Projects

This Bloomreach Experience Manager feature requires a standard or premium license.Please contact Bloomreach for more information.

Projects allow you to manage a group of changes to your channels and content that require a workflow process before publication.

We recommend the use of the Projects feature for (sets of) channels with up to 200 pages and up to 200 documents at the same time. Larger numbers may negatively affect brXM UI responsiveness.

Tasks

Concepts

Project

Aproject holds a set of related channel and content changes.

The changes contained within a project, once reviewed and ready, can bemerged to ‘core’ or run as acampaign.

When you add a channel to a project you are effectively saying that you want to make a set of changes to that channel, which can then be run as a campaign or merged to core (‘made live’) when ready.

When you add a document to a project you are doing the same thing; you are choosing to edit a document and have the edited content ‘go live’ (be published) when the project is run as a campaign or merged.

A channel, when initially added to a project, is duplicate to the channel as it is live on core. For example, if you add the ‘UK’ channel to a project, that channel, in the context of a project, will look the same as the ‘UK’ channel on core. If the UK channel is changed on core after being added to a project, and you want the project’s UK channel to reflect these changes on core, you canupdate the project.

Campaign

Acampaign is aproject that is 'live' without beingmerged tocore. Starting a campaign publishes all channel and content changes in the project. A running campaign can either be stopped (reverting the channels and content back to core) or merged to core (making the changes permanent). Campaigns can either be started and stopped manually or they can be scheduled to start and stop at certain dates and times.

Core

Thecore is the main state of all channels and documents. Changes made in any project do not affect the core until a project ismerged into the core. Changes to the core do not affect any project until a project isupdated.

Review

During areview, each channel and content change in aproject is verified by at least two webmasters and is either accepted orrejected.

Accepting

Any webmaster canaccept aproject’s channel and content changes when the project is in review. Each channel or document change within a project must be accepted by two webmasters before the project can bemerged into thecore or run as acampaign.

Rejecting

Any webmaster canreject a channel or content change within aproject when the project is in review.

A rejection of any change contained within a project will prevent the project from reaching an ‘approved’ state, which means that it cannot bemerged or run as acampaign.

When a document or channel is rejected it becomes editable again, and it is possible to restart the review of the document or channel. Alternatively, you can choose to remove the document or channel from the project entirely (rather than editing it and restarting the review).

Merging

Merging is the process of applying channel changes in aproject to thecore; it puts the changes live. It also publishes all documents contained within a project. During the merge process, the channel changes contained in a project will overwrite what is on core. For example, a component within a project is changed to show banner Y, on core the same component shows banner X- once the project is merged to core the component on core no longer shows banner X but instead shows banner Y.

Updating

Updating aproject is applying channel changes made to core since the project was started or last updated, to channels contained in the project. For example: if a component on the UK channel was changed on core, you can ensure this component change is represented within the UK channel added to a project, by ‘updating’ the project.

Please note that updating a project includes only channel changes on core; content changes on core are not included in an update.

Comments

As aproject can contain both channel and content changes, from multiple content editors, authors, marketeers etc., it is useful for changes made to be logged in some way - so that it is transparent to all what a project contains and what the impact oncore will be when that project ismerged. This is why it is possible to addcomments within a project; to log and keep track of changes made.

The ability to comment within a project is also useful when a change within a project isrejected; the user who rejected the change can explain why they did so and immediate action can be taken.

Did you find this page helpful?
How could this documentation serve you better?
Cheers!
On this page
    Did you find this page helpful?
    How could this documentation serve you better?
    Cheers!

    [8]ページ先頭

    ©2009-2025 Movatter.jp