platforms.[40] The station is served by the1 at all times[41] and by the2 during late nights;[42] the center express tracks are used by the 2 train during daytime hours and the3 train at all times.[42][43] The station is between86th Street to the north and72nd Street to the south.[44] The platforms were originally 200 feet (61 m) long, like at other local stations on the original IRT,[6]: 4 [5]: 3 [45]: 8  but as a result of the 1958–1959 platform extension, became 525 feet (160 m) long.[5]: 17  The station was also originally 55.5 feet (16.9 m) wide.[5]: 3 

Design

[edit]
Name in mosaics

As with other stations built as part of the original IRT, the station was constructed using acut-and-cover method.[46]: 237  The tunnel is covered by a U-shaped trough that contains utility pipes and wires. The bottom of this trough contains afoundation ofconcrete no less than 4 inches (100 mm) thick.[5]: 3–4 [45]: 9  Each platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The original platforms contain circular, cast-ironDoric-style columns spaced every 15 feet (4.6 m), while the platform extensions containI-beam columns. Additional columns between the tracks, spaced every 5 feet (1.5 m), support thejack-arched concrete station roofs.[5]: 3–4 [6]: 4 [45]: 9  The ceiling height varies based on whether there are utilities in the ceiling; the areas without utilities is about 15 feet (4.6 m) above platform level. There is a 1-inch (25 mm) gap between the trough wall and the platform walls, which are made of 4-inch (100 mm)-thick brick covered over by a tiled finish.[5]: 3–4 [45]: 9 

Platform extension tiling

Thefare control areas are at platform level, and there is no crossover or crossunder between the platforms.[5]: 4  The walls along the platforms near the fare control areas consist of a brickwainscoting on the lowest part of the wall, with bronze air vents along the wainscoting, and white glass tiles above. The platform walls are divided at 15-foot (4.6 m) intervals bybuff and salmon tilepilasters, or vertical bands. There are tiled plaques about halfway up each pilaster, with the number "79" in white-on-green tile, and buff-and-salmon foliate designs around them. Atop each pilaster are buff faience plaques depicting two cornucopias around a shield. A cornice withegg-and-dart patterns atop bead-and-reel moldings run atop these walls.[5]: 4–5 [6]: 9  The mosaic tiles at all original IRT stations were manufactured by the American Encaustic Tile Company, which subcontracted the installations at each station.[45]: 31  The decorative work was performed by tile contractor Alfred Boote Company and faience contractor Rookwood Pottery Company.[45]: 37  The ceilings of the original platforms and fare control areas contain plaster molding.[5]: 4–5 [45]: 10  The section of the ceiling north of the fare control area is smooth, and the section south of fare control is composed of segmental vaults supported by the center columns.[5]: 3–4 

The remainders of both platforms have cream-colored tiles and a salmon trim line with "79TH ST" written on it in blackSans Serif font at regular intervals. These tiles were installed during the late 1950s renovation.[47][48]

Exits

[edit]
Southeastern corner stairs

The southbound platform is fully staffed, containing aturnstile bank, token booth, staircase going up to the northwest corner of West 79th Street and Broadway, and passageway separated from the platform by a steel fence leading to a staircase that goes up to the southwest corner of the intersection. This passageway has aHigh Entry-Exit Turnstile to the platform, with walls made of cinder block tiles.[5]: 4–5, 17 [49]

The northbound platform's fare control is unstaffed, containing a turnstile bank, now-closed customer assistance booth, staircase going up to the southeast corner of West 79th Street and Broadway, and passageway separated from the platform by a steel fence leading to a staircase that goes up to the northeast corner of the intersection. This passageway has a High Exit-Only Turnstile to the platform, with walls made of cinder block tiles.[5]: 4–5, 17 [49] The street staircases on both sides contain relatively simple, modern steel railings like those seen at most New York City Subway stations.[5]: 5–6 

