Movatterモバイル変換


[0]ホーム

URL:


Jump to content
Wikimedia Commons
Search

STS-122

From Wikimedia Commons, the free media repository
STS-122
Mission insignia
Navigation
Previous missionNext mission
STS-120STS-123
English:STS-122 is a space shuttle mission by NASA using theSpace Shuttle Atlantis, launched February 7, 2008.

NASA galleries for STS-122:

Crew

[edit]
  • Crew-portrait of STS-122
    Crew-portrait of STS-122
  • Mission poster
    Mission poster
  • Crew of STS-122 posing at the Shuttle training facility
    Crew of STS-122 posing at the Shuttle training facility
  • STS-122 crew pauses alongside the Astrovan to wave farewell to onlookers before heading for Launch Pad 39A on February 7, 2008.
    STS-122 crew pauses alongside the Astrovan to wave farewell to onlookers before heading for Launch Pad 39A on February 7, 2008.
  • Commander Stephan Frick
    Commander Stephan Frick
  • Pilot Alan G. Poindexter
    Pilot Alan G. Poindexter
  • Mission Specialist Leland D. Melvin
    Mission Specialist Leland D. Melvin
  • Mission Specialist Rex J. Walheim
    Mission Specialist Rex J. Walheim
  • Mission Specialist Hans Schlegel
    Mission Specialist Hans Schlegel
  • Mission Specialist Stanley G. Love
    Mission Specialist Stanley G. Love
  • Mission Specialist and ISS crewmember Leopold Eyharts
    Mission Specialist and ISS crewmember Leopold Eyharts
  • Returning ISS crewmember Daniel M. Tani
    Returning ISS crewmember Daniel M. Tani

Before launch

[edit]
  • Colombus at Bremen airport
    Colombus at Bremen airport
  • Columbus module to be launched on STS-122
    Columbus module to be launched on STS-122
  • The external experiments of Columbus mounted on their ICC-Lite payload rack
    The external experiments ofColumbus mounted on their ICC-Lite payload rack
  • Columbus being lifted into the shuttle's payload canister.
    Columbus being lifted into the shuttle's payload canister.
  • ET-125 external tank being mated with SRBs
    ET-125 external tank being mated with SRBs
  • Atlantis is moved from OPF to the VAB.
    Atlantis is moved from OPF to the VAB.
  • Atlantis is lowered on the mobile launch platform
    Atlantis is lowered on the mobile launch platform
  • Atlantis is rolling out to Launch Pad 39A
    Atlantis is rolling out to Launch Pad 39A
  • Atlantis on it's way from the VAB.
    Atlantis on it's way from the VAB.
  • Atlantis on Launch Pad 39A
    Atlantis on Launch Pad 39A
  • At Launch Pad 39A, Columbus transferred from its payload canister into Atlantis
    At Launch Pad 39A,Columbus transferred from its payload canister intoAtlantis
  • Atlantis on the morning of its first launch attempt
    Atlantis on the morning of its first launch attempt
  • The time domain reflectometry (TDR) setup inside the Mobile Launcher Platform is prepared to be used for the tanking test.
    The time domain reflectometry (TDR) setup inside the Mobile Launcher Platform is prepared to be used for the tanking test.
  • The pin soldering of the replacement feed-through connector
    The pin soldering of the replacement feed-through connector
  • The new feed-through connector
    The new feed-through connector

Launch

[edit]
  • Low-Resolution NASA TV screen capture of STS-122 launch.
    Low-Resolution NASA TV screen capture of STS-122 launch.
  • STS-122 launches on February 7, 2008
    STS-122 launches on February 7, 2008
  • STS-122 Launch
    STS-122 Launch
  • Atlantis begins mission STS-122 to the International Space Station. Liftoff was on time at 2:45 p.m. EST. The mission will carry the European Space Agency's Columbus laboratory to the International Space Station.
    Atlantis begins mission STS-122 to the International Space Station. Liftoff was on time at 2:45 p.m. EST. The mission will carry the European Space Agency's Columbus laboratory to the International Space Station.
  • Launch Video

In Orbit

[edit]
  • Columbus in the payloadbay of Atlantis as it approaches the International Space Station
    Columbus in the payloadbay of Atlantis as it approaches the International Space Station
  • The interior of Columbus seen from starboard to port
    The interior of Columbus seen from starboard to port
  • The interior of Columbus seen from port to starboard
    The interior of Columbus seen from port to starboard
  • The STS-122 and Expedition 16 crewmembers gather for a photo in the Zvezda Service Module of the International Space Station
    The STS-122 and Expedition 16 crewmembers gather for a photo in the Zvezda Service Module of the International Space Station
  • Fly around closeup
    Fly around closeup
  • Picture of ISS after STS-122
    Picture of ISS after STS-122
  • NASA TV image of the undocking maneuver
    NASA TV image of the undocking maneuver
  • ISS floating above earth after STS-122 undocks
    ISS floating above earth after STS-122 undocks

First spacewalk

[edit]
  • Astronaut Stanley Love
    Astronaut Stanley Love
  • Astronaut Rex Walheim
    Astronaut Rex Walheim
  • Columbus laboratory
    Columbus laboratory
  • Stanley Love
    Stanley Love
  • Columbus laboratory
    Columbus laboratory
  • Columbus installed
    Columbus installed

Second spacewalk

[edit]
  • Rex Walheim transfers the nitrogen tank assembly
    Rex Walheim transfers the nitrogen tank assembly
  • Hans Schlegel and Rex Walheim participate in the mission's second scheduled session of extravehicular activity
    Hans Schlegel and Rex Walheim participate in the mission's second scheduled session of extravehicular activity
  • Astronaut Hans Schlegel
    Astronaut Hans Schlegel
  • In the darkness of space, astronauts participate in the mission's second scheduled session of extravehicular activity (EVA)
    In the darkness of space, astronauts participate in the mission's second scheduled session of extravehicular activity (EVA)
  • Hans Schlegel, close view
    Hans Schlegel, close view
  • Hans Schlegel works on Columbus
    Hans Schlegel works on Columbus

Third spacewalk

[edit]
  • Rex Walheim
    Rex Walheim
  • Rex Walheim, close view
    Rex Walheim, close view
  • Rex Walheim installing a handrail on Columbus module
    Rex Walheim installing a handrail on Columbus module
  • Rex Walheim uses a power tool while installing a handrail
    Rex Walheim uses a power tool while installing a handrail
  • Stanley Love works on the new Columbus laboratory's exterior
    Stanley Love works on the new Columbus laboratory's exterior

Landing

[edit]
  • Atlantis landing
    Atlantis landing
  • Atlantis touchdown
    Atlantis touchdown
  • Atlantis touchdown
    Atlantis touchdown

Others

[edit]
  • ISS after STS-122 (computer rendering of August 2006)
    ISS after STS-122 (computer rendering of August 2006)
  • ISS after STS-122
    ISS after STS-122
  • ISS after STS-122
    ISS after STS-122
  • ISS after STS-122
    ISS after STS-122
  • diagram of ECO sensors that plagued the original launch attempt
    diagram of ECO sensors that plagued the original launch attempt
Retrieved from "https://commons.wikimedia.org/w/index.php?title=STS-122&oldid=985207853"
Categories:

[8]ページ先頭

©2009-2026 Movatter.jp