Bangladesh Railway[5] (Bengali:বাংলাদেশ রেলওয়ে) is the state-owned rail transport agency ofBangladesh. It operates and maintains all railways in the country, and is overseen by the Directorate General of Bangladesh Railway. The Bangladesh Railway is governed by theMinistry of Railways and the Bangladesh Railway Authority with areporting mark known as "BR".[6]
![]() | |
Native name | বাংলাদেশ রেলওয়ে |
---|---|
Company type | State-owned |
Industry | Railways and locomotives |
Predecessor | Pakistan Eastern Railway |
Founded | 15 November 1862; 162 years ago (1862-11-15) |
Headquarters | , |
Area served | Bangladesh |
Key people | Md Afzal Hossain (Director General of Bangladesh Railway)[1] |
Revenue | ৳6421.791 million[2] (2024) |
![]() | |
Owner | Government of Bangladesh |
Number of employees | 27,535[3] (2015) |
Divisions | East Zone,West Zone |
Website | www |
Bangladesh Rail | |
---|---|
Operation | |
National railway | Ministry of Railways |
Major operators | Bangladesh Railway |
Statistics | |
Ridership | 18 million (2024) |
Passenger km | 8,135 million[4] |
Freight | 2.52 million tonnes[4] |
System length | |
Total | 3,600 kilometres (2,200 mi) |
Double track | 1,600 kilometres (990 mi) |
Track gauge | |
Metre gauge | 2,025 kilometres (1,258 mi) |
Broad gauge | 1,575 kilometres (979 mi) |
Dual gauge | 1,600 kilometres (990 mi) |
Features | |
No. bridges | 3,650[4] 546 (Major) 3,104 (Minor) |
Longest bridge | Padma Bridge (broad gauge, 6,150 metres (20,180 ft)) Jamuna Railway Bridge (dual gauge double line, 4,800 metres (15,700 ft)) Hardinge Bridge (broad gauge double line, 1,798 metres (5,899 ft)) Meghna Bridge (meter gauge double line, 984 metres (3,228 ft)) |
No. stations | 515 |

The Bangladesh Railway system has a total length of 3,600 kilometres (2,200 mi).[7] In 2009, it had 34,168 employees working for the operations.[8] In the year 2014, Bangladesh Railway recorded a ridership of 65 million passengers for a total of 8,135 millionpassenger-kilometres, and transported 2.52 million tonnes of freight racking up to 677 milliontonne-kilometres.[4]
History
editRail transport in Bangladesh (formerly known as British India) began on 15 November 1862, when 53.11 km of5 ft 6 in (1,676 mm) (broad gauge) line was opened betweenDarshana inChuadanga District and Jogotee inKushtia District. On 1 January 1871, extension of Darshana - Jogotee Railway line up to Goalanda byEastern Bengal Railway.[9] On 4 January 1885, a further 14.98 km and1,000 mm (3 ft 3+3⁄8 in) (metre gauge) line was opened. In 1891, theBengal Assam Railway was constructed with the assistance of the government and later managed by the Bengal Assam Railway Company.
On 1 July 1895, two sections of metre gauge railway were constructed by English railway companies. One railway connectedChattogram andComilla, with a distance of 150.6 kilometres (93.6 mi). Another was the connection built betweenLaksam Upazila andChandpur, with a distance of 51.2 kilometres (31.8 mi).[10]
In 1947, at the time of thePartition of India, the Bengal Assam Railway was divided into two parts. The 2,603.92 km of track located inEast Pakistan, came under the control of the centralGovernment of Pakistan. On 1 February 1961, the Eastern Bengal Railway was renamed thePakistan Eastern Railway. In 1962, control of the Pakistan Eastern Railway was transferred to theGovernment of East Pakistan. On 9 June 1962, by order of the president, the Pakistan Eastern Railway management was assumed by a Railway Board.[10]
As of 2005, the total length of the Bangladesh Railway is 3,600 kilometres (2,200 mi).[11] It was composed of 1,225 kilometres (761 mi) of broad gauge track (mostly in the western region), 1,600 kilometres (990 mi) of metre gauge track (mostly in the central and eastern regions) and 1,600 kilometres (990 mi) ofdual gauge track.[12] In 1998, theJamuna Bridge was built to connect the previously divided east and west rail networks in dual gauge.[13]
Bangladesh is currently[when?] converting its railway system to dual gauge system, to enable both broad gauge and metre gauge trains to run. It is also developing extensive railway transport relations with India. With the Bangladeshi and Indian Governments working side by side, at least 9 International Rail Transit System (IRTS) have come up presently in Bangladesh. They are as follows: - 1.Kolkata-Darsana-Iswardi-Dhaka; 2.Kolkata-Bangaon-Jessore-Khulna; 3.New Jalpaiguri-Haldibari-Chilahati-Iswardi-Dhaka; 4. Changrabandha-Burimari-Lalmonirhat-Teesta-Kaunia-Parbatipur; 5.Parbatipur-Dinajpur-Birol-Radhikapur-Raiganj-Barsoi; 6. Badarpur-Karimganj-Maishasan-Shabazpur-Kulaura-Sylhet/Chittagong; 7.Agartala-Akhaura-Dhaka/Chittagong; 8.Old Malda-Singhabad-Rohanpur-Rajshahi; 9. Eklakhi-Balurghat-Hili. While routes 1, 2, 3, 5 and 8 are already operational, routes 4 and 6 are being restored with routes 7 and 9 currently[when?] nearing construction completion.
