Atilting train is a train that has a mechanism enabling increased speed on regularrail tracks. As a train (or other vehicle) rounds a curve at speed, objects inside the train experiencecentrifugal force. This can cause packages to slide about or seated passengers to feel squashed by the outboard armrest, andstanding passengers to lose their balance. In such excessive speeds, it generates longitudinal force that can cause the train to physically tilt on one side, eventually causing it toderail. Tilting trains are designed to counteract this by tilting the carriages towards the inside of the curve, thus compensating for the g-force. The train may be constructed such that inertial forces cause the tilting (passive tilt), or it may have a computer-controlled powered mechanism (active tilt).
The first passivetilting car design was built in the US in 1937, and an improved version was built in 1939. The beginning ofWorld War II ended development.Talgo introduced a version based on theirarticulated bogie design in 1950s, and this concept was used on a number of commercial services. Among these was theUAC TurboTrain, which was the first (albeit short-lived) tilting train to enter commercial service in 1968 in the US and Canada. Japan similarly experimented, from the late 1960s, through the 591 Series[1] that developed into the highly successful Hitachi381 series, that has been in service since 1973.In parallelFiat Ferroviaria produced the experimental Y 0160 in 1970, that would evolve into thePendolino family, in 1976, and operated in 11 countries. All of these had problems with short curves like those in switchyards, where they tended to sway about. Also, because of the way the carriages always swung outward, they placed more weight on the outside of the curve, which limited their improvement in cornering speed to about 20%.
Starting in the late 1960s,British Rail also began experiments with itsAdvanced Passenger Train (APT) which pioneered the active-tilt concept, along with in-cab signalling, to permit High Speed Rail services on conventional tracks. The APT family used hydraulic rams on the bottoms of the carriages to tilt them, rotating them around their centre point rather than swinging outward. This had the advantage of keeping the carriage centred over the bogies, which reduced load on the rails, and could be turned off when navigating switches. Due to lengthy political delays, the APT did not begin service testing until 1979, entering limited scheduled service in December 1981, the media describing the initial revenue run as bothfifteen years late, and thequeasy rider; the sets only briefly entering full revenue operation in 1985, before being withdrawn and the associated technologies sold toAlstom / Fiat Ferroviaria.[2][3] By this time, the CanadianLRC design had become the first active tilting train to enter full commercial service, starting withVia Rail in 1981.
Design
editAeroplanes and bicycles tilt inwards when cornering, but automobiles and trains cannot do this on their own. Vehicles with highcentres of gravity rounding sharp curves at high speeds may topple over. To make their turns easier, the outer edge of a roadway of a high-speed highway or outer rail of a railway may be canted (raised) upward around the curve. The combination of tilt and centrifugal force combines to produce an effective acceleration that is down through the floor, reducing or eliminating any sideways component.[4][5]
The particular angle of tilt ("superelevation") is determined by the intended vehicle speed—higher speeds require more banking. However, with a growing desire in the 1960s and 1970s to build high-speed rail networks, a problem arose: the amount of tilt appropriate for high-speed trains would be over-tilted for lower-speed local passenger and freight trains sharing the lines.[6] Japan's earlybullet train efforts of the 1960s avoided this problem by laying all-new lines as part of a re-gauging effort, and France'sTGV followed the same pattern.[7][8] Other operators did not have this luxury and were generally limited to much lower speeds.
Spain's national railwayRenfe took a domestic invention, theTalgo, and developed it into a reliable high-speed train for a low-traffic-density railway.[9]British Rail invested heavily in tilting-train technology to overcome the limitations of a rail network located in space-constrained built-up areas.[10] Italy'sTrenitalia and theJapan National Railways have used tilting technology to speed express trains on conventional tracks through mountainous terrain.[11]
Tilting trains are meant to help reduce the effects ofcentrifugal force on the human body, but they can still causenausea, a problem that was widely seen on early "passive" tilting trains that exactly balanced the outward force. The effect could be felt under maximum speed and tilt, when the combination of tilting outside view and lack of corresponding sideways force can be disconcerting to passengers, like that of a "thrill ride".
More limited and slower tilt could be achieved using active, or 'forced', tilting mechanisms. In trains adopting these mechanisms tilt is initiated by computers, which 'force' train bodies to tilt at specific angles based on track information. This information could be stored on board or detected using a sensor at the front of the train or usingAutomatic train stop beacons. The slight delay in reacting to this information leads to a short period of sideways force while the cars react. It was found that when the cars tilt just at the beginning of the curves instead of while they are making the turns, there was no motion sickness.[12] Researchers have found that if the tilting motion is reduced to compensate for 80% or less of lateral apparent force, then passengers feel more secure. Also, motion sickness on tilting trains can be essentially eliminated by adjusting the timing of when the cars tilt as they enter and leave the curves.[13][14]
A similar technology widely adopted across Asia and Oceania, known ascontrolled passive tilt, achieves a similar effect by using on-board computers to limit tilt, initiated using inertia (as in traditional passive tilt).[15]Automatic train stop beacons are used to inform computers of the precise location of these trains and limit natural tilt to angles specified by track data.
High-speed trains
editAhigh-speed tilting train is a tilting train that operates at high speed, typically defined as by theEuropean Union to include 200 km/h (124 mph) for upgraded track and 250 km/h (155 mph) or faster for new track.[16]
Tilting trains operating at 200 km/h (124 mph) or more on upgraded track include theAcela in the US,[17] theX 2000 in Sweden,[18] thePendolinos andSuper Voyagers in the United Kingdom,[19][20] and theICE TD in Germany (the latter two being diesel powered).[21]
Some older high-speed lines were built for lower line speeds (≤ 230 km/h (143 mph)); newer tilting trainsets can maintain higher speeds on them. For example, the JapaneseN700 Series Shinkansen may tilt up to one degree on theTōkaidō Shinkansen, allowing the trains to maintain 270 km/h (168 mph) even on 2,500 m (8,200 ft) radius curves that previously had a maximum speed of 255 km/h (158 mph).[22][23]
Many high-speed trainsets are designed to operate on purpose-built high-speed lines and then continue their journeys on legacy lines, upgraded or not. Where the legacy lines justify it, a tilting train may operate at higher speeds on the latter, even if below the normal 200 km/h (124 mph) threshold, whilst operating at 250 km/h (155 mph) or faster, usually with tilt disabled, on the high speed lines.
History
editPendulum car
editThe first experimental tilting train concept was thependulum-suspension "chair" cars designed by the Pacific Railway Equipment Company. The first prototype, with an articulated bogie system, was built in 1937 and tested on theAtchison, Topeka and Santa Fe Railway that year. The company built another three pre-production models in 1939, using more conventional fore-and-aft bogies, and these saw some use with theSan Diegan, among others. Mounted on high springs, the car tilted inwards on curves to counterbalance thecant deficiency with the induced centrifugal force. The opening ofWorld War II prevented any immediate orders, and the concept was not revived in the post-war era.
SNCF experiment
editIn 1956,SNCF experimented with a self-propelled pendulum car, which also relied on centrifugal force. This experiment demonstrated the need for an active suspension system to tilt the coach bodies.
Talgo Pendular
editThe SpanishTalgo company had introduced the first widely successful shared-bogie system, which allowed cars to be connected end-to-end using a single bogie instead of each car having its own bogies at either end. This design saves weight and can reduce rail wear.[citation needed]
In the early 1950s, the Spanish National Railway,Renfe, experimented with passenger cars that combined the Talgo bogie with a new passive tilting system.[9] This system used a large A-frame connected to the centre of the bogie that was as high as the cars. At the top of the A was a bearing system that the cars attached to, and a spring and damping system to smooth its motion. Because the cars were connected at this high point, they could swing to either side around the bearing axis, and this caused them to naturally pendulum outward on curves.[citation needed]
The first test of a Talgo in the United States was theJohn Quincy Adams withFairbanks-MorseP-12-42 tested by theNew York, New Haven & Hartford Railroad in 1957–1958.[24] Due to technical troubles and the precarious financial state of the New Haven railroad, the trainset was stored. The idea caught the interest of theChesapeake & Ohio Railway, who began development of what would become theUAC TurboTrain using the same system. The TurboTrain entered service in the US and Canada in 1968.
The first successful European tilting train design was the Talgo in Spain, developed in the 1970s as a lightweight, fast train using passive tilt. Renfe, adopted the system widely, but was restricted to the Iberian peninsula initially.[citation needed]
The first full commercial application of passive tilting trains appeared in early 1980s with theTalgo Pendular.[25] Talgo is currently in its 21st generation of production. Talgo trains are in service in various parts of Europe, andbuilt under licence in Latin America and Asia. In North America,Amtrak uses Talgo trains in itsCascades service in the Northwest.[26]
The first Talgo tilting series were the "pendular" ones from 400 series onwards.[citation needed]
UAC TurboTrain
editThe first tilting train to enter into regular service in North America was theUAC TurboTrain, used byCanadian National in 1968.[27] Some figures[who?] have considered it to be the first tilting train in service in the world.[citation needed] It provided daily service betweenMontreal andToronto at speeds of 160 km/h (99 mph), until it was replaced byBombardierLRC trains in 1982, reaching the maximum speed of 225 km/h (140 mph) during Canadian trials.[28][29] TurboTrains were also operated by Amtrak between Boston and New York.[30][31] The UAC Turbos had a passive tilt mechanism based on a four-bar arrangement, and they inspired the second generation ofTALGO trains.[citation needed]
Pendolino
editIn Italy, the studies for a tilting train started in the mid 1960s and the concept was patented in 1967 by two engineers of Fiat railway materials, Franco di Maio and Luigi Santanera. A number of prototypes were built and tested, including anautomotrice (self-propelled) derived fromALn 668, the ALn 668 1999 diesel car, provided with tilting seats to test the effects of active tilting technologies. The first working prototype using a tilting carbody was ETR Y 0160, an electrically powered car launched byFIAT in 1969. This was the first to be christenedPendolino.[citation needed]
This design led to the construction of an entire EMU in 1975, theETR 401, built in two units by FIAT. One was put into public service on 2 July 1976 on the Rome-Ancona (later extended toRimini) line, operated byItalian State Railways. Between Roma and Ancona (km. 295), the train took 2 hours 50 minutes, while ordinary trains took 3 hours 30 minutes. The train had four cars and was mostly considered a travelling laboratory for the new technology. Initially the ETR 401 was conceived as the first of a series of four trains, but the government lost interest to the project because of financial problems, and the project was temporarily interrupted, as the service in 1983. The train was used in demonstration campaigns to foreign countries like Germany, Switzerland, Czechoslovakia and Yugoslavia. A second unit was built for service to the wide-gaugeRenfe Spanish lines in 1977, under the nickname of Platanito. The service didn't last of long, because problems with Spanish tracks made Platanito of little use.[citation needed]
New interest by the Italian government in the project in the mid 1980s, and the introduction of new technologies, led to the revision of the project with the ETR 401 with electronic systems, that led to the introduction of the slightly more advancedETR 450, the first Pendolino to enter regular service in the world. Characterized by an 8-car configuration, and a maximum tilt reduced to 8° from the 10° of the ETR 401, for safety and comfort reasons, ETR 450 could run the Rome-Milan line in under four hours, at speeds up to 250 km/h (160 mph). Passenger numbers increased from 220,000 in 1988 to 2.2 million in 1993.[citation needed]
In 1989, the old technologies and concepts of some parts of the ETR 450, and the introduction of new technologies in traction, led to the development of the next generation. The result was theETR 460, styled byGiorgetto Giugiaro, a train that began service in 1996. Though plagued by technical problems, the ETR 460 introduced several innovations, such as more powerful AC asynchronous motors. The pistons actuating the tilting action were placed in the bogie instead of on the carbody sides: this permitted the reorganisation of the vestibules and passenger compartment areas, improving comfort. The bogie-to-body connection is extremely simple and easy to build, with maintenance advantages.[citation needed]
ETR 460 keeps axle load to an extremely low level (14.5 ton/axle), to allow the train to negotiate curves up to 35% faster than conventional Intercity trains (locomotive plus coaches).[citation needed] The body, which exploits largealuminiumextrusion technology, has substantial modularity and allows for extremely low axle weight, whilst fully respecting the highest safety standards, and allows the best exploitation of the space with different loading gauges.[citation needed]
ETR 460 was built in only 10 units. Improved versions includeETR 470 for the Italo-Swiss Cisalpino company,[32] the ETR 460 France, later called as ETR 463, used by FS to the route Milan Lione, and theETR 480, used byTrenitalia under AC-powered Italian high speed lines. A total of 34 EMUs of the ETR 460/470/480 series were built for FS.[citation needed]
The development of the Pendolino technology continued in the Italian factories of Alstom and the next generation, theNew Pendolino, was delivered to Trenitalia and Cisalpino as theETR 600 and theETR 610 from 2006.[33][34]
Italian Pendolinos and their derivatives still represent the most popular solution for active tilting in passenger trains.[citation needed] The technology still in use today is almost the same developed byFiat Ferroviaria in the 1960s-70s.
The British version of the Pendolino, theBritish Rail Class 390, is a 225 km/h (140 mph) electric tilting train operated byAvanti West Coast.[19] It runs on theWest Coast Main Line (London Euston toGlasgow Central,Liverpool Lime Street andManchester Piccadilly). Class 390s commenced operation in 2001 with only one being in a major derailment.[35] Due to signalling constraints, Class 390s are limited to 201 km/h (125 mph) in regular service.[36]
Japanese designs
editJapan was an early adopter of tilting trains and continues to use them on many express services. Due to the slow and twisty nature of its conventional-speed,narrow gauge network, tilting trains were introduced as a way to speed up services on its congested main lines. The interurbanOdakyu Electric Railway began Japan's first experiments in tilting technology in the 1960s by fitting pneumatic bogies to their electric railcars,[37] while theJapanese National Railways pioneered their form of passive-tilt technology on their experimental 591 series EMU with commercial express services on mountain lines in mind. The381 series was the first commercial tilting EMU in Asia, entering service in 1973 on theShinano limited express services that operated on the hillyChūō Main Line. The sets remained in operation until June 2024, when the last regularly scheduled trains ended on theYakumo service.[15]
During the final years of theJapanese National Railways, experimentation on mechanically-regulated passive tilt—a combination known as 'controlled passive tilt' (制御付き自然振子式), where tilt is initiated passively but controlled (and slowed) by computers through mechanical active suspension—culminated post-privatisation with the2000 series DMU, built forJR Shikoku and introduced on theShiokaze andNanpū limited express services in 1990.[15] With problems of ride nausea and track wear alleviated, the benefits of tilting trains on the country's mountainousCape gauge (1,067mm) railway system soon became apparent and since then these 'semi-active' tilting trains have seen widespread use on limited-express trains throughout the archipelago. Particularly well-known diesel and electric examples of this generation of tilting trains includeJR Hokkaido'sKiHa 281 series,JR East'sE351 series,JR Central's383 series,JR Shikoku's8000 series, andJR Kyushu's885 series.[citation needed]
This generation of designs has seen some popularity overseas—the 8000 series serves as the basis of theElectric Tilt Train built forQueensland Rail's Cape Gauge network.[38] The 885 series, built as part of theHitachi A-train family, serves as the basis of the Taiwanese TEMU1000 series tilting EMU forTaroko Express services,[39] and some non-tilting variants including theBritish Rail Class 395 andBritish Rail Class 801.[40]
Later developments in pneumatic active suspension—based on theDB Class 403 (1973) built decades earlier—created a generation of trains with more limited tilt (around 2°) but are more economical to build and easier to maintain. The experimental300X built in 1995 developed into theN700 series, the first revenue-earning tilting Shinkansen unit in 2007. Applications toShinkansen lines—which would not have benefitted greatly with mechanical tilting mechanisms due to their already shallow curves that allow high speeds—allowed for greater ride comfort, less track wear and slightly higher speeds leading to increased frequency. The simplicity of this technology made it possible for smallerprivate operators to introduce tilting trains, such as theOdakyu 50000 series VSE, a luxurious sightseeing express train with active suspension introduced not to increase speeds but to enhance ride comfort; and even cheap enough to be applied to commuter stock, such asJR Hokkaido'sKiHa 201 series, which improved speeds and frequencies onSapporo's partly non-electrified suburban railway system.[41][42] This is also one of the only applications of tilting technology on 'metro-style' commuter trains to date.[citation needed]. More modern and more numerous examples of active suspension and pneumatic tilting trains, include the 'limited express' EMUsE353 series for JR East.
German designs
editDeutsche Bundesbahn started tests with tilting trains in Germany with itsClass 634 in 1967 when some Class 624 DMUs were equipped with passive tilting systems. As the passengers experienced motion sickness, the tilting technology was disabled and later removed. The tests continued with the prototypes of the followingClass 614 units, but due to the again unsatisfying results the serial types were delivered without tilting system.[citation needed]
Another early train with tilting technology wasDeutsche Bundesbahn'sClass 403 (today this number is used byICE 3) high speed EMU. Following itsInterCity services until 1979, it was also used for airport transfers betweenDüsseldorf andFrankfurt (see also:AiRail Service). Class 403 was able to tilt 4°, but the fixed pantographs limited this to 2°.[43] Shortly after the train had gone into service, the tilting technology was disabled as many passengers experienced motion sickness because the pivotal point was too low.[citation needed]
The next attempt was made with DMUs and the proven Italian hydraulic active tilting system. Between 1988 and 1990, DB commissioned 20Class 610 units for fast regional traffic.[44] This time the results were quite satisfying and allowed a significant reduction of running times. The Class 610 sets was followed by theClass 611, which basically was built for the same purpose (fast regional traffic with up to 160 km/h (99 mph) on twisting non-electrified lines). The Class 611's tilting system was electric, with a maximum 8° tilt, based on military technology from theLeopard tank. After entering service in 1996, this 50-unit class experienced problems both with the newly developed tilting system as well as chassis and axles, and was judged unsuccessful. The tilting system was out of service until 2006, when hardened axles and system updates solved the problems. In consideration of these problems DB ordered a full re-engineering, resulting in the development ofClass 612. Starting in 1998, a total of 192 units were commissioned by DB. The tilting system proved to be reliable. In 2004, cracks were detected in a number of wheel sets, and again wheels and axles had to be replaced. Today Class 612 is back to tilting operation and forms the backbone of DB's fast regional service on non-electrified lines. Additional units were sold toCroatia, where they are used for InterCity services.[citation needed]
In 1999 DB was able to use tilting technology for itsInterCityExpress services, when withclass 411 and 415 an electric high-speed tilting train was commissioned. While classes 401 to403 (without tilting technology) were to cover the newly built or modernized high speed lines at up to 300 km/h (186 mph) (ICE 3 Class 403), Classes 411 and 415 with maximum speed of 230 km/h (143 mph) were designed for older twisting main lines. A total of 60 Class 411 and 11 Class 415 (shorter version) have been built so far. Both classes worked reliably until late 2008 when cracks were found on an axle during a routine check.[45] The tilting mechanism has been switched off since 23 October 2008,[46] and the maintenance intervals were drastically reduced which led to major service disruptions.[47]
Much of the technical layout is derived from theICE 3. Austria'sÖBB has purchased three units in 2007, operating them jointly with DB for services from Germany to Austria. Even though DB assigned the nameICE-T to class 411/415, theT originally did not stand fortilting but forTriebwagen (self-propelled car), as DB's marketing department at first deemed the top speed too low for assignment of the InterCityExpress brand and therefore planned to refer to this class asIC-T (InterCity-Triebwagen).[citation needed]
Rather luckless was Class 411/415's adaptation for diesel services. In 2001, a total of 20 units were commissioned for use on theDresden–Munich line, but theseclass 605 (ICE-TD) units experienced trouble from the start. After breaking an axle in 2002, all remaining 19 units (one fell off a working platform) were taken out of service. Even though one year later the trains were admitted to service again, DB judged their operation to be overly expensive. In 2006, those trains were used for amplifier trains and from 2008 to 2017, they ran on theHamburg–Copenhagen route. Since 2018 and 2021, two units are in operation as theadvanced TrainLab [de] test train.[citation needed]
Light, Rapid, Comfortable
editIn 1966, a consortium of Canadian industrial firms began considering a conventionally-powered competitor to the TurboTrain, eventually emerging as theLRC (Light, Rapid, Comfortable) in the early 1970s. This design also used an active-tilt system, but one of very different form than the APT. The carriages rode on two C-shaped channels mounted across the top of the bogies. Tilt was accomplished by rams that pushed the bottom of the carriage side to side along these channels.[48][49]
Amtrak experimented with the LRC in 1980, but retired it seven years later. In Canada, it entered service in 1981, beating the APT into service and becoming the first operational active-tilt system. The LRC carriages remain in use today, although the tilt mechanisms are being removed to reduce weight and maintenance costs.[50]
Bombardier has since used updated versions of the LRC carriages forAmtrak'sAcela, the third generation of tilting ICE, the new generation of fast British trains (Super Voyager) and the experimentalJetTrain.[citation needed]
Advanced Passenger Train
editThe Advanced Passenger Train (APT) was initially an experimental project byBritish Rail, with the trainentering limited service in December 1981. Although eventually abandoned, the train was the pioneer of active tilt to negotiate tight curves at higher speeds than previous passive tilting trains. In the 1970s and 1980s, British Rail wanted an advanced fast train to negotiate Britain's twisting and windingVictorian-era rail system. Conventional trains were limited in speed due to the curvature of the network.
Engineers at theresearch division, opened in 1964, had done fundamental work on vehicle dynamics, with the APT to a degree an extension of this. The existing Chief Mechanical and Electrical Engineers department was overlooked by the new project, creating resentment with its engineers. The work included experimentation with aluminium bodies, turbines, suspension and bogies, in cab signalling, automatic train protection, and active tilt.
TheAPT-E (E for experimental) was powered by gas turbines; theAPT-P (P for prototype) was electric.[14] With no tilting, the train was developed to break the British rail speed record. Tilting trains using passive tilt were not new, but it was uncommon and not widely implemented. The engineers decided that active tilt was the key to negotiating curves at much higher speeds.
The train had hydro-dynamic brakes and lightweight articulated bodies, with two power cars in the centre of the train. When the prototypes were built, worked and proven, the engineering development team was disbanded and the trains handed over to British Rail's in-house engineering department to build. The developing engineers moved on to different fields while British Rail engineered the train into a production model. The BR engineers, who had little to no involvement in the development of the train, changed some of the prime and proven engineering aspects. For example, they changed the active tilt mechanism topneumatic, rather than the well-developed and provenhydraulics.[14]
The trains were introduced in 1981, but almost immediately taken out of service. During initial tests, some passengers complained of being nauseous due to the tilting motion. Subsequently, it was learned that this could be prevented by reducing the tilt slightly, so that there was still some sensation of cornering. The APT-P trains were quietly reintroduced to service in mid-1984 and ran regularly for a year, the teething problems having been corrected. However, under an in-house engineering management who felt slighted and by-passed in a project they had not developed, there was no political or managerial will to continue the project by building the projected APT-S production vehicles in numbers. Despite being an eventual success, the project was scrapped by British Rail in 1986,[51][14] more for political reasons than technical.
Much of the technology developed for the power cars was subsequently used in theInterCity 225Class 91 locomotives andMark 4 carriages which were designed to be retrofitted with tilting equipment, which run on theEast Coast Main Line route from London toLeeds andEdinburgh.[52][53]
X 2000
editIn 1990,Swedish railways introduced a high speed service calledX 2000.[54] The train uses an active tilting system, enabling higher speeds of (200 km/h or 124 mph) on standard track. The train was also used in Norway and Denmark but later the train was removed from service in Norway. X2000 was a collaborative project byKalmar Verkstad,Swedish railways andASEA. TheX 2000 has been tested in US, Canada, Australia and China.[55][56][57]
TGV Pendulaire
editIn 1998,SNCF bowed to political pressure (the tilt-train was a credible threat to the TGV dedicated high-speed line network) and put in service an experimental TGV pendulaire. Only the passenger trailers were tilting while the two heavy power cars kept non-tilting bogies.[58] Following the test program, it was converted back to aTGV-PSE train.
InterCity Neigezug
editSwitzerland got its first tilting train ever in its territory (discounting theCisalpino, which entered Switzerland in 1996) on 28 May 2000. TheICN (InterCity Neigezug, or InterCity Tilting Train) was made by Bombardier, including a tilting-system designed by SIG (today ALSTOM).[59] It began service on the line fromGeneva viaBiel/Bienne andZürich toSt Gallen. It was a major carrier in the national exhibitionExpo.02.
Bombardier Super Voyager
editForty-four diesel-electric poweredClass 221Super Voyagers were ordered byVirgin CrossCountry to operate in tilt mode on theWest Coast Main Line and betweenOxford andBanbury. After the fleet was split betweenArriva CrossCountry andVirgin Trains West Coast in 2007, the former disabled and later removed the tilting equipment from its Class 221s.[60][61]
Tilting Train Express
editThe Tilting Train Express (TTX) or Hanvit 200 is a prototype six-car experimental tilting train developed and built in South Korea.[62] Revealed in 2007, it had multiple test runs, including one which recorded a maximum speed of 223km/h. However, no production units were made as it was determined that it would be less costly to straighten existing trackage and banking the rails. It has done further test runs in 2014, however, to test the LTE-R system.
Technology
editMany of the problems with motion sickness are related to the fact that traditional servo systems respond inappropriately to the changes in trajectory forces, and even small errors, whilst not being consciously perceivable, cause nausea due to their unfamiliar nature. The originalFiat ETR 401 used individual gyroscopes in each carriage so there was a lag, even though nausea had not been a major problem with this train. TheAPT was supposed to overcome this problem by using gyroscopes at the ends of the train and a leader/follower control system which defined a "tilting curve" for the whole train. It would appear that the technology of the era was unable to properly implement this technique.[citation needed]
Modern tilting trains profit from state-of-the-art signal processing which senses the line ahead and is able to predict optimal control signals for the individual carriages. Complaints about nausea have largely become a thing of the past.[citation needed]
Some tilting trains run onnarrow-gauge railways. In Japan there are many narrow gauge lines in mountainous regions, and tilting trains have been designed to run there. In Australia, the service betweenBrisbane andCairns by theQR Tilt Train claims to be the fastest narrow-gauge train in the world, running at 160 km/h (99 mph). TheElectric Tilt Train also holds the record for the fastest narrow-gauge train by maximum test speed, reaching 210 km/h.[63]
With tilting EMUs, consideration is required on keeping the pantographs within the railway gauge. When mounted on top of a tilting car, the pantograph usually sways in the opposite direction in order to counter for the degree of tilting. This is done mechanically on for instance the BritishClass 390 Alstom Pendolino. On the Germanclass 411 and 415, the pantographs are however mounted on a separate non-tilting frame within the cars.
Tilting trains around the world
editTrains with tilting by inertial forces (passive tilt):
- Talgo XXI (Spain)
- UAC TurboTrain (United States, Canada)
- JNR381 series (Japan), introduced in 1973 by the former Japan National Railways. Currently used byJR West forYakumo limited express services.
Trains with tilting initiated by inertial forces but regulated by computer:
- JR Shikoku2000 series (Japan, 1989), the first tiltingDMU in the world. Currently used on numerous limited expresses inShikoku, includingAshizuri,Ishizuchi,Nanpū,Shimanto,Shiokaze,Uwakai, andUzushio. The upgraded N2000 Series was introduced in 1995.
- JR HokkaidoKiHa 281 series (Japan, 1992), brandedHeat 281 orFurico 281. Used on theSuper Hokuto limited express service.
- JR Shikoku 8000 series (Japan, 1992). Used on limited express services on theYosan Line, namelyIshizuchi andShiokaze.
- JR EastE351 series (Japan, 1993), formerly used on theSuper Azusa limited express.
- Chizu ExpressHOT7000 series (Japan, 1994), used on theSuper Hakuto limited express.
- JR Central383 series (Japan, 1994), used on theWide View Shinano limited express.
- JR Kyushu883 series (Japan, 1994), used on theNichirin,Huis ten Bosch andKamome limited expresses.
- JR HokkaidoKiHa 283 series (Japan, 1995), brandedFurico 283 and used on theSuper Hokuto,Super Ōzora, andSuper Tokachi limited expresses.
- JR West283 series (Japan, 1996), used on theKuroshio limited express.
- JR Kyushu885 series (Japan, 1999), used on theKamome andSonic limited expresses.
- JR WestKiHa 187 series (Japan, 2001), used on theSuper Inaba,Super Matsukaze, andSuper Oki limited expresses.
- JR Shikoku 2700 series (Japan, 2019), used on theAshizuri,Nanpū,Shimanto andUzushio limited expresses.
- TRA TEMU1000 series (Taiwan, 2007) use forTaroko Express, based on JR Kyūshū 885 Series.
- Tilt Train byQR,diesel andelectric tiltingTraveltrains (Australia), operating betweenBrisbane andCairns. Electric Tilt Train is based on theJR Shikoku 8000 series.
Trains with active tilt controlled with sensory information given byaccelerometers:
- LRC designed by MLW before being bought by Bombardier (Canada)
Trains with tilting controlled by a computer:
- Acela (United States), aBombardier-built high-speed tilting train operating betweenBoston andWashington DC
- Advanced Passenger Train (United Kingdom), aBritish Rail project for high-speed inter-city tilting trains that saw limited service in the 1980s, from London Euston to Glasgow.
- British Rail Class 390 "Pendolino" (United Kingdom), a high-speed train run by Avanti West Coast from London Euston to Liverpool/ Manchester / Glasgow / Birmingham and Wolverhampton.
- Alfa Pendular (Portugal)
- ElettroTreno (Italy)
- ICE-T, also called ICT (Germany), a tilting version of theICE
- ICN (Switzerland), a new generation of tilting trains operated by Swiss Rail, aBombardier-built high-speed tilting train operating between Zurich and Geneva.
- JetTrain (North America), Bombardier's experimental non-electric high-speed train
- NSB Class 73 (Norway)
- NSB Class 93 (Norway) Used on unelectrified regional services in northern Norway
- SŽ series 310 (InterCitySlovenija), a high-speed tilting train operating betweenLjubljana,Maribor andKoper
- RegioSwinger (Germany and Croatia), a diesel regional tilting train. In Croatia (Croatian Railways) the train operates the premium brand servicesInterCity Nagibni (ICN) on the routesZagreb–Osijek, Zagreb–Varaždin, Zagreb–Split, and Zagreb–Rijeka
- Pendolino (Italy, Finland, United Kingdom, and Czech Republic), built byAlstom (formerlyFiat); see also theBritish Rail Class 390 and FinnishVR Class Sm3.
- Super Voyager, aBombardier-built high-speed tilting train operating between London and Holyhead / Wrexham / Chester and Birmingham to Edinburgh or Glasgow.
- X2 (Sweden), with tilting mechanism ofABB. It was also used in China under the nameXīnshísù.
- JR HokkaidoKiHa 201 series (Japan, 1996), used for metro-style commuter locals and rapids aroundSapporo.
- JR HokkaidoKiHa 261 series (Japan, 1999), brandedTilt 261. Used on theSuper Sōya limited express service.
- Meitetsu 1600 series (Japan, 1999), brandedPanorama Super. Mainly used forMeitetsu Nishio Line limited express trains.
- Meitetsu 2000 series (Japan, 2004), brandedμ-Sky. Used on limited expresses linkingNagoya andChūbu Centrair International Airport.
- Odakyu 50000 series VSE (Japan, 2005), used forRomancecar limited express services.
- TTX (South Korea, 2007), later named Hanvit 200, experimental prototype for potential tilting trains in South Korea, with a max speed of 200km/h and a service speed of 180km/h. Production units not made.
- N700 Series Shinkansen (except N700-7000/8000 series) (Japan, 2007), introduced by JR Central and JR West and used on theTōkaidō andSanyō Shinkansen services.
- E5 Series Shinkansen (Japan, 2011), introduced by JR East, used onTōhoku Shinkansen andHokkaido Shinkansen services. Pooled with nearly identical H5 series units.
- E6 Series Shinkansen (Japan, 2013), introduced by JR East, used onTōhoku Shinkansen andAkita Shinkansen services.
- TRA TEMU2000 series (Taiwan, 2013) use forPuyuma Express.
- H5 Series Shinkansen (Japan, 2014), introduced by JR Hokkaido, used onTōhoku Shinkansen andHokkaido Shinkansen services. Pooled with nearly identical E5 series units.
- 8600 series (Japan, 2014), introduced by JR Shikoku, used onShiokaze andIshizuchi limited expresses.
- E353 series (Japan, 2015), introduced by JR East, used onAzusa andKaiji limited expresses.
- 2600 series (Japan, 2017), introduced by JR Shikoku, used onUzushio andShimanto limited expresses.
See also
editReferences
editCitations
edit- ^プロトタイプの世界 - Prototype World (in Japanese). Japan: Kōtsū Shimbunsha. December 2005. pp. 12–19.OCLC 170056962.
- ^"APT - With Hindsight by Professor Alan Herbert Wickens".www.apt-p.com. Retrieved16 June 2024.
- ^"APT tilting train: The laughing stock that changed the world".BBC News. 18 December 2015. Retrieved16 June 2024.
- ^Simmons & Biddle 1997, p. 486
- ^Williams 1985, p. 10-12
- ^Potter 1987, pp. 69–72
- ^"About the Shinkansen".global.jr-central.co.jp. Central Japan Railway Company.Archived from the original on 5 July 2022. Retrieved20 June 2021.
- ^Guigueno, Vincent (January 2008)."Building a High-Speed Society: France and the Aérotrain, 1962-1974".Technology and Culture.49 (1). The Johns Hopkins University Press:21–40.doi:10.1353/tech.2008.0018.JSTOR 40061376.
- ^ab"Talgo: A Train Ahead of the Curve". Spanish Railway Foundation. Retrieved23 January 2023.
- ^"High-speed tilting train on track".BBC News. 12 December 2005.
- ^Valenti, Michae (1998)."Tilting trains shorten transit time".Mechanical Engineering. Archived fromthe original on 4 June 2011.
- ^"New study shows how to eliminate motion sickness on tilting trains".Icahn School of Medicine at Mount Sinai. 4 August 2011.
- ^Review of the Advanced Passenger Train: final report by Ford and Dain Partners (Technical report). December 1981.Archived from the original on 4 November 2016. Retrieved9 February 2016.
- ^abcdHammer, Mick (1 August 1985)."The high-speed flop".New Scientist: 46.Archived from the original on 3 November 2016. Retrieved8 February 2016.
- ^abcMochizuki, Asahi (March 2010)."Electric Trains and Japanese Technology"(PDF).Japan Railway and Transport Review.Archived(PDF) from the original on 10 January 2017. Retrieved31 May 2022.
- ^"General definitions of highspeed".International Union of Railways. Retrieved13 May 2009.
- ^Lazo, Luz (3 June 2021)."Debut of Amtrak's new Acela trains delayed a year by new round of testing".The Washington Post.Washington.
- ^Beckhaus, John (January 1995), "The X2 Tilt Train",Australian Railway Historical Society Bulletin, pp. 15–17
- ^ab"Full tilt: Virgin's 140mph Pendolino trains". Mathieson, SA. March 2002.Archived from the original on 27 September 2013. Retrieved13 May 2011.
- ^"Class 221 data". The Railway Centre. 2 June 2008. Archived from the original on 27 October 2007.
- ^"ICE-TD" (in German). hochgeschwindigkeitszuege.com. Archived fromthe original on 19 January 2009. Retrieved19 January 2009.
- ^Japan Railfan Magazine, December 2008. issue: "山陽・九州新幹線直通用車両 量産先行車", pp. 64-67.
- ^"N700系量産車" [N700 series production trains].Japan Railfan Magazine (in Japanese). No. 556. Japan: Koyusha Co., Ltd. August 2007. pp. 13–20.
- ^"Historia de Talgo". www.talgo.com. Archived fromthe original on 22 May 2010. Retrieved15 June 2010.
- ^Guillen, Mauro F. (2005).The Rise of Spanish Multinationals.Cambridge University Press.ISBN 9780521847216. Retrieved7 May 2008 – viaGoogle Books.
- ^"Amtrak Cascades Facts". Archived fromthe original on 2 July 2017. Retrieved1 August 2017.
- ^Shron, Jason (2008).TurboTrain: A Journey. Rapido Trains Inc.ISBN 978-0-9783611-0-5.
- ^Langton, Jerry (8 December 2008)."Model-train manufacturer on the right track".thestar.com.
- ^Bateman, Chris (9 December 2015)."Remembering the ill-fated CN Turbo train".Spacing Magazine. Retrieved21 February 2017.
- ^"Amtrak peddling its headaches".Eugene Register-Guard. 10 April 1977.
- ^"Turbo train's first birthday"(PDF).Penn Central Post. May 1970. Archived fromthe original(PDF) on 6 October 2014.
- ^"The Cisalpino nears the end of the line". swissinfo.ch. 2 June 2011. Retrieved2 December 2014.
- ^"La Flotta AV" (in Italian). Trenitalia. 2008. Archived fromthe original on 3 January 2009. Retrieved12 May 2024.
- ^Artymiuk, Simon (18 January 2023)."SBB begins Astoro tilting train refurbishment". International Railway Journal.
- ^Derailment at Grayrigg 23 February 2007(PDF).gov.uk (Report).Rail Accident Investigation Branch. 14 July 2011. p. 151.Archived from the original on 13 November 2019. Retrieved13 November 2019.
