425 Park Avenue

Coordinates:40°45′38″N73°58′16″W / 40.760542°N 73.971157°W /40.760542; -73.971157
From Wikipedia, the free encyclopedia
Skyscraper in Manhattan, New York

425 Park Avenue
Seen in February 2022
Map
Interactive map of 425 Park Avenue
General information
StatusCompleted
TypeOffice
Location425 Park Avenue,Manhattan,New York City,United States
Coordinates40°45′38″N73°58′16″W / 40.760542°N 73.971157°W /40.760542; -73.971157
Construction started2016
Topped-outDecember 4, 2018[1]
CompletedOctober 2022
Cost$1 billion
Height860 feet (262.1 m)[2]
Technical details
Floor area670,000 square feet (62,000 m2)
Design and construction
ArchitectsFoster + Partners,AAI Architects, P.C. (asarchitect of record)

425 Park Avenue is an office building inNew York City redeveloped by L&L Holding andGreenOak Real Estate, with a design by architectural firmFoster + Partners. Work on the new structure began in 2016, and the building was completed in October 2022.

Architecture

[edit]

Original building

[edit]
The original 425 Park Avenue

The original 388-foot (118 m) building was designed byKahn & Jacobs.Modernist in style, it replaced a row of sixteen four-story townhouses built byRobert Goelet in 1871. The construction of the building began in 1954,[3][4] on land leased from theRobert Walton Goelet estate, who died in 1941.[5] At the time of the construction, it was one of the tallest buildings that utilized bolted connections.[6] The 32-story building was open in 1957 withNational Biscuit Company,[5]Kaye Scholer,Chemical Corn Exchange Bank as major tenants.[7][8]

Since 2004, L&L Holding, which was founded in 2000, had been trying to redevelop 425 Park Avenue when theGoelet family intended to sell a 33% stake of the property. After an extended negotiation, L&L, in partnership withLehman Brothers, entered into a 84-yearground lease deal with the Goelet family in 2006 that was valued at $320 million with a large upfront payment.[8] The lease allowed L&L to redevelop the easterly block of Park Avenue between 55th street and 56th street after the existing leases with the building tenants expired in 2015.[9] During the predevelopment phase, Lehman Brothers went intobankruptcy in 2008. L&L attempted to buy Lehman Brothers out at a steep discount, but Lehman Brothers opted to continue funding the project through its bankruptcy with the original financial obligations. However, in 2013, L&L, GreenOak Real Estate, and other investors bought 90% of Lehman Brothers’ stake in the project, allowing L&L to have full control of the redevelopment.[8]

Redesigned building

[edit]

L&L designed the new building under the assumption that it would keep 25% of its former structure in order to keep the total floor area of 670,000 sq ft (62,000 m2).[10] L&L chose Foster + Partners to design the building after a competition to choose an architect.[11] L&L solicited bids from 11 architectural firms. These entries were narrowed to four final proposals, fromZaha Hadid Architects,Rogers Stirk Harbour + Partners,OMA, and Foster + Partners. Each incorporated a portion of the original structure. Real estate news siteYIMBY noted that, due to its three roughly 200 ft (61 m) concrete fins, the Foster plan would have "[...] the most pronounced skyline effect" compared to the other proposals.[11] Another key element of Foster + Partners design was the three tiers of very high ceiling and virtually column-free floor space.[12]

Zoning

[edit]

425 Park Avenue is located in the eastern part ofMidtown Manhattan. The area, from approximately East 34th Street to East 59th Street, and from Second Avenue to Fifth Avenue, is one of the mainbusiness districts in Manhattan with more than 400 office buildings.[13]

The1961 Zoning Resolution restricted the size of buildings based onfloor area ratio (FAR), not height. As many as 300 office buildings in the area were built before 1961 with an average age of 73 years. The older building stock made the area less competitive in the modern office space market due to low ceilings and less open floor space by the obstruction of many columns in those buildings. The 1961 zoning was more restrictive than prior rules with low allowable FAR to make the area less dense. Many of those pre-1961 office buildings were considered overbuilt as the floor areas exceeded the area allowed by the 1961 zoning, but they weregrandfathered in. If the owners of those buildings were to have demolished an existing building to build a new one on the site, the new building would have had less floor space than the original one. This deterred redevelopment of those older office buildings. The concern was the reason for the city's East Midtown rezoning plan, which added moreair rights in the neighborhood immediately aroundGrand Central Terminal, thereby encouraging redevelopment.[13]

For 425 Park Avenue, without the redevelopment, the building could only generate revenue of about $50 to $70 per square foot. With a more modern building, the revenue could be boosted to more than $100 per square foot.[14] The 1961 zoning was a major obstacle for its redevelopment. If L&L would have demolished the building, it could only construct a building with the maximum of 580,000 sq ft (54,000 m2) instead of the original 670,000 sq ft (62,000 m2).[15] However, there was an exception to the 1961 zoning rules. If a redevelopment of a pre-1961 building could retain at least 25% of its original structure, the new building would be permitted to have up to the original square footage. This was an option that L&L explored, but the rezoning occurred only after L&L had already commissioned a design.[8]

Development

[edit]

A $556 million construction loan is secured by the property.[8]

The new base with the floor slabs connected to the new columns, and the old columns cut off.