References

[edit]
  1. ^"Glossary".Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS)(PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived fromthe original(PDF) on February 26, 2021. RetrievedJanuary 1, 2021.
  2. ^"Manhattan Bus Map"(PDF).Metropolitan Transportation Authority. July 2019. RetrievedDecember 1, 2020.
  3. ^ab"Our Subway Open: 150,000 Try It; Mayor McClellan Runs the First Official Train".The New York Times. October 28, 1904. p. 1.ISSN 0362-4331.Archived from the original on December 13, 2021. RetrievedApril 21, 2020.
  4. ^ab"Annual Subway Ridership (2018–2023)".Metropolitan Transportation Authority. 2023. RetrievedApril 20, 2024.
  5. ^abcdefghijklmnop"New York MPS 79th Street Subway Station (IRT)". Records of the National Park Service, 1785 - 2006, Series: National Register of Historic Places and National Historic Landmarks Program Records, 2013 - 2017, Box: National Register of Historic Places and National Historic Landmarks Program Records: New York, ID: 75313925. National Archives.
  6. ^abcdefgh"Interborough Rapid Transit System, Underground Interior"(PDF).New York City Landmarks Preservation Commission. October 23, 1979.Archived(PDF) from the original on September 21, 2020. RetrievedNovember 19, 2019.
  7. ^abcdefghWalker, James Blaine (1918).Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. RetrievedNovember 6, 2016.
  8. ^abReport of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
  9. ^"First of Subway Tests; West Side Experimental Trains to be Run by Jan. 1 Broadway Tunnel Tracks Laid, Except on Three Little Sections, to 104th Street -- Power House Delays".The New York Times. November 14, 1903.ISSN 0362-4331.Archived from the original on May 5, 2022. RetrievedMay 10, 2022.
  10. ^"Topics in New York: William Waldorf Astor Plans Another Great Hotel to Cost About $2,500,000 It Will Occupy Block Bounded by Broadway, West End Ave., Seventy -Eighth And Seventy-Ninth Sts".The Sun. November 8, 1901. p. 9.ProQuest 536355982.
  11. ^"Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street for a Nickel Is Possible Now".The New York Times. August 2, 1908. p. 10.Archived from the original on December 23, 2021. RetrievedNovember 6, 2016.
  12. ^Herries, William (1916).Brooklyn Daily Eagle Almanac. The Brooklyn Daily Eagle. p. 119.Archived from the original on May 11, 2021. RetrievedDecember 19, 2020.
  13. ^abHood, Clifton (1978)."The Impact of the IRT in New York City"(PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208)Public Domain This article incorporates text from this source, which is in thepublic domain..Archived(PDF) from the original on January 17, 2021. RetrievedDecember 20, 2020.
  14. ^abReport of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911.Archived from the original on January 20, 2021. RetrievedJanuary 7, 2021.
  15. ^"Open New Subway Lines to Traffic; Called a Triumph"(PDF).The New York Times. August 2, 1918. p. 1.ISSN 0362-4331.Archived(PDF) from the original on August 3, 2019. RetrievedOctober 4, 2011.
  16. ^"33d Street to Be I.R.T. Express Stop; Reconstruction One of Many Station Improvements Ordered by Commission".The New York Times. December 17, 1922.ISSN 0362-4331. RetrievedJune 21, 2022.
  17. ^"$4,000,000 in Construction on I. R. T. Ordered: 33d St. on East Side Subway Will Be Express Stop; Local Stations to Have 10-Car Train Capacity Aim to Speed Service Improvements Will Relieve Congestion Along Both Routes. Board Believes".New-York Tribune. December 18, 1922. p. 22.ProQuest 573974563.
  18. ^"Express Stop Plan Opposed by I.R.T.; Officials Say Money Is Not Available for Change at 33d Street Station".The New York Times. September 7, 1923.ISSN 0362-4331. RetrievedJune 21, 2022.
  19. ^"I. R. T. Wins Delay At Subway Platform Extension Hearing: Transit Commission Head Tells Meeting Widening West Side Stations Would Increase Capacity 25 P. C".New-York Tribune. September 7, 1923. p. 6.ProQuest 1237290874.
  20. ^"City Transit Unity Is Now a Reality; Title to I.R.T. Lines Passes to Municipality, Ending 19-Year Campaign".The New York Times. June 13, 1940.ISSN 0362-4331.Archived from the original on January 7, 2022. RetrievedMay 14, 2022.
  21. ^"Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration".New York Herald Tribune. June 13, 1940. p. 25.ProQuest 1248134780.
  22. ^Brown, Nicole (May 17, 2019)."How did the MTA subway lines get their letter or number? NYCurious".amNewYork.Archived from the original on March 2, 2021. RetrievedJanuary 27, 2021.
  23. ^Friedlander, Alex; Lonto, Arthur; Raudenbush, Henry (April 1960)."A Summary of Services on the IRT Division, NYCTA"(PDF).New York Division Bulletin.3 (1). Electric Railroaders' Association:2–3.Archived(PDF) from the original on September 14, 2020. RetrievedJanuary 27, 2021.