In 2010, funding was received for a bridge over theTitas River.[14] In September 2010, the Government of Bangladesh approved ten rail development projects costing 19·9 billionBangladeshi taka including plans for new tracks androlling stock.[15] To bolster the bilateral ties between India and Bangladesh, the Ministry of Railways in India has supplied 20 Broad Gauge (BG) locomotives to its eastern neighbour, thus contributing to the railway infrastructure of Bangladesh. These locomotives have been appropriately modified by the Indian side to align with the requirements of Bangladesh Railway. The provision of these locomotives will aid in managing the growing volume of passenger and freight train operations in Bangladesh, thereby supporting the enhancement of its railway system. It is worth noting that previously, in June 2020, the Indian Government had granted 10 locomotives to Bangladesh, further contributing to the improvement of its railways.[16]
In 2011,Sheikh Hasina Wazed, the then Prime Minister of Bangladesh, officiated at the start of construction of a link which would cross several rivers to reachCox's Bazar. The 100 kilometres (62 mi) of dual gauge line started from therailhead atDohazari, southeast of Chittagong. The plan was to reach Satkania, Dulahazra, Chakarin, Edgaon, Ramu and Cox's Bazar, with four major river bridges and a 30 kilometres (19 mi) branch from Ramu to Gundum. In 2013, theChhattogram Circular Railway was completed.
In 2015, construction of a 16 kilometres (9.9 mi) branch toAgartala,Tripura inNortheast India commenced.[17] In 2017, land acquisition took place to facilitate the construction.[18]
In 2022, construction of 6,250 metres (20,510 ft) longPadma Bridge was completed and the bridge was thrown open after inauguration bySheikh Hasina Wazed, the Prime Minister of Bangladesh to connectDhaka withFaridpur viaNarayanganj.
Structure
editFrom the end of theBangladesh Liberation War in 1971 until 1982, the railway was governed by a Railway Board. It then came under the Railway Division of the Ministry of Communications. The Director General of the railway was the Secretary of the Railway Division of the Ministry of Communications. In 1995, governance of the railway was assumed by the "Bangladesh Railway Authority" which was chaired by the Minister of Railways.[19] Inspections are made by an external government authority.
The features of Bangladesh Railway include the usage of several gauges and the division of the rail system by theJamuna River, Brahmaputra into the Western Zone and the Eastern Zone of operations. Crossing the river is one bridge, the Jamuna Bridge which was completed in 2003.
The East Zone and the West Zone each have a General Manager who answers to the Director General of the Railway Authority. Each zone has its own raft of departments for operation, maintenance, and finances. Each zone is divided into two divisions with departments for personnel, transportation, commercial, finance mechanical, way and works signalling, telecommunication, electrical and medical services.
The East Zone has a workshop division inPahartali. The West Zone's workshop division is inSaidpur. The railway has a central locomotive workshop for broad and metre gauge locomotives inParbatipur. It also has a Railway Training Academy.[19] There are diesel workshops in Pahartali, Dhaka and Parbatipur. Maintenance on coaches and wagons is carried out at the "C and W" shop in Saidpur,Nilphamari and at the "C and W" shop Pahartali.