Preserving the original structure led to difficulties during construction, requiring the developer to hire a third engineering firm to help orchestrate the sequence of demolition and construction. The first step was to completely demolish floor by floor from the top floor to the 18th floor. Temporary steel structures were then installed to support the remaining 17 floors before further demolition.[15] As much as 750 tons ofwind bracings, crane-bracing systems,shoring systems and temporarytrusses were put in place. Installing these large temporary steel structures in the middle of a partially demolished building proven to be a challenging and time-consuming process.[16] After the installation, the rear side of the building was demolished. Twelve new jumbo columns were erected, six as exterior columns at the front of the building and the other six at the center of the building. The new building core was also built at the rear to connect to every other floor that would be remained in the new building. The rest of the unconnected floor slabs were demolished creating high ceiling floors at the base. The work continued on the building core at the rear, and new floors were built atop the old structure. There was a waiting period of many months when more floors were built upward before the removal of the original columns and the temporary steel structures at the base, leaving those floors to be supported by 12 jumbo columns and the new building core only.[17][12]

The building reached half its full height in April 2018.[18] Facade installation began in June 2018; at the time, the superstructure was 22 stories from topping out.[19] The building topped out on December 4, 2018, in a ceremony attended by lead architectLord Norman Foster.[1] The building received a temporaryCertificate of occupancy in January 2021.[20][21][22] The renovation was completed in October 2022.[22][23]

425 Park Avenue in September 2018

Tenants

[edit]

L&L intended not to pre-lease the building, but in early 2016, hedge fundCitadel signed a lease for 200,000 sq ft (19,000 m2) across several floors, including the penthouse floor.[24][11] At the time it was signed, it was the most expensive lease in the city's history. Delays in construction led some to speculate that Citadel may back out of the lease, or that it was seeking temporary offices due to the delays.[25] L&L has asserted that the tenant will move in as planned. These concerns were officially allayed in January 2019 when Citadel executed a lease expansion for another 124,000 sq ft (11,500 m2) of space, bringing their total occupancy to 16 floors of the building.[26] The expansion will see Citadel occupy a total of 335,400 sq ft (31,160 m2), or 48% of the building's space.

Daniel Humm, a founder of restaurantEleven Madison Park, was originally contracted to open two restaurants in the building. One was to be two stories tall, in the building's base, totaling roughly 14,000 sq ft (1,300 m2). According to L&L's founder, David Levinson, the intention was for the restaurant to be "[...] aFour Seasons on steroids for the 21st century".[27] The other restaurant would have been open only to tenants, and would have been located on the 27th floor.[28] In 2018, it was reported that despite construction delays, both venues were still expected to open upon the completion of construction.[29] However, the plans for Humm's restaurant were cancelled in 2022 due to his pivot to serving exclusivelyvegan food at his restaurants.[30] In August 2022, it was reported by theNew York Post thatJean-Georges Vongerichten would replace Humm, opening a large restaurant in the building's base and a tenant-only restaurant.[31]Four Twenty Five, a restaurant by Jean-Georges Vongerichten, opened in the building in December 2023.[32]

See also

[edit]