  24. ^abc"High-Speed Broadway Local Service Began in 1959".The Bulletin.52 (2). New York Division, Electric Railroaders' Association. February 2009.Archived from the original on September 16, 2016. RetrievedAugust 26, 2016 – via Issuu.
  25. ^Association, General Contractors (1957).Bulletin. pp. 7, 18.Archived from the original on June 15, 2022. RetrievedDecember 14, 2021.
  26. ^"Wagner Praises Modernized IRT — Mayor and Transit Authority Are Hailed as West Side Changes Take Effect".The New York Times. February 7, 1959. p. 21.ISSN 0362-4331.Archived from the original on January 1, 2018. RetrievedNovember 6, 2016.
  27. ^Aciman, Andre (January 8, 1999)."My Manhattan — Next Stop: Subway's Past".The New York Times.ISSN 0362-4331.Archived from the original on August 28, 2016. RetrievedAugust 26, 2016.
  28. ^"15 More City Kiosks Slated for Scrap".The New York Times. November 9, 1959.ISSN 0362-4331.Archived from the original on January 30, 2022. RetrievedJanuary 30, 2022.
  29. ^Minutes and Proceedings of the New York City Transit Authority. New York City Transit Authority. 1964. pp. 371–373.Archived from the original on June 15, 2022. RetrievedDecember 21, 2020.
  30. ^Minutes and Proceedings of the New York City Transit Authority. New York City Transit Authority. 1969. p. 198.Archived from the original on June 15, 2022. RetrievedJanuary 25, 2021.
  31. ^Brozan, Nadine (June 4, 1989)."'Skip-Stop' Subway Plan Annoys No. 1 Riders".The New York Times.ISSN 0362-4331.Archived from the original on August 10, 2016. RetrievedJune 15, 2016.
  32. ^Moore, Keith (June 10, 1988)."TA's skip-stop plan hit".New York Daily News.Archived from the original on November 8, 2018. RetrievedNovember 8, 2018.
  33. ^"#1 Riders: Your Service is Changing".New York Daily News. August 20, 1989.Archived from the original on November 8, 2018. RetrievedNovember 8, 2018.
  34. ^"Announcing 1 and 9 Skip-Stop Service on the Broadway-Seventh Avenue Line"(PDF). New York City Transit Authority. August 1989. Archived fromthe original(PDF) on June 26, 2020. RetrievedAugust 1, 2009.
  35. ^Lorch, Donatella (August 22, 1989)."New Service For Subways On West Side".The New York Times.ISSN 0362-4331.Archived from the original on August 10, 2016. RetrievedJune 15, 2016.
  36. ^Chan, Sewell (May 25, 2005)."On Its Last Wheels, No. 9 Line Is Vanishing on Signs".The New York Times.ISSN 0362-4331.Archived from the original on March 17, 2015. RetrievedAugust 29, 2016.
  37. ^"Noteworthy – 9 discontinued".mta.info. Metropolitan Transportation Authority. May 7, 2005. Archived fromthe original on May 7, 2005. RetrievedSeptember 18, 2016.
  38. ^"12 IRT Subway Stops Get Landmark Status".The New York Times. October 27, 1979.ISSN 0362-4331.Archived from the original on March 9, 2018. RetrievedDecember 26, 2020.
  39. ^Saltonstall, Gus (March 1, 2024)."UWS Uptown Train Stop Will Be Out of Service Until End of March; 50th Street Stop Also Shutters".West Side Rag. RetrievedMarch 3, 2024.
  40. ^Dougherty, Peter (2006) [2002].Tracks of the New York City Subway 2006 (3rd ed.). Dougherty.OCLC 49777633 – viaGoogle Books.
  41. ^"1 Subway Timetable, Effective June 8, 2025".Metropolitan Transportation Authority. RetrievedNovember 10, 2025.
  42. ^ab"2 Subway Timetable, Effective June 8, 2025".Metropolitan Transportation Authority. RetrievedNovember 10, 2025.
  43. ^"3 Subway Timetable, Effective November 2, 2025".Metropolitan Transportation Authority. RetrievedNovember 10, 2025.
  44. ^"Subway Map"(PDF).Metropolitan Transportation Authority. April 2025. RetrievedApril 2, 2025.
  45. ^abcdefgFramberger, David J. (1978)."Architectural Designs for New York's First Subway"(PDF). Historic American Engineering Record. pp. 1–46 (PDF pp. 367–412)Public Domain This article incorporates text from this source, which is in thepublic domain..Archived(PDF) from the original on January 17, 2021. RetrievedDecember 20, 2020.
  46. ^Scott, Charles (1978)."Design and Construction of the IRT: Civil Engineering"(PDF). Historic American Engineering Record. pp. 208–282 (PDF pp. 209–283)Public Domain This article incorporates text from this source, which is in thepublic domain..Archived(PDF) from the original on January 17, 2021. RetrievedDecember 20, 2020.
  47. ^Tobar, Roberto C. (November 27, 2010)."Platform view".nycsubway.org.Archived from the original on March 1, 2021. RetrievedDecember 21, 2020.
  48. ^Cox, Jeremiah (February 10, 2004)."Looking down towards one end of the platforms at 79 St".subwaynut.com. Archived from the original on September 23, 2019. RetrievedDecember 21, 2020.
  49. ^ab"79th Street Neighborhood Map".mta.info. Metropolitan Transportation Authority. April 2018.Archived from the original on December 20, 2021. RetrievedJanuary 7, 2021.