- ^Ford, Roger (21 November 2019)."Pendolino 250 million miles and still going strong".Modern Railways.Archived from the original on 18 December 2023. Retrieved18 December 2023.
- ^「小田急座談 (Part1) 車両編」、「鉄道ピクトリアル アーカイブスセレクション」第1号、電気車研究会、2002年9月、 6-16頁.
- ^Hunter, Ross (21–23 May 2000)."Tilt Trains - The Queensland Experience". Adelaide: Conference on Railway Engineering.Archived from the original on 25 December 2022. Retrieved25 December 2022.
- ^Hitachi is Boosting up Railway System Business in Taiwan – Tilting Train ProjectArchived 26 July 2009 at theWayback Machine – Hitachi
- ^"AT300 - Intercity High Speed". Hitachi Rail Europe. Archived fromthe original on 21 February 2020. Retrieved23 February 2020.
- ^Osano, Kagehisa (16 April 2022)."「ロマンスカーVSE」デザイナーが明かす誕生秘話 | 特急・観光列車" ["Romancecar VSE" designer reveals the story behind its design].Toyo Keizai Online (in Japanese).Archived from the original on 18 April 2022. Retrieved3 May 2022.
- ^Haraguchi, Takayuki (2009).Encyclopedia of JR's Railway Cars: JR全車輌. Japan: Sekai Bunka. p. 139.ISBN 978-4-418-09905-4.
- ^Mertens, Maurice; Malaspina, Jean-Pierre (2007).La Légende des Trans Europ Express (in French). Vannes: LR Presse.ISBN 978-29-036514-5-9.
- ^Erpenbeck, Dr. T.; Büttner, A.; Voges, Dr. V. (2006)."Tilting train technology at Deustsche Bahn AG - Prophecies, reality and necessary innovations"(PDF).UIC. Archived fromthe original(PDF) on 19 February 2016. Retrieved27 November 2017.
- ^"Das Geheimnis der Achse".Süddeutsche Zeitung (in German). 22 November 2008. Archived fromthe original on 20 February 2009.
- ^"Weisung für Triebfahrzeugführer der ICE-T vom 23. Oktober 2008"(PDF).[permanent dead link]
- ^"Neigung zum Riss".Süddeutsche Zeitung (in German). 26 October 2008. Archived fromthe original on 29 October 2008.
- ^Litvak & Maule 1982, p. 55
- ^Maurer 1975, p. 61
- ^"An All-Canadian Rail Innovation from Roof to Wheels"(PDF).VIA Rail. Spring 2009.
- ^"Advanced Passenger Train".Crewe Heritage Centre. Retrieved16 June 2024.
- ^Donnison, P. J.; West, G. R. (1989). "The Design and Development of the Class 91 Locomotive".Main Line Railway Electrification Conference 1989 - Proceedings of the Institute of Electrical Engineers.
- ^Broom, M. L.; Smart, G. W. (1990). "The design, manufacture and assembly of the British Rail Class 91, 25 kV 225 km/h locomotive".Proceedings of the Institute of Mechanical Engineers Vol. 205.doi:10.1243/PIME_PROC_1990_204_200_02.
- ^"X2000 Tilting Trains operated by Swedish State Railways (SJ), Sweden".railway-technology.com. Retrieved29 June 2024.
- ^"X2 2088 arrives from China".Today's Railways Europe. No. 202. October 2012. p. 53.
- ^"SJ2000 sets to be refurbished".Today's Railways Europe. No. 219. March 2014. p. 54.
- ^"X2000 heads south".Railway Gazette International. December 1994. p. 777.
- ^Hazard, L. (July 1999)."FRENCH START TESTS WITH NEW TILTING TGV BOGIE".International Railway Journal and Rapid Transit Review.39 (7). New York, US: Simmons-Boardman Publishing Corporation:25–26.ISSN 0744-5326.
- ^Weiss, Theo (24 May 2000). "Die neuen Intercity-Neigezüge der SBB".Neue Zürcher Zeitung (in German). p. 79.
- ^"CrossCountry removes tilt from its 221 Voyagers".Rail. No. 595. 2 July 2008. p. 8.
- ^Hughes, Murray (1 March 2002)."Super Voyager completes tilt trials in France".Railway Gazette International. Archived fromthe original on 4 June 2012. Retrieved24 November 2009.
- ^"Korean Advanced Tilting Train Completes 200km/h Maximum Speed Test Run". KRRI. 30 December 2009. Retrieved21 November 2010.
- ^"World's fastest on narrow tracks - National".smh.com.au. 17 November 2004. Retrieved27 June 2017.
Bibliography
edit- Litvak, Isaiah; Maule, Christopher (1982).The Light-Rapid Comfortable (LRC) Train and the Intermediate Capacity Transit System (ICTS): Two Case Studies of Innovation in the Urban Transportation Equipment Manufacturing Industry. University of Toronto/York University Joint Program in Transportation.
- Maurer, Charles E. (July 1975)."120-mph train".Popular Science. No. July 1975. pp. 59–61.
- Potter, Stephen (1987).On the right lines?: the limits of technological innovation. London, UK: Frances Pinter (Publishers) Limited.ISBN 0-86187-580-X.
- Simmons, Jack; Biddle, Gordon (1997).The Oxford Companion to British Railway History: from 1603 to the 1990s. Oxford: Oxford University Press.ISBN 0-19-211697-5.
- Williams, Hugh (1985).APT: a promise unfilled. Shepperton, Surrey: Ian Allan Ltd.ISBN 0-7110-1474-4.