References

[edit]
  1. ^abYoung, Michael (December 15, 2018)."Norman Foster's 425 Park Avenue Officially Tops Out 897 Feet Atop Midtown East, Manhattan".New York YIMBY.
  2. ^"425 Park Avenue - The Skyscraper Center".www.skyscrapercenter.com. RetrievedJanuary 3, 2021.
  3. ^"425 Park Avenue".Emporis. Archived from the original on July 26, 2016. RetrievedJuly 27, 2019.
  4. ^Trager, James (2010).The New York chronology : the ultimate compendium of events, people and anecdotes from the Dutch to the present. Zondervan. p. 615.ISBN 9780062018601. RetrievedJuly 27, 2019 – via Google Books.
  5. ^ab"NATIONAL BISCUIT LEASES SIX FLOORS; Will Move Offices From the Chelsea District to New Space on Park Avenue"(PDF).The New York Times. February 11, 1955. RetrievedAugust 19, 2019.
  6. ^Friedman, Donald (2010).Historical building construction : design, materials & technology (2nd ed.). W.W. Norton & Co. p. 227.ISBN 978-0-393-73268-9. RetrievedJuly 27, 2019 – via Google Books.
  7. ^"BANK LEASES SPACE; Chemical Corn to Have Unit at 425 Park Avenue"(PDF).The New York Times. May 18, 1956. RetrievedAugust 19, 2019.
  8. ^abcdeClarke, Katherine (November 1, 2016)."The resurrection of 425 Park".The Real Deal. RetrievedJuly 28, 2019.
  9. ^Cuozzo, Steve (September 19, 2006)."$1B Park Ave. Deal is a Steal – L&L Wins Bid War".New York Post. RetrievedJuly 27, 2019.
  10. ^"Delay in L&L's Park Avenue office development could boost project".The Real Deal. May 15, 2012. RetrievedJuly 29, 2019.
  11. ^abcOgorodnikov, Vitali (April 8, 2016)."425 Park Avenue, Pioneer Of Modernism, Loses Half Its Height To Make Way For 893-Foot-Tall 21st Century Beacon".New York YIMBY. RetrievedOctober 12, 2018.
  12. ^abRosenfield, Karissa (November 16, 2012)."425 Park Avenue / Foster + Partners".ArchDaily. RetrievedJuly 30, 2019.
  13. ^abEast Midtown Rezoning(PDF). New York City Department of City Planning. 2013. RetrievedJuly 28, 2019.
  14. ^"L&L seeks architect for new Park Avenue tower".The Real Deal. April 23, 2012. RetrievedJuly 29, 2019.
  15. ^abLa Guerre, Liam (June 20, 2018)."Under Construction: L&L's 425 Park Avenue Demo Nears the Finish Line".Commercial Observer. RetrievedJuly 29, 2019.
  16. ^Rudarakanchana, Nat (November 29, 2017)."A 7,391-ton study in mind-boggling complexity".Fastmarkets AMM. RetrievedJuly 27, 2019.
  17. ^"425 Park Avenue Phasing Diagram". Tishman. RetrievedJuly 30, 2019.
  18. ^Walker, Ameena (April 17, 2018)."Norman Foster's Park Avenue office tower is now halfway to its pinnacle".Curbed NY. RetrievedOctober 15, 2018.
  19. ^Nelson, Andrew (June 29, 2018)."425 Park Avenue's Façade Installation Begins As Construction Nears Halfway Point, Midtown East".New York YIMBY. RetrievedOctober 12, 2018.
  20. ^Williams, Taylor (January 19, 2021)."L&L Holding Nears Completion of $1B Office Tower at 425 Park Ave. in Manhattan".REBusinessOnline. RetrievedNovember 20, 2021.
  21. ^"L&L secures TCO for 425 Park Avenue".Real Estate Weekly. January 20, 2021. RetrievedNovember 20, 2021.
  22. ^abGordon, Amanda L. (October 26, 2022)."NYC's Secret Weapon to Keep Finance Elite Is Park Avenue Revamp".Bloomberg News. RetrievedOctober 26, 2022.
  23. ^Crook, Lizzie (October 27, 2022)."Foster + Partners completes long-awaited 425 Park Avenue in New York".Dezeen. RetrievedOctober 27, 2022.
  24. ^Boysen, Ryan (February 17, 2016)."The Priciest Lease In NYC History May Have Just Been Signed". Bisnow. RetrievedOctober 12, 2018.
  25. ^Hall, Miriam (June 1, 2018)."Citadel, After Signing Most Expensive NYC Office Lease Ever, Exploring Other Office Options". Bisnow. RetrievedOctober 12, 2018.
  26. ^"With big lease expansion, Citadel kills rumors it's spooked by 425 Park delays".The Real Deal. January 8, 2019.
  27. ^Cuozzo, Steve (June 10, 2015)."Park Avenue tower will boast hot new eatery".New York Post. RetrievedOctober 12, 2018.
  28. ^Preston, Marguerite (June 10, 2015)."Eleven Madison Park Team to Open Fine Dining Behemoth on Park Avenue".Eater NY. RetrievedOctober 12, 2018.
  29. ^Dai, Serena (July 16, 2018)."Eleven Madison Park Team Nixes Plan for Big FiDi Restaurant".Eater NY. RetrievedOctober 15, 2018.
  30. ^Adams, Erika (March 29, 2022)."EMP Chef Daniel Humm's Vegan Focus Sinks Plans for Midtown Fine Dining Restaurant".Eater NY. RetrievedApril 13, 2022.
  31. ^Cuozzo, Steve (August 15, 2022)."Chef Jean-Georges Vongerichten expanding empire at 425 Park Ave".New York Post. RetrievedAugust 16, 2022.
  32. ^Landman, Beth (December 6, 2023)."Jean-Georges's Ambitious Midtown Restaurant Is Now Open".Eater NY. RetrievedJuly 2, 2024.
Buildings
West of
5th Av
Rockefeller Center
Times Square
East of
5th Av
Former
Theaters
Broadway theaters
Other venues
Closed/demolished
Hotels
Current
Former
Other points of interest
Restaurants/
nightlife
Museums/
cultural centers
Stores
Clubhouses
Clubhouses (former)
Green spaces
Educational
institutions
Art galleries
Transportation
Subway stations
Railroad stations
Streets and
intersections
Related topics
Structures onPark Avenue inManhattan
Below32nd Street
32nd–59th Streets
Above 59th Street
Transportation
Subway stations
Railroad stations
Bridges and tunnels
Former/unbuilt
Retrieved from "https://en.wikipedia.org/w/index.php?title=425_Park_Avenue&oldid=1311594066"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp