

Cobra method
This method enables economical construction by thrusting from small shaft

Semi-shield TBM can smash even bedrock
EM Korea bought from Taiko Techs the rights to manufacturing and selling its TBM
Cobra method TBMEM Korea’s Cobra method semi-shield TBM can cope with from normal soil to hard rock. It securesthe best productivity with high bearing capacity and slurry process which hasstrong grinding and shortening construction time
It is semi-shield TBM which can deal with every type of soil from normal one to boulder.It is suitable equipment to Korea where has lots of hard rock area. Also,economical construction is possible by thrusting through small sized launch shaft.The size of equipment also small so that it does not occupy much space and it does execution with high output motor and tri-cone bit
Feature of Cobra method and applicable area
Main Components






Cobra method machine enables to construct in many ways such as gas pipe, communication pipe, water and sewer pipe, ect
ㆍModel :CKE-1000 / CKE-1500
Pipe return method
The only TBM which is enable to excavate back and forth

Innovative method which do not need to construct receival shaft
Thanks to self-return equipment load, jacking body can be returned from launch shaft and then exchange cutter, after that re-excavate
EM Korea has acquired the rights to the Semi-shield TBM-- the only TBM which has the ability to move both forwards and backwards, allowing it to return to the launch shaft upon completion of a project. One of another impressive feature is that this semi-shield machine is able to excavate in every direction include downward, upward, horizontal and angles. In addition, all the process can be controlled by automatic operating system. Not only thrust constructions but also foundation work, slope work, pipe routing work and water collecting work can be done. Also, it is possible to exchange the beats while excavating in accordance with changes of soil type. Minimum diameter of launch shaft is 2000mm and maximum long distance excavating is longer than 300m.
Feature of pipe return method and applicable area




Construction examples : pipe line constructions such as water and sewer / gas / communication / electricity. Direct connection into existing buried
pipe, water collecting well work, reinforcement work of tunnel entrance, ect.

Thrust body returning process





Process of underground river
thrust work