Employees
editBangladesh Railway has a total of 25,083 regular employees as of 2020.[20]
In 1974, they were represented by three registered trade unions, but by 1999 that had multiplied to eight. According to Chittagong University professor of management Md. Abu Taher, this proliferation weakened the unions and undermined solidarity among the workers.[21]
Bangladesh Railway began recruiting women into its top ranks in 2001.[22]Salma Khatun became their first female train driver in 2004 when she joined as an assistant locomaster (ALM). As of 2015, the railway employed 788 ALMs. By 2022, the number of female train drivers had risen to 19.[23] Because of the lack of overnight facilities, and even toilets, for female staff, most prefer the shorter shuttle routes over long distance ones.[23][24] As of 2019, a total of about two dozen women worked in the railway's mechanical engineering, electrical engineering, civil engineering, stores, traffic, and signals divisions.[22]
Rolling stock
editLocomotives
editDiesel
editBangladesh Railway's fleet ofdiesel locomotives includes both diesel-electric and diesel-hydraulic machines.[25] In 2007, there were 77 broad gauge diesel-electric locomotives. In 2012, Bangladesh Railway ordered 16 new broad gauge locomotives of 3100 hp fromBanaras Locomotive Works, India.[26] There were also 208 metre gauge diesel-electric locomotives including those of classes2000,2600,2700, and2900. The total number was 285.
In 2013, the government purchased 20 sets ofdiesel-electric multiple unit (DEMU) trains from China for the first time, aiming to improve short-distance train travel services. However, all 20 DEMU sets have been abandoned ten years later due to lack of maintenance.[27]
In 2019, 40 EMD GT42ACLs were ordered fromProgress Rail.[28]
On 27 July 2020 and 24 May 2023Indian Railways (IR) handed over 10 and 20WDM-3D diesel locomotives to Bangladesh Railway under its "grant assistance" plan. The vehicles cost an estimated ₹600 million ($US 8 million) to manufacture.[29]
Steam
editA small number ofsteam locomotives are preserved in Bangladesh.[30]
Location | Class | Builder | Wheel arrangement | Gauge | Image |
---|---|---|---|---|---|
Dhaka Railway HQ | YD 718 | Nippon Sharyo, Japan | 2-8-2 | Metre gauge1,000 mm (3 ft 3+3⁄8 in) | |
Saidpur Works | CS 15 | W. G. Bagnall, England | 2-4-0T | Narrow Gauge2 ft 6 in (762 mm) | |
Saidpur Works | SGC-2 240 | Vulcan Foundry, England | 0-6-0 | Broad Gauge5 ft 6 in (1,676 mm) | |
Paksay Railway HQ | CB 8 | Vulcan Foundry, England | 2-4-0T | Narrow Gauge2 ft 6 in (762 mm) | |
Pahartoli Works | CB 7 | Vulcan Foundry, England | 2-4-0T | Narrow Gauge2 ft 6 in (762 mm) | |
Rajshahi Railway HQ | HPS 30 | Vulcan Foundry, England | 4-6-0 | Broad Gauge5 ft 6 in (1,676 mm) | |
National Scout Training Center, Mouchak, Gazipur | RC 233 | Kawasaki, Japan | 4-6-0 | Metre gauge1,000 mm (3 ft 3+3⁄8 in) |
The 762 mm gauge locomotives are from the Rupsa–Bagerhat railway which was the only 762 mm gauge line in East Pakistan in 1947. It was changed to 1,676 mm gauge in 1970.
Freight and cargo services
editAs a national carrier, Bangladesh Railway is obliged to carry essential commodities such as grain and fertiliser to remote parts of Bangladesh at discounted rates. Bangladesh Railway transports containers from thePort of Chittagong to Dhaka Inland Container Depot, where there arecustoms facilities.[31] The rolling stock to carry containers was manufactured from existing stock. On 5 August 1991, a container-only train came into service. A goods train operates fromSinghabad andPetrapole, India to Rohanpur andBenapole, Bangladesh.[32]
Accidents
edit- On 10 July 2014, a major freight train accident occurred nearFaujdarhat Railway Station at 6.30 am. A freight train fromPatenga was carrying furnace oil to a power plant, but near Faujdarhat the train derailed and leaked around 21,255 imp gal (96,630 L; 25,526 US gal) of furnace oil. Six wagons of the train derailed and oil from three of the wagons flowed into a nearby canal.[33]
- On 14 September 2016, a freight train derailed in theFaujdarhat area. The loco driver and the assistant driver were injured.[34]
Passenger services
editRailway is a principal mode of transport in Bangladesh. In the 2005 financial year, 42 million passengers travelled on the Bangladesh Railway.[35] Inter-city services, contribute to over seventy percent of Bangladesh Railway's revenue.[35] In 2014, the railway owned 312 broad gauge coaches and 1,164 metre gauge coaches.[4]
In 2017, Bangladesh Railway operated 90 inter-city trains (up and down), 52 mail or express trains, 64 commuter trains (DEMU), 135 shuttle or local trains and 2 international services.[36]
Two times per week, a passenger train operates a service to India. In April 2008, theMaitri Express betweenDhaka andKolkata came into operation on the Gede – Darsana route 400 kilometres (250 mi).[37] On 9 November 2017, a new weekly train, theBandhan Express, came into operation betweenKhulna and Kolkata via Petrapole and Benapole 176 kilometres (109 mi).[38] Recently in 2021, another new weekly train, theMitali Express, came into operation betweenNew Jalpaiguri andDhaka via Parbatipur and Iswardi 500 kilometres (310 mi).
In addition, manyinter-city rail services operate between the nation's two largest cities,Dhaka andChattogram. Such services may include: TheSonar Bangla Express,Suburno Express, Mohanagar Express, Turna Express, and Chattala Express services.[39] These services provide many options forBangladeshis to travel between the two destinations.
Tickets for Bangladesh Railway services are available at all stations. Most stations are computerized and tickets which can be purchased within four days of departure, are printed. Full refunds (excluding clerical charges) are available up until two days before departure. The railway reserves ten percent of tickets for online sales. Of these tickets, fifteen percent are reserved for mobile phone sales.[40]
Accidents
edit- On 19 April 1965,East Pakistan army attackedParbatipur-SealdahEast Bengal Mail,Goalundo Ghat-SealdahEast Bengal Express andDarjeeling Mail, killing 200 passengers on board these trains. These incidents stopped rail connections between West Bengal and East Bengal until 2008.
- On 1970, the Bhola Cyclone destroyed railway line and connections betweenKhulna andBarisal via Bagerhat.
- On 12 February 1971(date disputed),East Pakistan army bombed at least 10 passenger trains throughoutDhaka,Rajshahi,Khulna,Chittagong andSylhet in connection to Military Operation Searchlight. Nearly 1000 people died with many injured.
- On 11 July 2006, a train collided with a crowded bus at an unmanned railroad crossing atAkkelpur Upazila, Jaipurhat District. Thirty-three people died and thirty were injured.
- On 13 October 2007, the rear carriages of the Probhati Express derailed near Dhaka. Four people died and fifty were injured.
- On 16 April 2008, a Dinajpur – Dhaka Ekota express train collided with a local bus on a level crossing on the outskirts of Kalihati,Tangail District. Eighteen people died and thirty were injured.
- On 14 May 2008, an Upaban express train crashed into the rear of aNoakhali express train atthe Ashuganj Upazila station,Brahmanbaria District. Eight people died and one hundred were injured.
- On 8 December 2010, a collision between two passenger trains killed at least ten people.[41]
- On 23 June 2019, several bogies of Dhaka-bound Upaban Express train from Sylhet veered off the tracks at around 11:40 pm after a culvert over the Barochhara Canal broke down, 200 yards off Baramchal Railway Station. At least five people died and hundreds were injured. Locals who worked overnight with the first responders claimed at least 10-15 people have been killed.[42]
- On 12 November 2019, At least 16 passengers died and score other injured as Dhaka-bound Turni Nishita Express rammed Chattogram-bound Udayan Express from Sylhet at Mandobagh Railway Station in Kasba.
- On 14 November 2019, Two days after a deadly train crash in Brahmanbaria, Rangpur Express, bound from Dhaka to Rangpur, braced an accident at Ullapara station in Sirajganj at around 2pm on Thursday. Seven compartments of Rangpur Express, including its engine and power car, derailed in the Ullapara Railway Station area and a fire broke out in three of its compartments.
- On 5 January 2024, fire broke out at about 9 p.m. (1500 GMT), injuring eight passengers as it spread to four compartments of the Benapole Express headed for the capital city, Dhaka.Witnesses claim fire was due to arson in protest of National Elections scheduled for 7 January 2024.[43]
Accommodation classes
editBangladesh Railway has three main passenger classes, "Air conditioned", "First" and "Second". Most trains do not provide the "Air conditioned" class. On inter-city and long-distance trains, a restaurant car and a power car are included at the centre of the train. All inter-city trains are partially air-conditioned, feature padded leather seats and provide passengers with on-demand sheets, pillows, blankets, as well as meals in a dining car. Some diesel–electric trains provides commuter services.[44]
Class | Description |
---|---|
First Class AC (প্রথম শ্রেণী তাপানুকূল) | This is the most expensive class. This air-conditioned coach is used only on popular Inter-City routes. The coaches are carpeted, have sleeping accommodation, ample leg room and have privacy features like personal coupes. |
First class (প্রথম শ্রেণী) | This class is relatively luxurious, but not air-conditioned; has sleeping berths, and ample leg room. |
First class Chair (প্রথম শ্রেণী চেয়ার) | Chair car or day coach with a total of five seats in a row on broad gauge trains and four seats in a row on metre gauge trains, used for daily travel. |
2nd Class-Shovon Chair (২য় শ্রেণী-শোভন চেয়ার) | The 2nd Class Shovon Chair is basically a chair car preferred by most middle-class passengers. Has a total of five seats in a row on broad gauge trains and four seats in a row on metre gauge trains. |
2nd Class-Shovon (২য় শ্রেণী-শোভন) | One of the cheapest classes; These seats are the most uncomfortable. |
2nd Class-Shulov (২য় শ্রেণী- সুলভ) | The cheapest accommodation, with seats made of pressed wood or steel and are cushioned. Only found in sub-urban and short-distance routes. Although entry into the compartment is guaranteed, a seat is not guaranteed. These coaches are usually very crowded. |
Railway stations
editKamalapur Railway Station is the central railway station in Dhaka. Other major stations areKhulna railway station,Sylhet railway station,Rajshahi railway station,Chattogram railway station.In 2015, Bangladesh Railway serviced 489 railway stations. These include one block hut, thirteen train halts, and four goods booking points. The schedule of Bangladesh Railway has changed 26 Trains in the new year 2020. The East zone Train schedule will active on 10 January 2020.[45] There are 3 stations with international train services in Bangladesh; they areDhaka Cantonment railway station,Khulna railway station, andJashore Junction railway station, All international trains arrive and depart from these stations.
See also
editReferences
edit- ^"Bangladesh Railway".Bangladesh Railway. Retrieved12 December 2022.
- ^ab"Railway income Summary East Zone".Prothom Alo. Retrieved16 January 2025.
- ^বাংলাদেশ রেলওয়ের জনবল [Manpower of Bangladesh Railway].Bangladesh Railway (in Bengali). Archived fromthe original on 2 June 2016.
- ^abcde"Railway Reform Progress Report"(PDF).Asian Development Bank. Retrieved7 August 2016.
- ^Bangladesh Railway, accessed 8 Apr 2025.
- ^রেলপথ মন্ত্রণালয়ের সংক্ষিপ্ত ইতিহাস ও প্রধান কার্যাবলী [History of Ministry of Railways].Ministry of Railways-Government of the People's Republic of Bangladesh (in Bengali). Retrieved17 August 2017.
- ^"About Bangladesh Railway - Dohazari Cox's Bazar Railway Project | Bangladesh Railway". 29 January 2023.
- ^"Bangladesh Railway in Short".Bangladesh Railway. Archived fromthe original on 3 December 2009. Retrieved15 December 2009.
- ^"Information Book 2018"(PDF).Bangladesh Railway.
- ^ab"History".Bangladesh Railway. Archived fromthe original on 15 November 2007. Retrieved10 February 2012.
- ^"FAQ".Bangladesh Railway. Archived fromthe original on 20 December 2005. Retrieved26 December 2005.
- ^"Track, Bridges and Stations".Bangladesh Railway. Archived fromthe original on 31 December 2009. Retrieved16 December 2009.
- ^"Railway Route Map -Bangladesh Railway-Government of the People of Republic Bangladesh - বাংলাদেশ রেলওয়ে-গণপ্রজাতন্ত্রী বাংলাদেশ সরকার".Bangladesh Railway. Retrieved6 August 2016.
- ^"Bangladesh and India Finalise Rail Projects".Railway Technology. 22 July 2010. Retrieved20 March 2016.
- ^"Development projects get the go-ahead".Railway Gazette International.Archived from the original on 29 September 2010. Retrieved28 September 2010.
- ^"India provides key railway infrastructure to Bangladesh".The Hindu. 23 May 2023.ISSN 0971-751X. Retrieved20 July 2023.
- ^"Work on new India-Bangladesh railway link from 2015".The Times of India. 17 June 2014. Retrieved7 December 2014.
- ^"Rail project to connect India and Bangladesh begins; land acquisition notices served to 257 families".Firstpost. 30 July 2017. Retrieved17 August 2017.
- ^ab"Ministry of Railways".Ministry of Railways. 28 February 2016. Retrieved7 August 2016.
- ^"BR In Short".Bangladesh Railway. 9 March 2020.
- ^Taher, Md. Abu (April 1999)."Politicization of Trade Unions: Issues and Challenges in Bangladesh Perspective".Indian Journal of Industrial Relations.34 (4): 411.ISSN 0019-5286.JSTOR 27767614.
- ^abSultana, Munima (8 March 2019)."Top rail jobs still charmless for women".The Financial Express.
- ^abSajid, Eyamin (9 March 2022)."Salma Khatun: The woman who dared to build a career on an unknown track".The Business Standard.
- ^"Women on the wheels".Prothom Alo. 11 March 2015.
- ^"Rolling Stock and Railway Freey".Bangladesh Railway. Archived fromthe original on 30 August 2011. Retrieved11 September 2011.
- ^"DLW bags order for 16 locomotives from Bangladesh Railways".Global Rail News. 28 August 2012. Archived fromthe original on 28 August 2017. Retrieved28 August 2017.
- ^Hossain, Anowar (15 May 2023)."No DEMU train operative, no one takes the blame".Prothom Alo English. Retrieved16 March 2024.
- ^Bangladesh taps Progress Rail for GT Series powerRailway Age 2 July 2019
- ^increases rail connections with BangladeshRailway Gazette International 27 July 2020
- ^"Preserved Steam Locomotives in Bangladesh". International Steam Pages. Retrieved6 August 2016.
- ^"Facilities of CPA".Chittagong Port Authority. Archived fromthe original on 12 May 2015. Retrieved20 March 2016.
- ^"India approves new railway link with Bangladesh".Two Circles. 21 September 2011. Retrieved20 March 2016.
- ^"Oil-laden train derails in Ctg".The Daily Star. 10 July 2014.
- ^"Home Bangladesh 2 injured in Ctg rail engine derailment".Prothom Alo.
- ^ab"Stores".Bangladesh Railway. Archived fromthe original on 7 December 2009. Retrieved15 December 2009.
- ^বাংলাদেশ রেলওয়ে-গণপ্রজাতন্ত্রী বাংলাদেশ সরকার [Passenger Trains in BR].Bangladesh Railway (in Bengali). Retrieved20 March 2016.
- ^"Bangladesh – India border reopens".Railway Gazette International. 5 August 2007.
- ^"Tk 50 crore water vessels of Railway decaying at Balashi and Bahadurabad".The Daily Star. Archived fromthe original on 18 May 2011. Retrieved2 September 2008.
- ^"Train travel in Bangladesh | Dakha-Chittagong, Dhaka-Calcutta trains".www.seat61.com. Retrieved1 June 2024.
- ^"How to Buy Bangladesh Railway(Train) Ticket Online".Tech Thumbs. 13 October 2012. Retrieved17 August 2017.
- ^"Fatal Bangladesh Collision".Railways Africa. 12 December 2010. Archived fromthe original on 3 April 2012. Retrieved12 December 2010.
- ^"Bangladesh: 5 killed as four train coaches derail, hundreds injured".India Today. 24 June 2019.
- ^"Bangladesh poll booths burn on election eve, as train arson kills four".Reuters. 6 January 2024.
- ^বাংলাদেশ রেলওয়ের যাত্রীবাহী ট্রেন.Bangladesh Railway (in Bengali). Archived fromthe original on 24 March 2016. Retrieved20 March 2016.
- ^"Bangladesh Railway Schedule, Time table".Bdteletalk.com. 3 January 2020. Retrieved3 January 2020.