External links

[edit]
Wikimedia Commons has media related to79th Street (IRT Broadway – Seventh Avenue Line).
Buildings
59th–72nd Sts
72nd–86th Sts
86th–110th Sts
Former
Culture
Shops, restaurants
Museums
Theaters/performing arts
Lincoln Center
Former
Green spaces and recreation
Education
Primary and secondary
Post-secondary
Music schools
Religion
Churches, chapels
Synagogues
Transportation
Subway stations
Streets
Other
Related topics
"1" trainBroadway–
 Seventh Avenue Local
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Note: Service variations, station closures, and reroutes are not reflected here.
    Stations with asterisks have no regular peak, reverse peak, or midday service on that route. See linked articles for more information.
Broadway–
Seventh Ave. Line

"1" train"2" train"3" train
"1" train South Ferry branch
"2" train"3" train Brooklyn branch
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Stations and line segments initalics are closed, demolished, or planned (temporary closures are marked with asterisks). Track connections to other lines' terminals are displayed in brackets.Struck through passenger track connections are closed or unused in regular service.
Buildings (Houston Street –Times Square)
Buildings (Times Square –Columbus Circle)
Buildings (Columbus Circle –The Bronx)
Parks and plazas
Former
Cemeteries
Clubhouses
Commercial buildings
Office buildings
Drinking establishments
Stores,
other commercial
Educational buildings
Colleges and schools
Libraries
Government buildings
Post office buildings
Courthouse
Other governmental
Hospital buildings
Hotel buildings
Military facilities
Museums and memorials
Parks and recreation
Religious buildings
Churches
Synagogues
Residential buildings
Houses
Apartments,
other residential
Theatres
Transportation
Bridges and tunnels
Railway andsubway stations
Substations
Ships
Others
Others
Former
Retrieved from "https://en.wikipedia.org/w/index.php?title=79th_Street_station_(IRT_Broadway–Seventh_Avenue_Line)&oldid=1322559933"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp